Investment by regions
Discover how the investments already approved in the Recovery and Resilience Plan are distributed across the various regions of the country.
Recovery and Resilience Plan in numbers
21,9 billion €
Total investment to be applied by the Recovery and Resilience Plan
2,7 billion €
Total amount of funds already allocated to Nation-wide investments
13,3 billion €
Total amount of funds already invested in municipalities and regions
Geography of investments
The Recovery and Resilience Plan aims to provide the country with a set of tools for the future, seeking to ensure a more resilient economy, a more sustainable relationship with the environment, and more digital processes and functioning.
All of this is contributed by a broad geographical distribution of its investments and reforms, ensuring that both nationally implemented projects and resources applied in all municipalities of the country are invested where they have the greatest impact on the lives of the population.
Distribution of investment by regions
Distribution of investment by regions
| Region | Sub-region | Municipality | Approved amount | Amount spent | Percentage of investment |
|---|---|---|---|---|---|
| North |
Alto Minho
Cávado
Ave
Área Metropolitana do Porto
Alto Tâmega
Tâmega e Sousa
Douro
Terras de Trás-os-Montes
|
Arcos de Valdevez
Caminha
Melgaço
Monção
Paredes de Coura
Ponte da Barca
Ponte de Lima
Valença
Viana do Castelo
Vila Nova de Cerveira
Total
Amares
Barcelos
Braga
Esposende
Terras de Bouro
Vila Verde
Total
Cabeceiras de Basto
Fafe
Guimarães
Póvoa de Lanhoso
Vieira do Minho
Vila Nova de Famalicão
Vizela
Mondim de Basto
Total
Arouca
Espinho
Santa Maria da Feira
Oliveira de Azeméis
São João da Madeira
Vale de Cambra
Gondomar
Maia
Matosinhos
Paredes
Porto
Póvoa de Varzim
Santo Tirso
Valongo
Vila do Conde
Vila Nova de Gaia
Trofa
Total
Boticas
Chaves
Montalegre
Ribeira de Pena
Valpaços
Vila Pouca de Aguiar
Total
Castelo de Paiva
Celorico de Basto
Amarante
Baião
Felgueiras
Lousada
Marco de Canaveses
Paços de Ferreira
Penafiel
Cinfães
Resende
Total
Carrazeda de Ansiães
Freixo de Espada à Cinta
Torre de Moncorvo
Vila Nova de Foz Côa
Alijó
Mesão Frio
Murça
Peso da Régua
Sabrosa
Santa Marta de Penaguião
Vila Real
Armamar
Lamego
Moimenta da Beira
Penedono
São João da Pesqueira
Sernancelhe
Tabuaço
Tarouca
Total
Alfândega da Fé
Bragança
Macedo de Cavaleiros
Miranda do Douro
Mirandela
Mogadouro
Vila Flor
Vimioso
Vinhais
Total
|
29 856 437,00 €
14 085 923,00 €
20 289 188,00 €
31 244 659,00 €
6 654 825,00 €
9 977 553,00 €
31 816 325,00 €
36 139 919,00 €
185 884 962,00 €
19 472 651,00 €
385 422 443,00 €
12 188 962,00 €
185 993 584,00 €
435 148 994,00 €
48 421 846,00 €
4 585 357,00 €
34 137 906,00 €
720 476 650,00 €
13 449 291,00 €
51 976 070,00 €
454 960 077,00 €
26 371 021,00 €
6 437 484,00 €
314 205 233,00 €
28 380 168,00 €
10 004 129,00 €
905 783 474,00 €
28 269 990,00 €
22 157 172,00 €
133 260 989,00 €
83 608 662,00 €
72 559 360,00 €
35 069 959,00 €
88 223 597,00 €
279 806 757,00 €
707 758 444,00 €
93 175 031,00 €
1 433 477 481,00 €
84 988 975,00 €
91 217 605,00 €
72 332 236,00 €
154 563 217,00 €
347 611 958,00 €
94 668 876,00 €
3 822 750 308,00 €
6 152 620,00 €
52 467 159,00 €
7 382 130,00 €
14 020 004,00 €
5 954 701,00 €
20 338 344,00 €
106 314 958,00 €
26 189 325,00 €
25 470 136,00 €
64 186 924,00 €
48 929 905,00 €
47 029 081,00 €
50 814 873,00 €
35 101 355,00 €
94 319 785,00 €
148 088 419,00 €
17 417 789,00 €
6 103 349,00 €
563 650 940,00 €
5 718 530,00 €
7 540 857,00 €
4 091 167,00 €
10 585 468,00 €
13 657 134,00 €
1 433 547,00 €
4 441 563,00 €
23 906 209,00 €
13 461 041,00 €
10 954 353,00 €
204 491 563,00 €
4 197 503,00 €
34 863 706,00 €
16 439 862,00 €
6 190 287,00 €
11 796 941,00 €
12 246 874,00 €
4 689 577,00 €
10 853 863,00 €
401 560 047,00 €
15 765 943,00 €
109 857 735,00 €
14 023 371,00 €
3 581 905,00 €
24 171 247,00 €
12 487 369,00 €
1 995 785,00 €
2 688 515,00 €
111 611 644,00 €
296 183 513,00 €
|
18 645 454,00 €
6 628 691,00 €
18 198 810,00 €
18 654 463,00 €
3 652 670,00 €
5 196 716,00 €
20 451 615,00 €
16 752 998,00 €
131 917 475,00 €
13 692 264,00 €
253 791 157,00 €
8 054 615,00 €
96 696 744,00 €
305 820 964,00 €
23 996 771,00 €
2 430 307,00 €
22 162 579,00 €
459 161 980,00 €
5 535 268,00 €
30 582 959,00 €
294 050 652,00 €
12 567 504,00 €
3 994 648,00 €
202 675 864,00 €
21 011 890,00 €
4 332 411,00 €
574 751 194,00 €
18 123 795,00 €
8 556 637,00 €
86 115 869,00 €
41 970 320,00 €
45 774 769,00 €
21 992 442,00 €
54 626 881,00 €
179 488 934,00 €
484 883 271,00 €
58 610 459,00 €
983 262 710,00 €
64 577 263,00 €
63 307 648,00 €
36 205 034,00 €
102 359 341,00 €
191 500 563,00 €
74 102 562,00 €
2 515 458 497,00 €
3 923 036,00 €
26 798 011,00 €
3 007 044,00 €
10 070 967,00 €
3 622 853,00 €
9 225 002,00 €
56 646 912,00 €
16 943 155,00 €
19 312 105,00 €
37 967 108,00 €
44 358 762,00 €
29 680 424,00 €
38 088 596,00 €
24 986 331,00 €
64 593 206,00 €
119 517 869,00 €
13 786 041,00 €
3 711 904,00 €
412 945 501,00 €
2 764 173,00 €
3 671 353,00 €
2 798 357,00 €
4 448 967,00 €
9 877 674,00 €
921 728,00 €
1 578 580,00 €
17 522 796,00 €
7 321 428,00 €
4 046 765,00 €
125 235 477,00 €
1 884 917,00 €
20 069 769,00 €
8 959 222,00 €
2 927 313,00 €
6 545 989,00 €
6 769 099,00 €
2 433 411,00 €
3 823 437,00 €
233 600 454,00 €
8 877 987,00 €
61 285 851,00 €
8 510 355,00 €
1 864 196,00 €
15 399 163,00 €
7 323 229,00 €
1 280 899,00 €
2 201 613,00 €
108 841 430,00 €
215 584 721,00 €
|
7,75 %
3,65 %
5,26 %
8,11 %
1,73 %
2,59 %
8,25 %
9,38 %
48,23 %
5,05 %
1,69 %
25,82 %
60,40 %
6,72 %
0,64 %
4,74 %
1,48 %
5,74 %
50,23 %
2,91 %
0,71 %
34,69 %
3,13 %
1,10 %
0,74 %
0,58 %
3,49 %
2,19 %
1,90 %
0,92 %
2,31 %
7,32 %
18,51 %
2,44 %
37,50 %
2,22 %
2,39 %
1,89 %
4,04 %
9,09 %
2,48 %
5,79 %
49,35 %
6,94 %
13,19 %
5,60 %
19,13 %
4,65 %
4,52 %
11,39 %
8,68 %
8,34 %
9,02 %
6,23 %
16,73 %
26,27 %
3,09 %
1,08 %
1,42 %
1,88 %
1,02 %
2,64 %
3,40 %
0,36 %
1,11 %
5,95 %
3,35 %
2,73 %
50,92 %
1,05 %
8,68 %
4,09 %
1,54 %
2,94 %
3,05 %
1,17 %
2,70 %
5,32 %
37,09 %
4,73 %
1,21 %
8,16 %
4,22 %
0,67 %
0,91 %
37,68 %
|
| Center |
Oeste
Região de Aveiro
Região de Coimbra
Região de Leiria
Viseu Dão Lafões
Beira Baixa
Médio Tejo
Beiras e Serra da Estrela
|
Alcobaça
Bombarral
Caldas da Rainha
Nazaré
Óbidos
Peniche
Alenquer
Arruda dos Vinhos
Cadaval
Lourinhã
Sobral de Monte Agraço
Torres Vedras
Total
Águeda
Albergaria-a-Velha
Anadia
Aveiro
Estarreja
Ílhavo
Murtosa
Oliveira do Bairro
Ovar
Sever do Vouga
Vagos
Total
Mealhada
Arganil
Cantanhede
Coimbra
Condeixa-a-Nova
Figueira da Foz
Góis
Lousã
Mira
Miranda do Corvo
Montemor-o-Velho
Oliveira do Hospital
Pampilhosa da Serra
Penacova
Penela
Soure
Tábua
Vila Nova de Poiares
Mortágua
Total
Alvaiázere
Ansião
Batalha
Castanheira de Pêra
Figueiró dos Vinhos
Leiria
Marinha Grande
Pedrógão Grande
Pombal
Porto de Mós
Total
Aguiar da Beira
Carregal do Sal
Castro Daire
Mangualde
Nelas
Oliveira de Frades
Penalva do Castelo
Santa Comba Dão
São Pedro do Sul
Sátão
Tondela
Vila Nova de Paiva
Viseu
Vouzela
Total
Castelo Branco
Idanha-a-Nova
Oleiros
Penamacor
Proença-a-Nova
Vila Velha de Ródão
Total
Sertã
Vila de Rei
Abrantes
Alcanena
Constância
Entroncamento
Ferreira do Zêzere
Mação
Sardoal
Tomar
Torres Novas
Vila Nova da Barquinha
Ourém
Total
Belmonte
Covilhã
Fundão
Almeida
Celorico da Beira
Figueira de Castelo Rodrigo
Fornos de Algodres
Gouveia
Guarda
Manteigas
Mêda
Pinhel
Sabugal
Seia
Trancoso
Total
|
58 531 647,00 €
5 482 617,00 €
72 142 584,00 €
38 728 009,00 €
14 981 299,00 €
28 575 968,00 €
51 588 107,00 €
25 220 625,00 €
12 416 381,00 €
11 842 663,00 €
2 453 283,00 €
124 140 569,00 €
446 103 752,00 €
192 601 542,00 €
29 970 440,00 €
28 730 038,00 €
345 043 527,00 €
69 368 461,00 €
130 136 387,00 €
11 000 179,00 €
43 636 948,00 €
65 471 493,00 €
11 909 156,00 €
32 683 289,00 €
960 551 459,00 €
20 106 370,00 €
25 357 879,00 €
69 746 570,00 €
607 416 246,00 €
12 740 035,00 €
163 706 112,00 €
9 628 592,00 €
25 853 360,00 €
19 650 124,00 €
13 070 359,00 €
15 803 112,00 €
60 364 686,00 €
17 237 226,00 €
16 451 020,00 €
7 059 432,00 €
7 509 309,00 €
17 498 804,00 €
7 324 948,00 €
7 579 636,00 €
1 124 103 820,00 €
13 093 988,00 €
10 433 165,00 €
34 662 311,00 €
7 059 143,00 €
6 469 964,00 €
346 663 696,00 €
144 770 913,00 €
8 133 621,00 €
82 094 208,00 €
45 171 617,00 €
698 552 626,00 €
13 345 799,00 €
31 710 986,00 €
11 643 733,00 €
81 008 534,00 €
45 611 040,00 €
15 923 815,00 €
2 147 552,00 €
8 138 314,00 €
14 218 897,00 €
8 345 197,00 €
35 348 813,00 €
9 723 179,00 €
163 146 808,00 €
23 185 017,00 €
463 497 684,00 €
87 418 002,00 €
10 869 513,00 €
20 197 699,00 €
12 872 166,00 €
23 192 169,00 €
20 490 018,00 €
175 039 567,00 €
26 664 557,00 €
11 545 012,00 €
38 289 567,00 €
34 144 726,00 €
28 034 333,00 €
32 568 537,00 €
22 271 364,00 €
34 127 658,00 €
10 859 388,00 €
40 349 579,00 €
47 934 564,00 €
5 473 315,00 €
70 318 310,00 €
402 580 910,00 €
11 332 285,00 €
93 434 223,00 €
77 196 858,00 €
3 255 749,00 €
7 724 499,00 €
2 621 170,00 €
4 143 163,00 €
9 149 954,00 €
115 888 249,00 €
2 424 361,00 €
3 705 185,00 €
6 117 067,00 €
12 702 330,00 €
39 409 738,00 €
15 161 272,00 €
404 266 103,00 €
|
34 974 991,00 €
3 925 876,00 €
37 230 002,00 €
28 338 921,00 €
7 301 402,00 €
19 077 383,00 €
18 697 908,00 €
14 027 241,00 €
4 056 037,00 €
8 956 747,00 €
1 690 938,00 €
53 500 753,00 €
231 778 198,00 €
111 907 212,00 €
19 957 311,00 €
19 195 745,00 €
225 085 656,00 €
43 511 609,00 €
71 558 362,00 €
10 655 823,00 €
23 352 722,00 €
36 488 034,00 €
6 063 737,00 €
21 764 524,00 €
589 540 736,00 €
11 553 053,00 €
15 502 689,00 €
53 464 885,00 €
371 512 959,00 €
4 538 253,00 €
89 139 990,00 €
2 448 021,00 €
12 057 595,00 €
11 679 427,00 €
7 794 186,00 €
8 588 347,00 €
37 186 313,00 €
11 408 679,00 €
9 802 364,00 €
2 189 369,00 €
3 734 854,00 €
8 754 756,00 €
3 980 007,00 €
4 372 571,00 €
669 708 317,00 €
8 065 889,00 €
6 297 969,00 €
22 205 250,00 €
4 753 790,00 €
2 610 645,00 €
191 393 945,00 €
94 286 321,00 €
2 831 418,00 €
46 323 263,00 €
29 720 470,00 €
408 488 962,00 €
9 272 199,00 €
16 719 461,00 €
7 139 633,00 €
52 408 714,00 €
27 869 538,00 €
9 128 628,00 €
1 846 132,00 €
5 070 373,00 €
8 409 297,00 €
5 500 081,00 €
20 749 682,00 €
3 404 234,00 €
89 940 851,00 €
13 189 036,00 €
270 647 860,00 €
39 653 056,00 €
7 316 406,00 €
9 362 860,00 €
919 783,00 €
6 671 148,00 €
10 903 559,00 €
74 826 811,00 €
12 217 607,00 €
6 362 400,00 €
23 392 524,00 €
25 052 997,00 €
19 018 310,00 €
20 686 881,00 €
11 614 896,00 €
10 622 180,00 €
3 856 143,00 €
22 783 643,00 €
23 719 380,00 €
3 327 527,00 €
35 288 299,00 €
217 942 787,00 €
2 638 025,00 €
58 957 942,00 €
35 303 712,00 €
1 717 346,00 €
3 347 320,00 €
2 150 917,00 €
2 809 247,00 €
5 914 077,00 €
43 190 598,00 €
1 180 097,00 €
1 855 215,00 €
3 196 307,00 €
6 203 642,00 €
20 649 722,00 €
6 444 709,00 €
195 558 876,00 €
|
13,12 %
1,23 %
16,17 %
8,68 %
3,36 %
6,41 %
11,56 %
5,65 %
2,78 %
2,65 %
0,55 %
27,83 %
20,05 %
3,12 %
2,99 %
35,92 %
7,22 %
13,55 %
1,15 %
4,54 %
6,82 %
1,24 %
3,40 %
1,79 %
2,26 %
6,20 %
54,04 %
1,13 %
14,56 %
0,86 %
2,30 %
1,75 %
1,16 %
1,41 %
5,37 %
1,53 %
1,46 %
0,63 %
0,67 %
1,56 %
0,65 %
0,67 %
1,87 %
1,49 %
4,96 %
1,01 %
0,93 %
49,63 %
20,72 %
1,16 %
11,75 %
6,47 %
2,88 %
6,84 %
2,51 %
17,48 %
9,84 %
3,44 %
0,46 %
1,76 %
3,07 %
1,80 %
7,63 %
2,10 %
35,20 %
5,00 %
49,94 %
6,21 %
11,54 %
7,35 %
13,25 %
11,71 %
6,62 %
2,87 %
9,51 %
8,48 %
6,96 %
8,09 %
5,53 %
8,48 %
2,70 %
10,02 %
11,91 %
1,36 %
17,47 %
2,80 %
23,11 %
19,10 %
0,81 %
1,91 %
0,65 %
1,02 %
2,26 %
28,67 %
0,60 %
0,92 %
1,51 %
3,14 %
9,75 %
3,75 %
|
| Lisbon Metropolitan Area |
Lisbon Metropolitan Area
|
Cascais
Lisboa
Loures
Mafra
Oeiras
Sintra
Vila Franca de Xira
Amadora
Odivelas
Alcochete
Almada
Barreiro
Moita
Montijo
Palmela
Seixal
Sesimbra
Setúbal
Total
|
272 136 347,00 €
2 957 614 617,00 €
204 379 200,00 €
141 636 365,00 €
482 692 091,00 €
193 265 747,00 €
122 765 066,00 €
230 616 392,00 €
72 119 738,00 €
19 141 046,00 €
129 953 978,00 €
73 064 131,00 €
27 181 054,00 €
46 665 881,00 €
40 904 915,00 €
106 368 802,00 €
48 349 722,00 €
349 376 503,00 €
5 518 231 597,00 €
|
180 276 683,00 €
1 802 261 301,00 €
124 444 374,00 €
91 058 045,00 €
308 983 214,00 €
104 859 642,00 €
65 331 506,00 €
164 025 387,00 €
41 409 049,00 €
9 693 350,00 €
68 497 600,00 €
41 448 876,00 €
18 322 209,00 €
31 599 122,00 €
23 995 318,00 €
67 955 852,00 €
41 662 162,00 €
197 620 414,00 €
3 383 444 102,00 €
|
4,93 %
53,60 %
3,70 %
2,57 %
8,75 %
3,50 %
2,22 %
4,18 %
1,31 %
0,35 %
2,35 %
1,32 %
0,49 %
0,85 %
0,74 %
1,93 %
0,88 %
6,33 %
|
| Alentejo |
Alentejo Litoral
Baixo Alentejo
Lezíria do Tejo
Alto Alentejo
Alentejo Central
|
Odemira
Alcácer do Sal
Grândola
Santiago do Cacém
Sines
Total
Aljustrel
Almodôvar
Alvito
Barrancos
Beja
Castro Verde
Cuba
Ferreira do Alentejo
Mértola
Moura
Ourique
Serpa
Vidigueira
Total
Azambuja
Almeirim
Alpiarça
Benavente
Cartaxo
Chamusca
Coruche
Golegã
Rio Maior
Salvaterra de Magos
Santarém
Total
Alter do Chão
Arronches
Avis
Campo Maior
Castelo de Vide
Crato
Elvas
Fronteira
Gavião
Marvão
Monforte
Nisa
Ponte de Sor
Portalegre
Sousel
Total
Alandroal
Arraiolos
Borba
Estremoz
Évora
Montemor-o-Novo
Mora
Mourão
Portel
Redondo
Reguengos de Monsaraz
Vendas Novas
Viana do Alentejo
Vila Viçosa
Total
|
20 395 663,00 €
21 387 159,00 €
60 322 182,00 €
114 322 196,00 €
59 063 594,00 €
275 490 794,00 €
31 862 024,00 €
2 266 450,00 €
5 916 598,00 €
2 102 732,00 €
92 407 589,00 €
1 452 830,00 €
1 266 778,00 €
51 332 556,00 €
22 481 740,00 €
3 448 389,00 €
4 550 409,00 €
3 153 301,00 €
2 418 467,00 €
224 659 862,00 €
43 755 487,00 €
4 321 930,00 €
6 943 049,00 €
50 161 092,00 €
20 798 502,00 €
8 777 528,00 €
7 053 553,00 €
10 184 257,00 €
61 136 654,00 €
12 450 598,00 €
108 566 789,00 €
334 149 437,00 €
12 601 338,00 €
2 098 854,00 €
1 515 312,00 €
19 960 746,00 €
4 300 103,00 €
634 682,00 €
50 626 116,00 €
1 615 592,00 €
20 320 101,00 €
3 854 686,00 €
16 369 186,00 €
18 774 827,00 €
14 330 014,00 €
74 046 086,00 €
10 353 480,00 €
251 401 124,00 €
4 402 331,00 €
2 180 187,00 €
18 220 585,00 €
7 498 402,00 €
168 269 398,00 €
5 344 629,00 €
2 938 313,00 €
1 216 720,00 €
1 573 125,00 €
8 406 713,00 €
9 117 391,00 €
7 068 209,00 €
2 493 628,00 €
7 817 008,00 €
246 546 638,00 €
|
13 724 023,00 €
6 312 907,00 €
50 987 630,00 €
76 683 202,00 €
21 698 842,00 €
169 406 605,00 €
27 196 597,00 €
1 445 615,00 €
2 238 856,00 €
1 816 153,00 €
66 634 576,00 €
931 138,00 €
818 707,00 €
41 670 679,00 €
14 687 745,00 €
2 154 898,00 €
2 256 476,00 €
1 482 345,00 €
1 375 564,00 €
164 709 350,00 €
20 409 925,00 €
2 865 543,00 €
4 385 607,00 €
26 393 944,00 €
16 332 500,00 €
6 336 068,00 €
4 527 296,00 €
5 906 353,00 €
26 964 058,00 €
8 415 388,00 €
67 847 901,00 €
190 384 583,00 €
4 050 588,00 €
1 402 945,00 €
828 111,00 €
12 778 110,00 €
1 689 412,00 €
423 424,00 €
22 018 431,00 €
1 133 212,00 €
3 800 926,00 €
2 097 068,00 €
1 044 153,00 €
2 222 971,00 €
8 297 037,00 €
42 119 733,00 €
9 310 136,00 €
113 216 258,00 €
2 549 842,00 €
1 715 785,00 €
5 588 815,00 €
4 932 862,00 €
104 874 636,00 €
2 609 744,00 €
1 612 889,00 €
869 131,00 €
813 016,00 €
2 377 286,00 €
6 379 674,00 €
3 110 280,00 €
1 558 102,00 €
6 201 583,00 €
145 193 644,00 €
|
7,40 %
7,76 %
21,90 %
41,50 %
21,44 %
14,18 %
1,01 %
2,63 %
0,94 %
41,13 %
0,65 %
0,56 %
22,85 %
10,01 %
1,53 %
2,03 %
1,40 %
1,08 %
13,09 %
1,29 %
2,08 %
15,01 %
6,22 %
2,63 %
2,11 %
3,05 %
18,30 %
3,73 %
32,49 %
5,01 %
0,83 %
0,60 %
7,94 %
1,71 %
0,25 %
20,14 %
0,64 %
8,08 %
1,53 %
6,51 %
7,47 %
5,70 %
29,45 %
4,12 %
1,79 %
0,88 %
7,39 %
3,04 %
68,25 %
2,17 %
1,19 %
0,49 %
0,64 %
3,41 %
3,70 %
2,87 %
1,01 %
3,17 %
|
| Algarve |
Algarve
|
Albufeira
Alcoutim
Aljezur
Castro Marim
Faro
Lagoa
Lagos
Loulé
Monchique
Olhão
Portimão
São Brás de Alportel
Silves
Tavira
Vila do Bispo
Vila Real de Santo António
Total
|
45 974 070,00 €
35 248 087,00 €
7 813 354,00 €
3 375 962,00 €
152 713 268,00 €
20 470 398,00 €
45 883 958,00 €
63 524 050,00 €
13 964 688,00 €
54 581 579,00 €
65 205 368,00 €
7 726 804,00 €
30 956 272,00 €
19 174 602,00 €
7 685 946,00 €
149 562 511,00 €
723 860 916,00 €
|
33 069 483,00 €
7 556 548,00 €
3 333 349,00 €
1 869 263,00 €
88 316 253,00 €
13 996 922,00 €
29 310 037,00 €
39 331 525,00 €
8 032 917,00 €
36 529 833,00 €
31 440 693,00 €
5 615 089,00 €
19 160 935,00 €
11 694 658,00 €
3 918 130,00 €
128 073 434,00 €
461 249 070,00 €
|
6,35 %
4,87 %
1,08 %
0,47 %
21,10 %
2,83 %
6,34 %
8,78 %
1,93 %
7,54 %
9,01 %
1,07 %
4,28 %
2,65 %
1,06 %
20,66 %
|
| Autonomous Region of the Azores |
Autonomous Region of the Azores
|
Vila do Porto
Lagoa
Nordeste
Ponta Delgada
Povoação
Ribeira Grande
Vila Franca do Campo
Angra do Heroísmo
Vila da Praia da Vitória
Santa Cruz da Graciosa
Calheta
Velas
Lajes do Pico
Madalena
São Roque do Pico
Horta
Lajes das Flores
Santa Cruz das Flores
Corvo
Total
|
7 737 008,00 €
39 925 529,00 €
7 814 357,00 €
560 685 890,00 €
5 730 881,00 €
141 500 681,00 €
13 410 887,00 €
176 241 975,00 €
13 494 102,00 €
10 793 334,00 €
3 011 543,00 €
6 379 185,00 €
4 572 730,00 €
16 578 963,00 €
13 798 486,00 €
92 942 145,00 €
2 419 029,00 €
2 705 289,00 €
420 105,00 €
1 120 162 122,00 €
|
4 339 030,00 €
23 131 430,00 €
4 592 858,00 €
368 512 862,00 €
2 693 719,00 €
77 952 241,00 €
10 726 044,00 €
114 767 864,00 €
9 518 940,00 €
4 863 616,00 €
2 233 893,00 €
4 198 086,00 €
2 700 496,00 €
11 664 262,00 €
9 409 550,00 €
74 117 679,00 €
1 142 797,00 €
1 603 727,00 €
340 867,00 €
728 509 959,00 €
|
0,69 %
3,56 %
0,70 %
50,05 %
0,51 %
12,63 %
1,20 %
15,73 %
1,20 %
0,96 %
0,27 %
0,57 %
0,41 %
1,48 %
1,23 %
8,30 %
0,22 %
0,24 %
0,04 %
|
| Autonomous Region of Madeira |
Autonomous Region of Madeira
|
Calheta
Câmara de Lobos
Funchal
Machico
Ponta do Sol
Porto Moniz
Ribeira Brava
Santa Cruz
Santana
São Vicente
Porto Santo
Total
|
12 613 076,00 €
29 874 042,00 €
676 095 161,00 €
49 184 129,00 €
21 695 218,00 €
596 718,00 €
13 901 603,00 €
28 061 570,00 €
16 764 322,00 €
26 172 087,00 €
40 274 320,00 €
915 232 246,00 €
|
5 014 383,00 €
9 458 682,00 €
454 556 320,00 €
12 039 495,00 €
7 245 848,00 €
328 562,00 €
11 778 642,00 €
13 211 733,00 €
667 966,00 €
9 217 263,00 €
21 257 806,00 €
544 776 700,00 €
|
1,38 %
3,26 %
73,87 %
5,37 %
2,37 %
0,07 %
1,52 %
3,07 %
1,83 %
2,86 %
4,40 %
|
| Nation-wide investment |
|
|
3 658 561 304,00 €
|
2 679 369 203,00 €
|
|
Distribution of investment by regions
Region
North
:Sub-region
Alto Minho
:Municipality
Arcos de Valdevez
:Approved amount
: 29856437 €,29 856 437,00 €
Amount spent
: 18645454 €,18 645 454,00 €
Percentage of investment
: 7,75 %7,75 %
Municipality
Caminha
:Approved amount
: 14085923 €,14 085 923,00 €
Amount spent
: 6628691 €,6 628 691,00 €
Percentage of investment
: 3,65 %3,65 %
Municipality
Melgaço
:Approved amount
: 20289188 €,20 289 188,00 €
Amount spent
: 18198810 €,18 198 810,00 €
Percentage of investment
: 5,26 %5,26 %
Municipality
Monção
:Approved amount
: 31244659 €,31 244 659,00 €
Amount spent
: 18654463 €,18 654 463,00 €
Percentage of investment
: 8,11 %8,11 %
Municipality
Paredes de Coura
:Approved amount
: 6654825 €,6 654 825,00 €
Amount spent
: 3652670 €,3 652 670,00 €
Percentage of investment
: 1,73 %1,73 %
Municipality
Ponte da Barca
:Approved amount
: 9977553 €,9 977 553,00 €
Amount spent
: 5196716 €,5 196 716,00 €
Percentage of investment
: 2,59 %2,59 %
Municipality
Ponte de Lima
:Approved amount
: 31816325 €,31 816 325,00 €
Amount spent
: 20451615 €,20 451 615,00 €
Percentage of investment
: 8,25 %8,25 %
Municipality
Valença
:Approved amount
: 36139919 €,36 139 919,00 €
Amount spent
: 16752998 €,16 752 998,00 €
Percentage of investment
: 9,38 %9,38 %
Municipality
Viana do Castelo
:Approved amount
: 185884962 €,185 884 962,00 €
Amount spent
: 131917475 €,131 917 475,00 €
Percentage of investment
: 48,23 %48,23 %
Municipality
Vila Nova de Cerveira
:Approved amount
: 19472651 €,19 472 651,00 €
Amount spent
: 13692264 €,13 692 264,00 €
Percentage of investment
: 5,05 %5,05 %
Total
Approved amount
: 385422443 €,385 422 443,00 €
Amount spent
: 253791157 €,253 791 157,00 €
Percentage of investment
Sub-region
Cávado
:Municipality
Amares
:Approved amount
: 12188962 €,12 188 962,00 €
Amount spent
: 8054615 €,8 054 615,00 €
Percentage of investment
: 1,69 %1,69 %
Municipality
Barcelos
:Approved amount
: 185993584 €,185 993 584,00 €
Amount spent
: 96696744 €,96 696 744,00 €
Percentage of investment
: 25,82 %25,82 %
Municipality
Braga
:Approved amount
: 435148994 €,435 148 994,00 €
Amount spent
: 305820964 €,305 820 964,00 €
Percentage of investment
: 60,4 %60,40 %
Municipality
Esposende
:Approved amount
: 48421846 €,48 421 846,00 €
Amount spent
: 23996771 €,23 996 771,00 €
Percentage of investment
: 6,72 %6,72 %
Municipality
Terras de Bouro
:Approved amount
: 4585357 €,4 585 357,00 €
Amount spent
: 2430307 €,2 430 307,00 €
Percentage of investment
: 0,64 %0,64 %
Municipality
Vila Verde
:Approved amount
: 34137906 €,34 137 906,00 €
Amount spent
: 22162579 €,22 162 579,00 €
Percentage of investment
: 4,74 %4,74 %
Total
Approved amount
: 720476650 €,720 476 650,00 €
Amount spent
: 459161980 €,459 161 980,00 €
Percentage of investment
Sub-region
Ave
:Municipality
Cabeceiras de Basto
:Approved amount
: 13449291 €,13 449 291,00 €
Amount spent
: 5535268 €,5 535 268,00 €
Percentage of investment
: 1,48 %1,48 %
Municipality
Fafe
:Approved amount
: 51976070 €,51 976 070,00 €
Amount spent
: 30582959 €,30 582 959,00 €
Percentage of investment
: 5,74 %5,74 %
Municipality
Guimarães
:Approved amount
: 454960077 €,454 960 077,00 €
Amount spent
: 294050652 €,294 050 652,00 €
Percentage of investment
: 50,23 %50,23 %
Municipality
Póvoa de Lanhoso
:Approved amount
: 26371021 €,26 371 021,00 €
Amount spent
: 12567504 €,12 567 504,00 €
Percentage of investment
: 2,91 %2,91 %
Municipality
Vieira do Minho
:Approved amount
: 6437484 €,6 437 484,00 €
Amount spent
: 3994648 €,3 994 648,00 €
Percentage of investment
: 0,71 %0,71 %
Municipality
Vila Nova de Famalicão
:Approved amount
: 314205233 €,314 205 233,00 €
Amount spent
: 202675864 €,202 675 864,00 €
Percentage of investment
: 34,69 %34,69 %
Municipality
Vizela
:Approved amount
: 28380168 €,28 380 168,00 €
Amount spent
: 21011890 €,21 011 890,00 €
Percentage of investment
: 3,13 %3,13 %
Municipality
Mondim de Basto
:Approved amount
: 10004129 €,10 004 129,00 €
Amount spent
: 4332411 €,4 332 411,00 €
Percentage of investment
: 1,1 %1,10 %
Total
Approved amount
: 905783474 €,905 783 474,00 €
Amount spent
: 574751194 €,574 751 194,00 €
Percentage of investment
Sub-region
Área Metropolitana do Porto
:Municipality
Arouca
:Approved amount
: 28269990 €,28 269 990,00 €
Amount spent
: 18123795 €,18 123 795,00 €
Percentage of investment
: 0,74 %0,74 %
Municipality
Espinho
:Approved amount
: 22157172 €,22 157 172,00 €
Amount spent
: 8556637 €,8 556 637,00 €
Percentage of investment
: 0,58 %0,58 %
Municipality
Santa Maria da Feira
:Approved amount
: 133260989 €,133 260 989,00 €
Amount spent
: 86115869 €,86 115 869,00 €
Percentage of investment
: 3,49 %3,49 %
Municipality
Oliveira de Azeméis
:Approved amount
: 83608662 €,83 608 662,00 €
Amount spent
: 41970320 €,41 970 320,00 €
Percentage of investment
: 2,19 %2,19 %
Municipality
São João da Madeira
:Approved amount
: 72559360 €,72 559 360,00 €
Amount spent
: 45774769 €,45 774 769,00 €
Percentage of investment
: 1,9 %1,90 %
Municipality
Vale de Cambra
:Approved amount
: 35069959 €,35 069 959,00 €
Amount spent
: 21992442 €,21 992 442,00 €
Percentage of investment
: 0,92 %0,92 %
Municipality
Gondomar
:Approved amount
: 88223597 €,88 223 597,00 €
Amount spent
: 54626881 €,54 626 881,00 €
Percentage of investment
: 2,31 %2,31 %
Municipality
Maia
:Approved amount
: 279806757 €,279 806 757,00 €
Amount spent
: 179488934 €,179 488 934,00 €
Percentage of investment
: 7,32 %7,32 %
Municipality
Matosinhos
:Approved amount
: 707758444 €,707 758 444,00 €
Amount spent
: 484883271 €,484 883 271,00 €
Percentage of investment
: 18,51 %18,51 %
Municipality
Paredes
:Approved amount
: 93175031 €,93 175 031,00 €
Amount spent
: 58610459 €,58 610 459,00 €
Percentage of investment
: 2,44 %2,44 %
Municipality
Porto
:Approved amount
: 1433477481 €,1 433 477 481,00 €
Amount spent
: 983262710 €,983 262 710,00 €
Percentage of investment
: 37,5 %37,50 %
Municipality
Póvoa de Varzim
:Approved amount
: 84988975 €,84 988 975,00 €
Amount spent
: 64577263 €,64 577 263,00 €
Percentage of investment
: 2,22 %2,22 %
Municipality
Santo Tirso
:Approved amount
: 91217605 €,91 217 605,00 €
Amount spent
: 63307648 €,63 307 648,00 €
Percentage of investment
: 2,39 %2,39 %
Municipality
Valongo
:Approved amount
: 72332236 €,72 332 236,00 €
Amount spent
: 36205034 €,36 205 034,00 €
Percentage of investment
: 1,89 %1,89 %
Municipality
Vila do Conde
:Approved amount
: 154563217 €,154 563 217,00 €
Amount spent
: 102359341 €,102 359 341,00 €
Percentage of investment
: 4,04 %4,04 %
Municipality
Vila Nova de Gaia
:Approved amount
: 347611958 €,347 611 958,00 €
Amount spent
: 191500563 €,191 500 563,00 €
Percentage of investment
: 9,09 %9,09 %
Municipality
Trofa
:Approved amount
: 94668876 €,94 668 876,00 €
Amount spent
: 74102562 €,74 102 562,00 €
Percentage of investment
: 2,48 %2,48 %
Total
Approved amount
: 3822750308 €,3 822 750 308,00 €
Amount spent
: 2515458497 €,2 515 458 497,00 €
Percentage of investment
Sub-region
Alto Tâmega
:Municipality
Boticas
:Approved amount
: 6152620 €,6 152 620,00 €
Amount spent
: 3923036 €,3 923 036,00 €
Percentage of investment
: 5,79 %5,79 %
Municipality
Chaves
:Approved amount
: 52467159 €,52 467 159,00 €
Amount spent
: 26798011 €,26 798 011,00 €
Percentage of investment
: 49,35 %49,35 %
Municipality
Montalegre
:Approved amount
: 7382130 €,7 382 130,00 €
Amount spent
: 3007044 €,3 007 044,00 €
Percentage of investment
: 6,94 %6,94 %
Municipality
Ribeira de Pena
:Approved amount
: 14020004 €,14 020 004,00 €
Amount spent
: 10070967 €,10 070 967,00 €
Percentage of investment
: 13,19 %13,19 %
Municipality
Valpaços
:Approved amount
: 5954701 €,5 954 701,00 €
Amount spent
: 3622853 €,3 622 853,00 €
Percentage of investment
: 5,6 %5,60 %
Municipality
Vila Pouca de Aguiar
:Approved amount
: 20338344 €,20 338 344,00 €
Amount spent
: 9225002 €,9 225 002,00 €
Percentage of investment
: 19,13 %19,13 %
Total
Approved amount
: 106314958 €,106 314 958,00 €
Amount spent
: 56646912 €,56 646 912,00 €
Percentage of investment
Sub-region
Tâmega e Sousa
:Municipality
Castelo de Paiva
:Approved amount
: 26189325 €,26 189 325,00 €
Amount spent
: 16943155 €,16 943 155,00 €
Percentage of investment
: 4,65 %4,65 %
Municipality
Celorico de Basto
:Approved amount
: 25470136 €,25 470 136,00 €
Amount spent
: 19312105 €,19 312 105,00 €
Percentage of investment
: 4,52 %4,52 %
Municipality
Amarante
:Approved amount
: 64186924 €,64 186 924,00 €
Amount spent
: 37967108 €,37 967 108,00 €
Percentage of investment
: 11,39 %11,39 %
Municipality
Baião
:Approved amount
: 48929905 €,48 929 905,00 €
Amount spent
: 44358762 €,44 358 762,00 €
Percentage of investment
: 8,68 %8,68 %
Municipality
Felgueiras
:Approved amount
: 47029081 €,47 029 081,00 €
Amount spent
: 29680424 €,29 680 424,00 €
Percentage of investment
: 8,34 %8,34 %
Municipality
Lousada
:Approved amount
: 50814873 €,50 814 873,00 €
Amount spent
: 38088596 €,38 088 596,00 €
Percentage of investment
: 9,02 %9,02 %
Municipality
Marco de Canaveses
:Approved amount
: 35101355 €,35 101 355,00 €
Amount spent
: 24986331 €,24 986 331,00 €
Percentage of investment
: 6,23 %6,23 %
Municipality
Paços de Ferreira
:Approved amount
: 94319785 €,94 319 785,00 €
Amount spent
: 64593206 €,64 593 206,00 €
Percentage of investment
: 16,73 %16,73 %
Municipality
Penafiel
:Approved amount
: 148088419 €,148 088 419,00 €
Amount spent
: 119517869 €,119 517 869,00 €
Percentage of investment
: 26,27 %26,27 %
Municipality
Cinfães
:Approved amount
: 17417789 €,17 417 789,00 €
Amount spent
: 13786041 €,13 786 041,00 €
Percentage of investment
: 3,09 %3,09 %
Municipality
Resende
:Approved amount
: 6103349 €,6 103 349,00 €
Amount spent
: 3711904 €,3 711 904,00 €
Percentage of investment
: 1,08 %1,08 %
Total
Approved amount
: 563650940 €,563 650 940,00 €
Amount spent
: 412945501 €,412 945 501,00 €
Percentage of investment
Sub-region
Douro
:Municipality
Carrazeda de Ansiães
:Approved amount
: 5718530 €,5 718 530,00 €
Amount spent
: 2764173 €,2 764 173,00 €
Percentage of investment
: 1,42 %1,42 %
Municipality
Freixo de Espada à Cinta
:Approved amount
: 7540857 €,7 540 857,00 €
Amount spent
: 3671353 €,3 671 353,00 €
Percentage of investment
: 1,88 %1,88 %
Municipality
Torre de Moncorvo
:Approved amount
: 4091167 €,4 091 167,00 €
Amount spent
: 2798357 €,2 798 357,00 €
Percentage of investment
: 1,02 %1,02 %
Municipality
Vila Nova de Foz Côa
:Approved amount
: 10585468 €,10 585 468,00 €
Amount spent
: 4448967 €,4 448 967,00 €
Percentage of investment
: 2,64 %2,64 %
Municipality
Alijó
:Approved amount
: 13657134 €,13 657 134,00 €
Amount spent
: 9877674 €,9 877 674,00 €
Percentage of investment
: 3,4 %3,40 %
Municipality
Mesão Frio
:Approved amount
: 1433547 €,1 433 547,00 €
Amount spent
: 921728 €,921 728,00 €
Percentage of investment
: 0,36 %0,36 %
Municipality
Murça
:Approved amount
: 4441563 €,4 441 563,00 €
Amount spent
: 1578580 €,1 578 580,00 €
Percentage of investment
: 1,11 %1,11 %
Municipality
Peso da Régua
:Approved amount
: 23906209 €,23 906 209,00 €
Amount spent
: 17522796 €,17 522 796,00 €
Percentage of investment
: 5,95 %5,95 %
Municipality
Sabrosa
:Approved amount
: 13461041 €,13 461 041,00 €
Amount spent
: 7321428 €,7 321 428,00 €
Percentage of investment
: 3,35 %3,35 %
Municipality
Santa Marta de Penaguião
:Approved amount
: 10954353 €,10 954 353,00 €
Amount spent
: 4046765 €,4 046 765,00 €
Percentage of investment
: 2,73 %2,73 %
Municipality
Vila Real
:Approved amount
: 204491563 €,204 491 563,00 €
Amount spent
: 125235477 €,125 235 477,00 €
Percentage of investment
: 50,92 %50,92 %
Municipality
Armamar
:Approved amount
: 4197503 €,4 197 503,00 €
Amount spent
: 1884917 €,1 884 917,00 €
Percentage of investment
: 1,05 %1,05 %
Municipality
Lamego
:Approved amount
: 34863706 €,34 863 706,00 €
Amount spent
: 20069769 €,20 069 769,00 €
Percentage of investment
: 8,68 %8,68 %
Municipality
Moimenta da Beira
:Approved amount
: 16439862 €,16 439 862,00 €
Amount spent
: 8959222 €,8 959 222,00 €
Percentage of investment
: 4,09 %4,09 %
Municipality
Penedono
:Approved amount
: 6190287 €,6 190 287,00 €
Amount spent
: 2927313 €,2 927 313,00 €
Percentage of investment
: 1,54 %1,54 %
Municipality
São João da Pesqueira
:Approved amount
: 11796941 €,11 796 941,00 €
Amount spent
: 6545989 €,6 545 989,00 €
Percentage of investment
: 2,94 %2,94 %
Municipality
Sernancelhe
:Approved amount
: 12246874 €,12 246 874,00 €
Amount spent
: 6769099 €,6 769 099,00 €
Percentage of investment
: 3,05 %3,05 %
Municipality
Tabuaço
:Approved amount
: 4689577 €,4 689 577,00 €
Amount spent
: 2433411 €,2 433 411,00 €
Percentage of investment
: 1,17 %1,17 %
Municipality
Tarouca
:Approved amount
: 10853863 €,10 853 863,00 €
Amount spent
: 3823437 €,3 823 437,00 €
Percentage of investment
: 2,7 %2,70 %
Total
Approved amount
: 401560047 €,401 560 047,00 €
Amount spent
: 233600454 €,233 600 454,00 €
Percentage of investment
Sub-region
Terras de Trás-os-Montes
:Municipality
Alfândega da Fé
:Approved amount
: 15765943 €,15 765 943,00 €
Amount spent
: 8877987 €,8 877 987,00 €
Percentage of investment
: 5,32 %5,32 %
Municipality
Bragança
:Approved amount
: 109857735 €,109 857 735,00 €
Amount spent
: 61285851 €,61 285 851,00 €
Percentage of investment
: 37,09 %37,09 %
Municipality
Macedo de Cavaleiros
:Approved amount
: 14023371 €,14 023 371,00 €
Amount spent
: 8510355 €,8 510 355,00 €
Percentage of investment
: 4,73 %4,73 %
Municipality
Miranda do Douro
:Approved amount
: 3581905 €,3 581 905,00 €
Amount spent
: 1864196 €,1 864 196,00 €
Percentage of investment
: 1,21 %1,21 %
Municipality
Mirandela
:Approved amount
: 24171247 €,24 171 247,00 €
Amount spent
: 15399163 €,15 399 163,00 €
Percentage of investment
: 8,16 %8,16 %
Municipality
Mogadouro
:Approved amount
: 12487369 €,12 487 369,00 €
Amount spent
: 7323229 €,7 323 229,00 €
Percentage of investment
: 4,22 %4,22 %
Municipality
Vila Flor
:Approved amount
: 1995785 €,1 995 785,00 €
Amount spent
: 1280899 €,1 280 899,00 €
Percentage of investment
: 0,67 %0,67 %
Municipality
Vimioso
:Approved amount
: 2688515 €,2 688 515,00 €
Amount spent
: 2201613 €,2 201 613,00 €
Percentage of investment
: 0,91 %0,91 %
Municipality
Vinhais
:Approved amount
: 111611644 €,111 611 644,00 €
Amount spent
: 108841430 €,108 841 430,00 €
Percentage of investment
: 37,68 %37,68 %
Total
Approved amount
: 296183513 €,296 183 513,00 €
Amount spent
: 215584721 €,215 584 721,00 €
Percentage of investment
Region
Center
:Sub-region
Oeste
:Municipality
Alcobaça
:Approved amount
: 58531647 €,58 531 647,00 €
Amount spent
: 34974991 €,34 974 991,00 €
Percentage of investment
: 13,12 %13,12 %
Municipality
Bombarral
:Approved amount
: 5482617 €,5 482 617,00 €
Amount spent
: 3925876 €,3 925 876,00 €
Percentage of investment
: 1,23 %1,23 %
Municipality
Caldas da Rainha
:Approved amount
: 72142584 €,72 142 584,00 €
Amount spent
: 37230002 €,37 230 002,00 €
Percentage of investment
: 16,17 %16,17 %
Municipality
Nazaré
:Approved amount
: 38728009 €,38 728 009,00 €
Amount spent
: 28338921 €,28 338 921,00 €
Percentage of investment
: 8,68 %8,68 %
Municipality
Óbidos
:Approved amount
: 14981299 €,14 981 299,00 €
Amount spent
: 7301402 €,7 301 402,00 €
Percentage of investment
: 3,36 %3,36 %
Municipality
Peniche
:Approved amount
: 28575968 €,28 575 968,00 €
Amount spent
: 19077383 €,19 077 383,00 €
Percentage of investment
: 6,41 %6,41 %
Municipality
Alenquer
:Approved amount
: 51588107 €,51 588 107,00 €
Amount spent
: 18697908 €,18 697 908,00 €
Percentage of investment
: 11,56 %11,56 %
Municipality
Arruda dos Vinhos
:Approved amount
: 25220625 €,25 220 625,00 €
Amount spent
: 14027241 €,14 027 241,00 €
Percentage of investment
: 5,65 %5,65 %
Municipality
Cadaval
:Approved amount
: 12416381 €,12 416 381,00 €
Amount spent
: 4056037 €,4 056 037,00 €
Percentage of investment
: 2,78 %2,78 %
Municipality
Lourinhã
:Approved amount
: 11842663 €,11 842 663,00 €
Amount spent
: 8956747 €,8 956 747,00 €
Percentage of investment
: 2,65 %2,65 %
Municipality
Sobral de Monte Agraço
:Approved amount
: 2453283 €,2 453 283,00 €
Amount spent
: 1690938 €,1 690 938,00 €
Percentage of investment
: 0,55 %0,55 %
Municipality
Torres Vedras
:Approved amount
: 124140569 €,124 140 569,00 €
Amount spent
: 53500753 €,53 500 753,00 €
Percentage of investment
: 27,83 %27,83 %
Total
Approved amount
: 446103752 €,446 103 752,00 €
Amount spent
: 231778198 €,231 778 198,00 €
Percentage of investment
Sub-region
Região de Aveiro
:Municipality
Águeda
:Approved amount
: 192601542 €,192 601 542,00 €
Amount spent
: 111907212 €,111 907 212,00 €
Percentage of investment
: 20,05 %20,05 %
Municipality
Albergaria-a-Velha
:Approved amount
: 29970440 €,29 970 440,00 €
Amount spent
: 19957311 €,19 957 311,00 €
Percentage of investment
: 3,12 %3,12 %
Municipality
Anadia
:Approved amount
: 28730038 €,28 730 038,00 €
Amount spent
: 19195745 €,19 195 745,00 €
Percentage of investment
: 2,99 %2,99 %
Municipality
Aveiro
:Approved amount
: 345043527 €,345 043 527,00 €
Amount spent
: 225085656 €,225 085 656,00 €
Percentage of investment
: 35,92 %35,92 %
Municipality
Estarreja
:Approved amount
: 69368461 €,69 368 461,00 €
Amount spent
: 43511609 €,43 511 609,00 €
Percentage of investment
: 7,22 %7,22 %
Municipality
Ílhavo
:Approved amount
: 130136387 €,130 136 387,00 €
Amount spent
: 71558362 €,71 558 362,00 €
Percentage of investment
: 13,55 %13,55 %
Municipality
Murtosa
:Approved amount
: 11000179 €,11 000 179,00 €
Amount spent
: 10655823 €,10 655 823,00 €
Percentage of investment
: 1,15 %1,15 %
Municipality
Oliveira do Bairro
:Approved amount
: 43636948 €,43 636 948,00 €
Amount spent
: 23352722 €,23 352 722,00 €
Percentage of investment
: 4,54 %4,54 %
Municipality
Ovar
:Approved amount
: 65471493 €,65 471 493,00 €
Amount spent
: 36488034 €,36 488 034,00 €
Percentage of investment
: 6,82 %6,82 %
Municipality
Sever do Vouga
:Approved amount
: 11909156 €,11 909 156,00 €
Amount spent
: 6063737 €,6 063 737,00 €
Percentage of investment
: 1,24 %1,24 %
Municipality
Vagos
:Approved amount
: 32683289 €,32 683 289,00 €
Amount spent
: 21764524 €,21 764 524,00 €
Percentage of investment
: 3,4 %3,40 %
Total
Approved amount
: 960551459 €,960 551 459,00 €
Amount spent
: 589540736 €,589 540 736,00 €
Percentage of investment
Sub-region
Região de Coimbra
:Municipality
Mealhada
:Approved amount
: 20106370 €,20 106 370,00 €
Amount spent
: 11553053 €,11 553 053,00 €
Percentage of investment
: 1,79 %1,79 %
Municipality
Arganil
:Approved amount
: 25357879 €,25 357 879,00 €
Amount spent
: 15502689 €,15 502 689,00 €
Percentage of investment
: 2,26 %2,26 %
Municipality
Cantanhede
:Approved amount
: 69746570 €,69 746 570,00 €
Amount spent
: 53464885 €,53 464 885,00 €
Percentage of investment
: 6,2 %6,20 %
Municipality
Coimbra
:Approved amount
: 607416246 €,607 416 246,00 €
Amount spent
: 371512959 €,371 512 959,00 €
Percentage of investment
: 54,04 %54,04 %
Municipality
Condeixa-a-Nova
:Approved amount
: 12740035 €,12 740 035,00 €
Amount spent
: 4538253 €,4 538 253,00 €
Percentage of investment
: 1,13 %1,13 %
Municipality
Figueira da Foz
:Approved amount
: 163706112 €,163 706 112,00 €
Amount spent
: 89139990 €,89 139 990,00 €
Percentage of investment
: 14,56 %14,56 %
Municipality
Góis
:Approved amount
: 9628592 €,9 628 592,00 €
Amount spent
: 2448021 €,2 448 021,00 €
Percentage of investment
: 0,86 %0,86 %
Municipality
Lousã
:Approved amount
: 25853360 €,25 853 360,00 €
Amount spent
: 12057595 €,12 057 595,00 €
Percentage of investment
: 2,3 %2,30 %
Municipality
Mira
:Approved amount
: 19650124 €,19 650 124,00 €
Amount spent
: 11679427 €,11 679 427,00 €
Percentage of investment
: 1,75 %1,75 %
Municipality
Miranda do Corvo
:Approved amount
: 13070359 €,13 070 359,00 €
Amount spent
: 7794186 €,7 794 186,00 €
Percentage of investment
: 1,16 %1,16 %
Municipality
Montemor-o-Velho
:Approved amount
: 15803112 €,15 803 112,00 €
Amount spent
: 8588347 €,8 588 347,00 €
Percentage of investment
: 1,41 %1,41 %
Municipality
Oliveira do Hospital
:Approved amount
: 60364686 €,60 364 686,00 €
Amount spent
: 37186313 €,37 186 313,00 €
Percentage of investment
: 5,37 %5,37 %
Municipality
Pampilhosa da Serra
:Approved amount
: 17237226 €,17 237 226,00 €
Amount spent
: 11408679 €,11 408 679,00 €
Percentage of investment
: 1,53 %1,53 %
Municipality
Penacova
:Approved amount
: 16451020 €,16 451 020,00 €
Amount spent
: 9802364 €,9 802 364,00 €
Percentage of investment
: 1,46 %1,46 %
Municipality
Penela
:Approved amount
: 7059432 €,7 059 432,00 €
Amount spent
: 2189369 €,2 189 369,00 €
Percentage of investment
: 0,63 %0,63 %
Municipality
Soure
:Approved amount
: 7509309 €,7 509 309,00 €
Amount spent
: 3734854 €,3 734 854,00 €
Percentage of investment
: 0,67 %0,67 %
Municipality
Tábua
:Approved amount
: 17498804 €,17 498 804,00 €
Amount spent
: 8754756 €,8 754 756,00 €
Percentage of investment
: 1,56 %1,56 %
Municipality
Vila Nova de Poiares
:Approved amount
: 7324948 €,7 324 948,00 €
Amount spent
: 3980007 €,3 980 007,00 €
Percentage of investment
: 0,65 %0,65 %
Municipality
Mortágua
:Approved amount
: 7579636 €,7 579 636,00 €
Amount spent
: 4372571 €,4 372 571,00 €
Percentage of investment
: 0,67 %0,67 %
Total
Approved amount
: 1124103820 €,1 124 103 820,00 €
Amount spent
: 669708317 €,669 708 317,00 €
Percentage of investment
Sub-region
Região de Leiria
:Municipality
Alvaiázere
:Approved amount
: 13093988 €,13 093 988,00 €
Amount spent
: 8065889 €,8 065 889,00 €
Percentage of investment
: 1,87 %1,87 %
Municipality
Ansião
:Approved amount
: 10433165 €,10 433 165,00 €
Amount spent
: 6297969 €,6 297 969,00 €
Percentage of investment
: 1,49 %1,49 %
Municipality
Batalha
:Approved amount
: 34662311 €,34 662 311,00 €
Amount spent
: 22205250 €,22 205 250,00 €
Percentage of investment
: 4,96 %4,96 %
Municipality
Castanheira de Pêra
:Approved amount
: 7059143 €,7 059 143,00 €
Amount spent
: 4753790 €,4 753 790,00 €
Percentage of investment
: 1,01 %1,01 %
Municipality
Figueiró dos Vinhos
:Approved amount
: 6469964 €,6 469 964,00 €
Amount spent
: 2610645 €,2 610 645,00 €
Percentage of investment
: 0,93 %0,93 %
Municipality
Leiria
:Approved amount
: 346663696 €,346 663 696,00 €
Amount spent
: 191393945 €,191 393 945,00 €
Percentage of investment
: 49,63 %49,63 %
Municipality
Marinha Grande
:Approved amount
: 144770913 €,144 770 913,00 €
Amount spent
: 94286321 €,94 286 321,00 €
Percentage of investment
: 20,72 %20,72 %
Municipality
Pedrógão Grande
:Approved amount
: 8133621 €,8 133 621,00 €
Amount spent
: 2831418 €,2 831 418,00 €
Percentage of investment
: 1,16 %1,16 %
Municipality
Pombal
:Approved amount
: 82094208 €,82 094 208,00 €
Amount spent
: 46323263 €,46 323 263,00 €
Percentage of investment
: 11,75 %11,75 %
Municipality
Porto de Mós
:Approved amount
: 45171617 €,45 171 617,00 €
Amount spent
: 29720470 €,29 720 470,00 €
Percentage of investment
: 6,47 %6,47 %
Total
Approved amount
: 698552626 €,698 552 626,00 €
Amount spent
: 408488962 €,408 488 962,00 €
Percentage of investment
Sub-region
Viseu Dão Lafões
:Municipality
Aguiar da Beira
:Approved amount
: 13345799 €,13 345 799,00 €
Amount spent
: 9272199 €,9 272 199,00 €
Percentage of investment
: 2,88 %2,88 %
Municipality
Carregal do Sal
:Approved amount
: 31710986 €,31 710 986,00 €
Amount spent
: 16719461 €,16 719 461,00 €
Percentage of investment
: 6,84 %6,84 %
Municipality
Castro Daire
:Approved amount
: 11643733 €,11 643 733,00 €
Amount spent
: 7139633 €,7 139 633,00 €
Percentage of investment
: 2,51 %2,51 %
Municipality
Mangualde
:Approved amount
: 81008534 €,81 008 534,00 €
Amount spent
: 52408714 €,52 408 714,00 €
Percentage of investment
: 17,48 %17,48 %
Municipality
Nelas
:Approved amount
: 45611040 €,45 611 040,00 €
Amount spent
: 27869538 €,27 869 538,00 €
Percentage of investment
: 9,84 %9,84 %
Municipality
Oliveira de Frades
:Approved amount
: 15923815 €,15 923 815,00 €
Amount spent
: 9128628 €,9 128 628,00 €
Percentage of investment
: 3,44 %3,44 %
Municipality
Penalva do Castelo
:Approved amount
: 2147552 €,2 147 552,00 €
Amount spent
: 1846132 €,1 846 132,00 €
Percentage of investment
: 0,46 %0,46 %
Municipality
Santa Comba Dão
:Approved amount
: 8138314 €,8 138 314,00 €
Amount spent
: 5070373 €,5 070 373,00 €
Percentage of investment
: 1,76 %1,76 %
Municipality
São Pedro do Sul
:Approved amount
: 14218897 €,14 218 897,00 €
Amount spent
: 8409297 €,8 409 297,00 €
Percentage of investment
: 3,07 %3,07 %
Municipality
Sátão
:Approved amount
: 8345197 €,8 345 197,00 €
Amount spent
: 5500081 €,5 500 081,00 €
Percentage of investment
: 1,8 %1,80 %
Municipality
Tondela
:Approved amount
: 35348813 €,35 348 813,00 €
Amount spent
: 20749682 €,20 749 682,00 €
Percentage of investment
: 7,63 %7,63 %
Municipality
Vila Nova de Paiva
:Approved amount
: 9723179 €,9 723 179,00 €
Amount spent
: 3404234 €,3 404 234,00 €
Percentage of investment
: 2,1 %2,10 %
Municipality
Viseu
:Approved amount
: 163146808 €,163 146 808,00 €
Amount spent
: 89940851 €,89 940 851,00 €
Percentage of investment
: 35,2 %35,20 %
Municipality
Vouzela
:Approved amount
: 23185017 €,23 185 017,00 €
Amount spent
: 13189036 €,13 189 036,00 €
Percentage of investment
: 5 %5,00 %
Total
Approved amount
: 463497684 €,463 497 684,00 €
Amount spent
: 270647860 €,270 647 860,00 €
Percentage of investment
Sub-region
Beira Baixa
:Municipality
Castelo Branco
:Approved amount
: 87418002 €,87 418 002,00 €
Amount spent
: 39653056 €,39 653 056,00 €
Percentage of investment
: 49,94 %49,94 %
Municipality
Idanha-a-Nova
:Approved amount
: 10869513 €,10 869 513,00 €
Amount spent
: 7316406 €,7 316 406,00 €
Percentage of investment
: 6,21 %6,21 %
Municipality
Oleiros
:Approved amount
: 20197699 €,20 197 699,00 €
Amount spent
: 9362860 €,9 362 860,00 €
Percentage of investment
: 11,54 %11,54 %
Municipality
Penamacor
:Approved amount
: 12872166 €,12 872 166,00 €
Amount spent
: 919783 €,919 783,00 €
Percentage of investment
: 7,35 %7,35 %
Municipality
Proença-a-Nova
:Approved amount
: 23192169 €,23 192 169,00 €
Amount spent
: 6671148 €,6 671 148,00 €
Percentage of investment
: 13,25 %13,25 %
Municipality
Vila Velha de Ródão
:Approved amount
: 20490018 €,20 490 018,00 €
Amount spent
: 10903559 €,10 903 559,00 €
Percentage of investment
: 11,71 %11,71 %
Total
Approved amount
: 175039567 €,175 039 567,00 €
Amount spent
: 74826811 €,74 826 811,00 €
Percentage of investment
Sub-region
Médio Tejo
:Municipality
Sertã
:Approved amount
: 26664557 €,26 664 557,00 €
Amount spent
: 12217607 €,12 217 607,00 €
Percentage of investment
: 6,62 %6,62 %
Municipality
Vila de Rei
:Approved amount
: 11545012 €,11 545 012,00 €
Amount spent
: 6362400 €,6 362 400,00 €
Percentage of investment
: 2,87 %2,87 %
Municipality
Abrantes
:Approved amount
: 38289567 €,38 289 567,00 €
Amount spent
: 23392524 €,23 392 524,00 €
Percentage of investment
: 9,51 %9,51 %
Municipality
Alcanena
:Approved amount
: 34144726 €,34 144 726,00 €
Amount spent
: 25052997 €,25 052 997,00 €
Percentage of investment
: 8,48 %8,48 %
Municipality
Constância
:Approved amount
: 28034333 €,28 034 333,00 €
Amount spent
: 19018310 €,19 018 310,00 €
Percentage of investment
: 6,96 %6,96 %
Municipality
Entroncamento
:Approved amount
: 32568537 €,32 568 537,00 €
Amount spent
: 20686881 €,20 686 881,00 €
Percentage of investment
: 8,09 %8,09 %
Municipality
Ferreira do Zêzere
:Approved amount
: 22271364 €,22 271 364,00 €
Amount spent
: 11614896 €,11 614 896,00 €
Percentage of investment
: 5,53 %5,53 %
Municipality
Mação
:Approved amount
: 34127658 €,34 127 658,00 €
Amount spent
: 10622180 €,10 622 180,00 €
Percentage of investment
: 8,48 %8,48 %
Municipality
Sardoal
:Approved amount
: 10859388 €,10 859 388,00 €
Amount spent
: 3856143 €,3 856 143,00 €
Percentage of investment
: 2,7 %2,70 %
Municipality
Tomar
:Approved amount
: 40349579 €,40 349 579,00 €
Amount spent
: 22783643 €,22 783 643,00 €
Percentage of investment
: 10,02 %10,02 %
Municipality
Torres Novas
:Approved amount
: 47934564 €,47 934 564,00 €
Amount spent
: 23719380 €,23 719 380,00 €
Percentage of investment
: 11,91 %11,91 %
Municipality
Vila Nova da Barquinha
:Approved amount
: 5473315 €,5 473 315,00 €
Amount spent
: 3327527 €,3 327 527,00 €
Percentage of investment
: 1,36 %1,36 %
Municipality
Ourém
:Approved amount
: 70318310 €,70 318 310,00 €
Amount spent
: 35288299 €,35 288 299,00 €
Percentage of investment
: 17,47 %17,47 %
Total
Approved amount
: 402580910 €,402 580 910,00 €
Amount spent
: 217942787 €,217 942 787,00 €
Percentage of investment
Sub-region
Beiras e Serra da Estrela
:Municipality
Belmonte
:Approved amount
: 11332285 €,11 332 285,00 €
Amount spent
: 2638025 €,2 638 025,00 €
Percentage of investment
: 2,8 %2,80 %
Municipality
Covilhã
:Approved amount
: 93434223 €,93 434 223,00 €
Amount spent
: 58957942 €,58 957 942,00 €
Percentage of investment
: 23,11 %23,11 %
Municipality
Fundão
:Approved amount
: 77196858 €,77 196 858,00 €
Amount spent
: 35303712 €,35 303 712,00 €
Percentage of investment
: 19,1 %19,10 %
Municipality
Almeida
:Approved amount
: 3255749 €,3 255 749,00 €
Amount spent
: 1717346 €,1 717 346,00 €
Percentage of investment
: 0,81 %0,81 %
Municipality
Celorico da Beira
:Approved amount
: 7724499 €,7 724 499,00 €
Amount spent
: 3347320 €,3 347 320,00 €
Percentage of investment
: 1,91 %1,91 %
Municipality
Figueira de Castelo Rodrigo
:Approved amount
: 2621170 €,2 621 170,00 €
Amount spent
: 2150917 €,2 150 917,00 €
Percentage of investment
: 0,65 %0,65 %
Municipality
Fornos de Algodres
:Approved amount
: 4143163 €,4 143 163,00 €
Amount spent
: 2809247 €,2 809 247,00 €
Percentage of investment
: 1,02 %1,02 %
Municipality
Gouveia
:Approved amount
: 9149954 €,9 149 954,00 €
Amount spent
: 5914077 €,5 914 077,00 €
Percentage of investment
: 2,26 %2,26 %
Municipality
Guarda
:Approved amount
: 115888249 €,115 888 249,00 €
Amount spent
: 43190598 €,43 190 598,00 €
Percentage of investment
: 28,67 %28,67 %
Municipality
Manteigas
:Approved amount
: 2424361 €,2 424 361,00 €
Amount spent
: 1180097 €,1 180 097,00 €
Percentage of investment
: 0,6 %0,60 %
Municipality
Mêda
:Approved amount
: 3705185 €,3 705 185,00 €
Amount spent
: 1855215 €,1 855 215,00 €
Percentage of investment
: 0,92 %0,92 %
Municipality
Pinhel
:Approved amount
: 6117067 €,6 117 067,00 €
Amount spent
: 3196307 €,3 196 307,00 €
Percentage of investment
: 1,51 %1,51 %
Municipality
Sabugal
:Approved amount
: 12702330 €,12 702 330,00 €
Amount spent
: 6203642 €,6 203 642,00 €
Percentage of investment
: 3,14 %3,14 %
Municipality
Seia
:Approved amount
: 39409738 €,39 409 738,00 €
Amount spent
: 20649722 €,20 649 722,00 €
Percentage of investment
: 9,75 %9,75 %
Municipality
Trancoso
:Approved amount
: 15161272 €,15 161 272,00 €
Amount spent
: 6444709 €,6 444 709,00 €
Percentage of investment
: 3,75 %3,75 %
Total
Approved amount
: 404266103 €,404 266 103,00 €
Amount spent
: 195558876 €,195 558 876,00 €
Percentage of investment
Region
Lisbon Metropolitan Area
:Sub-region
Lisbon Metropolitan Area
:Municipality
Cascais
:Approved amount
: 272136347 €,272 136 347,00 €
Amount spent
: 180276683 €,180 276 683,00 €
Percentage of investment
: 4,93 %4,93 %
Municipality
Lisboa
:Approved amount
: 2957614617 €,2 957 614 617,00 €
Amount spent
: 1802261301 €,1 802 261 301,00 €
Percentage of investment
: 53,6 %53,60 %
Municipality
Loures
:Approved amount
: 204379200 €,204 379 200,00 €
Amount spent
: 124444374 €,124 444 374,00 €
Percentage of investment
: 3,7 %3,70 %
Municipality
Mafra
:Approved amount
: 141636365 €,141 636 365,00 €
Amount spent
: 91058045 €,91 058 045,00 €
Percentage of investment
: 2,57 %2,57 %
Municipality
Oeiras
:Approved amount
: 482692091 €,482 692 091,00 €
Amount spent
: 308983214 €,308 983 214,00 €
Percentage of investment
: 8,75 %8,75 %
Municipality
Sintra
:Approved amount
: 193265747 €,193 265 747,00 €
Amount spent
: 104859642 €,104 859 642,00 €
Percentage of investment
: 3,5 %3,50 %
Municipality
Vila Franca de Xira
:Approved amount
: 122765066 €,122 765 066,00 €
Amount spent
: 65331506 €,65 331 506,00 €
Percentage of investment
: 2,22 %2,22 %
Municipality
Amadora
:Approved amount
: 230616392 €,230 616 392,00 €
Amount spent
: 164025387 €,164 025 387,00 €
Percentage of investment
: 4,18 %4,18 %
Municipality
Odivelas
:Approved amount
: 72119738 €,72 119 738,00 €
Amount spent
: 41409049 €,41 409 049,00 €
Percentage of investment
: 1,31 %1,31 %
Municipality
Alcochete
:Approved amount
: 19141046 €,19 141 046,00 €
Amount spent
: 9693350 €,9 693 350,00 €
Percentage of investment
: 0,35 %0,35 %
Municipality
Almada
:Approved amount
: 129953978 €,129 953 978,00 €
Amount spent
: 68497600 €,68 497 600,00 €
Percentage of investment
: 2,35 %2,35 %
Municipality
Barreiro
:Approved amount
: 73064131 €,73 064 131,00 €
Amount spent
: 41448876 €,41 448 876,00 €
Percentage of investment
: 1,32 %1,32 %
Municipality
Moita
:Approved amount
: 27181054 €,27 181 054,00 €
Amount spent
: 18322209 €,18 322 209,00 €
Percentage of investment
: 0,49 %0,49 %
Municipality
Montijo
:Approved amount
: 46665881 €,46 665 881,00 €
Amount spent
: 31599122 €,31 599 122,00 €
Percentage of investment
: 0,85 %0,85 %
Municipality
Palmela
:Approved amount
: 40904915 €,40 904 915,00 €
Amount spent
: 23995318 €,23 995 318,00 €
Percentage of investment
: 0,74 %0,74 %
Municipality
Seixal
:Approved amount
: 106368802 €,106 368 802,00 €
Amount spent
: 67955852 €,67 955 852,00 €
Percentage of investment
: 1,93 %1,93 %
Municipality
Sesimbra
:Approved amount
: 48349722 €,48 349 722,00 €
Amount spent
: 41662162 €,41 662 162,00 €
Percentage of investment
: 0,88 %0,88 %
Municipality
Setúbal
:Approved amount
: 349376503 €,349 376 503,00 €
Amount spent
: 197620414 €,197 620 414,00 €
Percentage of investment
: 6,33 %6,33 %
Total
Approved amount
: 5518231597 €,5 518 231 597,00 €
Amount spent
: 3383444102 €,3 383 444 102,00 €
Percentage of investment
Region
Alentejo
:Sub-region
Alentejo Litoral
:Municipality
Odemira
:Approved amount
: 20395663 €,20 395 663,00 €
Amount spent
: 13724023 €,13 724 023,00 €
Percentage of investment
: 7,4 %7,40 %
Municipality
Alcácer do Sal
:Approved amount
: 21387159 €,21 387 159,00 €
Amount spent
: 6312907 €,6 312 907,00 €
Percentage of investment
: 7,76 %7,76 %
Municipality
Grândola
:Approved amount
: 60322182 €,60 322 182,00 €
Amount spent
: 50987630 €,50 987 630,00 €
Percentage of investment
: 21,9 %21,90 %
Municipality
Santiago do Cacém
:Approved amount
: 114322196 €,114 322 196,00 €
Amount spent
: 76683202 €,76 683 202,00 €
Percentage of investment
: 41,5 %41,50 %
Municipality
Sines
:Approved amount
: 59063594 €,59 063 594,00 €
Amount spent
: 21698842 €,21 698 842,00 €
Percentage of investment
: 21,44 %21,44 %
Total
Approved amount
: 275490794 €,275 490 794,00 €
Amount spent
: 169406605 €,169 406 605,00 €
Percentage of investment
Sub-region
Baixo Alentejo
:Municipality
Aljustrel
:Approved amount
: 31862024 €,31 862 024,00 €
Amount spent
: 27196597 €,27 196 597,00 €
Percentage of investment
: 14,18 %14,18 %
Municipality
Almodôvar
:Approved amount
: 2266450 €,2 266 450,00 €
Amount spent
: 1445615 €,1 445 615,00 €
Percentage of investment
: 1,01 %1,01 %
Municipality
Alvito
:Approved amount
: 5916598 €,5 916 598,00 €
Amount spent
: 2238856 €,2 238 856,00 €
Percentage of investment
: 2,63 %2,63 %
Municipality
Barrancos
:Approved amount
: 2102732 €,2 102 732,00 €
Amount spent
: 1816153 €,1 816 153,00 €
Percentage of investment
: 0,94 %0,94 %
Municipality
Beja
:Approved amount
: 92407589 €,92 407 589,00 €
Amount spent
: 66634576 €,66 634 576,00 €
Percentage of investment
: 41,13 %41,13 %
Municipality
Castro Verde
:Approved amount
: 1452830 €,1 452 830,00 €
Amount spent
: 931138 €,931 138,00 €
Percentage of investment
: 0,65 %0,65 %
Municipality
Cuba
:Approved amount
: 1266778 €,1 266 778,00 €
Amount spent
: 818707 €,818 707,00 €
Percentage of investment
: 0,56 %0,56 %
Municipality
Ferreira do Alentejo
:Approved amount
: 51332556 €,51 332 556,00 €
Amount spent
: 41670679 €,41 670 679,00 €
Percentage of investment
: 22,85 %22,85 %
Municipality
Mértola
:Approved amount
: 22481740 €,22 481 740,00 €
Amount spent
: 14687745 €,14 687 745,00 €
Percentage of investment
: 10,01 %10,01 %
Municipality
Moura
:Approved amount
: 3448389 €,3 448 389,00 €
Amount spent
: 2154898 €,2 154 898,00 €
Percentage of investment
: 1,53 %1,53 %
Municipality
Ourique
:Approved amount
: 4550409 €,4 550 409,00 €
Amount spent
: 2256476 €,2 256 476,00 €
Percentage of investment
: 2,03 %2,03 %
Municipality
Serpa
:Approved amount
: 3153301 €,3 153 301,00 €
Amount spent
: 1482345 €,1 482 345,00 €
Percentage of investment
: 1,4 %1,40 %
Municipality
Vidigueira
:Approved amount
: 2418467 €,2 418 467,00 €
Amount spent
: 1375564 €,1 375 564,00 €
Percentage of investment
: 1,08 %1,08 %
Total
Approved amount
: 224659862 €,224 659 862,00 €
Amount spent
: 164709350 €,164 709 350,00 €
Percentage of investment
Sub-region
Lezíria do Tejo
:Municipality
Azambuja
:Approved amount
: 43755487 €,43 755 487,00 €
Amount spent
: 20409925 €,20 409 925,00 €
Percentage of investment
: 13,09 %13,09 %
Municipality
Almeirim
:Approved amount
: 4321930 €,4 321 930,00 €
Amount spent
: 2865543 €,2 865 543,00 €
Percentage of investment
: 1,29 %1,29 %
Municipality
Alpiarça
:Approved amount
: 6943049 €,6 943 049,00 €
Amount spent
: 4385607 €,4 385 607,00 €
Percentage of investment
: 2,08 %2,08 %
Municipality
Benavente
:Approved amount
: 50161092 €,50 161 092,00 €
Amount spent
: 26393944 €,26 393 944,00 €
Percentage of investment
: 15,01 %15,01 %
Municipality
Cartaxo
:Approved amount
: 20798502 €,20 798 502,00 €
Amount spent
: 16332500 €,16 332 500,00 €
Percentage of investment
: 6,22 %6,22 %
Municipality
Chamusca
:Approved amount
: 8777528 €,8 777 528,00 €
Amount spent
: 6336068 €,6 336 068,00 €
Percentage of investment
: 2,63 %2,63 %
Municipality
Coruche
:Approved amount
: 7053553 €,7 053 553,00 €
Amount spent
: 4527296 €,4 527 296,00 €
Percentage of investment
: 2,11 %2,11 %
Municipality
Golegã
:Approved amount
: 10184257 €,10 184 257,00 €
Amount spent
: 5906353 €,5 906 353,00 €
Percentage of investment
: 3,05 %3,05 %
Municipality
Rio Maior
:Approved amount
: 61136654 €,61 136 654,00 €
Amount spent
: 26964058 €,26 964 058,00 €
Percentage of investment
: 18,3 %18,30 %
Municipality
Salvaterra de Magos
:Approved amount
: 12450598 €,12 450 598,00 €
Amount spent
: 8415388 €,8 415 388,00 €
Percentage of investment
: 3,73 %3,73 %
Municipality
Santarém
:Approved amount
: 108566789 €,108 566 789,00 €
Amount spent
: 67847901 €,67 847 901,00 €
Percentage of investment
: 32,49 %32,49 %
Total
Approved amount
: 334149437 €,334 149 437,00 €
Amount spent
: 190384583 €,190 384 583,00 €
Percentage of investment
Sub-region
Alto Alentejo
:Municipality
Alter do Chão
:Approved amount
: 12601338 €,12 601 338,00 €
Amount spent
: 4050588 €,4 050 588,00 €
Percentage of investment
: 5,01 %5,01 %
Municipality
Arronches
:Approved amount
: 2098854 €,2 098 854,00 €
Amount spent
: 1402945 €,1 402 945,00 €
Percentage of investment
: 0,83 %0,83 %
Municipality
Avis
:Approved amount
: 1515312 €,1 515 312,00 €
Amount spent
: 828111 €,828 111,00 €
Percentage of investment
: 0,6 %0,60 %
Municipality
Campo Maior
:Approved amount
: 19960746 €,19 960 746,00 €
Amount spent
: 12778110 €,12 778 110,00 €
Percentage of investment
: 7,94 %7,94 %
Municipality
Castelo de Vide
:Approved amount
: 4300103 €,4 300 103,00 €
Amount spent
: 1689412 €,1 689 412,00 €
Percentage of investment
: 1,71 %1,71 %
Municipality
Crato
:Approved amount
: 634682 €,634 682,00 €
Amount spent
: 423424 €,423 424,00 €
Percentage of investment
: 0,25 %0,25 %
Municipality
Elvas
:Approved amount
: 50626116 €,50 626 116,00 €
Amount spent
: 22018431 €,22 018 431,00 €
Percentage of investment
: 20,14 %20,14 %
Municipality
Fronteira
:Approved amount
: 1615592 €,1 615 592,00 €
Amount spent
: 1133212 €,1 133 212,00 €
Percentage of investment
: 0,64 %0,64 %
Municipality
Gavião
:Approved amount
: 20320101 €,20 320 101,00 €
Amount spent
: 3800926 €,3 800 926,00 €
Percentage of investment
: 8,08 %8,08 %
Municipality
Marvão
:Approved amount
: 3854686 €,3 854 686,00 €
Amount spent
: 2097068 €,2 097 068,00 €
Percentage of investment
: 1,53 %1,53 %
Municipality
Monforte
:Approved amount
: 16369186 €,16 369 186,00 €
Amount spent
: 1044153 €,1 044 153,00 €
Percentage of investment
: 6,51 %6,51 %
Municipality
Nisa
:Approved amount
: 18774827 €,18 774 827,00 €
Amount spent
: 2222971 €,2 222 971,00 €
Percentage of investment
: 7,47 %7,47 %
Municipality
Ponte de Sor
:Approved amount
: 14330014 €,14 330 014,00 €
Amount spent
: 8297037 €,8 297 037,00 €
Percentage of investment
: 5,7 %5,70 %
Municipality
Portalegre
:Approved amount
: 74046086 €,74 046 086,00 €
Amount spent
: 42119733 €,42 119 733,00 €
Percentage of investment
: 29,45 %29,45 %
Municipality
Sousel
:Approved amount
: 10353480 €,10 353 480,00 €
Amount spent
: 9310136 €,9 310 136,00 €
Percentage of investment
: 4,12 %4,12 %
Total
Approved amount
: 251401124 €,251 401 124,00 €
Amount spent
: 113216258 €,113 216 258,00 €
Percentage of investment
Sub-region
Alentejo Central
:Municipality
Alandroal
:Approved amount
: 4402331 €,4 402 331,00 €
Amount spent
: 2549842 €,2 549 842,00 €
Percentage of investment
: 1,79 %1,79 %
Municipality
Arraiolos
:Approved amount
: 2180187 €,2 180 187,00 €
Amount spent
: 1715785 €,1 715 785,00 €
Percentage of investment
: 0,88 %0,88 %
Municipality
Borba
:Approved amount
: 18220585 €,18 220 585,00 €
Amount spent
: 5588815 €,5 588 815,00 €
Percentage of investment
: 7,39 %7,39 %
Municipality
Estremoz
:Approved amount
: 7498402 €,7 498 402,00 €
Amount spent
: 4932862 €,4 932 862,00 €
Percentage of investment
: 3,04 %3,04 %
Municipality
Évora
:Approved amount
: 168269398 €,168 269 398,00 €
Amount spent
: 104874636 €,104 874 636,00 €
Percentage of investment
: 68,25 %68,25 %
Municipality
Montemor-o-Novo
:Approved amount
: 5344629 €,5 344 629,00 €
Amount spent
: 2609744 €,2 609 744,00 €
Percentage of investment
: 2,17 %2,17 %
Municipality
Mora
:Approved amount
: 2938313 €,2 938 313,00 €
Amount spent
: 1612889 €,1 612 889,00 €
Percentage of investment
: 1,19 %1,19 %
Municipality
Mourão
:Approved amount
: 1216720 €,1 216 720,00 €
Amount spent
: 869131 €,869 131,00 €
Percentage of investment
: 0,49 %0,49 %
Municipality
Portel
:Approved amount
: 1573125 €,1 573 125,00 €
Amount spent
: 813016 €,813 016,00 €
Percentage of investment
: 0,64 %0,64 %
Municipality
Redondo
:Approved amount
: 8406713 €,8 406 713,00 €
Amount spent
: 2377286 €,2 377 286,00 €
Percentage of investment
: 3,41 %3,41 %
Municipality
Reguengos de Monsaraz
:Approved amount
: 9117391 €,9 117 391,00 €
Amount spent
: 6379674 €,6 379 674,00 €
Percentage of investment
: 3,7 %3,70 %
Municipality
Vendas Novas
:Approved amount
: 7068209 €,7 068 209,00 €
Amount spent
: 3110280 €,3 110 280,00 €
Percentage of investment
: 2,87 %2,87 %
Municipality
Viana do Alentejo
:Approved amount
: 2493628 €,2 493 628,00 €
Amount spent
: 1558102 €,1 558 102,00 €
Percentage of investment
: 1,01 %1,01 %
Municipality
Vila Viçosa
:Approved amount
: 7817008 €,7 817 008,00 €
Amount spent
: 6201583 €,6 201 583,00 €
Percentage of investment
: 3,17 %3,17 %
Total
Approved amount
: 246546638 €,246 546 638,00 €
Amount spent
: 145193644 €,145 193 644,00 €
Percentage of investment
Region
Algarve
:Sub-region
Algarve
:Municipality
Albufeira
:Approved amount
: 45974070 €,45 974 070,00 €
Amount spent
: 33069483 €,33 069 483,00 €
Percentage of investment
: 6,35 %6,35 %
Municipality
Alcoutim
:Approved amount
: 35248087 €,35 248 087,00 €
Amount spent
: 7556548 €,7 556 548,00 €
Percentage of investment
: 4,87 %4,87 %
Municipality
Aljezur
:Approved amount
: 7813354 €,7 813 354,00 €
Amount spent
: 3333349 €,3 333 349,00 €
Percentage of investment
: 1,08 %1,08 %
Municipality
Castro Marim
:Approved amount
: 3375962 €,3 375 962,00 €
Amount spent
: 1869263 €,1 869 263,00 €
Percentage of investment
: 0,47 %0,47 %
Municipality
Faro
:Approved amount
: 152713268 €,152 713 268,00 €
Amount spent
: 88316253 €,88 316 253,00 €
Percentage of investment
: 21,1 %21,10 %
Municipality
Lagoa
:Approved amount
: 20470398 €,20 470 398,00 €
Amount spent
: 13996922 €,13 996 922,00 €
Percentage of investment
: 2,83 %2,83 %
Municipality
Lagos
:Approved amount
: 45883958 €,45 883 958,00 €
Amount spent
: 29310037 €,29 310 037,00 €
Percentage of investment
: 6,34 %6,34 %
Municipality
Loulé
:Approved amount
: 63524050 €,63 524 050,00 €
Amount spent
: 39331525 €,39 331 525,00 €
Percentage of investment
: 8,78 %8,78 %
Municipality
Monchique
:Approved amount
: 13964688 €,13 964 688,00 €
Amount spent
: 8032917 €,8 032 917,00 €
Percentage of investment
: 1,93 %1,93 %
Municipality
Olhão
:Approved amount
: 54581579 €,54 581 579,00 €
Amount spent
: 36529833 €,36 529 833,00 €
Percentage of investment
: 7,54 %7,54 %
Municipality
Portimão
:Approved amount
: 65205368 €,65 205 368,00 €
Amount spent
: 31440693 €,31 440 693,00 €
Percentage of investment
: 9,01 %9,01 %
Municipality
São Brás de Alportel
:Approved amount
: 7726804 €,7 726 804,00 €
Amount spent
: 5615089 €,5 615 089,00 €
Percentage of investment
: 1,07 %1,07 %
Municipality
Silves
:Approved amount
: 30956272 €,30 956 272,00 €
Amount spent
: 19160935 €,19 160 935,00 €
Percentage of investment
: 4,28 %4,28 %
Municipality
Tavira
:Approved amount
: 19174602 €,19 174 602,00 €
Amount spent
: 11694658 €,11 694 658,00 €
Percentage of investment
: 2,65 %2,65 %
Municipality
Vila do Bispo
:Approved amount
: 7685946 €,7 685 946,00 €
Amount spent
: 3918130 €,3 918 130,00 €
Percentage of investment
: 1,06 %1,06 %
Municipality
Vila Real de Santo António
:Approved amount
: 149562511 €,149 562 511,00 €
Amount spent
: 128073434 €,128 073 434,00 €
Percentage of investment
: 20,66 %20,66 %
Total
Approved amount
: 723860916 €,723 860 916,00 €
Amount spent
: 461249070 €,461 249 070,00 €
Percentage of investment
Region
Autonomous Region of the Azores
:Sub-region
Autonomous Region of the Azores
:Municipality
Vila do Porto
:Approved amount
: 7737008 €,7 737 008,00 €
Amount spent
: 4339030 €,4 339 030,00 €
Percentage of investment
: 0,69 %0,69 %
Municipality
Lagoa
:Approved amount
: 39925529 €,39 925 529,00 €
Amount spent
: 23131430 €,23 131 430,00 €
Percentage of investment
: 3,56 %3,56 %
Municipality
Nordeste
:Approved amount
: 7814357 €,7 814 357,00 €
Amount spent
: 4592858 €,4 592 858,00 €
Percentage of investment
: 0,7 %0,70 %
Municipality
Ponta Delgada
:Approved amount
: 560685890 €,560 685 890,00 €
Amount spent
: 368512862 €,368 512 862,00 €
Percentage of investment
: 50,05 %50,05 %
Municipality
Povoação
:Approved amount
: 5730881 €,5 730 881,00 €
Amount spent
: 2693719 €,2 693 719,00 €
Percentage of investment
: 0,51 %0,51 %
Municipality
Ribeira Grande
:Approved amount
: 141500681 €,141 500 681,00 €
Amount spent
: 77952241 €,77 952 241,00 €
Percentage of investment
: 12,63 %12,63 %
Municipality
Vila Franca do Campo
:Approved amount
: 13410887 €,13 410 887,00 €
Amount spent
: 10726044 €,10 726 044,00 €
Percentage of investment
: 1,2 %1,20 %
Municipality
Angra do Heroísmo
:Approved amount
: 176241975 €,176 241 975,00 €
Amount spent
: 114767864 €,114 767 864,00 €
Percentage of investment
: 15,73 %15,73 %
Municipality
Vila da Praia da Vitória
:Approved amount
: 13494102 €,13 494 102,00 €
Amount spent
: 9518940 €,9 518 940,00 €
Percentage of investment
: 1,2 %1,20 %
Municipality
Santa Cruz da Graciosa
:Approved amount
: 10793334 €,10 793 334,00 €
Amount spent
: 4863616 €,4 863 616,00 €
Percentage of investment
: 0,96 %0,96 %
Municipality
Calheta
:Approved amount
: 3011543 €,3 011 543,00 €
Amount spent
: 2233893 €,2 233 893,00 €
Percentage of investment
: 0,27 %0,27 %
Municipality
Velas
:Approved amount
: 6379185 €,6 379 185,00 €
Amount spent
: 4198086 €,4 198 086,00 €
Percentage of investment
: 0,57 %0,57 %
Municipality
Lajes do Pico
:Approved amount
: 4572730 €,4 572 730,00 €
Amount spent
: 2700496 €,2 700 496,00 €
Percentage of investment
: 0,41 %0,41 %
Municipality
Madalena
:Approved amount
: 16578963 €,16 578 963,00 €
Amount spent
: 11664262 €,11 664 262,00 €
Percentage of investment
: 1,48 %1,48 %
Municipality
São Roque do Pico
:Approved amount
: 13798486 €,13 798 486,00 €
Amount spent
: 9409550 €,9 409 550,00 €
Percentage of investment
: 1,23 %1,23 %
Municipality
Horta
:Approved amount
: 92942145 €,92 942 145,00 €
Amount spent
: 74117679 €,74 117 679,00 €
Percentage of investment
: 8,3 %8,30 %
Municipality
Lajes das Flores
:Approved amount
: 2419029 €,2 419 029,00 €
Amount spent
: 1142797 €,1 142 797,00 €
Percentage of investment
: 0,22 %0,22 %
Municipality
Santa Cruz das Flores
:Approved amount
: 2705289 €,2 705 289,00 €
Amount spent
: 1603727 €,1 603 727,00 €
Percentage of investment
: 0,24 %0,24 %
Municipality
Corvo
:Approved amount
: 420105 €,420 105,00 €
Amount spent
: 340867 €,340 867,00 €
Percentage of investment
: 0,04 %0,04 %
Total
Approved amount
: 1120162122 €,1 120 162 122,00 €
Amount spent
: 728509959 €,728 509 959,00 €
Percentage of investment
Region
Autonomous Region of Madeira
:Sub-region
Autonomous Region of Madeira
:Municipality
Calheta
:Approved amount
: 12613076 €,12 613 076,00 €
Amount spent
: 5014383 €,5 014 383,00 €
Percentage of investment
: 1,38 %1,38 %
Municipality
Câmara de Lobos
:Approved amount
: 29874042 €,29 874 042,00 €
Amount spent
: 9458682 €,9 458 682,00 €
Percentage of investment
: 3,26 %3,26 %
Municipality
Funchal
:Approved amount
: 676095161 €,676 095 161,00 €
Amount spent
: 454556320 €,454 556 320,00 €
Percentage of investment
: 73,87 %73,87 %
Municipality
Machico
:Approved amount
: 49184129 €,49 184 129,00 €
Amount spent
: 12039495 €,12 039 495,00 €
Percentage of investment
: 5,37 %5,37 %
Municipality
Ponta do Sol
:Approved amount
: 21695218 €,21 695 218,00 €
Amount spent
: 7245848 €,7 245 848,00 €
Percentage of investment
: 2,37 %2,37 %
Municipality
Porto Moniz
:Approved amount
: 596718 €,596 718,00 €
Amount spent
: 328562 €,328 562,00 €
Percentage of investment
: 0,07 %0,07 %
Municipality
Ribeira Brava
:Approved amount
: 13901603 €,13 901 603,00 €
Amount spent
: 11778642 €,11 778 642,00 €
Percentage of investment
: 1,52 %1,52 %
Municipality
Santa Cruz
:Approved amount
: 28061570 €,28 061 570,00 €
Amount spent
: 13211733 €,13 211 733,00 €
Percentage of investment
: 3,07 %3,07 %
Municipality
Santana
:Approved amount
: 16764322 €,16 764 322,00 €
Amount spent
: 667966 €,667 966,00 €
Percentage of investment
: 1,83 %1,83 %
Municipality
São Vicente
:Approved amount
: 26172087 €,26 172 087,00 €
Amount spent
: 9217263 €,9 217 263,00 €
Percentage of investment
: 2,86 %2,86 %
Municipality
Porto Santo
:Approved amount
: 40274320 €,40 274 320,00 €
Amount spent
: 21257806 €,21 257 806,00 €
Percentage of investment
: 4,4 %4,40 %
Total
Approved amount
: 915232246 €,915 232 246,00 €
Amount spent
: 544776700 €,544 776 700,00 €
Percentage of investment
Region
Nation-wide investment
:Approved amount
: 3658561304 €,3 658 561 304,00 €
:Amount spent
: {{ regionNutsii.apoio_gasto|floatformat:'-2'|cut:' '|checkifdataisavailable|euro_symbol,2 679 369 203,00 €
:Comparison between realities
Assessing the impact of investments in the Recovery and Resilience Plan on the daily lives of populations is not a simple topic. It is necessary to analyze the context in a broader way and understand how investments can suppress everyday needs.
However, there are some indicators that can help to envision an equitable way in which investments are being distributed geographically.
How much is already approved to invest per inhabitant?
Number of inhabitants according to the 2021 Census
How much is already approved to invest per inhabitant?
Number of inhabitants according to the 2021 Census
| Municipality | Approved amount |
|---|---|
| Highest national value Vinhais | 14368 € 14 368,00 € |
| National average | 2431 € 2 431,00 € |
| Lowest national value Almeirim | 196 € 196,00 € |
How much is already approved to invest per inhabitant?
Municipality
Highest national value Vinhais
Approved amount
14368 €
14 368,00 €
Municipality
National average
Approved amount
2431 €
2 431,00 €
Municipality
Lowest national value Almeirim
Approved amount
196 €
196,00 €
How much is already approved to invest per km2?
How much is already approved to invest per km2?
| Municipality | Approved amount |
|---|---|
| Highest national value Porto | 34608341 € 34 608 341,00 € |
| National average | 272649 € 272 649,00 € |
| Lowest national value Crato | 1594 € 1 594,00 € |
How much is already approved to invest per km2?
Municipality
Highest national value Porto
Approved amount
34608341 €
34 608 341,00 €
Municipality
National average
Approved amount
272649 €
272 649,00 €
Municipality
Lowest national value Crato
Approved amount
1594 €
1 594,00 €
If you'd like to know more about a specific municipality, tell us which one...