Investment by regions
Discover how the investments already approved in the Recovery and Resilience Plan are distributed across the various regions of the country.
Recovery and Resilience Plan in numbers
22,2 billion €
Total investment to be applied by the Recovery and Resilience Plan
2,2 billion €
Total amount of funds already allocated to Nation-wide investments
10,1 billion €
Total amount of funds already invested in municipalities and regions
Geography of investments
The Recovery and Resilience Plan aims to provide the country with a set of tools for the future, seeking to ensure a more resilient economy, a more sustainable relationship with the environment, and more digital processes and functioning.
All of this is contributed by a broad geographical distribution of its investments and reforms, ensuring that both nationally implemented projects and resources applied in all municipalities of the country are invested where they have the greatest impact on the lives of the population.
Distribution of investment by regions
Distribution of investment by regions
| Region | Sub-region | Municipality | Approved amount | Amount spent | Percentage of investment |
|---|---|---|---|---|---|
| North |
Alto Minho
Cávado
Ave
Área Metropolitana do Porto
Alto Tâmega
Tâmega e Sousa
Douro
Terras de Trás-os-Montes
|
Arcos de Valdevez
Caminha
Melgaço
Monção
Paredes de Coura
Ponte da Barca
Ponte de Lima
Valença
Viana do Castelo
Vila Nova de Cerveira
Total
Amares
Barcelos
Braga
Esposende
Terras de Bouro
Vila Verde
Total
Cabeceiras de Basto
Fafe
Guimarães
Póvoa de Lanhoso
Vieira do Minho
Vila Nova de Famalicão
Vizela
Mondim de Basto
Total
Arouca
Espinho
Santa Maria da Feira
Oliveira de Azeméis
São João da Madeira
Vale de Cambra
Gondomar
Maia
Matosinhos
Paredes
Porto
Póvoa de Varzim
Santo Tirso
Valongo
Vila do Conde
Vila Nova de Gaia
Trofa
Total
Boticas
Chaves
Montalegre
Ribeira de Pena
Valpaços
Vila Pouca de Aguiar
Total
Castelo de Paiva
Celorico de Basto
Amarante
Baião
Felgueiras
Lousada
Marco de Canaveses
Paços de Ferreira
Penafiel
Cinfães
Resende
Total
Carrazeda de Ansiães
Freixo de Espada à Cinta
Torre de Moncorvo
Vila Nova de Foz Côa
Alijó
Mesão Frio
Murça
Peso da Régua
Sabrosa
Santa Marta de Penaguião
Vila Real
Armamar
Lamego
Moimenta da Beira
Penedono
São João da Pesqueira
Sernancelhe
Tabuaço
Tarouca
Total
Alfândega da Fé
Bragança
Macedo de Cavaleiros
Miranda do Douro
Mirandela
Mogadouro
Vila Flor
Vimioso
Vinhais
Total
|
28 621 667,00 €
13 121 536,00 €
20 396 673,00 €
30 148 539,00 €
6 762 229,00 €
9 658 783,00 €
31 320 251,00 €
35 397 266,00 €
174 808 967,00 €
18 638 617,00 €
368 874 529,00 €
15 264 866,00 €
171 011 524,00 €
484 611 039,00 €
42 464 920,00 €
3 427 433,00 €
33 237 419,00 €
750 017 202,00 €
14 255 827,00 €
45 440 173,00 €
468 640 732,00 €
23 297 959,00 €
6 336 301,00 €
309 454 998,00 €
26 426 001,00 €
9 750 120,00 €
903 602 109,00 €
27 241 279,00 €
23 750 656,00 €
155 075 758,00 €
88 570 929,00 €
71 481 750,00 €
34 836 186,00 €
100 680 243,00 €
276 736 080,00 €
711 857 716,00 €
91 385 401,00 €
1 524 130 892,00 €
81 258 404,00 €
89 221 819,00 €
72 342 082,00 €
153 175 781,00 €
327 535 322,00 €
89 515 815,00 €
3 918 796 116,00 €
5 810 144,00 €
51 670 363,00 €
4 429 247,00 €
12 732 606,00 €
5 993 660,00 €
19 082 947,00 €
99 718 967,00 €
26 342 981,00 €
35 496 107,00 €
62 001 806,00 €
49 275 946,00 €
53 509 986,00 €
50 156 126,00 €
34 850 839,00 €
89 724 269,00 €
144 894 032,00 €
16 413 669,00 €
6 505 287,00 €
569 171 047,00 €
5 704 030,00 €
7 359 287,00 €
5 035 945,00 €
9 976 443,00 €
13 228 391,00 €
1 415 296,00 €
3 819 148,00 €
23 319 096,00 €
12 423 509,00 €
11 358 628,00 €
199 252 702,00 €
4 169 285,00 €
32 527 131,00 €
14 893 100,00 €
6 187 856,00 €
10 636 306,00 €
8 877 894,00 €
4 934 528,00 €
5 668 307,00 €
380 786 880,00 €
15 386 808,00 €
109 611 335,00 €
13 794 619,00 €
3 407 344,00 €
23 548 633,00 €
11 610 995,00 €
1 780 284,00 €
2 643 205,00 €
111 251 924,00 €
293 035 146,00 €
|
12 549 373,00 €
5 207 380,00 €
16 331 910,00 €
11 584 883,00 €
3 272 405,00 €
4 709 706,00 €
16 402 187,00 €
12 647 603,00 €
103 237 344,00 €
7 433 196,00 €
193 375 987,00 €
6 357 482,00 €
74 765 990,00 €
238 674 988,00 €
14 758 859,00 €
1 866 851,00 €
18 612 687,00 €
355 036 857,00 €
4 634 454,00 €
19 265 783,00 €
228 207 785,00 €
8 428 352,00 €
2 524 168,00 €
146 318 176,00 €
18 911 703,00 €
3 194 404,00 €
431 484 825,00 €
13 743 317,00 €
5 469 826,00 €
57 260 524,00 €
29 483 536,00 €
34 977 046,00 €
15 020 981,00 €
37 639 281,00 €
126 233 033,00 €
376 797 623,00 €
50 205 578,00 €
732 110 660,00 €
56 349 015,00 €
56 435 853,00 €
30 336 021,00 €
79 064 254,00 €
117 529 191,00 €
60 296 014,00 €
1 878 951 753,00 €
2 895 971,00 €
22 035 864,00 €
2 219 591,00 €
8 080 260,00 €
3 242 677,00 €
8 004 567,00 €
46 478 931,00 €
12 564 592,00 €
12 726 865,00 €
30 710 765,00 €
38 156 655,00 €
24 763 905,00 €
29 364 635,00 €
21 085 394,00 €
42 970 808,00 €
93 864 659,00 €
7 206 480,00 €
3 132 915,00 €
316 547 673,00 €
1 931 745,00 €
2 487 945,00 €
2 623 205,00 €
3 843 023,00 €
8 720 476,00 €
566 571,00 €
1 496 078,00 €
12 383 649,00 €
5 539 218,00 €
3 461 148,00 €
102 329 783,00 €
1 770 536,00 €
14 969 806,00 €
6 576 754,00 €
2 383 848,00 €
3 747 842,00 €
4 832 017,00 €
1 770 839,00 €
3 038 214,00 €
184 472 696,00 €
6 407 699,00 €
50 512 831,00 €
7 722 179,00 €
1 700 877,00 €
12 387 358,00 €
5 112 136,00 €
1 049 603,00 €
1 610 345,00 €
108 180 286,00 €
194 683 314,00 €
|
7,76 %
3,56 %
5,53 %
8,17 %
1,83 %
2,62 %
8,49 %
9,60 %
47,39 %
5,05 %
2,04 %
22,80 %
64,61 %
5,66 %
0,46 %
4,43 %
1,58 %
5,03 %
51,86 %
2,58 %
0,70 %
34,25 %
2,92 %
1,08 %
0,70 %
0,61 %
3,96 %
2,26 %
1,82 %
0,89 %
2,57 %
7,06 %
18,17 %
2,33 %
38,89 %
2,07 %
2,28 %
1,85 %
3,91 %
8,36 %
2,28 %
5,83 %
51,82 %
4,44 %
12,77 %
6,01 %
19,14 %
4,63 %
6,24 %
10,89 %
8,66 %
9,40 %
8,81 %
6,12 %
15,76 %
25,46 %
2,88 %
1,14 %
1,50 %
1,93 %
1,32 %
2,62 %
3,47 %
0,37 %
1,00 %
6,12 %
3,26 %
2,98 %
52,33 %
1,09 %
8,54 %
3,91 %
1,63 %
2,79 %
2,33 %
1,30 %
1,49 %
5,25 %
37,41 %
4,71 %
1,16 %
8,04 %
3,96 %
0,61 %
0,90 %
37,97 %
|
| Center |
Oeste
Região de Aveiro
Região de Coimbra
Região de Leiria
Viseu Dão Lafões
Beira Baixa
Médio Tejo
Beiras e Serra da Estrela
|
Alcobaça
Bombarral
Caldas da Rainha
Nazaré
Óbidos
Peniche
Alenquer
Arruda dos Vinhos
Cadaval
Lourinhã
Sobral de Monte Agraço
Torres Vedras
Total
Águeda
Albergaria-a-Velha
Anadia
Aveiro
Estarreja
Ílhavo
Murtosa
Oliveira do Bairro
Ovar
Sever do Vouga
Vagos
Total
Mealhada
Arganil
Cantanhede
Coimbra
Condeixa-a-Nova
Figueira da Foz
Góis
Lousã
Mira
Miranda do Corvo
Montemor-o-Velho
Oliveira do Hospital
Pampilhosa da Serra
Penacova
Penela
Soure
Tábua
Vila Nova de Poiares
Mortágua
Total
Alvaiázere
Ansião
Batalha
Castanheira de Pêra
Figueiró dos Vinhos
Leiria
Marinha Grande
Pedrógão Grande
Pombal
Porto de Mós
Total
Aguiar da Beira
Carregal do Sal
Castro Daire
Mangualde
Nelas
Oliveira de Frades
Penalva do Castelo
Santa Comba Dão
São Pedro do Sul
Sátão
Tondela
Vila Nova de Paiva
Viseu
Vouzela
Total
Castelo Branco
Idanha-a-Nova
Oleiros
Penamacor
Proença-a-Nova
Vila Velha de Ródão
Total
Sertã
Vila de Rei
Abrantes
Alcanena
Constância
Entroncamento
Ferreira do Zêzere
Mação
Sardoal
Tomar
Torres Novas
Vila Nova da Barquinha
Ourém
Total
Belmonte
Covilhã
Fundão
Almeida
Celorico da Beira
Figueira de Castelo Rodrigo
Fornos de Algodres
Gouveia
Guarda
Manteigas
Mêda
Pinhel
Sabugal
Seia
Trancoso
Total
|
49 948 692,00 €
5 425 876,00 €
67 471 331,00 €
34 025 024,00 €
8 013 696,00 €
27 659 479,00 €
39 525 829,00 €
27 267 463,00 €
11 738 078,00 €
11 236 438,00 €
2 352 184,00 €
79 799 644,00 €
364 463 734,00 €
179 891 842,00 €
28 400 705,00 €
25 326 220,00 €
327 245 949,00 €
59 249 912,00 €
122 627 933,00 €
10 951 144,00 €
42 941 305,00 €
62 855 289,00 €
11 087 425,00 €
19 756 820,00 €
890 334 545,00 €
17 203 331,00 €
23 555 949,00 €
67 400 647,00 €
561 201 624,00 €
15 982 547,00 €
151 562 637,00 €
7 535 684,00 €
25 293 810,00 €
19 760 575,00 €
9 663 409,00 €
14 470 819,00 €
61 745 439,00 €
16 646 513,00 €
15 991 621,00 €
4 337 471,00 €
7 084 898,00 €
17 638 410,00 €
7 325 502,00 €
6 937 927,00 €
1 051 338 812,00 €
12 508 437,00 €
11 050 112,00 €
24 000 883,00 €
7 922 990,00 €
5 089 781,00 €
269 488 936,00 €
121 691 514,00 €
7 901 426,00 €
66 849 080,00 €
38 440 105,00 €
564 943 264,00 €
13 472 058,00 €
30 619 824,00 €
11 227 021,00 €
81 333 427,00 €
45 033 142,00 €
15 691 336,00 €
5 829 286,00 €
7 495 667,00 €
14 087 161,00 €
9 052 165,00 €
34 963 581,00 €
7 875 324,00 €
171 066 312,00 €
21 535 167,00 €
469 281 472,00 €
77 574 833,00 €
9 465 495,00 €
19 599 655,00 €
2 790 742,00 €
15 026 198,00 €
17 007 851,00 €
141 464 773,00 €
21 691 320,00 €
10 635 486,00 €
33 081 111,00 €
33 844 680,00 €
27 872 970,00 €
33 887 526,00 €
20 751 835,00 €
33 300 302,00 €
10 837 332,00 €
41 317 038,00 €
44 123 458,00 €
5 509 136,00 €
46 897 367,00 €
363 749 560,00 €
11 340 922,00 €
89 166 764,00 €
68 788 400,00 €
3 257 188,00 €
7 114 056,00 €
2 653 095,00 €
3 918 909,00 €
8 078 629,00 €
107 027 930,00 €
2 321 633,00 €
3 275 154,00 €
6 010 236,00 €
12 365 049,00 €
40 390 008,00 €
15 114 327,00 €
380 822 300,00 €
|
24 823 235,00 €
3 133 894,00 €
24 874 109,00 €
20 984 880,00 €
3 975 057,00 €
12 175 208,00 €
14 291 909,00 €
6 679 191,00 €
2 208 059,00 €
6 861 344,00 €
1 490 250,00 €
34 335 251,00 €
155 832 387,00 €
86 056 407,00 €
17 209 977,00 €
15 275 374,00 €
173 423 392,00 €
35 696 708,00 €
57 524 239,00 €
10 509 541,00 €
16 417 907,00 €
24 099 524,00 €
5 024 635,00 €
9 259 307,00 €
450 497 011,00 €
5 046 880,00 €
10 673 295,00 €
41 912 153,00 €
259 507 608,00 €
3 471 792,00 €
71 731 144,00 €
1 482 377,00 €
10 200 453,00 €
7 658 394,00 €
4 001 833,00 €
6 591 074,00 €
27 345 132,00 €
9 945 045,00 €
6 243 499,00 €
1 651 922,00 €
3 157 253,00 €
6 989 882,00 €
2 915 749,00 €
3 395 363,00 €
483 920 850,00 €
3 663 339,00 €
5 340 769,00 €
15 111 912,00 €
3 150 129,00 €
1 837 510,00 €
131 059 639,00 €
73 972 477,00 €
1 871 858,00 €
32 836 538,00 €
20 613 672,00 €
289 457 844,00 €
4 097 905,00 €
12 070 631,00 €
6 544 482,00 €
40 499 694,00 €
23 118 841,00 €
7 038 342,00 €
2 434 096,00 €
3 394 397,00 €
6 613 366,00 €
4 706 687,00 €
17 880 041,00 €
2 289 424,00 €
66 874 542,00 €
7 391 752,00 €
204 954 200,00 €
30 828 240,00 €
5 756 785,00 €
8 211 149,00 €
751 116,00 €
5 076 174,00 €
9 524 964,00 €
60 148 429,00 €
8 516 771,00 €
5 664 183,00 €
16 780 036,00 €
18 337 159,00 €
14 675 139,00 €
16 347 972,00 €
8 328 834,00 €
10 182 338,00 €
3 754 608,00 €
18 490 716,00 €
18 057 980,00 €
2 344 013,00 €
20 805 595,00 €
162 285 344,00 €
1 534 772,00 €
46 198 016,00 €
28 478 855,00 €
1 352 723,00 €
2 507 410,00 €
1 100 070,00 €
2 667 708,00 €
4 954 203,00 €
32 888 373,00 €
863 638,00 €
761 010,00 €
2 195 318,00 €
4 639 742,00 €
14 425 774,00 €
2 873 677,00 €
147 441 290,00 €
|
13,70 %
1,49 %
18,51 %
9,34 %
2,20 %
7,59 %
10,84 %
7,48 %
3,22 %
3,08 %
0,65 %
21,90 %
20,20 %
3,19 %
2,84 %
36,76 %
6,65 %
13,77 %
1,23 %
4,82 %
7,06 %
1,25 %
2,22 %
1,64 %
2,24 %
6,41 %
53,38 %
1,52 %
14,42 %
0,72 %
2,41 %
1,88 %
0,92 %
1,38 %
5,87 %
1,58 %
1,52 %
0,41 %
0,67 %
1,68 %
0,70 %
0,66 %
2,21 %
1,96 %
4,25 %
1,40 %
0,90 %
47,70 %
21,54 %
1,40 %
11,83 %
6,80 %
2,87 %
6,52 %
2,39 %
17,33 %
9,60 %
3,34 %
1,24 %
1,60 %
3,00 %
1,93 %
7,45 %
1,68 %
36,45 %
4,59 %
54,84 %
6,69 %
13,85 %
1,97 %
10,62 %
12,02 %
5,96 %
2,92 %
9,09 %
9,30 %
7,66 %
9,32 %
5,70 %
9,15 %
2,98 %
11,36 %
12,13 %
1,51 %
12,89 %
2,98 %
23,41 %
18,06 %
0,86 %
1,87 %
0,70 %
1,03 %
2,12 %
28,10 %
0,61 %
0,86 %
1,58 %
3,25 %
10,61 %
3,97 %
|
| Lisbon Metropolitan Area |
Lisbon Metropolitan Area
|
Cascais
Lisboa
Loures
Mafra
Oeiras
Sintra
Vila Franca de Xira
Amadora
Odivelas
Alcochete
Almada
Barreiro
Moita
Montijo
Palmela
Seixal
Sesimbra
Setúbal
Total
|
278 363 719,00 €
3 079 404 846,00 €
183 499 937,00 €
136 969 507,00 €
474 348 276,00 €
184 380 730,00 €
113 622 849,00 €
243 463 135,00 €
71 600 971,00 €
19 131 312,00 €
129 939 207,00 €
73 075 160,00 €
26 815 908,00 €
35 190 497,00 €
40 963 064,00 €
113 850 546,00 €
33 016 261,00 €
309 253 352,00 €
5 546 889 277,00 €
|
149 693 919,00 €
1 517 657 414,00 €
94 669 493,00 €
71 580 903,00 €
199 990 381,00 €
90 975 280,00 €
48 209 446,00 €
133 792 790,00 €
32 299 450,00 €
8 242 607,00 €
48 696 189,00 €
30 036 059,00 €
15 987 443,00 €
19 090 875,00 €
20 693 193,00 €
61 300 936,00 €
7 402 762,00 €
128 100 404,00 €
2 678 419 543,00 €
|
5,02 %
55,52 %
3,31 %
2,47 %
8,55 %
3,32 %
2,05 %
4,39 %
1,29 %
0,34 %
2,34 %
1,32 %
0,48 %
0,63 %
0,74 %
2,05 %
0,60 %
5,58 %
|
| Alentejo |
Alentejo Litoral
Baixo Alentejo
Lezíria do Tejo
Alto Alentejo
Alentejo Central
|
Odemira
Alcácer do Sal
Grândola
Santiago do Cacém
Sines
Total
Aljustrel
Almodôvar
Alvito
Barrancos
Beja
Castro Verde
Cuba
Ferreira do Alentejo
Mértola
Moura
Ourique
Serpa
Vidigueira
Total
Azambuja
Almeirim
Alpiarça
Benavente
Cartaxo
Chamusca
Coruche
Golegã
Rio Maior
Salvaterra de Magos
Santarém
Total
Alter do Chão
Arronches
Avis
Campo Maior
Castelo de Vide
Crato
Elvas
Fronteira
Gavião
Marvão
Monforte
Nisa
Ponte de Sor
Portalegre
Sousel
Total
Alandroal
Arraiolos
Borba
Estremoz
Évora
Montemor-o-Novo
Mora
Mourão
Portel
Redondo
Reguengos de Monsaraz
Vendas Novas
Viana do Alentejo
Vila Viçosa
Total
|
10 500 347,00 €
13 887 533,00 €
67 285 846,00 €
107 113 670,00 €
38 773 343,00 €
237 560 740,00 €
37 874 548,00 €
2 208 616,00 €
5 587 196,00 €
1 957 878,00 €
86 859 028,00 €
3 595 523,00 €
1 860 235,00 €
51 323 660,00 €
26 080 862,00 €
4 820 265,00 €
3 977 578,00 €
3 123 728,00 €
2 324 974,00 €
231 594 091,00 €
32 437 363,00 €
4 808 934,00 €
4 971 895,00 €
48 640 983,00 €
20 797 031,00 €
8 622 649,00 €
6 531 999,00 €
9 349 772,00 €
52 362 485,00 €
11 520 277,00 €
106 197 983,00 €
306 241 370,00 €
12 151 790,00 €
1 926 085,00 €
1 602 081,00 €
24 906 256,00 €
3 844 576,00 €
666 794,00 €
50 756 958,00 €
1 619 424,00 €
11 578 477,00 €
3 770 752,00 €
8 893 865,00 €
18 772 457,00 €
27 645 956,00 €
78 451 073,00 €
10 209 464,00 €
256 796 008,00 €
5 668 050,00 €
2 191 369,00 €
17 898 349,00 €
7 621 417,00 €
168 564 271,00 €
3 979 600,00 €
1 891 168,00 €
1 216 894,00 €
1 500 697,00 €
8 253 708,00 €
9 337 254,00 €
7 051 051,00 €
4 591 333,00 €
7 843 610,00 €
247 608 772,00 €
|
5 063 788,00 €
5 377 146,00 €
44 815 135,00 €
57 163 547,00 €
15 545 864,00 €
127 965 481,00 €
25 538 081,00 €
1 184 496,00 €
2 028 643,00 €
737 574,00 €
46 650 152,00 €
1 240 538,00 €
741 680,00 €
38 010 949,00 €
12 645 781,00 €
2 100 420,00 €
1 484 126,00 €
1 087 765,00 €
1 117 831,00 €
134 568 035,00 €
12 796 471,00 €
2 595 974,00 €
2 115 934,00 €
19 269 136,00 €
10 049 289,00 €
5 605 126,00 €
4 154 607,00 €
4 402 740,00 €
15 635 475,00 €
7 338 559,00 €
48 865 228,00 €
132 828 538,00 €
2 865 249,00 €
791 112,00 €
738 202,00 €
11 278 178,00 €
1 465 457,00 €
376 828,00 €
19 855 289,00 €
1 096 756,00 €
4 215 437,00 €
2 034 034,00 €
951 816,00 €
2 165 166,00 €
13 354 034,00 €
30 679 403,00 €
8 782 886,00 €
100 649 848,00 €
1 283 470,00 €
1 519 465,00 €
4 959 318,00 €
4 147 478,00 €
81 427 607,00 €
2 268 819,00 €
1 442 605,00 €
844 991,00 €
518 927,00 €
2 143 275,00 €
4 738 551,00 €
2 209 164,00 €
1 127 703,00 €
5 171 550,00 €
113 802 921,00 €
|
4,42 %
5,85 %
28,32 %
45,09 %
16,32 %
16,35 %
0,95 %
2,41 %
0,85 %
37,50 %
1,55 %
0,80 %
22,16 %
11,26 %
2,08 %
1,72 %
1,35 %
1,00 %
10,59 %
1,57 %
1,62 %
15,88 %
6,79 %
2,82 %
2,13 %
3,05 %
17,10 %
3,76 %
34,68 %
4,73 %
0,75 %
0,62 %
9,70 %
1,50 %
0,26 %
19,77 %
0,63 %
4,51 %
1,47 %
3,46 %
7,31 %
10,77 %
30,55 %
3,98 %
2,29 %
0,89 %
7,23 %
3,08 %
68,08 %
1,61 %
0,76 %
0,49 %
0,61 %
3,33 %
3,77 %
2,85 %
1,85 %
3,17 %
|
| Algarve |
Algarve
|
Albufeira
Alcoutim
Aljezur
Castro Marim
Faro
Lagoa
Lagos
Loulé
Monchique
Olhão
Portimão
São Brás de Alportel
Silves
Tavira
Vila do Bispo
Vila Real de Santo António
Total
|
49 168 197,00 €
35 289 252,00 €
5 311 935,00 €
4 035 721,00 €
149 295 978,00 €
20 058 898,00 €
48 092 081,00 €
53 766 633,00 €
17 782 759,00 €
56 090 205,00 €
64 381 021,00 €
7 800 305,00 €
29 470 320,00 €
21 488 071,00 €
8 099 899,00 €
111 597 764,00 €
681 729 041,00 €
|
27 735 361,00 €
7 251 624,00 €
1 133 025,00 €
1 769 741,00 €
77 145 322,00 €
12 889 030,00 €
17 755 111,00 €
35 595 737,00 €
6 700 972,00 €
28 057 427,00 €
23 912 206,00 €
4 588 288,00 €
16 861 711,00 €
12 029 746,00 €
3 019 785,00 €
38 955 237,00 €
315 400 322,00 €
|
7,21 %
5,18 %
0,78 %
0,59 %
21,90 %
2,94 %
7,05 %
7,89 %
2,61 %
8,23 %
9,44 %
1,14 %
4,32 %
3,15 %
1,19 %
16,37 %
|
| Autonomous Region of the Azores |
Autonomous Region of the Azores
|
Vila do Porto
Lagoa
Nordeste
Ponta Delgada
Povoação
Ribeira Grande
Vila Franca do Campo
Angra do Heroísmo
Vila da Praia da Vitória
Santa Cruz da Graciosa
Calheta
Velas
Lajes do Pico
Madalena
São Roque do Pico
Horta
Lajes das Flores
Santa Cruz das Flores
Corvo
Total
|
7 272 403,00 €
32 741 554,00 €
6 076 652,00 €
538 008 147,00 €
2 353 886,00 €
110 574 089,00 €
12 887 317,00 €
150 706 137,00 €
11 220 955,00 €
4 261 408,00 €
3 002 828,00 €
4 881 263,00 €
4 728 368,00 €
18 968 716,00 €
13 658 462,00 €
86 261 315,00 €
926 037,00 €
2 722 626,00 €
426 969,00 €
1 011 679 131,00 €
|
3 109 917,00 €
15 435 237,00 €
3 468 152,00 €
312 373 616,00 €
1 458 077,00 €
56 969 276,00 €
9 772 695,00 €
84 223 609,00 €
6 310 599,00 €
1 388 898,00 €
1 685 641,00 €
2 558 757,00 €
1 929 522,00 €
7 016 540,00 €
9 212 981,00 €
59 391 799,00 €
298 107,00 €
1 053 095,00 €
139 742,00 €
577 796 259,00 €
|
0,72 %
3,24 %
0,60 %
53,18 %
0,23 %
10,93 %
1,27 %
14,90 %
1,11 %
0,42 %
0,30 %
0,48 %
0,47 %
1,87 %
1,35 %
8,53 %
0,09 %
0,27 %
0,04 %
|
| Autonomous Region of Madeira |
Autonomous Region of Madeira
|
Calheta
Câmara de Lobos
Funchal
Machico
Ponta do Sol
Porto Moniz
Ribeira Brava
Santa Cruz
Santana
São Vicente
Porto Santo
Total
|
11 953 898,00 €
18 240 175,00 €
711 651 922,00 €
11 685 788,00 €
4 773 762,00 €
268 599,00 €
10 947 912,00 €
19 078 612,00 €
561 822,00 €
36 679 023,00 €
26 188 219,00 €
852 029 733,00 €
|
4 348 968,00 €
6 000 479,00 €
362 214 772,00 €
3 847 468,00 €
1 728 829,00 €
206 289,00 €
6 664 926,00 €
8 114 082,00 €
449 192,00 €
8 767 707,00 €
7 081 059,00 €
409 423 771,00 €
|
1,40 %
2,14 %
83,52 %
1,37 %
0,56 %
0,03 %
1,28 %
2,24 %
0,07 %
4,30 %
3,07 %
|
| Nation-wide investment |
|
|
3 846 451 274,00 €
|
2 242 038 162,00 €
|
|
Distribution of investment by regions
Region
North
:Sub-region
Alto Minho
:Municipality
Arcos de Valdevez
:Approved amount
: 28621667 €,28 621 667,00 €
Amount spent
: 12549373 €,12 549 373,00 €
Percentage of investment
: 7,76 %7,76 %
Municipality
Caminha
:Approved amount
: 13121536 €,13 121 536,00 €
Amount spent
: 5207380 €,5 207 380,00 €
Percentage of investment
: 3,56 %3,56 %
Municipality
Melgaço
:Approved amount
: 20396673 €,20 396 673,00 €
Amount spent
: 16331910 €,16 331 910,00 €
Percentage of investment
: 5,53 %5,53 %
Municipality
Monção
:Approved amount
: 30148539 €,30 148 539,00 €
Amount spent
: 11584883 €,11 584 883,00 €
Percentage of investment
: 8,17 %8,17 %
Municipality
Paredes de Coura
:Approved amount
: 6762229 €,6 762 229,00 €
Amount spent
: 3272405 €,3 272 405,00 €
Percentage of investment
: 1,83 %1,83 %
Municipality
Ponte da Barca
:Approved amount
: 9658783 €,9 658 783,00 €
Amount spent
: 4709706 €,4 709 706,00 €
Percentage of investment
: 2,62 %2,62 %
Municipality
Ponte de Lima
:Approved amount
: 31320251 €,31 320 251,00 €
Amount spent
: 16402187 €,16 402 187,00 €
Percentage of investment
: 8,49 %8,49 %
Municipality
Valença
:Approved amount
: 35397266 €,35 397 266,00 €
Amount spent
: 12647603 €,12 647 603,00 €
Percentage of investment
: 9,6 %9,60 %
Municipality
Viana do Castelo
:Approved amount
: 174808967 €,174 808 967,00 €
Amount spent
: 103237344 €,103 237 344,00 €
Percentage of investment
: 47,39 %47,39 %
Municipality
Vila Nova de Cerveira
:Approved amount
: 18638617 €,18 638 617,00 €
Amount spent
: 7433196 €,7 433 196,00 €
Percentage of investment
: 5,05 %5,05 %
Total
Approved amount
: 368874529 €,368 874 529,00 €
Amount spent
: 193375987 €,193 375 987,00 €
Percentage of investment
Sub-region
Cávado
:Municipality
Amares
:Approved amount
: 15264866 €,15 264 866,00 €
Amount spent
: 6357482 €,6 357 482,00 €
Percentage of investment
: 2,04 %2,04 %
Municipality
Barcelos
:Approved amount
: 171011524 €,171 011 524,00 €
Amount spent
: 74765990 €,74 765 990,00 €
Percentage of investment
: 22,8 %22,80 %
Municipality
Braga
:Approved amount
: 484611039 €,484 611 039,00 €
Amount spent
: 238674988 €,238 674 988,00 €
Percentage of investment
: 64,61 %64,61 %
Municipality
Esposende
:Approved amount
: 42464920 €,42 464 920,00 €
Amount spent
: 14758859 €,14 758 859,00 €
Percentage of investment
: 5,66 %5,66 %
Municipality
Terras de Bouro
:Approved amount
: 3427433 €,3 427 433,00 €
Amount spent
: 1866851 €,1 866 851,00 €
Percentage of investment
: 0,46 %0,46 %
Municipality
Vila Verde
:Approved amount
: 33237419 €,33 237 419,00 €
Amount spent
: 18612687 €,18 612 687,00 €
Percentage of investment
: 4,43 %4,43 %
Total
Approved amount
: 750017202 €,750 017 202,00 €
Amount spent
: 355036857 €,355 036 857,00 €
Percentage of investment
Sub-region
Ave
:Municipality
Cabeceiras de Basto
:Approved amount
: 14255827 €,14 255 827,00 €
Amount spent
: 4634454 €,4 634 454,00 €
Percentage of investment
: 1,58 %1,58 %
Municipality
Fafe
:Approved amount
: 45440173 €,45 440 173,00 €
Amount spent
: 19265783 €,19 265 783,00 €
Percentage of investment
: 5,03 %5,03 %
Municipality
Guimarães
:Approved amount
: 468640732 €,468 640 732,00 €
Amount spent
: 228207785 €,228 207 785,00 €
Percentage of investment
: 51,86 %51,86 %
Municipality
Póvoa de Lanhoso
:Approved amount
: 23297959 €,23 297 959,00 €
Amount spent
: 8428352 €,8 428 352,00 €
Percentage of investment
: 2,58 %2,58 %
Municipality
Vieira do Minho
:Approved amount
: 6336301 €,6 336 301,00 €
Amount spent
: 2524168 €,2 524 168,00 €
Percentage of investment
: 0,7 %0,70 %
Municipality
Vila Nova de Famalicão
:Approved amount
: 309454998 €,309 454 998,00 €
Amount spent
: 146318176 €,146 318 176,00 €
Percentage of investment
: 34,25 %34,25 %
Municipality
Vizela
:Approved amount
: 26426001 €,26 426 001,00 €
Amount spent
: 18911703 €,18 911 703,00 €
Percentage of investment
: 2,92 %2,92 %
Municipality
Mondim de Basto
:Approved amount
: 9750120 €,9 750 120,00 €
Amount spent
: 3194404 €,3 194 404,00 €
Percentage of investment
: 1,08 %1,08 %
Total
Approved amount
: 903602109 €,903 602 109,00 €
Amount spent
: 431484825 €,431 484 825,00 €
Percentage of investment
Sub-region
Área Metropolitana do Porto
:Municipality
Arouca
:Approved amount
: 27241279 €,27 241 279,00 €
Amount spent
: 13743317 €,13 743 317,00 €
Percentage of investment
: 0,7 %0,70 %
Municipality
Espinho
:Approved amount
: 23750656 €,23 750 656,00 €
Amount spent
: 5469826 €,5 469 826,00 €
Percentage of investment
: 0,61 %0,61 %
Municipality
Santa Maria da Feira
:Approved amount
: 155075758 €,155 075 758,00 €
Amount spent
: 57260524 €,57 260 524,00 €
Percentage of investment
: 3,96 %3,96 %
Municipality
Oliveira de Azeméis
:Approved amount
: 88570929 €,88 570 929,00 €
Amount spent
: 29483536 €,29 483 536,00 €
Percentage of investment
: 2,26 %2,26 %
Municipality
São João da Madeira
:Approved amount
: 71481750 €,71 481 750,00 €
Amount spent
: 34977046 €,34 977 046,00 €
Percentage of investment
: 1,82 %1,82 %
Municipality
Vale de Cambra
:Approved amount
: 34836186 €,34 836 186,00 €
Amount spent
: 15020981 €,15 020 981,00 €
Percentage of investment
: 0,89 %0,89 %
Municipality
Gondomar
:Approved amount
: 100680243 €,100 680 243,00 €
Amount spent
: 37639281 €,37 639 281,00 €
Percentage of investment
: 2,57 %2,57 %
Municipality
Maia
:Approved amount
: 276736080 €,276 736 080,00 €
Amount spent
: 126233033 €,126 233 033,00 €
Percentage of investment
: 7,06 %7,06 %
Municipality
Matosinhos
:Approved amount
: 711857716 €,711 857 716,00 €
Amount spent
: 376797623 €,376 797 623,00 €
Percentage of investment
: 18,17 %18,17 %
Municipality
Paredes
:Approved amount
: 91385401 €,91 385 401,00 €
Amount spent
: 50205578 €,50 205 578,00 €
Percentage of investment
: 2,33 %2,33 %
Municipality
Porto
:Approved amount
: 1524130892 €,1 524 130 892,00 €
Amount spent
: 732110660 €,732 110 660,00 €
Percentage of investment
: 38,89 %38,89 %
Municipality
Póvoa de Varzim
:Approved amount
: 81258404 €,81 258 404,00 €
Amount spent
: 56349015 €,56 349 015,00 €
Percentage of investment
: 2,07 %2,07 %
Municipality
Santo Tirso
:Approved amount
: 89221819 €,89 221 819,00 €
Amount spent
: 56435853 €,56 435 853,00 €
Percentage of investment
: 2,28 %2,28 %
Municipality
Valongo
:Approved amount
: 72342082 €,72 342 082,00 €
Amount spent
: 30336021 €,30 336 021,00 €
Percentage of investment
: 1,85 %1,85 %
Municipality
Vila do Conde
:Approved amount
: 153175781 €,153 175 781,00 €
Amount spent
: 79064254 €,79 064 254,00 €
Percentage of investment
: 3,91 %3,91 %
Municipality
Vila Nova de Gaia
:Approved amount
: 327535322 €,327 535 322,00 €
Amount spent
: 117529191 €,117 529 191,00 €
Percentage of investment
: 8,36 %8,36 %
Municipality
Trofa
:Approved amount
: 89515815 €,89 515 815,00 €
Amount spent
: 60296014 €,60 296 014,00 €
Percentage of investment
: 2,28 %2,28 %
Total
Approved amount
: 3918796116 €,3 918 796 116,00 €
Amount spent
: 1878951753 €,1 878 951 753,00 €
Percentage of investment
Sub-region
Alto Tâmega
:Municipality
Boticas
:Approved amount
: 5810144 €,5 810 144,00 €
Amount spent
: 2895971 €,2 895 971,00 €
Percentage of investment
: 5,83 %5,83 %
Municipality
Chaves
:Approved amount
: 51670363 €,51 670 363,00 €
Amount spent
: 22035864 €,22 035 864,00 €
Percentage of investment
: 51,82 %51,82 %
Municipality
Montalegre
:Approved amount
: 4429247 €,4 429 247,00 €
Amount spent
: 2219591 €,2 219 591,00 €
Percentage of investment
: 4,44 %4,44 %
Municipality
Ribeira de Pena
:Approved amount
: 12732606 €,12 732 606,00 €
Amount spent
: 8080260 €,8 080 260,00 €
Percentage of investment
: 12,77 %12,77 %
Municipality
Valpaços
:Approved amount
: 5993660 €,5 993 660,00 €
Amount spent
: 3242677 €,3 242 677,00 €
Percentage of investment
: 6,01 %6,01 %
Municipality
Vila Pouca de Aguiar
:Approved amount
: 19082947 €,19 082 947,00 €
Amount spent
: 8004567 €,8 004 567,00 €
Percentage of investment
: 19,14 %19,14 %
Total
Approved amount
: 99718967 €,99 718 967,00 €
Amount spent
: 46478931 €,46 478 931,00 €
Percentage of investment
Sub-region
Tâmega e Sousa
:Municipality
Castelo de Paiva
:Approved amount
: 26342981 €,26 342 981,00 €
Amount spent
: 12564592 €,12 564 592,00 €
Percentage of investment
: 4,63 %4,63 %
Municipality
Celorico de Basto
:Approved amount
: 35496107 €,35 496 107,00 €
Amount spent
: 12726865 €,12 726 865,00 €
Percentage of investment
: 6,24 %6,24 %
Municipality
Amarante
:Approved amount
: 62001806 €,62 001 806,00 €
Amount spent
: 30710765 €,30 710 765,00 €
Percentage of investment
: 10,89 %10,89 %
Municipality
Baião
:Approved amount
: 49275946 €,49 275 946,00 €
Amount spent
: 38156655 €,38 156 655,00 €
Percentage of investment
: 8,66 %8,66 %
Municipality
Felgueiras
:Approved amount
: 53509986 €,53 509 986,00 €
Amount spent
: 24763905 €,24 763 905,00 €
Percentage of investment
: 9,4 %9,40 %
Municipality
Lousada
:Approved amount
: 50156126 €,50 156 126,00 €
Amount spent
: 29364635 €,29 364 635,00 €
Percentage of investment
: 8,81 %8,81 %
Municipality
Marco de Canaveses
:Approved amount
: 34850839 €,34 850 839,00 €
Amount spent
: 21085394 €,21 085 394,00 €
Percentage of investment
: 6,12 %6,12 %
Municipality
Paços de Ferreira
:Approved amount
: 89724269 €,89 724 269,00 €
Amount spent
: 42970808 €,42 970 808,00 €
Percentage of investment
: 15,76 %15,76 %
Municipality
Penafiel
:Approved amount
: 144894032 €,144 894 032,00 €
Amount spent
: 93864659 €,93 864 659,00 €
Percentage of investment
: 25,46 %25,46 %
Municipality
Cinfães
:Approved amount
: 16413669 €,16 413 669,00 €
Amount spent
: 7206480 €,7 206 480,00 €
Percentage of investment
: 2,88 %2,88 %
Municipality
Resende
:Approved amount
: 6505287 €,6 505 287,00 €
Amount spent
: 3132915 €,3 132 915,00 €
Percentage of investment
: 1,14 %1,14 %
Total
Approved amount
: 569171047 €,569 171 047,00 €
Amount spent
: 316547673 €,316 547 673,00 €
Percentage of investment
Sub-region
Douro
:Municipality
Carrazeda de Ansiães
:Approved amount
: 5704030 €,5 704 030,00 €
Amount spent
: 1931745 €,1 931 745,00 €
Percentage of investment
: 1,5 %1,50 %
Municipality
Freixo de Espada à Cinta
:Approved amount
: 7359287 €,7 359 287,00 €
Amount spent
: 2487945 €,2 487 945,00 €
Percentage of investment
: 1,93 %1,93 %
Municipality
Torre de Moncorvo
:Approved amount
: 5035945 €,5 035 945,00 €
Amount spent
: 2623205 €,2 623 205,00 €
Percentage of investment
: 1,32 %1,32 %
Municipality
Vila Nova de Foz Côa
:Approved amount
: 9976443 €,9 976 443,00 €
Amount spent
: 3843023 €,3 843 023,00 €
Percentage of investment
: 2,62 %2,62 %
Municipality
Alijó
:Approved amount
: 13228391 €,13 228 391,00 €
Amount spent
: 8720476 €,8 720 476,00 €
Percentage of investment
: 3,47 %3,47 %
Municipality
Mesão Frio
:Approved amount
: 1415296 €,1 415 296,00 €
Amount spent
: 566571 €,566 571,00 €
Percentage of investment
: 0,37 %0,37 %
Municipality
Murça
:Approved amount
: 3819148 €,3 819 148,00 €
Amount spent
: 1496078 €,1 496 078,00 €
Percentage of investment
: 1 %1,00 %
Municipality
Peso da Régua
:Approved amount
: 23319096 €,23 319 096,00 €
Amount spent
: 12383649 €,12 383 649,00 €
Percentage of investment
: 6,12 %6,12 %
Municipality
Sabrosa
:Approved amount
: 12423509 €,12 423 509,00 €
Amount spent
: 5539218 €,5 539 218,00 €
Percentage of investment
: 3,26 %3,26 %
Municipality
Santa Marta de Penaguião
:Approved amount
: 11358628 €,11 358 628,00 €
Amount spent
: 3461148 €,3 461 148,00 €
Percentage of investment
: 2,98 %2,98 %
Municipality
Vila Real
:Approved amount
: 199252702 €,199 252 702,00 €
Amount spent
: 102329783 €,102 329 783,00 €
Percentage of investment
: 52,33 %52,33 %
Municipality
Armamar
:Approved amount
: 4169285 €,4 169 285,00 €
Amount spent
: 1770536 €,1 770 536,00 €
Percentage of investment
: 1,09 %1,09 %
Municipality
Lamego
:Approved amount
: 32527131 €,32 527 131,00 €
Amount spent
: 14969806 €,14 969 806,00 €
Percentage of investment
: 8,54 %8,54 %
Municipality
Moimenta da Beira
:Approved amount
: 14893100 €,14 893 100,00 €
Amount spent
: 6576754 €,6 576 754,00 €
Percentage of investment
: 3,91 %3,91 %
Municipality
Penedono
:Approved amount
: 6187856 €,6 187 856,00 €
Amount spent
: 2383848 €,2 383 848,00 €
Percentage of investment
: 1,63 %1,63 %
Municipality
São João da Pesqueira
:Approved amount
: 10636306 €,10 636 306,00 €
Amount spent
: 3747842 €,3 747 842,00 €
Percentage of investment
: 2,79 %2,79 %
Municipality
Sernancelhe
:Approved amount
: 8877894 €,8 877 894,00 €
Amount spent
: 4832017 €,4 832 017,00 €
Percentage of investment
: 2,33 %2,33 %
Municipality
Tabuaço
:Approved amount
: 4934528 €,4 934 528,00 €
Amount spent
: 1770839 €,1 770 839,00 €
Percentage of investment
: 1,3 %1,30 %
Municipality
Tarouca
:Approved amount
: 5668307 €,5 668 307,00 €
Amount spent
: 3038214 €,3 038 214,00 €
Percentage of investment
: 1,49 %1,49 %
Total
Approved amount
: 380786880 €,380 786 880,00 €
Amount spent
: 184472696 €,184 472 696,00 €
Percentage of investment
Sub-region
Terras de Trás-os-Montes
:Municipality
Alfândega da Fé
:Approved amount
: 15386808 €,15 386 808,00 €
Amount spent
: 6407699 €,6 407 699,00 €
Percentage of investment
: 5,25 %5,25 %
Municipality
Bragança
:Approved amount
: 109611335 €,109 611 335,00 €
Amount spent
: 50512831 €,50 512 831,00 €
Percentage of investment
: 37,41 %37,41 %
Municipality
Macedo de Cavaleiros
:Approved amount
: 13794619 €,13 794 619,00 €
Amount spent
: 7722179 €,7 722 179,00 €
Percentage of investment
: 4,71 %4,71 %
Municipality
Miranda do Douro
:Approved amount
: 3407344 €,3 407 344,00 €
Amount spent
: 1700877 €,1 700 877,00 €
Percentage of investment
: 1,16 %1,16 %
Municipality
Mirandela
:Approved amount
: 23548633 €,23 548 633,00 €
Amount spent
: 12387358 €,12 387 358,00 €
Percentage of investment
: 8,04 %8,04 %
Municipality
Mogadouro
:Approved amount
: 11610995 €,11 610 995,00 €
Amount spent
: 5112136 €,5 112 136,00 €
Percentage of investment
: 3,96 %3,96 %
Municipality
Vila Flor
:Approved amount
: 1780284 €,1 780 284,00 €
Amount spent
: 1049603 €,1 049 603,00 €
Percentage of investment
: 0,61 %0,61 %
Municipality
Vimioso
:Approved amount
: 2643205 €,2 643 205,00 €
Amount spent
: 1610345 €,1 610 345,00 €
Percentage of investment
: 0,9 %0,90 %
Municipality
Vinhais
:Approved amount
: 111251924 €,111 251 924,00 €
Amount spent
: 108180286 €,108 180 286,00 €
Percentage of investment
: 37,97 %37,97 %
Total
Approved amount
: 293035146 €,293 035 146,00 €
Amount spent
: 194683314 €,194 683 314,00 €
Percentage of investment
Region
Center
:Sub-region
Oeste
:Municipality
Alcobaça
:Approved amount
: 49948692 €,49 948 692,00 €
Amount spent
: 24823235 €,24 823 235,00 €
Percentage of investment
: 13,7 %13,70 %
Municipality
Bombarral
:Approved amount
: 5425876 €,5 425 876,00 €
Amount spent
: 3133894 €,3 133 894,00 €
Percentage of investment
: 1,49 %1,49 %
Municipality
Caldas da Rainha
:Approved amount
: 67471331 €,67 471 331,00 €
Amount spent
: 24874109 €,24 874 109,00 €
Percentage of investment
: 18,51 %18,51 %
Municipality
Nazaré
:Approved amount
: 34025024 €,34 025 024,00 €
Amount spent
: 20984880 €,20 984 880,00 €
Percentage of investment
: 9,34 %9,34 %
Municipality
Óbidos
:Approved amount
: 8013696 €,8 013 696,00 €
Amount spent
: 3975057 €,3 975 057,00 €
Percentage of investment
: 2,2 %2,20 %
Municipality
Peniche
:Approved amount
: 27659479 €,27 659 479,00 €
Amount spent
: 12175208 €,12 175 208,00 €
Percentage of investment
: 7,59 %7,59 %
Municipality
Alenquer
:Approved amount
: 39525829 €,39 525 829,00 €
Amount spent
: 14291909 €,14 291 909,00 €
Percentage of investment
: 10,84 %10,84 %
Municipality
Arruda dos Vinhos
:Approved amount
: 27267463 €,27 267 463,00 €
Amount spent
: 6679191 €,6 679 191,00 €
Percentage of investment
: 7,48 %7,48 %
Municipality
Cadaval
:Approved amount
: 11738078 €,11 738 078,00 €
Amount spent
: 2208059 €,2 208 059,00 €
Percentage of investment
: 3,22 %3,22 %
Municipality
Lourinhã
:Approved amount
: 11236438 €,11 236 438,00 €
Amount spent
: 6861344 €,6 861 344,00 €
Percentage of investment
: 3,08 %3,08 %
Municipality
Sobral de Monte Agraço
:Approved amount
: 2352184 €,2 352 184,00 €
Amount spent
: 1490250 €,1 490 250,00 €
Percentage of investment
: 0,65 %0,65 %
Municipality
Torres Vedras
:Approved amount
: 79799644 €,79 799 644,00 €
Amount spent
: 34335251 €,34 335 251,00 €
Percentage of investment
: 21,9 %21,90 %
Total
Approved amount
: 364463734 €,364 463 734,00 €
Amount spent
: 155832387 €,155 832 387,00 €
Percentage of investment
Sub-region
Região de Aveiro
:Municipality
Águeda
:Approved amount
: 179891842 €,179 891 842,00 €
Amount spent
: 86056407 €,86 056 407,00 €
Percentage of investment
: 20,2 %20,20 %
Municipality
Albergaria-a-Velha
:Approved amount
: 28400705 €,28 400 705,00 €
Amount spent
: 17209977 €,17 209 977,00 €
Percentage of investment
: 3,19 %3,19 %
Municipality
Anadia
:Approved amount
: 25326220 €,25 326 220,00 €
Amount spent
: 15275374 €,15 275 374,00 €
Percentage of investment
: 2,84 %2,84 %
Municipality
Aveiro
:Approved amount
: 327245949 €,327 245 949,00 €
Amount spent
: 173423392 €,173 423 392,00 €
Percentage of investment
: 36,76 %36,76 %
Municipality
Estarreja
:Approved amount
: 59249912 €,59 249 912,00 €
Amount spent
: 35696708 €,35 696 708,00 €
Percentage of investment
: 6,65 %6,65 %
Municipality
Ílhavo
:Approved amount
: 122627933 €,122 627 933,00 €
Amount spent
: 57524239 €,57 524 239,00 €
Percentage of investment
: 13,77 %13,77 %
Municipality
Murtosa
:Approved amount
: 10951144 €,10 951 144,00 €
Amount spent
: 10509541 €,10 509 541,00 €
Percentage of investment
: 1,23 %1,23 %
Municipality
Oliveira do Bairro
:Approved amount
: 42941305 €,42 941 305,00 €
Amount spent
: 16417907 €,16 417 907,00 €
Percentage of investment
: 4,82 %4,82 %
Municipality
Ovar
:Approved amount
: 62855289 €,62 855 289,00 €
Amount spent
: 24099524 €,24 099 524,00 €
Percentage of investment
: 7,06 %7,06 %
Municipality
Sever do Vouga
:Approved amount
: 11087425 €,11 087 425,00 €
Amount spent
: 5024635 €,5 024 635,00 €
Percentage of investment
: 1,25 %1,25 %
Municipality
Vagos
:Approved amount
: 19756820 €,19 756 820,00 €
Amount spent
: 9259307 €,9 259 307,00 €
Percentage of investment
: 2,22 %2,22 %
Total
Approved amount
: 890334545 €,890 334 545,00 €
Amount spent
: 450497011 €,450 497 011,00 €
Percentage of investment
Sub-region
Região de Coimbra
:Municipality
Mealhada
:Approved amount
: 17203331 €,17 203 331,00 €
Amount spent
: 5046880 €,5 046 880,00 €
Percentage of investment
: 1,64 %1,64 %
Municipality
Arganil
:Approved amount
: 23555949 €,23 555 949,00 €
Amount spent
: 10673295 €,10 673 295,00 €
Percentage of investment
: 2,24 %2,24 %
Municipality
Cantanhede
:Approved amount
: 67400647 €,67 400 647,00 €
Amount spent
: 41912153 €,41 912 153,00 €
Percentage of investment
: 6,41 %6,41 %
Municipality
Coimbra
:Approved amount
: 561201624 €,561 201 624,00 €
Amount spent
: 259507608 €,259 507 608,00 €
Percentage of investment
: 53,38 %53,38 %
Municipality
Condeixa-a-Nova
:Approved amount
: 15982547 €,15 982 547,00 €
Amount spent
: 3471792 €,3 471 792,00 €
Percentage of investment
: 1,52 %1,52 %
Municipality
Figueira da Foz
:Approved amount
: 151562637 €,151 562 637,00 €
Amount spent
: 71731144 €,71 731 144,00 €
Percentage of investment
: 14,42 %14,42 %
Municipality
Góis
:Approved amount
: 7535684 €,7 535 684,00 €
Amount spent
: 1482377 €,1 482 377,00 €
Percentage of investment
: 0,72 %0,72 %
Municipality
Lousã
:Approved amount
: 25293810 €,25 293 810,00 €
Amount spent
: 10200453 €,10 200 453,00 €
Percentage of investment
: 2,41 %2,41 %
Municipality
Mira
:Approved amount
: 19760575 €,19 760 575,00 €
Amount spent
: 7658394 €,7 658 394,00 €
Percentage of investment
: 1,88 %1,88 %
Municipality
Miranda do Corvo
:Approved amount
: 9663409 €,9 663 409,00 €
Amount spent
: 4001833 €,4 001 833,00 €
Percentage of investment
: 0,92 %0,92 %
Municipality
Montemor-o-Velho
:Approved amount
: 14470819 €,14 470 819,00 €
Amount spent
: 6591074 €,6 591 074,00 €
Percentage of investment
: 1,38 %1,38 %
Municipality
Oliveira do Hospital
:Approved amount
: 61745439 €,61 745 439,00 €
Amount spent
: 27345132 €,27 345 132,00 €
Percentage of investment
: 5,87 %5,87 %
Municipality
Pampilhosa da Serra
:Approved amount
: 16646513 €,16 646 513,00 €
Amount spent
: 9945045 €,9 945 045,00 €
Percentage of investment
: 1,58 %1,58 %
Municipality
Penacova
:Approved amount
: 15991621 €,15 991 621,00 €
Amount spent
: 6243499 €,6 243 499,00 €
Percentage of investment
: 1,52 %1,52 %
Municipality
Penela
:Approved amount
: 4337471 €,4 337 471,00 €
Amount spent
: 1651922 €,1 651 922,00 €
Percentage of investment
: 0,41 %0,41 %
Municipality
Soure
:Approved amount
: 7084898 €,7 084 898,00 €
Amount spent
: 3157253 €,3 157 253,00 €
Percentage of investment
: 0,67 %0,67 %
Municipality
Tábua
:Approved amount
: 17638410 €,17 638 410,00 €
Amount spent
: 6989882 €,6 989 882,00 €
Percentage of investment
: 1,68 %1,68 %
Municipality
Vila Nova de Poiares
:Approved amount
: 7325502 €,7 325 502,00 €
Amount spent
: 2915749 €,2 915 749,00 €
Percentage of investment
: 0,7 %0,70 %
Municipality
Mortágua
:Approved amount
: 6937927 €,6 937 927,00 €
Amount spent
: 3395363 €,3 395 363,00 €
Percentage of investment
: 0,66 %0,66 %
Total
Approved amount
: 1051338812 €,1 051 338 812,00 €
Amount spent
: 483920850 €,483 920 850,00 €
Percentage of investment
Sub-region
Região de Leiria
:Municipality
Alvaiázere
:Approved amount
: 12508437 €,12 508 437,00 €
Amount spent
: 3663339 €,3 663 339,00 €
Percentage of investment
: 2,21 %2,21 %
Municipality
Ansião
:Approved amount
: 11050112 €,11 050 112,00 €
Amount spent
: 5340769 €,5 340 769,00 €
Percentage of investment
: 1,96 %1,96 %
Municipality
Batalha
:Approved amount
: 24000883 €,24 000 883,00 €
Amount spent
: 15111912 €,15 111 912,00 €
Percentage of investment
: 4,25 %4,25 %
Municipality
Castanheira de Pêra
:Approved amount
: 7922990 €,7 922 990,00 €
Amount spent
: 3150129 €,3 150 129,00 €
Percentage of investment
: 1,4 %1,40 %
Municipality
Figueiró dos Vinhos
:Approved amount
: 5089781 €,5 089 781,00 €
Amount spent
: 1837510 €,1 837 510,00 €
Percentage of investment
: 0,9 %0,90 %
Municipality
Leiria
:Approved amount
: 269488936 €,269 488 936,00 €
Amount spent
: 131059639 €,131 059 639,00 €
Percentage of investment
: 47,7 %47,70 %
Municipality
Marinha Grande
:Approved amount
: 121691514 €,121 691 514,00 €
Amount spent
: 73972477 €,73 972 477,00 €
Percentage of investment
: 21,54 %21,54 %
Municipality
Pedrógão Grande
:Approved amount
: 7901426 €,7 901 426,00 €
Amount spent
: 1871858 €,1 871 858,00 €
Percentage of investment
: 1,4 %1,40 %
Municipality
Pombal
:Approved amount
: 66849080 €,66 849 080,00 €
Amount spent
: 32836538 €,32 836 538,00 €
Percentage of investment
: 11,83 %11,83 %
Municipality
Porto de Mós
:Approved amount
: 38440105 €,38 440 105,00 €
Amount spent
: 20613672 €,20 613 672,00 €
Percentage of investment
: 6,8 %6,80 %
Total
Approved amount
: 564943264 €,564 943 264,00 €
Amount spent
: 289457844 €,289 457 844,00 €
Percentage of investment
Sub-region
Viseu Dão Lafões
:Municipality
Aguiar da Beira
:Approved amount
: 13472058 €,13 472 058,00 €
Amount spent
: 4097905 €,4 097 905,00 €
Percentage of investment
: 2,87 %2,87 %
Municipality
Carregal do Sal
:Approved amount
: 30619824 €,30 619 824,00 €
Amount spent
: 12070631 €,12 070 631,00 €
Percentage of investment
: 6,52 %6,52 %
Municipality
Castro Daire
:Approved amount
: 11227021 €,11 227 021,00 €
Amount spent
: 6544482 €,6 544 482,00 €
Percentage of investment
: 2,39 %2,39 %
Municipality
Mangualde
:Approved amount
: 81333427 €,81 333 427,00 €
Amount spent
: 40499694 €,40 499 694,00 €
Percentage of investment
: 17,33 %17,33 %
Municipality
Nelas
:Approved amount
: 45033142 €,45 033 142,00 €
Amount spent
: 23118841 €,23 118 841,00 €
Percentage of investment
: 9,6 %9,60 %
Municipality
Oliveira de Frades
:Approved amount
: 15691336 €,15 691 336,00 €
Amount spent
: 7038342 €,7 038 342,00 €
Percentage of investment
: 3,34 %3,34 %
Municipality
Penalva do Castelo
:Approved amount
: 5829286 €,5 829 286,00 €
Amount spent
: 2434096 €,2 434 096,00 €
Percentage of investment
: 1,24 %1,24 %
Municipality
Santa Comba Dão
:Approved amount
: 7495667 €,7 495 667,00 €
Amount spent
: 3394397 €,3 394 397,00 €
Percentage of investment
: 1,6 %1,60 %
Municipality
São Pedro do Sul
:Approved amount
: 14087161 €,14 087 161,00 €
Amount spent
: 6613366 €,6 613 366,00 €
Percentage of investment
: 3 %3,00 %
Municipality
Sátão
:Approved amount
: 9052165 €,9 052 165,00 €
Amount spent
: 4706687 €,4 706 687,00 €
Percentage of investment
: 1,93 %1,93 %
Municipality
Tondela
:Approved amount
: 34963581 €,34 963 581,00 €
Amount spent
: 17880041 €,17 880 041,00 €
Percentage of investment
: 7,45 %7,45 %
Municipality
Vila Nova de Paiva
:Approved amount
: 7875324 €,7 875 324,00 €
Amount spent
: 2289424 €,2 289 424,00 €
Percentage of investment
: 1,68 %1,68 %
Municipality
Viseu
:Approved amount
: 171066312 €,171 066 312,00 €
Amount spent
: 66874542 €,66 874 542,00 €
Percentage of investment
: 36,45 %36,45 %
Municipality
Vouzela
:Approved amount
: 21535167 €,21 535 167,00 €
Amount spent
: 7391752 €,7 391 752,00 €
Percentage of investment
: 4,59 %4,59 %
Total
Approved amount
: 469281472 €,469 281 472,00 €
Amount spent
: 204954200 €,204 954 200,00 €
Percentage of investment
Sub-region
Beira Baixa
:Municipality
Castelo Branco
:Approved amount
: 77574833 €,77 574 833,00 €
Amount spent
: 30828240 €,30 828 240,00 €
Percentage of investment
: 54,84 %54,84 %
Municipality
Idanha-a-Nova
:Approved amount
: 9465495 €,9 465 495,00 €
Amount spent
: 5756785 €,5 756 785,00 €
Percentage of investment
: 6,69 %6,69 %
Municipality
Oleiros
:Approved amount
: 19599655 €,19 599 655,00 €
Amount spent
: 8211149 €,8 211 149,00 €
Percentage of investment
: 13,85 %13,85 %
Municipality
Penamacor
:Approved amount
: 2790742 €,2 790 742,00 €
Amount spent
: 751116 €,751 116,00 €
Percentage of investment
: 1,97 %1,97 %
Municipality
Proença-a-Nova
:Approved amount
: 15026198 €,15 026 198,00 €
Amount spent
: 5076174 €,5 076 174,00 €
Percentage of investment
: 10,62 %10,62 %
Municipality
Vila Velha de Ródão
:Approved amount
: 17007851 €,17 007 851,00 €
Amount spent
: 9524964 €,9 524 964,00 €
Percentage of investment
: 12,02 %12,02 %
Total
Approved amount
: 141464773 €,141 464 773,00 €
Amount spent
: 60148429 €,60 148 429,00 €
Percentage of investment
Sub-region
Médio Tejo
:Municipality
Sertã
:Approved amount
: 21691320 €,21 691 320,00 €
Amount spent
: 8516771 €,8 516 771,00 €
Percentage of investment
: 5,96 %5,96 %
Municipality
Vila de Rei
:Approved amount
: 10635486 €,10 635 486,00 €
Amount spent
: 5664183 €,5 664 183,00 €
Percentage of investment
: 2,92 %2,92 %
Municipality
Abrantes
:Approved amount
: 33081111 €,33 081 111,00 €
Amount spent
: 16780036 €,16 780 036,00 €
Percentage of investment
: 9,09 %9,09 %
Municipality
Alcanena
:Approved amount
: 33844680 €,33 844 680,00 €
Amount spent
: 18337159 €,18 337 159,00 €
Percentage of investment
: 9,3 %9,30 %
Municipality
Constância
:Approved amount
: 27872970 €,27 872 970,00 €
Amount spent
: 14675139 €,14 675 139,00 €
Percentage of investment
: 7,66 %7,66 %
Municipality
Entroncamento
:Approved amount
: 33887526 €,33 887 526,00 €
Amount spent
: 16347972 €,16 347 972,00 €
Percentage of investment
: 9,32 %9,32 %
Municipality
Ferreira do Zêzere
:Approved amount
: 20751835 €,20 751 835,00 €
Amount spent
: 8328834 €,8 328 834,00 €
Percentage of investment
: 5,7 %5,70 %
Municipality
Mação
:Approved amount
: 33300302 €,33 300 302,00 €
Amount spent
: 10182338 €,10 182 338,00 €
Percentage of investment
: 9,15 %9,15 %
Municipality
Sardoal
:Approved amount
: 10837332 €,10 837 332,00 €
Amount spent
: 3754608 €,3 754 608,00 €
Percentage of investment
: 2,98 %2,98 %
Municipality
Tomar
:Approved amount
: 41317038 €,41 317 038,00 €
Amount spent
: 18490716 €,18 490 716,00 €
Percentage of investment
: 11,36 %11,36 %
Municipality
Torres Novas
:Approved amount
: 44123458 €,44 123 458,00 €
Amount spent
: 18057980 €,18 057 980,00 €
Percentage of investment
: 12,13 %12,13 %
Municipality
Vila Nova da Barquinha
:Approved amount
: 5509136 €,5 509 136,00 €
Amount spent
: 2344013 €,2 344 013,00 €
Percentage of investment
: 1,51 %1,51 %
Municipality
Ourém
:Approved amount
: 46897367 €,46 897 367,00 €
Amount spent
: 20805595 €,20 805 595,00 €
Percentage of investment
: 12,89 %12,89 %
Total
Approved amount
: 363749560 €,363 749 560,00 €
Amount spent
: 162285344 €,162 285 344,00 €
Percentage of investment
Sub-region
Beiras e Serra da Estrela
:Municipality
Belmonte
:Approved amount
: 11340922 €,11 340 922,00 €
Amount spent
: 1534772 €,1 534 772,00 €
Percentage of investment
: 2,98 %2,98 %
Municipality
Covilhã
:Approved amount
: 89166764 €,89 166 764,00 €
Amount spent
: 46198016 €,46 198 016,00 €
Percentage of investment
: 23,41 %23,41 %
Municipality
Fundão
:Approved amount
: 68788400 €,68 788 400,00 €
Amount spent
: 28478855 €,28 478 855,00 €
Percentage of investment
: 18,06 %18,06 %
Municipality
Almeida
:Approved amount
: 3257188 €,3 257 188,00 €
Amount spent
: 1352723 €,1 352 723,00 €
Percentage of investment
: 0,86 %0,86 %
Municipality
Celorico da Beira
:Approved amount
: 7114056 €,7 114 056,00 €
Amount spent
: 2507410 €,2 507 410,00 €
Percentage of investment
: 1,87 %1,87 %
Municipality
Figueira de Castelo Rodrigo
:Approved amount
: 2653095 €,2 653 095,00 €
Amount spent
: 1100070 €,1 100 070,00 €
Percentage of investment
: 0,7 %0,70 %
Municipality
Fornos de Algodres
:Approved amount
: 3918909 €,3 918 909,00 €
Amount spent
: 2667708 €,2 667 708,00 €
Percentage of investment
: 1,03 %1,03 %
Municipality
Gouveia
:Approved amount
: 8078629 €,8 078 629,00 €
Amount spent
: 4954203 €,4 954 203,00 €
Percentage of investment
: 2,12 %2,12 %
Municipality
Guarda
:Approved amount
: 107027930 €,107 027 930,00 €
Amount spent
: 32888373 €,32 888 373,00 €
Percentage of investment
: 28,1 %28,10 %
Municipality
Manteigas
:Approved amount
: 2321633 €,2 321 633,00 €
Amount spent
: 863638 €,863 638,00 €
Percentage of investment
: 0,61 %0,61 %
Municipality
Mêda
:Approved amount
: 3275154 €,3 275 154,00 €
Amount spent
: 761010 €,761 010,00 €
Percentage of investment
: 0,86 %0,86 %
Municipality
Pinhel
:Approved amount
: 6010236 €,6 010 236,00 €
Amount spent
: 2195318 €,2 195 318,00 €
Percentage of investment
: 1,58 %1,58 %
Municipality
Sabugal
:Approved amount
: 12365049 €,12 365 049,00 €
Amount spent
: 4639742 €,4 639 742,00 €
Percentage of investment
: 3,25 %3,25 %
Municipality
Seia
:Approved amount
: 40390008 €,40 390 008,00 €
Amount spent
: 14425774 €,14 425 774,00 €
Percentage of investment
: 10,61 %10,61 %
Municipality
Trancoso
:Approved amount
: 15114327 €,15 114 327,00 €
Amount spent
: 2873677 €,2 873 677,00 €
Percentage of investment
: 3,97 %3,97 %
Total
Approved amount
: 380822300 €,380 822 300,00 €
Amount spent
: 147441290 €,147 441 290,00 €
Percentage of investment
Region
Lisbon Metropolitan Area
:Sub-region
Lisbon Metropolitan Area
:Municipality
Cascais
:Approved amount
: 278363719 €,278 363 719,00 €
Amount spent
: 149693919 €,149 693 919,00 €
Percentage of investment
: 5,02 %5,02 %
Municipality
Lisboa
:Approved amount
: 3079404846 €,3 079 404 846,00 €
Amount spent
: 1517657414 €,1 517 657 414,00 €
Percentage of investment
: 55,52 %55,52 %
Municipality
Loures
:Approved amount
: 183499937 €,183 499 937,00 €
Amount spent
: 94669493 €,94 669 493,00 €
Percentage of investment
: 3,31 %3,31 %
Municipality
Mafra
:Approved amount
: 136969507 €,136 969 507,00 €
Amount spent
: 71580903 €,71 580 903,00 €
Percentage of investment
: 2,47 %2,47 %
Municipality
Oeiras
:Approved amount
: 474348276 €,474 348 276,00 €
Amount spent
: 199990381 €,199 990 381,00 €
Percentage of investment
: 8,55 %8,55 %
Municipality
Sintra
:Approved amount
: 184380730 €,184 380 730,00 €
Amount spent
: 90975280 €,90 975 280,00 €
Percentage of investment
: 3,32 %3,32 %
Municipality
Vila Franca de Xira
:Approved amount
: 113622849 €,113 622 849,00 €
Amount spent
: 48209446 €,48 209 446,00 €
Percentage of investment
: 2,05 %2,05 %
Municipality
Amadora
:Approved amount
: 243463135 €,243 463 135,00 €
Amount spent
: 133792790 €,133 792 790,00 €
Percentage of investment
: 4,39 %4,39 %
Municipality
Odivelas
:Approved amount
: 71600971 €,71 600 971,00 €
Amount spent
: 32299450 €,32 299 450,00 €
Percentage of investment
: 1,29 %1,29 %
Municipality
Alcochete
:Approved amount
: 19131312 €,19 131 312,00 €
Amount spent
: 8242607 €,8 242 607,00 €
Percentage of investment
: 0,34 %0,34 %
Municipality
Almada
:Approved amount
: 129939207 €,129 939 207,00 €
Amount spent
: 48696189 €,48 696 189,00 €
Percentage of investment
: 2,34 %2,34 %
Municipality
Barreiro
:Approved amount
: 73075160 €,73 075 160,00 €
Amount spent
: 30036059 €,30 036 059,00 €
Percentage of investment
: 1,32 %1,32 %
Municipality
Moita
:Approved amount
: 26815908 €,26 815 908,00 €
Amount spent
: 15987443 €,15 987 443,00 €
Percentage of investment
: 0,48 %0,48 %
Municipality
Montijo
:Approved amount
: 35190497 €,35 190 497,00 €
Amount spent
: 19090875 €,19 090 875,00 €
Percentage of investment
: 0,63 %0,63 %
Municipality
Palmela
:Approved amount
: 40963064 €,40 963 064,00 €
Amount spent
: 20693193 €,20 693 193,00 €
Percentage of investment
: 0,74 %0,74 %
Municipality
Seixal
:Approved amount
: 113850546 €,113 850 546,00 €
Amount spent
: 61300936 €,61 300 936,00 €
Percentage of investment
: 2,05 %2,05 %
Municipality
Sesimbra
:Approved amount
: 33016261 €,33 016 261,00 €
Amount spent
: 7402762 €,7 402 762,00 €
Percentage of investment
: 0,6 %0,60 %
Municipality
Setúbal
:Approved amount
: 309253352 €,309 253 352,00 €
Amount spent
: 128100404 €,128 100 404,00 €
Percentage of investment
: 5,58 %5,58 %
Total
Approved amount
: 5546889277 €,5 546 889 277,00 €
Amount spent
: 2678419543 €,2 678 419 543,00 €
Percentage of investment
Region
Alentejo
:Sub-region
Alentejo Litoral
:Municipality
Odemira
:Approved amount
: 10500347 €,10 500 347,00 €
Amount spent
: 5063788 €,5 063 788,00 €
Percentage of investment
: 4,42 %4,42 %
Municipality
Alcácer do Sal
:Approved amount
: 13887533 €,13 887 533,00 €
Amount spent
: 5377146 €,5 377 146,00 €
Percentage of investment
: 5,85 %5,85 %
Municipality
Grândola
:Approved amount
: 67285846 €,67 285 846,00 €
Amount spent
: 44815135 €,44 815 135,00 €
Percentage of investment
: 28,32 %28,32 %
Municipality
Santiago do Cacém
:Approved amount
: 107113670 €,107 113 670,00 €
Amount spent
: 57163547 €,57 163 547,00 €
Percentage of investment
: 45,09 %45,09 %
Municipality
Sines
:Approved amount
: 38773343 €,38 773 343,00 €
Amount spent
: 15545864 €,15 545 864,00 €
Percentage of investment
: 16,32 %16,32 %
Total
Approved amount
: 237560740 €,237 560 740,00 €
Amount spent
: 127965481 €,127 965 481,00 €
Percentage of investment
Sub-region
Baixo Alentejo
:Municipality
Aljustrel
:Approved amount
: 37874548 €,37 874 548,00 €
Amount spent
: 25538081 €,25 538 081,00 €
Percentage of investment
: 16,35 %16,35 %
Municipality
Almodôvar
:Approved amount
: 2208616 €,2 208 616,00 €
Amount spent
: 1184496 €,1 184 496,00 €
Percentage of investment
: 0,95 %0,95 %
Municipality
Alvito
:Approved amount
: 5587196 €,5 587 196,00 €
Amount spent
: 2028643 €,2 028 643,00 €
Percentage of investment
: 2,41 %2,41 %
Municipality
Barrancos
:Approved amount
: 1957878 €,1 957 878,00 €
Amount spent
: 737574 €,737 574,00 €
Percentage of investment
: 0,85 %0,85 %
Municipality
Beja
:Approved amount
: 86859028 €,86 859 028,00 €
Amount spent
: 46650152 €,46 650 152,00 €
Percentage of investment
: 37,5 %37,50 %
Municipality
Castro Verde
:Approved amount
: 3595523 €,3 595 523,00 €
Amount spent
: 1240538 €,1 240 538,00 €
Percentage of investment
: 1,55 %1,55 %
Municipality
Cuba
:Approved amount
: 1860235 €,1 860 235,00 €
Amount spent
: 741680 €,741 680,00 €
Percentage of investment
: 0,8 %0,80 %
Municipality
Ferreira do Alentejo
:Approved amount
: 51323660 €,51 323 660,00 €
Amount spent
: 38010949 €,38 010 949,00 €
Percentage of investment
: 22,16 %22,16 %
Municipality
Mértola
:Approved amount
: 26080862 €,26 080 862,00 €
Amount spent
: 12645781 €,12 645 781,00 €
Percentage of investment
: 11,26 %11,26 %
Municipality
Moura
:Approved amount
: 4820265 €,4 820 265,00 €
Amount spent
: 2100420 €,2 100 420,00 €
Percentage of investment
: 2,08 %2,08 %
Municipality
Ourique
:Approved amount
: 3977578 €,3 977 578,00 €
Amount spent
: 1484126 €,1 484 126,00 €
Percentage of investment
: 1,72 %1,72 %
Municipality
Serpa
:Approved amount
: 3123728 €,3 123 728,00 €
Amount spent
: 1087765 €,1 087 765,00 €
Percentage of investment
: 1,35 %1,35 %
Municipality
Vidigueira
:Approved amount
: 2324974 €,2 324 974,00 €
Amount spent
: 1117831 €,1 117 831,00 €
Percentage of investment
: 1 %1,00 %
Total
Approved amount
: 231594091 €,231 594 091,00 €
Amount spent
: 134568035 €,134 568 035,00 €
Percentage of investment
Sub-region
Lezíria do Tejo
:Municipality
Azambuja
:Approved amount
: 32437363 €,32 437 363,00 €
Amount spent
: 12796471 €,12 796 471,00 €
Percentage of investment
: 10,59 %10,59 %
Municipality
Almeirim
:Approved amount
: 4808934 €,4 808 934,00 €
Amount spent
: 2595974 €,2 595 974,00 €
Percentage of investment
: 1,57 %1,57 %
Municipality
Alpiarça
:Approved amount
: 4971895 €,4 971 895,00 €
Amount spent
: 2115934 €,2 115 934,00 €
Percentage of investment
: 1,62 %1,62 %
Municipality
Benavente
:Approved amount
: 48640983 €,48 640 983,00 €
Amount spent
: 19269136 €,19 269 136,00 €
Percentage of investment
: 15,88 %15,88 %
Municipality
Cartaxo
:Approved amount
: 20797031 €,20 797 031,00 €
Amount spent
: 10049289 €,10 049 289,00 €
Percentage of investment
: 6,79 %6,79 %
Municipality
Chamusca
:Approved amount
: 8622649 €,8 622 649,00 €
Amount spent
: 5605126 €,5 605 126,00 €
Percentage of investment
: 2,82 %2,82 %
Municipality
Coruche
:Approved amount
: 6531999 €,6 531 999,00 €
Amount spent
: 4154607 €,4 154 607,00 €
Percentage of investment
: 2,13 %2,13 %
Municipality
Golegã
:Approved amount
: 9349772 €,9 349 772,00 €
Amount spent
: 4402740 €,4 402 740,00 €
Percentage of investment
: 3,05 %3,05 %
Municipality
Rio Maior
:Approved amount
: 52362485 €,52 362 485,00 €
Amount spent
: 15635475 €,15 635 475,00 €
Percentage of investment
: 17,1 %17,10 %
Municipality
Salvaterra de Magos
:Approved amount
: 11520277 €,11 520 277,00 €
Amount spent
: 7338559 €,7 338 559,00 €
Percentage of investment
: 3,76 %3,76 %
Municipality
Santarém
:Approved amount
: 106197983 €,106 197 983,00 €
Amount spent
: 48865228 €,48 865 228,00 €
Percentage of investment
: 34,68 %34,68 %
Total
Approved amount
: 306241370 €,306 241 370,00 €
Amount spent
: 132828538 €,132 828 538,00 €
Percentage of investment
Sub-region
Alto Alentejo
:Municipality
Alter do Chão
:Approved amount
: 12151790 €,12 151 790,00 €
Amount spent
: 2865249 €,2 865 249,00 €
Percentage of investment
: 4,73 %4,73 %
Municipality
Arronches
:Approved amount
: 1926085 €,1 926 085,00 €
Amount spent
: 791112 €,791 112,00 €
Percentage of investment
: 0,75 %0,75 %
Municipality
Avis
:Approved amount
: 1602081 €,1 602 081,00 €
Amount spent
: 738202 €,738 202,00 €
Percentage of investment
: 0,62 %0,62 %
Municipality
Campo Maior
:Approved amount
: 24906256 €,24 906 256,00 €
Amount spent
: 11278178 €,11 278 178,00 €
Percentage of investment
: 9,7 %9,70 %
Municipality
Castelo de Vide
:Approved amount
: 3844576 €,3 844 576,00 €
Amount spent
: 1465457 €,1 465 457,00 €
Percentage of investment
: 1,5 %1,50 %
Municipality
Crato
:Approved amount
: 666794 €,666 794,00 €
Amount spent
: 376828 €,376 828,00 €
Percentage of investment
: 0,26 %0,26 %
Municipality
Elvas
:Approved amount
: 50756958 €,50 756 958,00 €
Amount spent
: 19855289 €,19 855 289,00 €
Percentage of investment
: 19,77 %19,77 %
Municipality
Fronteira
:Approved amount
: 1619424 €,1 619 424,00 €
Amount spent
: 1096756 €,1 096 756,00 €
Percentage of investment
: 0,63 %0,63 %
Municipality
Gavião
:Approved amount
: 11578477 €,11 578 477,00 €
Amount spent
: 4215437 €,4 215 437,00 €
Percentage of investment
: 4,51 %4,51 %
Municipality
Marvão
:Approved amount
: 3770752 €,3 770 752,00 €
Amount spent
: 2034034 €,2 034 034,00 €
Percentage of investment
: 1,47 %1,47 %
Municipality
Monforte
:Approved amount
: 8893865 €,8 893 865,00 €
Amount spent
: 951816 €,951 816,00 €
Percentage of investment
: 3,46 %3,46 %
Municipality
Nisa
:Approved amount
: 18772457 €,18 772 457,00 €
Amount spent
: 2165166 €,2 165 166,00 €
Percentage of investment
: 7,31 %7,31 %
Municipality
Ponte de Sor
:Approved amount
: 27645956 €,27 645 956,00 €
Amount spent
: 13354034 €,13 354 034,00 €
Percentage of investment
: 10,77 %10,77 %
Municipality
Portalegre
:Approved amount
: 78451073 €,78 451 073,00 €
Amount spent
: 30679403 €,30 679 403,00 €
Percentage of investment
: 30,55 %30,55 %
Municipality
Sousel
:Approved amount
: 10209464 €,10 209 464,00 €
Amount spent
: 8782886 €,8 782 886,00 €
Percentage of investment
: 3,98 %3,98 %
Total
Approved amount
: 256796008 €,256 796 008,00 €
Amount spent
: 100649848 €,100 649 848,00 €
Percentage of investment
Sub-region
Alentejo Central
:Municipality
Alandroal
:Approved amount
: 5668050 €,5 668 050,00 €
Amount spent
: 1283470 €,1 283 470,00 €
Percentage of investment
: 2,29 %2,29 %
Municipality
Arraiolos
:Approved amount
: 2191369 €,2 191 369,00 €
Amount spent
: 1519465 €,1 519 465,00 €
Percentage of investment
: 0,89 %0,89 %
Municipality
Borba
:Approved amount
: 17898349 €,17 898 349,00 €
Amount spent
: 4959318 €,4 959 318,00 €
Percentage of investment
: 7,23 %7,23 %
Municipality
Estremoz
:Approved amount
: 7621417 €,7 621 417,00 €
Amount spent
: 4147478 €,4 147 478,00 €
Percentage of investment
: 3,08 %3,08 %
Municipality
Évora
:Approved amount
: 168564271 €,168 564 271,00 €
Amount spent
: 81427607 €,81 427 607,00 €
Percentage of investment
: 68,08 %68,08 %
Municipality
Montemor-o-Novo
:Approved amount
: 3979600 €,3 979 600,00 €
Amount spent
: 2268819 €,2 268 819,00 €
Percentage of investment
: 1,61 %1,61 %
Municipality
Mora
:Approved amount
: 1891168 €,1 891 168,00 €
Amount spent
: 1442605 €,1 442 605,00 €
Percentage of investment
: 0,76 %0,76 %
Municipality
Mourão
:Approved amount
: 1216894 €,1 216 894,00 €
Amount spent
: 844991 €,844 991,00 €
Percentage of investment
: 0,49 %0,49 %
Municipality
Portel
:Approved amount
: 1500697 €,1 500 697,00 €
Amount spent
: 518927 €,518 927,00 €
Percentage of investment
: 0,61 %0,61 %
Municipality
Redondo
:Approved amount
: 8253708 €,8 253 708,00 €
Amount spent
: 2143275 €,2 143 275,00 €
Percentage of investment
: 3,33 %3,33 %
Municipality
Reguengos de Monsaraz
:Approved amount
: 9337254 €,9 337 254,00 €
Amount spent
: 4738551 €,4 738 551,00 €
Percentage of investment
: 3,77 %3,77 %
Municipality
Vendas Novas
:Approved amount
: 7051051 €,7 051 051,00 €
Amount spent
: 2209164 €,2 209 164,00 €
Percentage of investment
: 2,85 %2,85 %
Municipality
Viana do Alentejo
:Approved amount
: 4591333 €,4 591 333,00 €
Amount spent
: 1127703 €,1 127 703,00 €
Percentage of investment
: 1,85 %1,85 %
Municipality
Vila Viçosa
:Approved amount
: 7843610 €,7 843 610,00 €
Amount spent
: 5171550 €,5 171 550,00 €
Percentage of investment
: 3,17 %3,17 %
Total
Approved amount
: 247608772 €,247 608 772,00 €
Amount spent
: 113802921 €,113 802 921,00 €
Percentage of investment
Region
Algarve
:Sub-region
Algarve
:Municipality
Albufeira
:Approved amount
: 49168197 €,49 168 197,00 €
Amount spent
: 27735361 €,27 735 361,00 €
Percentage of investment
: 7,21 %7,21 %
Municipality
Alcoutim
:Approved amount
: 35289252 €,35 289 252,00 €
Amount spent
: 7251624 €,7 251 624,00 €
Percentage of investment
: 5,18 %5,18 %
Municipality
Aljezur
:Approved amount
: 5311935 €,5 311 935,00 €
Amount spent
: 1133025 €,1 133 025,00 €
Percentage of investment
: 0,78 %0,78 %
Municipality
Castro Marim
:Approved amount
: 4035721 €,4 035 721,00 €
Amount spent
: 1769741 €,1 769 741,00 €
Percentage of investment
: 0,59 %0,59 %
Municipality
Faro
:Approved amount
: 149295978 €,149 295 978,00 €
Amount spent
: 77145322 €,77 145 322,00 €
Percentage of investment
: 21,9 %21,90 %
Municipality
Lagoa
:Approved amount
: 20058898 €,20 058 898,00 €
Amount spent
: 12889030 €,12 889 030,00 €
Percentage of investment
: 2,94 %2,94 %
Municipality
Lagos
:Approved amount
: 48092081 €,48 092 081,00 €
Amount spent
: 17755111 €,17 755 111,00 €
Percentage of investment
: 7,05 %7,05 %
Municipality
Loulé
:Approved amount
: 53766633 €,53 766 633,00 €
Amount spent
: 35595737 €,35 595 737,00 €
Percentage of investment
: 7,89 %7,89 %
Municipality
Monchique
:Approved amount
: 17782759 €,17 782 759,00 €
Amount spent
: 6700972 €,6 700 972,00 €
Percentage of investment
: 2,61 %2,61 %
Municipality
Olhão
:Approved amount
: 56090205 €,56 090 205,00 €
Amount spent
: 28057427 €,28 057 427,00 €
Percentage of investment
: 8,23 %8,23 %
Municipality
Portimão
:Approved amount
: 64381021 €,64 381 021,00 €
Amount spent
: 23912206 €,23 912 206,00 €
Percentage of investment
: 9,44 %9,44 %
Municipality
São Brás de Alportel
:Approved amount
: 7800305 €,7 800 305,00 €
Amount spent
: 4588288 €,4 588 288,00 €
Percentage of investment
: 1,14 %1,14 %
Municipality
Silves
:Approved amount
: 29470320 €,29 470 320,00 €
Amount spent
: 16861711 €,16 861 711,00 €
Percentage of investment
: 4,32 %4,32 %
Municipality
Tavira
:Approved amount
: 21488071 €,21 488 071,00 €
Amount spent
: 12029746 €,12 029 746,00 €
Percentage of investment
: 3,15 %3,15 %
Municipality
Vila do Bispo
:Approved amount
: 8099899 €,8 099 899,00 €
Amount spent
: 3019785 €,3 019 785,00 €
Percentage of investment
: 1,19 %1,19 %
Municipality
Vila Real de Santo António
:Approved amount
: 111597764 €,111 597 764,00 €
Amount spent
: 38955237 €,38 955 237,00 €
Percentage of investment
: 16,37 %16,37 %
Total
Approved amount
: 681729041 €,681 729 041,00 €
Amount spent
: 315400322 €,315 400 322,00 €
Percentage of investment
Region
Autonomous Region of the Azores
:Sub-region
Autonomous Region of the Azores
:Municipality
Vila do Porto
:Approved amount
: 7272403 €,7 272 403,00 €
Amount spent
: 3109917 €,3 109 917,00 €
Percentage of investment
: 0,72 %0,72 %
Municipality
Lagoa
:Approved amount
: 32741554 €,32 741 554,00 €
Amount spent
: 15435237 €,15 435 237,00 €
Percentage of investment
: 3,24 %3,24 %
Municipality
Nordeste
:Approved amount
: 6076652 €,6 076 652,00 €
Amount spent
: 3468152 €,3 468 152,00 €
Percentage of investment
: 0,6 %0,60 %
Municipality
Ponta Delgada
:Approved amount
: 538008147 €,538 008 147,00 €
Amount spent
: 312373616 €,312 373 616,00 €
Percentage of investment
: 53,18 %53,18 %
Municipality
Povoação
:Approved amount
: 2353886 €,2 353 886,00 €
Amount spent
: 1458077 €,1 458 077,00 €
Percentage of investment
: 0,23 %0,23 %
Municipality
Ribeira Grande
:Approved amount
: 110574089 €,110 574 089,00 €
Amount spent
: 56969276 €,56 969 276,00 €
Percentage of investment
: 10,93 %10,93 %
Municipality
Vila Franca do Campo
:Approved amount
: 12887317 €,12 887 317,00 €
Amount spent
: 9772695 €,9 772 695,00 €
Percentage of investment
: 1,27 %1,27 %
Municipality
Angra do Heroísmo
:Approved amount
: 150706137 €,150 706 137,00 €
Amount spent
: 84223609 €,84 223 609,00 €
Percentage of investment
: 14,9 %14,90 %
Municipality
Vila da Praia da Vitória
:Approved amount
: 11220955 €,11 220 955,00 €
Amount spent
: 6310599 €,6 310 599,00 €
Percentage of investment
: 1,11 %1,11 %
Municipality
Santa Cruz da Graciosa
:Approved amount
: 4261408 €,4 261 408,00 €
Amount spent
: 1388898 €,1 388 898,00 €
Percentage of investment
: 0,42 %0,42 %
Municipality
Calheta
:Approved amount
: 3002828 €,3 002 828,00 €
Amount spent
: 1685641 €,1 685 641,00 €
Percentage of investment
: 0,3 %0,30 %
Municipality
Velas
:Approved amount
: 4881263 €,4 881 263,00 €
Amount spent
: 2558757 €,2 558 757,00 €
Percentage of investment
: 0,48 %0,48 %
Municipality
Lajes do Pico
:Approved amount
: 4728368 €,4 728 368,00 €
Amount spent
: 1929522 €,1 929 522,00 €
Percentage of investment
: 0,47 %0,47 %
Municipality
Madalena
:Approved amount
: 18968716 €,18 968 716,00 €
Amount spent
: 7016540 €,7 016 540,00 €
Percentage of investment
: 1,87 %1,87 %
Municipality
São Roque do Pico
:Approved amount
: 13658462 €,13 658 462,00 €
Amount spent
: 9212981 €,9 212 981,00 €
Percentage of investment
: 1,35 %1,35 %
Municipality
Horta
:Approved amount
: 86261315 €,86 261 315,00 €
Amount spent
: 59391799 €,59 391 799,00 €
Percentage of investment
: 8,53 %8,53 %
Municipality
Lajes das Flores
:Approved amount
: 926037 €,926 037,00 €
Amount spent
: 298107 €,298 107,00 €
Percentage of investment
: 0,09 %0,09 %
Municipality
Santa Cruz das Flores
:Approved amount
: 2722626 €,2 722 626,00 €
Amount spent
: 1053095 €,1 053 095,00 €
Percentage of investment
: 0,27 %0,27 %
Municipality
Corvo
:Approved amount
: 426969 €,426 969,00 €
Amount spent
: 139742 €,139 742,00 €
Percentage of investment
: 0,04 %0,04 %
Total
Approved amount
: 1011679131 €,1 011 679 131,00 €
Amount spent
: 577796259 €,577 796 259,00 €
Percentage of investment
Region
Autonomous Region of Madeira
:Sub-region
Autonomous Region of Madeira
:Municipality
Calheta
:Approved amount
: 11953898 €,11 953 898,00 €
Amount spent
: 4348968 €,4 348 968,00 €
Percentage of investment
: 1,4 %1,40 %
Municipality
Câmara de Lobos
:Approved amount
: 18240175 €,18 240 175,00 €
Amount spent
: 6000479 €,6 000 479,00 €
Percentage of investment
: 2,14 %2,14 %
Municipality
Funchal
:Approved amount
: 711651922 €,711 651 922,00 €
Amount spent
: 362214772 €,362 214 772,00 €
Percentage of investment
: 83,52 %83,52 %
Municipality
Machico
:Approved amount
: 11685788 €,11 685 788,00 €
Amount spent
: 3847468 €,3 847 468,00 €
Percentage of investment
: 1,37 %1,37 %
Municipality
Ponta do Sol
:Approved amount
: 4773762 €,4 773 762,00 €
Amount spent
: 1728829 €,1 728 829,00 €
Percentage of investment
: 0,56 %0,56 %
Municipality
Porto Moniz
:Approved amount
: 268599 €,268 599,00 €
Amount spent
: 206289 €,206 289,00 €
Percentage of investment
: 0,03 %0,03 %
Municipality
Ribeira Brava
:Approved amount
: 10947912 €,10 947 912,00 €
Amount spent
: 6664926 €,6 664 926,00 €
Percentage of investment
: 1,28 %1,28 %
Municipality
Santa Cruz
:Approved amount
: 19078612 €,19 078 612,00 €
Amount spent
: 8114082 €,8 114 082,00 €
Percentage of investment
: 2,24 %2,24 %
Municipality
Santana
:Approved amount
: 561822 €,561 822,00 €
Amount spent
: 449192 €,449 192,00 €
Percentage of investment
: 0,07 %0,07 %
Municipality
São Vicente
:Approved amount
: 36679023 €,36 679 023,00 €
Amount spent
: 8767707 €,8 767 707,00 €
Percentage of investment
: 4,3 %4,30 %
Municipality
Porto Santo
:Approved amount
: 26188219 €,26 188 219,00 €
Amount spent
: 7081059 €,7 081 059,00 €
Percentage of investment
: 3,07 %3,07 %
Total
Approved amount
: 852029733 €,852 029 733,00 €
Amount spent
: 409423771 €,409 423 771,00 €
Percentage of investment
Region
Nation-wide investment
:Approved amount
: 3846451274 €,3 846 451 274,00 €
:Amount spent
: {{ regionNutsii.apoio_gasto|floatformat:'-2'|cut:' '|checkifdataisavailable|euro_symbol,2 242 038 162,00 €
:Comparison between realities
Assessing the impact of investments in the Recovery and Resilience Plan on the daily lives of populations is not a simple topic. It is necessary to analyze the context in a broader way and understand how investments can suppress everyday needs.
However, there are some indicators that can help to envision an equitable way in which investments are being distributed geographically.
How much is already approved to invest per inhabitant?
Number of inhabitants according to the 2021 Census
How much is already approved to invest per inhabitant?
Number of inhabitants according to the 2021 Census
| Municipality | Approved amount |
|---|---|
| Highest national value Vinhais | 14322 € 14 322,00 € |
| National average | 2391 € 2 391,00 € |
| Lowest national value Santana | 86 € 86,00 € |
How much is already approved to invest per inhabitant?
Municipality
Highest national value Vinhais
Approved amount
14322 €
14 322,00 €
Municipality
National average
Approved amount
2391 €
2 391,00 €
Municipality
Lowest national value Santana
Approved amount
86 €
86,00 €
How much is already approved to invest per km2?
How much is already approved to invest per km2?
| Municipality | Approved amount |
|---|---|
| Highest national value Porto | 36796980 € 36 796 980,00 € |
| National average | 268137 € 268 137,00 € |
| Lowest national value Crato | 1675 € 1 675,00 € |
How much is already approved to invest per km2?
Municipality
Highest national value Porto
Approved amount
36796980 €
36 796 980,00 €
Municipality
National average
Approved amount
268137 €
268 137,00 €
Municipality
Lowest national value Crato
Approved amount
1675 €
1 675,00 €