Investment by regions
Discover how the investments already approved in the Recovery and Resilience Plan are distributed across the various regions of the country.
Recovery and Resilience Plan in numbers
21,9 billion €
Total investment to be applied by the Recovery and Resilience Plan
2,7 billion €
Total amount of funds already allocated to Nation-wide investments
12,6 billion €
Total amount of funds already invested in municipalities and regions
Geography of investments
The Recovery and Resilience Plan aims to provide the country with a set of tools for the future, seeking to ensure a more resilient economy, a more sustainable relationship with the environment, and more digital processes and functioning.
All of this is contributed by a broad geographical distribution of its investments and reforms, ensuring that both nationally implemented projects and resources applied in all municipalities of the country are invested where they have the greatest impact on the lives of the population.
Distribution of investment by regions
Distribution of investment by regions
| Region | Sub-region | Municipality | Approved amount | Amount spent | Percentage of investment |
|---|---|---|---|---|---|
| North |
Alto Minho
Cávado
Ave
Área Metropolitana do Porto
Alto Tâmega
Tâmega e Sousa
Douro
Terras de Trás-os-Montes
|
Arcos de Valdevez
Caminha
Melgaço
Monção
Paredes de Coura
Ponte da Barca
Ponte de Lima
Valença
Viana do Castelo
Vila Nova de Cerveira
Total
Amares
Barcelos
Braga
Esposende
Terras de Bouro
Vila Verde
Total
Cabeceiras de Basto
Fafe
Guimarães
Póvoa de Lanhoso
Vieira do Minho
Vila Nova de Famalicão
Vizela
Mondim de Basto
Total
Arouca
Espinho
Santa Maria da Feira
Oliveira de Azeméis
São João da Madeira
Vale de Cambra
Gondomar
Maia
Matosinhos
Paredes
Porto
Póvoa de Varzim
Santo Tirso
Valongo
Vila do Conde
Vila Nova de Gaia
Trofa
Total
Boticas
Chaves
Montalegre
Ribeira de Pena
Valpaços
Vila Pouca de Aguiar
Total
Castelo de Paiva
Celorico de Basto
Amarante
Baião
Felgueiras
Lousada
Marco de Canaveses
Paços de Ferreira
Penafiel
Cinfães
Resende
Total
Carrazeda de Ansiães
Freixo de Espada à Cinta
Torre de Moncorvo
Vila Nova de Foz Côa
Alijó
Mesão Frio
Murça
Peso da Régua
Sabrosa
Santa Marta de Penaguião
Vila Real
Armamar
Lamego
Moimenta da Beira
Penedono
São João da Pesqueira
Sernancelhe
Tabuaço
Tarouca
Total
Alfândega da Fé
Bragança
Macedo de Cavaleiros
Miranda do Douro
Mirandela
Mogadouro
Vila Flor
Vimioso
Vinhais
Total
|
29 975 397,00 €
14 200 547,00 €
20 409 759,00 €
31 610 919,00 €
6 783 028,00 €
10 096 968,00 €
31 929 347,00 €
35 465 847,00 €
186 312 790,00 €
19 350 460,00 €
386 135 062,00 €
12 193 031,00 €
187 080 747,00 €
436 532 826,00 €
51 705 630,00 €
4 588 157,00 €
34 566 532,00 €
726 666 923,00 €
13 564 868,00 €
51 780 021,00 €
462 804 786,00 €
26 398 614,00 €
6 479 057,00 €
314 258 539,00 €
28 395 976,00 €
9 755 217,00 €
913 437 078,00 €
28 297 552,00 €
23 772 114,00 €
133 752 719,00 €
86 202 796,00 €
72 604 897,00 €
35 261 679,00 €
92 228 113,00 €
279 862 840,00 €
707 357 862,00 €
96 599 867,00 €
1 432 832 156,00 €
84 823 108,00 €
92 733 959,00 €
72 562 374,00 €
153 502 782,00 €
346 571 990,00 €
96 606 095,00 €
3 835 572 903,00 €
6 162 572,00 €
51 903 699,00 €
7 395 524,00 €
14 029 711,00 €
5 969 712,00 €
20 441 032,00 €
105 902 249,00 €
26 227 471,00 €
25 284 087,00 €
64 233 017,00 €
48 960 665,00 €
47 064 990,00 €
50 831 601,00 €
35 194 627,00 €
90 820 943,00 €
148 272 887,00 €
17 503 159,00 €
6 157 366,00 €
560 550 813,00 €
5 714 750,00 €
7 543 857,00 €
3 986 199,00 €
10 601 289,00 €
13 469 053,00 €
1 443 780,00 €
4 452 147,00 €
23 908 868,00 €
13 467 670,00 €
10 960 616,00 €
203 261 366,00 €
4 196 711,00 €
34 219 009,00 €
16 350 075,00 €
6 191 072,00 €
11 331 114,00 €
12 248 855,00 €
4 842 911,00 €
10 831 866,00 €
399 021 209,00 €
15 787 425,00 €
90 962 326,00 €
14 027 750,00 €
3 584 298,00 €
24 206 800,00 €
12 495 342,00 €
1 997 116,00 €
2 702 610,00 €
111 621 894,00 €
277 385 561,00 €
|
17 028 204,00 €
6 295 216,00 €
17 918 178,00 €
18 434 329,00 €
3 631 108,00 €
5 120 403,00 €
19 208 323,00 €
16 506 745,00 €
126 894 289,00 €
13 063 408,00 €
244 100 204,00 €
7 660 386,00 €
90 290 137,00 €
287 084 940,00 €
21 847 454,00 €
2 209 569,00 €
22 184 874,00 €
431 277 360,00 €
5 379 612,00 €
30 244 212,00 €
283 976 485,00 €
11 956 982,00 €
3 544 676,00 €
194 725 164,00 €
20 871 205,00 €
4 276 407,00 €
554 974 744,00 €
15 218 138,00 €
7 871 831,00 €
76 873 864,00 €
39 269 202,00 €
44 059 942,00 €
20 643 068,00 €
51 921 899,00 €
171 576 840,00 €
453 014 811,00 €
55 929 792,00 €
934 899 536,00 €
63 212 274,00 €
62 944 109,00 €
34 813 852,00 €
96 481 199,00 €
176 683 974,00 €
73 619 309,00 €
2 379 033 639,00 €
3 850 162,00 €
24 278 256,00 €
2 994 863,00 €
9 525 087,00 €
3 570 902,00 €
9 036 641,00 €
53 255 913,00 €
16 627 883,00 €
18 304 201,00 €
36 565 165,00 €
43 588 007,00 €
28 862 549,00 €
35 302 738,00 €
24 304 794,00 €
54 864 102,00 €
111 962 367,00 €
13 696 948,00 €
3 665 186,00 €
387 743 941,00 €
2 167 676,00 €
3 016 232,00 €
2 785 519,00 €
4 180 192,00 €
9 786 578,00 €
755 019,00 €
1 572 442,00 €
16 140 761,00 €
6 569 481,00 €
3 944 735,00 €
118 986 092,00 €
1 859 970,00 €
16 657 651,00 €
8 889 204,00 €
2 925 183,00 €
5 219 842,00 €
5 459 167,00 €
2 406 317,00 €
3 575 648,00 €
216 897 706,00 €
8 849 422,00 €
56 850 881,00 €
8 482 502,00 €
1 850 364,00 €
14 720 065,00 €
6 268 572,00 €
1 268 787,00 €
2 186 452,00 €
108 835 281,00 €
209 312 326,00 €
|
7,76 %
3,68 %
5,29 %
8,19 %
1,76 %
2,61 %
8,27 %
9,18 %
48,25 %
5,01 %
1,68 %
25,75 %
60,07 %
7,12 %
0,63 %
4,76 %
1,49 %
5,67 %
50,67 %
2,89 %
0,71 %
34,40 %
3,11 %
1,07 %
0,74 %
0,62 %
3,49 %
2,25 %
1,89 %
0,92 %
2,40 %
7,30 %
18,44 %
2,52 %
37,36 %
2,21 %
2,42 %
1,89 %
4,00 %
9,04 %
2,52 %
5,82 %
49,01 %
6,98 %
13,25 %
5,64 %
19,30 %
4,68 %
4,51 %
11,46 %
8,73 %
8,40 %
9,07 %
6,28 %
16,20 %
26,45 %
3,12 %
1,10 %
1,43 %
1,89 %
1,00 %
2,66 %
3,38 %
0,36 %
1,12 %
5,99 %
3,38 %
2,75 %
50,94 %
1,05 %
8,58 %
4,10 %
1,55 %
2,84 %
3,07 %
1,21 %
2,71 %
5,69 %
32,79 %
5,06 %
1,29 %
8,73 %
4,50 %
0,72 %
0,97 %
40,24 %
|
| Center |
Oeste
Região de Aveiro
Região de Coimbra
Região de Leiria
Viseu Dão Lafões
Beira Baixa
Médio Tejo
Beiras e Serra da Estrela
|
Alcobaça
Bombarral
Caldas da Rainha
Nazaré
Óbidos
Peniche
Alenquer
Arruda dos Vinhos
Cadaval
Lourinhã
Sobral de Monte Agraço
Torres Vedras
Total
Águeda
Albergaria-a-Velha
Anadia
Aveiro
Estarreja
Ílhavo
Murtosa
Oliveira do Bairro
Ovar
Sever do Vouga
Vagos
Total
Mealhada
Arganil
Cantanhede
Coimbra
Condeixa-a-Nova
Figueira da Foz
Góis
Lousã
Mira
Miranda do Corvo
Montemor-o-Velho
Oliveira do Hospital
Pampilhosa da Serra
Penacova
Penela
Soure
Tábua
Vila Nova de Poiares
Mortágua
Total
Alvaiázere
Ansião
Batalha
Castanheira de Pêra
Figueiró dos Vinhos
Leiria
Marinha Grande
Pedrógão Grande
Pombal
Porto de Mós
Total
Aguiar da Beira
Carregal do Sal
Castro Daire
Mangualde
Nelas
Oliveira de Frades
Penalva do Castelo
Santa Comba Dão
São Pedro do Sul
Sátão
Tondela
Vila Nova de Paiva
Viseu
Vouzela
Total
Castelo Branco
Idanha-a-Nova
Oleiros
Penamacor
Proença-a-Nova
Vila Velha de Ródão
Total
Sertã
Vila de Rei
Abrantes
Alcanena
Constância
Entroncamento
Ferreira do Zêzere
Mação
Sardoal
Tomar
Torres Novas
Vila Nova da Barquinha
Ourém
Total
Belmonte
Covilhã
Fundão
Almeida
Celorico da Beira
Figueira de Castelo Rodrigo
Fornos de Algodres
Gouveia
Guarda
Manteigas
Mêda
Pinhel
Sabugal
Seia
Trancoso
Total
|
58 568 445,00 €
5 498 635,00 €
74 283 699,00 €
38 628 421,00 €
14 989 345,00 €
28 605 434,00 €
51 503 764,00 €
25 231 685,00 €
12 948 719,00 €
11 864 904,00 €
2 473 056,00 €
128 612 150,00 €
453 208 257,00 €
192 598 608,00 €
30 004 515,00 €
28 724 499,00 €
345 946 613,00 €
69 372 175,00 €
130 185 568,00 €
11 000 144,00 €
43 646 990,00 €
65 483 087,00 €
11 721 920,00 €
32 686 727,00 €
961 370 846,00 €
20 138 152,00 €
25 372 461,00 €
69 005 722,00 €
571 401 297,00 €
12 761 427,00 €
164 532 583,00 €
9 646 160,00 €
25 894 632,00 €
19 678 286,00 €
11 855 495,00 €
15 831 678,00 €
60 413 314,00 €
17 248 626,00 €
16 477 653,00 €
7 082 227,00 €
7 531 661,00 €
17 802 473,00 €
7 515 701,00 €
7 593 949,00 €
1 087 783 498,00 €
12 885 790,00 €
10 152 041,00 €
33 380 822,00 €
7 066 390,00 €
6 484 641,00 €
345 148 394,00 €
144 788 471,00 €
8 145 947,00 €
82 081 136,00 €
45 186 321,00 €
695 319 952,00 €
13 355 832,00 €
31 562 103,00 €
11 660 841,00 €
81 038 563,00 €
45 633 847,00 €
15 931 750,00 €
2 145 765,00 €
8 184 191,00 €
14 238 650,00 €
8 362 441,00 €
35 381 125,00 €
9 725 937,00 €
163 075 697,00 €
24 472 783,00 €
464 769 524,00 €
87 596 695,00 €
10 879 198,00 €
20 204 936,00 €
12 876 694,00 €
23 205 813,00 €
20 496 864,00 €
175 260 201,00 €
26 716 141,00 €
11 556 239,00 €
38 281 900,00 €
34 172 413,00 €
28 038 370,00 €
32 591 656,00 €
22 286 468,00 €
33 994 636,00 €
10 862 182,00 €
42 801 207,00 €
48 227 110,00 €
5 487 396,00 €
70 019 853,00 €
405 035 570,00 €
11 341 733,00 €
92 749 341,00 €
76 041 832,00 €
3 256 012,00 €
7 241 077,00 €
2 625 803,00 €
4 146 412,00 €
9 168 772,00 €
113 073 878,00 €
2 430 786,00 €
3 717 217,00 €
6 125 812,00 €
12 343 841,00 €
39 446 225,00 €
15 167 832,00 €
398 876 572,00 €
|
34 702 136,00 €
3 890 199,00 €
32 469 995,00 €
27 186 433,00 €
7 078 969,00 €
18 297 236,00 €
17 391 469,00 €
13 699 500,00 €
4 078 034,00 €
8 427 806,00 €
1 706 388,00 €
51 739 817,00 €
220 667 983,00 €
107 876 694,00 €
19 456 948,00 €
18 948 666,00 €
216 497 282,00 €
43 460 362,00 €
69 467 987,00 €
10 636 714,00 €
22 362 370,00 €
35 411 697,00 €
5 831 899,00 €
21 716 533,00 €
571 667 152,00 €
10 487 441,00 €
15 200 363,00 €
51 569 703,00 €
320 391 796,00 €
4 465 312,00 €
84 927 928,00 €
2 425 712,00 €
12 035 014,00 €
11 639 833,00 €
7 119 118,00 €
8 539 848,00 €
36 156 024,00 €
11 260 981,00 €
9 442 795,00 €
2 184 352,00 €
3 628 740,00 €
8 500 871,00 €
3 782 629,00 €
4 370 525,00 €
608 128 985,00 €
7 404 727,00 €
6 248 824,00 €
20 464 985,00 €
3 971 790,00 €
2 285 860,00 €
177 260 673,00 €
91 548 874,00 €
2 823 182,00 €
44 708 550,00 €
28 510 016,00 €
385 227 480,00 €
9 121 489,00 €
16 160 704,00 €
6 865 245,00 €
47 736 129,00 €
27 739 455,00 €
9 047 793,00 €
1 823 939,00 €
4 744 720,00 €
7 871 330,00 €
5 442 801,00 €
20 222 303,00 €
2 550 543,00 €
85 302 586,00 €
12 070 686,00 €
256 699 724,00 €
38 183 225,00 €
7 267 915,00 €
9 343 492,00 €
915 610,00 €
5 982 032,00 €
10 895 175,00 €
72 587 449,00 €
12 172 938,00 €
6 193 464,00 €
22 272 030,00 €
22 928 696,00 €
17 078 380,00 €
20 584 272,00 €
10 491 945,00 €
10 612 488,00 €
3 838 370,00 €
21 958 862,00 €
23 709 291,00 €
3 320 500,00 €
33 606 158,00 €
208 767 394,00 €
2 338 991,00 €
56 080 600,00 €
32 293 526,00 €
1 706 135,00 €
3 333 083,00 €
2 138 870,00 €
2 750 000,00 €
5 890 087,00 €
40 778 700,00 €
1 186 485,00 €
1 806 581,00 €
3 181 352,00 €
6 066 995,00 €
19 440 057,00 €
6 264 308,00 €
185 255 771,00 €
|
12,92 %
1,21 %
16,39 %
8,52 %
3,31 %
6,31 %
11,36 %
5,57 %
2,86 %
2,62 %
0,55 %
28,38 %
20,03 %
3,12 %
2,99 %
35,98 %
7,22 %
13,54 %
1,14 %
4,54 %
6,81 %
1,22 %
3,40 %
1,85 %
2,33 %
6,34 %
52,53 %
1,17 %
15,13 %
0,89 %
2,38 %
1,81 %
1,09 %
1,46 %
5,55 %
1,59 %
1,51 %
0,65 %
0,69 %
1,64 %
0,69 %
0,70 %
1,85 %
1,46 %
4,80 %
1,02 %
0,93 %
49,64 %
20,82 %
1,17 %
11,80 %
6,50 %
2,87 %
6,79 %
2,51 %
17,44 %
9,82 %
3,43 %
0,46 %
1,76 %
3,06 %
1,80 %
7,61 %
2,09 %
35,09 %
5,27 %
49,98 %
6,21 %
11,53 %
7,35 %
13,24 %
11,70 %
6,60 %
2,85 %
9,45 %
8,44 %
6,92 %
8,05 %
5,50 %
8,39 %
2,68 %
10,57 %
11,91 %
1,35 %
17,29 %
2,84 %
23,25 %
19,06 %
0,82 %
1,82 %
0,66 %
1,04 %
2,30 %
28,35 %
0,61 %
0,93 %
1,54 %
3,09 %
9,89 %
3,80 %
|
| Lisbon Metropolitan Area |
Lisbon Metropolitan Area
|
Cascais
Lisboa
Loures
Mafra
Oeiras
Sintra
Vila Franca de Xira
Amadora
Odivelas
Alcochete
Almada
Barreiro
Moita
Montijo
Palmela
Seixal
Sesimbra
Setúbal
Total
|
273 326 739,00 €
2 965 873 183,00 €
183 164 322,00 €
140 866 164,00 €
482 766 885,00 €
192 629 944,00 €
123 067 757,00 €
231 122 609,00 €
72 446 583,00 €
19 164 116,00 €
130 620 215,00 €
73 143 666,00 €
27 280 065,00 €
46 728 633,00 €
40 995 633,00 €
108 840 880,00 €
33 163 556,00 €
318 274 556,00 €
5 463 475 505,00 €
|
177 452 343,00 €
1 712 277 168,00 €
112 311 077,00 €
87 212 795,00 €
273 516 256,00 €
103 742 318,00 €
61 483 836,00 €
159 334 481,00 €
38 675 101,00 €
9 596 116,00 €
61 210 309,00 €
39 061 590,00 €
17 939 676,00 €
31 414 173,00 €
23 361 881,00 €
65 879 222,00 €
27 229 734,00 €
173 822 003,00 €
3 175 520 080,00 €
|
5,00 %
54,29 %
3,35 %
2,58 %
8,84 %
3,53 %
2,25 %
4,23 %
1,33 %
0,35 %
2,39 %
1,34 %
0,50 %
0,86 %
0,75 %
1,99 %
0,61 %
5,83 %
|
| Alentejo |
Alentejo Litoral
Baixo Alentejo
Lezíria do Tejo
Alto Alentejo
Alentejo Central
|
Odemira
Alcácer do Sal
Grândola
Santiago do Cacém
Sines
Total
Aljustrel
Almodôvar
Alvito
Barrancos
Beja
Castro Verde
Cuba
Ferreira do Alentejo
Mértola
Moura
Ourique
Serpa
Vidigueira
Total
Azambuja
Almeirim
Alpiarça
Benavente
Cartaxo
Chamusca
Coruche
Golegã
Rio Maior
Salvaterra de Magos
Santarém
Total
Alter do Chão
Arronches
Avis
Campo Maior
Castelo de Vide
Crato
Elvas
Fronteira
Gavião
Marvão
Monforte
Nisa
Ponte de Sor
Portalegre
Sousel
Total
Alandroal
Arraiolos
Borba
Estremoz
Évora
Montemor-o-Novo
Mora
Mourão
Portel
Redondo
Reguengos de Monsaraz
Vendas Novas
Viana do Alentejo
Vila Viçosa
Total
|
20 004 414,00 €
21 401 026,00 €
60 334 919,00 €
110 114 818,00 €
59 372 231,00 €
271 227 409,00 €
31 874 056,00 €
2 272 349,00 €
5 920 631,00 €
2 107 573,00 €
90 515 425,00 €
3 605 767,00 €
1 276 568,00 €
51 336 779,00 €
22 488 625,00 €
3 450 318,00 €
4 406 514,00 €
3 162 894,00 €
2 436 762,00 €
224 854 259,00 €
43 757 469,00 €
4 358 096,00 €
6 950 662,00 €
50 187 652,00 €
20 805 573,00 €
8 787 042,00 €
7 379 367,00 €
10 412 056,00 €
64 061 094,00 €
12 474 082,00 €
108 677 068,00 €
337 850 160,00 €
12 645 350,00 €
2 102 254,00 €
1 259 057,00 €
19 964 739,00 €
4 197 439,00 €
642 728,00 €
50 648 504,00 €
1 622 036,00 €
20 332 954,00 €
4 079 164,00 €
16 379 968,00 €
18 791 059,00 €
14 355 131,00 €
75 806 398,00 €
10 356 676,00 €
253 183 455,00 €
3 783 234,00 €
2 199 763,00 €
18 221 567,00 €
7 497 554,00 €
168 894 436,00 €
5 261 059,00 €
2 947 480,00 €
1 218 853,00 €
1 589 215,00 €
8 354 786,00 €
9 423 997,00 €
7 210 628,00 €
2 505 009,00 €
7 810 397,00 €
246 917 980,00 €
|
13 602 748,00 €
6 055 074,00 €
50 040 549,00 €
69 604 113,00 €
20 890 189,00 €
160 192 672,00 €
26 071 278,00 €
1 439 167,00 €
2 237 571,00 €
1 660 247,00 €
62 281 419,00 €
1 462 778,00 €
802 853,00 €
41 046 066,00 €
14 459 531,00 €
2 018 193,00 €
2 253 726,00 €
1 465 881,00 €
1 364 020,00 €
158 562 731,00 €
20 214 615,00 €
2 796 046,00 €
2 358 506,00 €
20 941 200,00 €
14 861 140,00 €
6 272 833,00 €
4 344 322,00 €
5 763 799,00 €
27 594 187,00 €
8 361 935,00 €
64 589 446,00 €
178 098 029,00 €
4 046 624,00 €
1 402 722,00 €
747 825,00 €
12 745 969,00 €
1 531 145,00 €
416 126,00 €
21 526 463,00 €
1 130 759,00 €
3 791 853,00 €
2 094 372,00 €
1 044 901,00 €
2 202 468,00 €
7 726 027,00 €
35 245 275,00 €
9 096 824,00 €
104 749 352,00 €
2 198 969,00 €
1 698 945,00 €
5 573 418,00 €
4 892 608,00 €
95 601 654,00 €
2 590 566,00 €
1 607 664,00 €
866 316,00 €
702 594,00 €
2 308 392,00 €
6 340 683,00 €
3 046 496,00 €
1 551 818,00 €
6 104 230,00 €
135 084 354,00 €
|
7,38 %
7,89 %
22,25 %
40,60 %
21,89 %
14,18 %
1,01 %
2,63 %
0,94 %
40,26 %
1,60 %
0,57 %
22,83 %
10,00 %
1,53 %
1,96 %
1,41 %
1,08 %
12,95 %
1,29 %
2,06 %
14,86 %
6,16 %
2,60 %
2,18 %
3,08 %
18,96 %
3,69 %
32,17 %
4,99 %
0,83 %
0,50 %
7,89 %
1,66 %
0,25 %
20,00 %
0,64 %
8,03 %
1,61 %
6,47 %
7,42 %
5,67 %
29,94 %
4,09 %
1,53 %
0,89 %
7,38 %
3,04 %
68,40 %
2,13 %
1,19 %
0,49 %
0,64 %
3,38 %
3,82 %
2,92 %
1,01 %
3,16 %
|
| Algarve |
Algarve
|
Albufeira
Alcoutim
Aljezur
Castro Marim
Faro
Lagoa
Lagos
Loulé
Monchique
Olhão
Portimão
São Brás de Alportel
Silves
Tavira
Vila do Bispo
Vila Real de Santo António
Total
|
45 148 195,00 €
35 256 626,00 €
7 812 935,00 €
3 383 756,00 €
153 203 296,00 €
20 498 656,00 €
46 217 208,00 €
63 848 732,00 €
17 805 569,00 €
54 412 074,00 €
65 257 927,00 €
7 742 581,00 €
31 001 397,00 €
19 211 446,00 €
7 667 673,00 €
110 009 026,00 €
688 477 096,00 €
|
32 785 384,00 €
7 555 605,00 €
3 325 434,00 €
1 866 383,00 €
85 887 506,00 €
13 975 666,00 €
29 013 051,00 €
37 708 590,00 €
7 995 176,00 €
33 380 313,00 €
30 300 841,00 €
5 297 705,00 €
18 361 646,00 €
11 682 727,00 €
3 209 479,00 €
90 214 836,00 €
412 560 343,00 €
|
6,56 %
5,12 %
1,13 %
0,49 %
22,25 %
2,98 %
6,71 %
9,27 %
2,59 %
7,90 %
9,48 %
1,12 %
4,50 %
2,79 %
1,11 %
15,98 %
|
| Autonomous Region of the Azores |
Autonomous Region of the Azores
|
Vila do Porto
Lagoa
Nordeste
Ponta Delgada
Povoação
Ribeira Grande
Vila Franca do Campo
Angra do Heroísmo
Vila da Praia da Vitória
Santa Cruz da Graciosa
Calheta
Velas
Lajes do Pico
Madalena
São Roque do Pico
Horta
Lajes das Flores
Santa Cruz das Flores
Corvo
Total
|
7 740 893,00 €
40 253 987,00 €
7 846 572,00 €
561 610 940,00 €
5 725 086,00 €
141 578 851,00 €
13 397 539,00 €
176 870 099,00 €
13 525 498,00 €
10 802 026,00 €
3 012 975,00 €
6 402 540,00 €
4 724 911,00 €
16 553 814,00 €
13 799 852,00 €
92 743 868,00 €
2 419 429,00 €
2 721 882,00 €
426 969,00 €
1 122 157 733,00 €
|
4 050 373,00 €
22 857 408,00 €
4 583 195,00 €
360 028 906,00 €
2 656 426,00 €
77 568 386,00 €
10 592 954,00 €
111 722 820,00 €
9 035 120,00 €
4 246 736,00 €
2 169 164,00 €
3 770 633,00 €
2 514 813,00 €
10 701 229,00 €
9 123 265,00 €
72 529 314,00 €
1 138 272,00 €
1 312 727,00 €
178 867,00 €
710 780 608,00 €
|
0,69 %
3,59 %
0,70 %
50,05 %
0,51 %
12,62 %
1,19 %
15,76 %
1,21 %
0,96 %
0,27 %
0,57 %
0,42 %
1,48 %
1,23 %
8,26 %
0,22 %
0,24 %
0,04 %
|
| Autonomous Region of Madeira |
Autonomous Region of Madeira
|
Calheta
Câmara de Lobos
Funchal
Machico
Ponta do Sol
Porto Moniz
Ribeira Brava
Santa Cruz
Santana
São Vicente
Porto Santo
Total
|
12 612 913,00 €
29 868 433,00 €
752 470 112,00 €
49 182 822,00 €
21 693 893,00 €
596 718,00 €
13 898 950,00 €
28 918 939,00 €
16 763 669,00 €
26 172 087,00 €
40 273 013,00 €
992 451 551,00 €
|
4 997 586,00 €
9 233 792,00 €
451 422 910,00 €
11 981 176,00 €
7 179 285,00 €
328 562,00 €
11 520 076,00 €
13 225 398,00 €
667 313,00 €
9 217 263,00 €
21 218 936,00 €
540 992 297,00 €
|
1,27 %
3,01 %
75,82 %
4,96 %
2,19 %
0,06 %
1,40 %
2,91 %
1,69 %
2,64 %
4,06 %
|
| Nation-wide investment |
|
|
3 655 353 461,00 €
|
2 654 617 913,00 €
|
|
Distribution of investment by regions
Region
North
:Sub-region
Alto Minho
:Municipality
Arcos de Valdevez
:Approved amount
: 29975397 €,29 975 397,00 €
Amount spent
: 17028204 €,17 028 204,00 €
Percentage of investment
: 7,76 %7,76 %
Municipality
Caminha
:Approved amount
: 14200547 €,14 200 547,00 €
Amount spent
: 6295216 €,6 295 216,00 €
Percentage of investment
: 3,68 %3,68 %
Municipality
Melgaço
:Approved amount
: 20409759 €,20 409 759,00 €
Amount spent
: 17918178 €,17 918 178,00 €
Percentage of investment
: 5,29 %5,29 %
Municipality
Monção
:Approved amount
: 31610919 €,31 610 919,00 €
Amount spent
: 18434329 €,18 434 329,00 €
Percentage of investment
: 8,19 %8,19 %
Municipality
Paredes de Coura
:Approved amount
: 6783028 €,6 783 028,00 €
Amount spent
: 3631108 €,3 631 108,00 €
Percentage of investment
: 1,76 %1,76 %
Municipality
Ponte da Barca
:Approved amount
: 10096968 €,10 096 968,00 €
Amount spent
: 5120403 €,5 120 403,00 €
Percentage of investment
: 2,61 %2,61 %
Municipality
Ponte de Lima
:Approved amount
: 31929347 €,31 929 347,00 €
Amount spent
: 19208323 €,19 208 323,00 €
Percentage of investment
: 8,27 %8,27 %
Municipality
Valença
:Approved amount
: 35465847 €,35 465 847,00 €
Amount spent
: 16506745 €,16 506 745,00 €
Percentage of investment
: 9,18 %9,18 %
Municipality
Viana do Castelo
:Approved amount
: 186312790 €,186 312 790,00 €
Amount spent
: 126894289 €,126 894 289,00 €
Percentage of investment
: 48,25 %48,25 %
Municipality
Vila Nova de Cerveira
:Approved amount
: 19350460 €,19 350 460,00 €
Amount spent
: 13063408 €,13 063 408,00 €
Percentage of investment
: 5,01 %5,01 %
Total
Approved amount
: 386135062 €,386 135 062,00 €
Amount spent
: 244100204 €,244 100 204,00 €
Percentage of investment
Sub-region
Cávado
:Municipality
Amares
:Approved amount
: 12193031 €,12 193 031,00 €
Amount spent
: 7660386 €,7 660 386,00 €
Percentage of investment
: 1,68 %1,68 %
Municipality
Barcelos
:Approved amount
: 187080747 €,187 080 747,00 €
Amount spent
: 90290137 €,90 290 137,00 €
Percentage of investment
: 25,75 %25,75 %
Municipality
Braga
:Approved amount
: 436532826 €,436 532 826,00 €
Amount spent
: 287084940 €,287 084 940,00 €
Percentage of investment
: 60,07 %60,07 %
Municipality
Esposende
:Approved amount
: 51705630 €,51 705 630,00 €
Amount spent
: 21847454 €,21 847 454,00 €
Percentage of investment
: 7,12 %7,12 %
Municipality
Terras de Bouro
:Approved amount
: 4588157 €,4 588 157,00 €
Amount spent
: 2209569 €,2 209 569,00 €
Percentage of investment
: 0,63 %0,63 %
Municipality
Vila Verde
:Approved amount
: 34566532 €,34 566 532,00 €
Amount spent
: 22184874 €,22 184 874,00 €
Percentage of investment
: 4,76 %4,76 %
Total
Approved amount
: 726666923 €,726 666 923,00 €
Amount spent
: 431277360 €,431 277 360,00 €
Percentage of investment
Sub-region
Ave
:Municipality
Cabeceiras de Basto
:Approved amount
: 13564868 €,13 564 868,00 €
Amount spent
: 5379612 €,5 379 612,00 €
Percentage of investment
: 1,49 %1,49 %
Municipality
Fafe
:Approved amount
: 51780021 €,51 780 021,00 €
Amount spent
: 30244212 €,30 244 212,00 €
Percentage of investment
: 5,67 %5,67 %
Municipality
Guimarães
:Approved amount
: 462804786 €,462 804 786,00 €
Amount spent
: 283976485 €,283 976 485,00 €
Percentage of investment
: 50,67 %50,67 %
Municipality
Póvoa de Lanhoso
:Approved amount
: 26398614 €,26 398 614,00 €
Amount spent
: 11956982 €,11 956 982,00 €
Percentage of investment
: 2,89 %2,89 %
Municipality
Vieira do Minho
:Approved amount
: 6479057 €,6 479 057,00 €
Amount spent
: 3544676 €,3 544 676,00 €
Percentage of investment
: 0,71 %0,71 %
Municipality
Vila Nova de Famalicão
:Approved amount
: 314258539 €,314 258 539,00 €
Amount spent
: 194725164 €,194 725 164,00 €
Percentage of investment
: 34,4 %34,40 %
Municipality
Vizela
:Approved amount
: 28395976 €,28 395 976,00 €
Amount spent
: 20871205 €,20 871 205,00 €
Percentage of investment
: 3,11 %3,11 %
Municipality
Mondim de Basto
:Approved amount
: 9755217 €,9 755 217,00 €
Amount spent
: 4276407 €,4 276 407,00 €
Percentage of investment
: 1,07 %1,07 %
Total
Approved amount
: 913437078 €,913 437 078,00 €
Amount spent
: 554974744 €,554 974 744,00 €
Percentage of investment
Sub-region
Área Metropolitana do Porto
:Municipality
Arouca
:Approved amount
: 28297552 €,28 297 552,00 €
Amount spent
: 15218138 €,15 218 138,00 €
Percentage of investment
: 0,74 %0,74 %
Municipality
Espinho
:Approved amount
: 23772114 €,23 772 114,00 €
Amount spent
: 7871831 €,7 871 831,00 €
Percentage of investment
: 0,62 %0,62 %
Municipality
Santa Maria da Feira
:Approved amount
: 133752719 €,133 752 719,00 €
Amount spent
: 76873864 €,76 873 864,00 €
Percentage of investment
: 3,49 %3,49 %
Municipality
Oliveira de Azeméis
:Approved amount
: 86202796 €,86 202 796,00 €
Amount spent
: 39269202 €,39 269 202,00 €
Percentage of investment
: 2,25 %2,25 %
Municipality
São João da Madeira
:Approved amount
: 72604897 €,72 604 897,00 €
Amount spent
: 44059942 €,44 059 942,00 €
Percentage of investment
: 1,89 %1,89 %
Municipality
Vale de Cambra
:Approved amount
: 35261679 €,35 261 679,00 €
Amount spent
: 20643068 €,20 643 068,00 €
Percentage of investment
: 0,92 %0,92 %
Municipality
Gondomar
:Approved amount
: 92228113 €,92 228 113,00 €
Amount spent
: 51921899 €,51 921 899,00 €
Percentage of investment
: 2,4 %2,40 %
Municipality
Maia
:Approved amount
: 279862840 €,279 862 840,00 €
Amount spent
: 171576840 €,171 576 840,00 €
Percentage of investment
: 7,3 %7,30 %
Municipality
Matosinhos
:Approved amount
: 707357862 €,707 357 862,00 €
Amount spent
: 453014811 €,453 014 811,00 €
Percentage of investment
: 18,44 %18,44 %
Municipality
Paredes
:Approved amount
: 96599867 €,96 599 867,00 €
Amount spent
: 55929792 €,55 929 792,00 €
Percentage of investment
: 2,52 %2,52 %
Municipality
Porto
:Approved amount
: 1432832156 €,1 432 832 156,00 €
Amount spent
: 934899536 €,934 899 536,00 €
Percentage of investment
: 37,36 %37,36 %
Municipality
Póvoa de Varzim
:Approved amount
: 84823108 €,84 823 108,00 €
Amount spent
: 63212274 €,63 212 274,00 €
Percentage of investment
: 2,21 %2,21 %
Municipality
Santo Tirso
:Approved amount
: 92733959 €,92 733 959,00 €
Amount spent
: 62944109 €,62 944 109,00 €
Percentage of investment
: 2,42 %2,42 %
Municipality
Valongo
:Approved amount
: 72562374 €,72 562 374,00 €
Amount spent
: 34813852 €,34 813 852,00 €
Percentage of investment
: 1,89 %1,89 %
Municipality
Vila do Conde
:Approved amount
: 153502782 €,153 502 782,00 €
Amount spent
: 96481199 €,96 481 199,00 €
Percentage of investment
: 4 %4,00 %
Municipality
Vila Nova de Gaia
:Approved amount
: 346571990 €,346 571 990,00 €
Amount spent
: 176683974 €,176 683 974,00 €
Percentage of investment
: 9,04 %9,04 %
Municipality
Trofa
:Approved amount
: 96606095 €,96 606 095,00 €
Amount spent
: 73619309 €,73 619 309,00 €
Percentage of investment
: 2,52 %2,52 %
Total
Approved amount
: 3835572903 €,3 835 572 903,00 €
Amount spent
: 2379033639 €,2 379 033 639,00 €
Percentage of investment
Sub-region
Alto Tâmega
:Municipality
Boticas
:Approved amount
: 6162572 €,6 162 572,00 €
Amount spent
: 3850162 €,3 850 162,00 €
Percentage of investment
: 5,82 %5,82 %
Municipality
Chaves
:Approved amount
: 51903699 €,51 903 699,00 €
Amount spent
: 24278256 €,24 278 256,00 €
Percentage of investment
: 49,01 %49,01 %
Municipality
Montalegre
:Approved amount
: 7395524 €,7 395 524,00 €
Amount spent
: 2994863 €,2 994 863,00 €
Percentage of investment
: 6,98 %6,98 %
Municipality
Ribeira de Pena
:Approved amount
: 14029711 €,14 029 711,00 €
Amount spent
: 9525087 €,9 525 087,00 €
Percentage of investment
: 13,25 %13,25 %
Municipality
Valpaços
:Approved amount
: 5969712 €,5 969 712,00 €
Amount spent
: 3570902 €,3 570 902,00 €
Percentage of investment
: 5,64 %5,64 %
Municipality
Vila Pouca de Aguiar
:Approved amount
: 20441032 €,20 441 032,00 €
Amount spent
: 9036641 €,9 036 641,00 €
Percentage of investment
: 19,3 %19,30 %
Total
Approved amount
: 105902249 €,105 902 249,00 €
Amount spent
: 53255913 €,53 255 913,00 €
Percentage of investment
Sub-region
Tâmega e Sousa
:Municipality
Castelo de Paiva
:Approved amount
: 26227471 €,26 227 471,00 €
Amount spent
: 16627883 €,16 627 883,00 €
Percentage of investment
: 4,68 %4,68 %
Municipality
Celorico de Basto
:Approved amount
: 25284087 €,25 284 087,00 €
Amount spent
: 18304201 €,18 304 201,00 €
Percentage of investment
: 4,51 %4,51 %
Municipality
Amarante
:Approved amount
: 64233017 €,64 233 017,00 €
Amount spent
: 36565165 €,36 565 165,00 €
Percentage of investment
: 11,46 %11,46 %
Municipality
Baião
:Approved amount
: 48960665 €,48 960 665,00 €
Amount spent
: 43588007 €,43 588 007,00 €
Percentage of investment
: 8,73 %8,73 %
Municipality
Felgueiras
:Approved amount
: 47064990 €,47 064 990,00 €
Amount spent
: 28862549 €,28 862 549,00 €
Percentage of investment
: 8,4 %8,40 %
Municipality
Lousada
:Approved amount
: 50831601 €,50 831 601,00 €
Amount spent
: 35302738 €,35 302 738,00 €
Percentage of investment
: 9,07 %9,07 %
Municipality
Marco de Canaveses
:Approved amount
: 35194627 €,35 194 627,00 €
Amount spent
: 24304794 €,24 304 794,00 €
Percentage of investment
: 6,28 %6,28 %
Municipality
Paços de Ferreira
:Approved amount
: 90820943 €,90 820 943,00 €
Amount spent
: 54864102 €,54 864 102,00 €
Percentage of investment
: 16,2 %16,20 %
Municipality
Penafiel
:Approved amount
: 148272887 €,148 272 887,00 €
Amount spent
: 111962367 €,111 962 367,00 €
Percentage of investment
: 26,45 %26,45 %
Municipality
Cinfães
:Approved amount
: 17503159 €,17 503 159,00 €
Amount spent
: 13696948 €,13 696 948,00 €
Percentage of investment
: 3,12 %3,12 %
Municipality
Resende
:Approved amount
: 6157366 €,6 157 366,00 €
Amount spent
: 3665186 €,3 665 186,00 €
Percentage of investment
: 1,1 %1,10 %
Total
Approved amount
: 560550813 €,560 550 813,00 €
Amount spent
: 387743941 €,387 743 941,00 €
Percentage of investment
Sub-region
Douro
:Municipality
Carrazeda de Ansiães
:Approved amount
: 5714750 €,5 714 750,00 €
Amount spent
: 2167676 €,2 167 676,00 €
Percentage of investment
: 1,43 %1,43 %
Municipality
Freixo de Espada à Cinta
:Approved amount
: 7543857 €,7 543 857,00 €
Amount spent
: 3016232 €,3 016 232,00 €
Percentage of investment
: 1,89 %1,89 %
Municipality
Torre de Moncorvo
:Approved amount
: 3986199 €,3 986 199,00 €
Amount spent
: 2785519 €,2 785 519,00 €
Percentage of investment
: 1 %1,00 %
Municipality
Vila Nova de Foz Côa
:Approved amount
: 10601289 €,10 601 289,00 €
Amount spent
: 4180192 €,4 180 192,00 €
Percentage of investment
: 2,66 %2,66 %
Municipality
Alijó
:Approved amount
: 13469053 €,13 469 053,00 €
Amount spent
: 9786578 €,9 786 578,00 €
Percentage of investment
: 3,38 %3,38 %
Municipality
Mesão Frio
:Approved amount
: 1443780 €,1 443 780,00 €
Amount spent
: 755019 €,755 019,00 €
Percentage of investment
: 0,36 %0,36 %
Municipality
Murça
:Approved amount
: 4452147 €,4 452 147,00 €
Amount spent
: 1572442 €,1 572 442,00 €
Percentage of investment
: 1,12 %1,12 %
Municipality
Peso da Régua
:Approved amount
: 23908868 €,23 908 868,00 €
Amount spent
: 16140761 €,16 140 761,00 €
Percentage of investment
: 5,99 %5,99 %
Municipality
Sabrosa
:Approved amount
: 13467670 €,13 467 670,00 €
Amount spent
: 6569481 €,6 569 481,00 €
Percentage of investment
: 3,38 %3,38 %
Municipality
Santa Marta de Penaguião
:Approved amount
: 10960616 €,10 960 616,00 €
Amount spent
: 3944735 €,3 944 735,00 €
Percentage of investment
: 2,75 %2,75 %
Municipality
Vila Real
:Approved amount
: 203261366 €,203 261 366,00 €
Amount spent
: 118986092 €,118 986 092,00 €
Percentage of investment
: 50,94 %50,94 %
Municipality
Armamar
:Approved amount
: 4196711 €,4 196 711,00 €
Amount spent
: 1859970 €,1 859 970,00 €
Percentage of investment
: 1,05 %1,05 %
Municipality
Lamego
:Approved amount
: 34219009 €,34 219 009,00 €
Amount spent
: 16657651 €,16 657 651,00 €
Percentage of investment
: 8,58 %8,58 %
Municipality
Moimenta da Beira
:Approved amount
: 16350075 €,16 350 075,00 €
Amount spent
: 8889204 €,8 889 204,00 €
Percentage of investment
: 4,1 %4,10 %
Municipality
Penedono
:Approved amount
: 6191072 €,6 191 072,00 €
Amount spent
: 2925183 €,2 925 183,00 €
Percentage of investment
: 1,55 %1,55 %
Municipality
São João da Pesqueira
:Approved amount
: 11331114 €,11 331 114,00 €
Amount spent
: 5219842 €,5 219 842,00 €
Percentage of investment
: 2,84 %2,84 %
Municipality
Sernancelhe
:Approved amount
: 12248855 €,12 248 855,00 €
Amount spent
: 5459167 €,5 459 167,00 €
Percentage of investment
: 3,07 %3,07 %
Municipality
Tabuaço
:Approved amount
: 4842911 €,4 842 911,00 €
Amount spent
: 2406317 €,2 406 317,00 €
Percentage of investment
: 1,21 %1,21 %
Municipality
Tarouca
:Approved amount
: 10831866 €,10 831 866,00 €
Amount spent
: 3575648 €,3 575 648,00 €
Percentage of investment
: 2,71 %2,71 %
Total
Approved amount
: 399021209 €,399 021 209,00 €
Amount spent
: 216897706 €,216 897 706,00 €
Percentage of investment
Sub-region
Terras de Trás-os-Montes
:Municipality
Alfândega da Fé
:Approved amount
: 15787425 €,15 787 425,00 €
Amount spent
: 8849422 €,8 849 422,00 €
Percentage of investment
: 5,69 %5,69 %
Municipality
Bragança
:Approved amount
: 90962326 €,90 962 326,00 €
Amount spent
: 56850881 €,56 850 881,00 €
Percentage of investment
: 32,79 %32,79 %
Municipality
Macedo de Cavaleiros
:Approved amount
: 14027750 €,14 027 750,00 €
Amount spent
: 8482502 €,8 482 502,00 €
Percentage of investment
: 5,06 %5,06 %
Municipality
Miranda do Douro
:Approved amount
: 3584298 €,3 584 298,00 €
Amount spent
: 1850364 €,1 850 364,00 €
Percentage of investment
: 1,29 %1,29 %
Municipality
Mirandela
:Approved amount
: 24206800 €,24 206 800,00 €
Amount spent
: 14720065 €,14 720 065,00 €
Percentage of investment
: 8,73 %8,73 %
Municipality
Mogadouro
:Approved amount
: 12495342 €,12 495 342,00 €
Amount spent
: 6268572 €,6 268 572,00 €
Percentage of investment
: 4,5 %4,50 %
Municipality
Vila Flor
:Approved amount
: 1997116 €,1 997 116,00 €
Amount spent
: 1268787 €,1 268 787,00 €
Percentage of investment
: 0,72 %0,72 %
Municipality
Vimioso
:Approved amount
: 2702610 €,2 702 610,00 €
Amount spent
: 2186452 €,2 186 452,00 €
Percentage of investment
: 0,97 %0,97 %
Municipality
Vinhais
:Approved amount
: 111621894 €,111 621 894,00 €
Amount spent
: 108835281 €,108 835 281,00 €
Percentage of investment
: 40,24 %40,24 %
Total
Approved amount
: 277385561 €,277 385 561,00 €
Amount spent
: 209312326 €,209 312 326,00 €
Percentage of investment
Region
Center
:Sub-region
Oeste
:Municipality
Alcobaça
:Approved amount
: 58568445 €,58 568 445,00 €
Amount spent
: 34702136 €,34 702 136,00 €
Percentage of investment
: 12,92 %12,92 %
Municipality
Bombarral
:Approved amount
: 5498635 €,5 498 635,00 €
Amount spent
: 3890199 €,3 890 199,00 €
Percentage of investment
: 1,21 %1,21 %
Municipality
Caldas da Rainha
:Approved amount
: 74283699 €,74 283 699,00 €
Amount spent
: 32469995 €,32 469 995,00 €
Percentage of investment
: 16,39 %16,39 %
Municipality
Nazaré
:Approved amount
: 38628421 €,38 628 421,00 €
Amount spent
: 27186433 €,27 186 433,00 €
Percentage of investment
: 8,52 %8,52 %
Municipality
Óbidos
:Approved amount
: 14989345 €,14 989 345,00 €
Amount spent
: 7078969 €,7 078 969,00 €
Percentage of investment
: 3,31 %3,31 %
Municipality
Peniche
:Approved amount
: 28605434 €,28 605 434,00 €
Amount spent
: 18297236 €,18 297 236,00 €
Percentage of investment
: 6,31 %6,31 %
Municipality
Alenquer
:Approved amount
: 51503764 €,51 503 764,00 €
Amount spent
: 17391469 €,17 391 469,00 €
Percentage of investment
: 11,36 %11,36 %
Municipality
Arruda dos Vinhos
:Approved amount
: 25231685 €,25 231 685,00 €
Amount spent
: 13699500 €,13 699 500,00 €
Percentage of investment
: 5,57 %5,57 %
Municipality
Cadaval
:Approved amount
: 12948719 €,12 948 719,00 €
Amount spent
: 4078034 €,4 078 034,00 €
Percentage of investment
: 2,86 %2,86 %
Municipality
Lourinhã
:Approved amount
: 11864904 €,11 864 904,00 €
Amount spent
: 8427806 €,8 427 806,00 €
Percentage of investment
: 2,62 %2,62 %
Municipality
Sobral de Monte Agraço
:Approved amount
: 2473056 €,2 473 056,00 €
Amount spent
: 1706388 €,1 706 388,00 €
Percentage of investment
: 0,55 %0,55 %
Municipality
Torres Vedras
:Approved amount
: 128612150 €,128 612 150,00 €
Amount spent
: 51739817 €,51 739 817,00 €
Percentage of investment
: 28,38 %28,38 %
Total
Approved amount
: 453208257 €,453 208 257,00 €
Amount spent
: 220667983 €,220 667 983,00 €
Percentage of investment
Sub-region
Região de Aveiro
:Municipality
Águeda
:Approved amount
: 192598608 €,192 598 608,00 €
Amount spent
: 107876694 €,107 876 694,00 €
Percentage of investment
: 20,03 %20,03 %
Municipality
Albergaria-a-Velha
:Approved amount
: 30004515 €,30 004 515,00 €
Amount spent
: 19456948 €,19 456 948,00 €
Percentage of investment
: 3,12 %3,12 %
Municipality
Anadia
:Approved amount
: 28724499 €,28 724 499,00 €
Amount spent
: 18948666 €,18 948 666,00 €
Percentage of investment
: 2,99 %2,99 %
Municipality
Aveiro
:Approved amount
: 345946613 €,345 946 613,00 €
Amount spent
: 216497282 €,216 497 282,00 €
Percentage of investment
: 35,98 %35,98 %
Municipality
Estarreja
:Approved amount
: 69372175 €,69 372 175,00 €
Amount spent
: 43460362 €,43 460 362,00 €
Percentage of investment
: 7,22 %7,22 %
Municipality
Ílhavo
:Approved amount
: 130185568 €,130 185 568,00 €
Amount spent
: 69467987 €,69 467 987,00 €
Percentage of investment
: 13,54 %13,54 %
Municipality
Murtosa
:Approved amount
: 11000144 €,11 000 144,00 €
Amount spent
: 10636714 €,10 636 714,00 €
Percentage of investment
: 1,14 %1,14 %
Municipality
Oliveira do Bairro
:Approved amount
: 43646990 €,43 646 990,00 €
Amount spent
: 22362370 €,22 362 370,00 €
Percentage of investment
: 4,54 %4,54 %
Municipality
Ovar
:Approved amount
: 65483087 €,65 483 087,00 €
Amount spent
: 35411697 €,35 411 697,00 €
Percentage of investment
: 6,81 %6,81 %
Municipality
Sever do Vouga
:Approved amount
: 11721920 €,11 721 920,00 €
Amount spent
: 5831899 €,5 831 899,00 €
Percentage of investment
: 1,22 %1,22 %
Municipality
Vagos
:Approved amount
: 32686727 €,32 686 727,00 €
Amount spent
: 21716533 €,21 716 533,00 €
Percentage of investment
: 3,4 %3,40 %
Total
Approved amount
: 961370846 €,961 370 846,00 €
Amount spent
: 571667152 €,571 667 152,00 €
Percentage of investment
Sub-region
Região de Coimbra
:Municipality
Mealhada
:Approved amount
: 20138152 €,20 138 152,00 €
Amount spent
: 10487441 €,10 487 441,00 €
Percentage of investment
: 1,85 %1,85 %
Municipality
Arganil
:Approved amount
: 25372461 €,25 372 461,00 €
Amount spent
: 15200363 €,15 200 363,00 €
Percentage of investment
: 2,33 %2,33 %
Municipality
Cantanhede
:Approved amount
: 69005722 €,69 005 722,00 €
Amount spent
: 51569703 €,51 569 703,00 €
Percentage of investment
: 6,34 %6,34 %
Municipality
Coimbra
:Approved amount
: 571401297 €,571 401 297,00 €
Amount spent
: 320391796 €,320 391 796,00 €
Percentage of investment
: 52,53 %52,53 %
Municipality
Condeixa-a-Nova
:Approved amount
: 12761427 €,12 761 427,00 €
Amount spent
: 4465312 €,4 465 312,00 €
Percentage of investment
: 1,17 %1,17 %
Municipality
Figueira da Foz
:Approved amount
: 164532583 €,164 532 583,00 €
Amount spent
: 84927928 €,84 927 928,00 €
Percentage of investment
: 15,13 %15,13 %
Municipality
Góis
:Approved amount
: 9646160 €,9 646 160,00 €
Amount spent
: 2425712 €,2 425 712,00 €
Percentage of investment
: 0,89 %0,89 %
Municipality
Lousã
:Approved amount
: 25894632 €,25 894 632,00 €
Amount spent
: 12035014 €,12 035 014,00 €
Percentage of investment
: 2,38 %2,38 %
Municipality
Mira
:Approved amount
: 19678286 €,19 678 286,00 €
Amount spent
: 11639833 €,11 639 833,00 €
Percentage of investment
: 1,81 %1,81 %
Municipality
Miranda do Corvo
:Approved amount
: 11855495 €,11 855 495,00 €
Amount spent
: 7119118 €,7 119 118,00 €
Percentage of investment
: 1,09 %1,09 %
Municipality
Montemor-o-Velho
:Approved amount
: 15831678 €,15 831 678,00 €
Amount spent
: 8539848 €,8 539 848,00 €
Percentage of investment
: 1,46 %1,46 %
Municipality
Oliveira do Hospital
:Approved amount
: 60413314 €,60 413 314,00 €
Amount spent
: 36156024 €,36 156 024,00 €
Percentage of investment
: 5,55 %5,55 %
Municipality
Pampilhosa da Serra
:Approved amount
: 17248626 €,17 248 626,00 €
Amount spent
: 11260981 €,11 260 981,00 €
Percentage of investment
: 1,59 %1,59 %
Municipality
Penacova
:Approved amount
: 16477653 €,16 477 653,00 €
Amount spent
: 9442795 €,9 442 795,00 €
Percentage of investment
: 1,51 %1,51 %
Municipality
Penela
:Approved amount
: 7082227 €,7 082 227,00 €
Amount spent
: 2184352 €,2 184 352,00 €
Percentage of investment
: 0,65 %0,65 %
Municipality
Soure
:Approved amount
: 7531661 €,7 531 661,00 €
Amount spent
: 3628740 €,3 628 740,00 €
Percentage of investment
: 0,69 %0,69 %
Municipality
Tábua
:Approved amount
: 17802473 €,17 802 473,00 €
Amount spent
: 8500871 €,8 500 871,00 €
Percentage of investment
: 1,64 %1,64 %
Municipality
Vila Nova de Poiares
:Approved amount
: 7515701 €,7 515 701,00 €
Amount spent
: 3782629 €,3 782 629,00 €
Percentage of investment
: 0,69 %0,69 %
Municipality
Mortágua
:Approved amount
: 7593949 €,7 593 949,00 €
Amount spent
: 4370525 €,4 370 525,00 €
Percentage of investment
: 0,7 %0,70 %
Total
Approved amount
: 1087783498 €,1 087 783 498,00 €
Amount spent
: 608128985 €,608 128 985,00 €
Percentage of investment
Sub-region
Região de Leiria
:Municipality
Alvaiázere
:Approved amount
: 12885790 €,12 885 790,00 €
Amount spent
: 7404727 €,7 404 727,00 €
Percentage of investment
: 1,85 %1,85 %
Municipality
Ansião
:Approved amount
: 10152041 €,10 152 041,00 €
Amount spent
: 6248824 €,6 248 824,00 €
Percentage of investment
: 1,46 %1,46 %
Municipality
Batalha
:Approved amount
: 33380822 €,33 380 822,00 €
Amount spent
: 20464985 €,20 464 985,00 €
Percentage of investment
: 4,8 %4,80 %
Municipality
Castanheira de Pêra
:Approved amount
: 7066390 €,7 066 390,00 €
Amount spent
: 3971790 €,3 971 790,00 €
Percentage of investment
: 1,02 %1,02 %
Municipality
Figueiró dos Vinhos
:Approved amount
: 6484641 €,6 484 641,00 €
Amount spent
: 2285860 €,2 285 860,00 €
Percentage of investment
: 0,93 %0,93 %
Municipality
Leiria
:Approved amount
: 345148394 €,345 148 394,00 €
Amount spent
: 177260673 €,177 260 673,00 €
Percentage of investment
: 49,64 %49,64 %
Municipality
Marinha Grande
:Approved amount
: 144788471 €,144 788 471,00 €
Amount spent
: 91548874 €,91 548 874,00 €
Percentage of investment
: 20,82 %20,82 %
Municipality
Pedrógão Grande
:Approved amount
: 8145947 €,8 145 947,00 €
Amount spent
: 2823182 €,2 823 182,00 €
Percentage of investment
: 1,17 %1,17 %
Municipality
Pombal
:Approved amount
: 82081136 €,82 081 136,00 €
Amount spent
: 44708550 €,44 708 550,00 €
Percentage of investment
: 11,8 %11,80 %
Municipality
Porto de Mós
:Approved amount
: 45186321 €,45 186 321,00 €
Amount spent
: 28510016 €,28 510 016,00 €
Percentage of investment
: 6,5 %6,50 %
Total
Approved amount
: 695319952 €,695 319 952,00 €
Amount spent
: 385227480 €,385 227 480,00 €
Percentage of investment
Sub-region
Viseu Dão Lafões
:Municipality
Aguiar da Beira
:Approved amount
: 13355832 €,13 355 832,00 €
Amount spent
: 9121489 €,9 121 489,00 €
Percentage of investment
: 2,87 %2,87 %
Municipality
Carregal do Sal
:Approved amount
: 31562103 €,31 562 103,00 €
Amount spent
: 16160704 €,16 160 704,00 €
Percentage of investment
: 6,79 %6,79 %
Municipality
Castro Daire
:Approved amount
: 11660841 €,11 660 841,00 €
Amount spent
: 6865245 €,6 865 245,00 €
Percentage of investment
: 2,51 %2,51 %
Municipality
Mangualde
:Approved amount
: 81038563 €,81 038 563,00 €
Amount spent
: 47736129 €,47 736 129,00 €
Percentage of investment
: 17,44 %17,44 %
Municipality
Nelas
:Approved amount
: 45633847 €,45 633 847,00 €
Amount spent
: 27739455 €,27 739 455,00 €
Percentage of investment
: 9,82 %9,82 %
Municipality
Oliveira de Frades
:Approved amount
: 15931750 €,15 931 750,00 €
Amount spent
: 9047793 €,9 047 793,00 €
Percentage of investment
: 3,43 %3,43 %
Municipality
Penalva do Castelo
:Approved amount
: 2145765 €,2 145 765,00 €
Amount spent
: 1823939 €,1 823 939,00 €
Percentage of investment
: 0,46 %0,46 %
Municipality
Santa Comba Dão
:Approved amount
: 8184191 €,8 184 191,00 €
Amount spent
: 4744720 €,4 744 720,00 €
Percentage of investment
: 1,76 %1,76 %
Municipality
São Pedro do Sul
:Approved amount
: 14238650 €,14 238 650,00 €
Amount spent
: 7871330 €,7 871 330,00 €
Percentage of investment
: 3,06 %3,06 %
Municipality
Sátão
:Approved amount
: 8362441 €,8 362 441,00 €
Amount spent
: 5442801 €,5 442 801,00 €
Percentage of investment
: 1,8 %1,80 %
Municipality
Tondela
:Approved amount
: 35381125 €,35 381 125,00 €
Amount spent
: 20222303 €,20 222 303,00 €
Percentage of investment
: 7,61 %7,61 %
Municipality
Vila Nova de Paiva
:Approved amount
: 9725937 €,9 725 937,00 €
Amount spent
: 2550543 €,2 550 543,00 €
Percentage of investment
: 2,09 %2,09 %
Municipality
Viseu
:Approved amount
: 163075697 €,163 075 697,00 €
Amount spent
: 85302586 €,85 302 586,00 €
Percentage of investment
: 35,09 %35,09 %
Municipality
Vouzela
:Approved amount
: 24472783 €,24 472 783,00 €
Amount spent
: 12070686 €,12 070 686,00 €
Percentage of investment
: 5,27 %5,27 %
Total
Approved amount
: 464769524 €,464 769 524,00 €
Amount spent
: 256699724 €,256 699 724,00 €
Percentage of investment
Sub-region
Beira Baixa
:Municipality
Castelo Branco
:Approved amount
: 87596695 €,87 596 695,00 €
Amount spent
: 38183225 €,38 183 225,00 €
Percentage of investment
: 49,98 %49,98 %
Municipality
Idanha-a-Nova
:Approved amount
: 10879198 €,10 879 198,00 €
Amount spent
: 7267915 €,7 267 915,00 €
Percentage of investment
: 6,21 %6,21 %
Municipality
Oleiros
:Approved amount
: 20204936 €,20 204 936,00 €
Amount spent
: 9343492 €,9 343 492,00 €
Percentage of investment
: 11,53 %11,53 %
Municipality
Penamacor
:Approved amount
: 12876694 €,12 876 694,00 €
Amount spent
: 915610 €,915 610,00 €
Percentage of investment
: 7,35 %7,35 %
Municipality
Proença-a-Nova
:Approved amount
: 23205813 €,23 205 813,00 €
Amount spent
: 5982032 €,5 982 032,00 €
Percentage of investment
: 13,24 %13,24 %
Municipality
Vila Velha de Ródão
:Approved amount
: 20496864 €,20 496 864,00 €
Amount spent
: 10895175 €,10 895 175,00 €
Percentage of investment
: 11,7 %11,70 %
Total
Approved amount
: 175260201 €,175 260 201,00 €
Amount spent
: 72587449 €,72 587 449,00 €
Percentage of investment
Sub-region
Médio Tejo
:Municipality
Sertã
:Approved amount
: 26716141 €,26 716 141,00 €
Amount spent
: 12172938 €,12 172 938,00 €
Percentage of investment
: 6,6 %6,60 %
Municipality
Vila de Rei
:Approved amount
: 11556239 €,11 556 239,00 €
Amount spent
: 6193464 €,6 193 464,00 €
Percentage of investment
: 2,85 %2,85 %
Municipality
Abrantes
:Approved amount
: 38281900 €,38 281 900,00 €
Amount spent
: 22272030 €,22 272 030,00 €
Percentage of investment
: 9,45 %9,45 %
Municipality
Alcanena
:Approved amount
: 34172413 €,34 172 413,00 €
Amount spent
: 22928696 €,22 928 696,00 €
Percentage of investment
: 8,44 %8,44 %
Municipality
Constância
:Approved amount
: 28038370 €,28 038 370,00 €
Amount spent
: 17078380 €,17 078 380,00 €
Percentage of investment
: 6,92 %6,92 %
Municipality
Entroncamento
:Approved amount
: 32591656 €,32 591 656,00 €
Amount spent
: 20584272 €,20 584 272,00 €
Percentage of investment
: 8,05 %8,05 %
Municipality
Ferreira do Zêzere
:Approved amount
: 22286468 €,22 286 468,00 €
Amount spent
: 10491945 €,10 491 945,00 €
Percentage of investment
: 5,5 %5,50 %
Municipality
Mação
:Approved amount
: 33994636 €,33 994 636,00 €
Amount spent
: 10612488 €,10 612 488,00 €
Percentage of investment
: 8,39 %8,39 %
Municipality
Sardoal
:Approved amount
: 10862182 €,10 862 182,00 €
Amount spent
: 3838370 €,3 838 370,00 €
Percentage of investment
: 2,68 %2,68 %
Municipality
Tomar
:Approved amount
: 42801207 €,42 801 207,00 €
Amount spent
: 21958862 €,21 958 862,00 €
Percentage of investment
: 10,57 %10,57 %
Municipality
Torres Novas
:Approved amount
: 48227110 €,48 227 110,00 €
Amount spent
: 23709291 €,23 709 291,00 €
Percentage of investment
: 11,91 %11,91 %
Municipality
Vila Nova da Barquinha
:Approved amount
: 5487396 €,5 487 396,00 €
Amount spent
: 3320500 €,3 320 500,00 €
Percentage of investment
: 1,35 %1,35 %
Municipality
Ourém
:Approved amount
: 70019853 €,70 019 853,00 €
Amount spent
: 33606158 €,33 606 158,00 €
Percentage of investment
: 17,29 %17,29 %
Total
Approved amount
: 405035570 €,405 035 570,00 €
Amount spent
: 208767394 €,208 767 394,00 €
Percentage of investment
Sub-region
Beiras e Serra da Estrela
:Municipality
Belmonte
:Approved amount
: 11341733 €,11 341 733,00 €
Amount spent
: 2338991 €,2 338 991,00 €
Percentage of investment
: 2,84 %2,84 %
Municipality
Covilhã
:Approved amount
: 92749341 €,92 749 341,00 €
Amount spent
: 56080600 €,56 080 600,00 €
Percentage of investment
: 23,25 %23,25 %
Municipality
Fundão
:Approved amount
: 76041832 €,76 041 832,00 €
Amount spent
: 32293526 €,32 293 526,00 €
Percentage of investment
: 19,06 %19,06 %
Municipality
Almeida
:Approved amount
: 3256012 €,3 256 012,00 €
Amount spent
: 1706135 €,1 706 135,00 €
Percentage of investment
: 0,82 %0,82 %
Municipality
Celorico da Beira
:Approved amount
: 7241077 €,7 241 077,00 €
Amount spent
: 3333083 €,3 333 083,00 €
Percentage of investment
: 1,82 %1,82 %
Municipality
Figueira de Castelo Rodrigo
:Approved amount
: 2625803 €,2 625 803,00 €
Amount spent
: 2138870 €,2 138 870,00 €
Percentage of investment
: 0,66 %0,66 %
Municipality
Fornos de Algodres
:Approved amount
: 4146412 €,4 146 412,00 €
Amount spent
: 2750000 €,2 750 000,00 €
Percentage of investment
: 1,04 %1,04 %
Municipality
Gouveia
:Approved amount
: 9168772 €,9 168 772,00 €
Amount spent
: 5890087 €,5 890 087,00 €
Percentage of investment
: 2,3 %2,30 %
Municipality
Guarda
:Approved amount
: 113073878 €,113 073 878,00 €
Amount spent
: 40778700 €,40 778 700,00 €
Percentage of investment
: 28,35 %28,35 %
Municipality
Manteigas
:Approved amount
: 2430786 €,2 430 786,00 €
Amount spent
: 1186485 €,1 186 485,00 €
Percentage of investment
: 0,61 %0,61 %
Municipality
Mêda
:Approved amount
: 3717217 €,3 717 217,00 €
Amount spent
: 1806581 €,1 806 581,00 €
Percentage of investment
: 0,93 %0,93 %
Municipality
Pinhel
:Approved amount
: 6125812 €,6 125 812,00 €
Amount spent
: 3181352 €,3 181 352,00 €
Percentage of investment
: 1,54 %1,54 %
Municipality
Sabugal
:Approved amount
: 12343841 €,12 343 841,00 €
Amount spent
: 6066995 €,6 066 995,00 €
Percentage of investment
: 3,09 %3,09 %
Municipality
Seia
:Approved amount
: 39446225 €,39 446 225,00 €
Amount spent
: 19440057 €,19 440 057,00 €
Percentage of investment
: 9,89 %9,89 %
Municipality
Trancoso
:Approved amount
: 15167832 €,15 167 832,00 €
Amount spent
: 6264308 €,6 264 308,00 €
Percentage of investment
: 3,8 %3,80 %
Total
Approved amount
: 398876572 €,398 876 572,00 €
Amount spent
: 185255771 €,185 255 771,00 €
Percentage of investment
Region
Lisbon Metropolitan Area
:Sub-region
Lisbon Metropolitan Area
:Municipality
Cascais
:Approved amount
: 273326739 €,273 326 739,00 €
Amount spent
: 177452343 €,177 452 343,00 €
Percentage of investment
: 5 %5,00 %
Municipality
Lisboa
:Approved amount
: 2965873183 €,2 965 873 183,00 €
Amount spent
: 1712277168 €,1 712 277 168,00 €
Percentage of investment
: 54,29 %54,29 %
Municipality
Loures
:Approved amount
: 183164322 €,183 164 322,00 €
Amount spent
: 112311077 €,112 311 077,00 €
Percentage of investment
: 3,35 %3,35 %
Municipality
Mafra
:Approved amount
: 140866164 €,140 866 164,00 €
Amount spent
: 87212795 €,87 212 795,00 €
Percentage of investment
: 2,58 %2,58 %
Municipality
Oeiras
:Approved amount
: 482766885 €,482 766 885,00 €
Amount spent
: 273516256 €,273 516 256,00 €
Percentage of investment
: 8,84 %8,84 %
Municipality
Sintra
:Approved amount
: 192629944 €,192 629 944,00 €
Amount spent
: 103742318 €,103 742 318,00 €
Percentage of investment
: 3,53 %3,53 %
Municipality
Vila Franca de Xira
:Approved amount
: 123067757 €,123 067 757,00 €
Amount spent
: 61483836 €,61 483 836,00 €
Percentage of investment
: 2,25 %2,25 %
Municipality
Amadora
:Approved amount
: 231122609 €,231 122 609,00 €
Amount spent
: 159334481 €,159 334 481,00 €
Percentage of investment
: 4,23 %4,23 %
Municipality
Odivelas
:Approved amount
: 72446583 €,72 446 583,00 €
Amount spent
: 38675101 €,38 675 101,00 €
Percentage of investment
: 1,33 %1,33 %
Municipality
Alcochete
:Approved amount
: 19164116 €,19 164 116,00 €
Amount spent
: 9596116 €,9 596 116,00 €
Percentage of investment
: 0,35 %0,35 %
Municipality
Almada
:Approved amount
: 130620215 €,130 620 215,00 €
Amount spent
: 61210309 €,61 210 309,00 €
Percentage of investment
: 2,39 %2,39 %
Municipality
Barreiro
:Approved amount
: 73143666 €,73 143 666,00 €
Amount spent
: 39061590 €,39 061 590,00 €
Percentage of investment
: 1,34 %1,34 %
Municipality
Moita
:Approved amount
: 27280065 €,27 280 065,00 €
Amount spent
: 17939676 €,17 939 676,00 €
Percentage of investment
: 0,5 %0,50 %
Municipality
Montijo
:Approved amount
: 46728633 €,46 728 633,00 €
Amount spent
: 31414173 €,31 414 173,00 €
Percentage of investment
: 0,86 %0,86 %
Municipality
Palmela
:Approved amount
: 40995633 €,40 995 633,00 €
Amount spent
: 23361881 €,23 361 881,00 €
Percentage of investment
: 0,75 %0,75 %
Municipality
Seixal
:Approved amount
: 108840880 €,108 840 880,00 €
Amount spent
: 65879222 €,65 879 222,00 €
Percentage of investment
: 1,99 %1,99 %
Municipality
Sesimbra
:Approved amount
: 33163556 €,33 163 556,00 €
Amount spent
: 27229734 €,27 229 734,00 €
Percentage of investment
: 0,61 %0,61 %
Municipality
Setúbal
:Approved amount
: 318274556 €,318 274 556,00 €
Amount spent
: 173822003 €,173 822 003,00 €
Percentage of investment
: 5,83 %5,83 %
Total
Approved amount
: 5463475505 €,5 463 475 505,00 €
Amount spent
: 3175520080 €,3 175 520 080,00 €
Percentage of investment
Region
Alentejo
:Sub-region
Alentejo Litoral
:Municipality
Odemira
:Approved amount
: 20004414 €,20 004 414,00 €
Amount spent
: 13602748 €,13 602 748,00 €
Percentage of investment
: 7,38 %7,38 %
Municipality
Alcácer do Sal
:Approved amount
: 21401026 €,21 401 026,00 €
Amount spent
: 6055074 €,6 055 074,00 €
Percentage of investment
: 7,89 %7,89 %
Municipality
Grândola
:Approved amount
: 60334919 €,60 334 919,00 €
Amount spent
: 50040549 €,50 040 549,00 €
Percentage of investment
: 22,25 %22,25 %
Municipality
Santiago do Cacém
:Approved amount
: 110114818 €,110 114 818,00 €
Amount spent
: 69604113 €,69 604 113,00 €
Percentage of investment
: 40,6 %40,60 %
Municipality
Sines
:Approved amount
: 59372231 €,59 372 231,00 €
Amount spent
: 20890189 €,20 890 189,00 €
Percentage of investment
: 21,89 %21,89 %
Total
Approved amount
: 271227409 €,271 227 409,00 €
Amount spent
: 160192672 €,160 192 672,00 €
Percentage of investment
Sub-region
Baixo Alentejo
:Municipality
Aljustrel
:Approved amount
: 31874056 €,31 874 056,00 €
Amount spent
: 26071278 €,26 071 278,00 €
Percentage of investment
: 14,18 %14,18 %
Municipality
Almodôvar
:Approved amount
: 2272349 €,2 272 349,00 €
Amount spent
: 1439167 €,1 439 167,00 €
Percentage of investment
: 1,01 %1,01 %
Municipality
Alvito
:Approved amount
: 5920631 €,5 920 631,00 €
Amount spent
: 2237571 €,2 237 571,00 €
Percentage of investment
: 2,63 %2,63 %
Municipality
Barrancos
:Approved amount
: 2107573 €,2 107 573,00 €
Amount spent
: 1660247 €,1 660 247,00 €
Percentage of investment
: 0,94 %0,94 %
Municipality
Beja
:Approved amount
: 90515425 €,90 515 425,00 €
Amount spent
: 62281419 €,62 281 419,00 €
Percentage of investment
: 40,26 %40,26 %
Municipality
Castro Verde
:Approved amount
: 3605767 €,3 605 767,00 €
Amount spent
: 1462778 €,1 462 778,00 €
Percentage of investment
: 1,6 %1,60 %
Municipality
Cuba
:Approved amount
: 1276568 €,1 276 568,00 €
Amount spent
: 802853 €,802 853,00 €
Percentage of investment
: 0,57 %0,57 %
Municipality
Ferreira do Alentejo
:Approved amount
: 51336779 €,51 336 779,00 €
Amount spent
: 41046066 €,41 046 066,00 €
Percentage of investment
: 22,83 %22,83 %
Municipality
Mértola
:Approved amount
: 22488625 €,22 488 625,00 €
Amount spent
: 14459531 €,14 459 531,00 €
Percentage of investment
: 10 %10,00 %
Municipality
Moura
:Approved amount
: 3450318 €,3 450 318,00 €
Amount spent
: 2018193 €,2 018 193,00 €
Percentage of investment
: 1,53 %1,53 %
Municipality
Ourique
:Approved amount
: 4406514 €,4 406 514,00 €
Amount spent
: 2253726 €,2 253 726,00 €
Percentage of investment
: 1,96 %1,96 %
Municipality
Serpa
:Approved amount
: 3162894 €,3 162 894,00 €
Amount spent
: 1465881 €,1 465 881,00 €
Percentage of investment
: 1,41 %1,41 %
Municipality
Vidigueira
:Approved amount
: 2436762 €,2 436 762,00 €
Amount spent
: 1364020 €,1 364 020,00 €
Percentage of investment
: 1,08 %1,08 %
Total
Approved amount
: 224854259 €,224 854 259,00 €
Amount spent
: 158562731 €,158 562 731,00 €
Percentage of investment
Sub-region
Lezíria do Tejo
:Municipality
Azambuja
:Approved amount
: 43757469 €,43 757 469,00 €
Amount spent
: 20214615 €,20 214 615,00 €
Percentage of investment
: 12,95 %12,95 %
Municipality
Almeirim
:Approved amount
: 4358096 €,4 358 096,00 €
Amount spent
: 2796046 €,2 796 046,00 €
Percentage of investment
: 1,29 %1,29 %
Municipality
Alpiarça
:Approved amount
: 6950662 €,6 950 662,00 €
Amount spent
: 2358506 €,2 358 506,00 €
Percentage of investment
: 2,06 %2,06 %
Municipality
Benavente
:Approved amount
: 50187652 €,50 187 652,00 €
Amount spent
: 20941200 €,20 941 200,00 €
Percentage of investment
: 14,86 %14,86 %
Municipality
Cartaxo
:Approved amount
: 20805573 €,20 805 573,00 €
Amount spent
: 14861140 €,14 861 140,00 €
Percentage of investment
: 6,16 %6,16 %
Municipality
Chamusca
:Approved amount
: 8787042 €,8 787 042,00 €
Amount spent
: 6272833 €,6 272 833,00 €
Percentage of investment
: 2,6 %2,60 %
Municipality
Coruche
:Approved amount
: 7379367 €,7 379 367,00 €
Amount spent
: 4344322 €,4 344 322,00 €
Percentage of investment
: 2,18 %2,18 %
Municipality
Golegã
:Approved amount
: 10412056 €,10 412 056,00 €
Amount spent
: 5763799 €,5 763 799,00 €
Percentage of investment
: 3,08 %3,08 %
Municipality
Rio Maior
:Approved amount
: 64061094 €,64 061 094,00 €
Amount spent
: 27594187 €,27 594 187,00 €
Percentage of investment
: 18,96 %18,96 %
Municipality
Salvaterra de Magos
:Approved amount
: 12474082 €,12 474 082,00 €
Amount spent
: 8361935 €,8 361 935,00 €
Percentage of investment
: 3,69 %3,69 %
Municipality
Santarém
:Approved amount
: 108677068 €,108 677 068,00 €
Amount spent
: 64589446 €,64 589 446,00 €
Percentage of investment
: 32,17 %32,17 %
Total
Approved amount
: 337850160 €,337 850 160,00 €
Amount spent
: 178098029 €,178 098 029,00 €
Percentage of investment
Sub-region
Alto Alentejo
:Municipality
Alter do Chão
:Approved amount
: 12645350 €,12 645 350,00 €
Amount spent
: 4046624 €,4 046 624,00 €
Percentage of investment
: 4,99 %4,99 %
Municipality
Arronches
:Approved amount
: 2102254 €,2 102 254,00 €
Amount spent
: 1402722 €,1 402 722,00 €
Percentage of investment
: 0,83 %0,83 %
Municipality
Avis
:Approved amount
: 1259057 €,1 259 057,00 €
Amount spent
: 747825 €,747 825,00 €
Percentage of investment
: 0,5 %0,50 %
Municipality
Campo Maior
:Approved amount
: 19964739 €,19 964 739,00 €
Amount spent
: 12745969 €,12 745 969,00 €
Percentage of investment
: 7,89 %7,89 %
Municipality
Castelo de Vide
:Approved amount
: 4197439 €,4 197 439,00 €
Amount spent
: 1531145 €,1 531 145,00 €
Percentage of investment
: 1,66 %1,66 %
Municipality
Crato
:Approved amount
: 642728 €,642 728,00 €
Amount spent
: 416126 €,416 126,00 €
Percentage of investment
: 0,25 %0,25 %
Municipality
Elvas
:Approved amount
: 50648504 €,50 648 504,00 €
Amount spent
: 21526463 €,21 526 463,00 €
Percentage of investment
: 20 %20,00 %
Municipality
Fronteira
:Approved amount
: 1622036 €,1 622 036,00 €
Amount spent
: 1130759 €,1 130 759,00 €
Percentage of investment
: 0,64 %0,64 %
Municipality
Gavião
:Approved amount
: 20332954 €,20 332 954,00 €
Amount spent
: 3791853 €,3 791 853,00 €
Percentage of investment
: 8,03 %8,03 %
Municipality
Marvão
:Approved amount
: 4079164 €,4 079 164,00 €
Amount spent
: 2094372 €,2 094 372,00 €
Percentage of investment
: 1,61 %1,61 %
Municipality
Monforte
:Approved amount
: 16379968 €,16 379 968,00 €
Amount spent
: 1044901 €,1 044 901,00 €
Percentage of investment
: 6,47 %6,47 %
Municipality
Nisa
:Approved amount
: 18791059 €,18 791 059,00 €
Amount spent
: 2202468 €,2 202 468,00 €
Percentage of investment
: 7,42 %7,42 %
Municipality
Ponte de Sor
:Approved amount
: 14355131 €,14 355 131,00 €
Amount spent
: 7726027 €,7 726 027,00 €
Percentage of investment
: 5,67 %5,67 %
Municipality
Portalegre
:Approved amount
: 75806398 €,75 806 398,00 €
Amount spent
: 35245275 €,35 245 275,00 €
Percentage of investment
: 29,94 %29,94 %
Municipality
Sousel
:Approved amount
: 10356676 €,10 356 676,00 €
Amount spent
: 9096824 €,9 096 824,00 €
Percentage of investment
: 4,09 %4,09 %
Total
Approved amount
: 253183455 €,253 183 455,00 €
Amount spent
: 104749352 €,104 749 352,00 €
Percentage of investment
Sub-region
Alentejo Central
:Municipality
Alandroal
:Approved amount
: 3783234 €,3 783 234,00 €
Amount spent
: 2198969 €,2 198 969,00 €
Percentage of investment
: 1,53 %1,53 %
Municipality
Arraiolos
:Approved amount
: 2199763 €,2 199 763,00 €
Amount spent
: 1698945 €,1 698 945,00 €
Percentage of investment
: 0,89 %0,89 %
Municipality
Borba
:Approved amount
: 18221567 €,18 221 567,00 €
Amount spent
: 5573418 €,5 573 418,00 €
Percentage of investment
: 7,38 %7,38 %
Municipality
Estremoz
:Approved amount
: 7497554 €,7 497 554,00 €
Amount spent
: 4892608 €,4 892 608,00 €
Percentage of investment
: 3,04 %3,04 %
Municipality
Évora
:Approved amount
: 168894436 €,168 894 436,00 €
Amount spent
: 95601654 €,95 601 654,00 €
Percentage of investment
: 68,4 %68,40 %
Municipality
Montemor-o-Novo
:Approved amount
: 5261059 €,5 261 059,00 €
Amount spent
: 2590566 €,2 590 566,00 €
Percentage of investment
: 2,13 %2,13 %
Municipality
Mora
:Approved amount
: 2947480 €,2 947 480,00 €
Amount spent
: 1607664 €,1 607 664,00 €
Percentage of investment
: 1,19 %1,19 %
Municipality
Mourão
:Approved amount
: 1218853 €,1 218 853,00 €
Amount spent
: 866316 €,866 316,00 €
Percentage of investment
: 0,49 %0,49 %
Municipality
Portel
:Approved amount
: 1589215 €,1 589 215,00 €
Amount spent
: 702594 €,702 594,00 €
Percentage of investment
: 0,64 %0,64 %
Municipality
Redondo
:Approved amount
: 8354786 €,8 354 786,00 €
Amount spent
: 2308392 €,2 308 392,00 €
Percentage of investment
: 3,38 %3,38 %
Municipality
Reguengos de Monsaraz
:Approved amount
: 9423997 €,9 423 997,00 €
Amount spent
: 6340683 €,6 340 683,00 €
Percentage of investment
: 3,82 %3,82 %
Municipality
Vendas Novas
:Approved amount
: 7210628 €,7 210 628,00 €
Amount spent
: 3046496 €,3 046 496,00 €
Percentage of investment
: 2,92 %2,92 %
Municipality
Viana do Alentejo
:Approved amount
: 2505009 €,2 505 009,00 €
Amount spent
: 1551818 €,1 551 818,00 €
Percentage of investment
: 1,01 %1,01 %
Municipality
Vila Viçosa
:Approved amount
: 7810397 €,7 810 397,00 €
Amount spent
: 6104230 €,6 104 230,00 €
Percentage of investment
: 3,16 %3,16 %
Total
Approved amount
: 246917980 €,246 917 980,00 €
Amount spent
: 135084354 €,135 084 354,00 €
Percentage of investment
Region
Algarve
:Sub-region
Algarve
:Municipality
Albufeira
:Approved amount
: 45148195 €,45 148 195,00 €
Amount spent
: 32785384 €,32 785 384,00 €
Percentage of investment
: 6,56 %6,56 %
Municipality
Alcoutim
:Approved amount
: 35256626 €,35 256 626,00 €
Amount spent
: 7555605 €,7 555 605,00 €
Percentage of investment
: 5,12 %5,12 %
Municipality
Aljezur
:Approved amount
: 7812935 €,7 812 935,00 €
Amount spent
: 3325434 €,3 325 434,00 €
Percentage of investment
: 1,13 %1,13 %
Municipality
Castro Marim
:Approved amount
: 3383756 €,3 383 756,00 €
Amount spent
: 1866383 €,1 866 383,00 €
Percentage of investment
: 0,49 %0,49 %
Municipality
Faro
:Approved amount
: 153203296 €,153 203 296,00 €
Amount spent
: 85887506 €,85 887 506,00 €
Percentage of investment
: 22,25 %22,25 %
Municipality
Lagoa
:Approved amount
: 20498656 €,20 498 656,00 €
Amount spent
: 13975666 €,13 975 666,00 €
Percentage of investment
: 2,98 %2,98 %
Municipality
Lagos
:Approved amount
: 46217208 €,46 217 208,00 €
Amount spent
: 29013051 €,29 013 051,00 €
Percentage of investment
: 6,71 %6,71 %
Municipality
Loulé
:Approved amount
: 63848732 €,63 848 732,00 €
Amount spent
: 37708590 €,37 708 590,00 €
Percentage of investment
: 9,27 %9,27 %
Municipality
Monchique
:Approved amount
: 17805569 €,17 805 569,00 €
Amount spent
: 7995176 €,7 995 176,00 €
Percentage of investment
: 2,59 %2,59 %
Municipality
Olhão
:Approved amount
: 54412074 €,54 412 074,00 €
Amount spent
: 33380313 €,33 380 313,00 €
Percentage of investment
: 7,9 %7,90 %
Municipality
Portimão
:Approved amount
: 65257927 €,65 257 927,00 €
Amount spent
: 30300841 €,30 300 841,00 €
Percentage of investment
: 9,48 %9,48 %
Municipality
São Brás de Alportel
:Approved amount
: 7742581 €,7 742 581,00 €
Amount spent
: 5297705 €,5 297 705,00 €
Percentage of investment
: 1,12 %1,12 %
Municipality
Silves
:Approved amount
: 31001397 €,31 001 397,00 €
Amount spent
: 18361646 €,18 361 646,00 €
Percentage of investment
: 4,5 %4,50 %
Municipality
Tavira
:Approved amount
: 19211446 €,19 211 446,00 €
Amount spent
: 11682727 €,11 682 727,00 €
Percentage of investment
: 2,79 %2,79 %
Municipality
Vila do Bispo
:Approved amount
: 7667673 €,7 667 673,00 €
Amount spent
: 3209479 €,3 209 479,00 €
Percentage of investment
: 1,11 %1,11 %
Municipality
Vila Real de Santo António
:Approved amount
: 110009026 €,110 009 026,00 €
Amount spent
: 90214836 €,90 214 836,00 €
Percentage of investment
: 15,98 %15,98 %
Total
Approved amount
: 688477096 €,688 477 096,00 €
Amount spent
: 412560343 €,412 560 343,00 €
Percentage of investment
Region
Autonomous Region of the Azores
:Sub-region
Autonomous Region of the Azores
:Municipality
Vila do Porto
:Approved amount
: 7740893 €,7 740 893,00 €
Amount spent
: 4050373 €,4 050 373,00 €
Percentage of investment
: 0,69 %0,69 %
Municipality
Lagoa
:Approved amount
: 40253987 €,40 253 987,00 €
Amount spent
: 22857408 €,22 857 408,00 €
Percentage of investment
: 3,59 %3,59 %
Municipality
Nordeste
:Approved amount
: 7846572 €,7 846 572,00 €
Amount spent
: 4583195 €,4 583 195,00 €
Percentage of investment
: 0,7 %0,70 %
Municipality
Ponta Delgada
:Approved amount
: 561610940 €,561 610 940,00 €
Amount spent
: 360028906 €,360 028 906,00 €
Percentage of investment
: 50,05 %50,05 %
Municipality
Povoação
:Approved amount
: 5725086 €,5 725 086,00 €
Amount spent
: 2656426 €,2 656 426,00 €
Percentage of investment
: 0,51 %0,51 %
Municipality
Ribeira Grande
:Approved amount
: 141578851 €,141 578 851,00 €
Amount spent
: 77568386 €,77 568 386,00 €
Percentage of investment
: 12,62 %12,62 %
Municipality
Vila Franca do Campo
:Approved amount
: 13397539 €,13 397 539,00 €
Amount spent
: 10592954 €,10 592 954,00 €
Percentage of investment
: 1,19 %1,19 %
Municipality
Angra do Heroísmo
:Approved amount
: 176870099 €,176 870 099,00 €
Amount spent
: 111722820 €,111 722 820,00 €
Percentage of investment
: 15,76 %15,76 %
Municipality
Vila da Praia da Vitória
:Approved amount
: 13525498 €,13 525 498,00 €
Amount spent
: 9035120 €,9 035 120,00 €
Percentage of investment
: 1,21 %1,21 %
Municipality
Santa Cruz da Graciosa
:Approved amount
: 10802026 €,10 802 026,00 €
Amount spent
: 4246736 €,4 246 736,00 €
Percentage of investment
: 0,96 %0,96 %
Municipality
Calheta
:Approved amount
: 3012975 €,3 012 975,00 €
Amount spent
: 2169164 €,2 169 164,00 €
Percentage of investment
: 0,27 %0,27 %
Municipality
Velas
:Approved amount
: 6402540 €,6 402 540,00 €
Amount spent
: 3770633 €,3 770 633,00 €
Percentage of investment
: 0,57 %0,57 %
Municipality
Lajes do Pico
:Approved amount
: 4724911 €,4 724 911,00 €
Amount spent
: 2514813 €,2 514 813,00 €
Percentage of investment
: 0,42 %0,42 %
Municipality
Madalena
:Approved amount
: 16553814 €,16 553 814,00 €
Amount spent
: 10701229 €,10 701 229,00 €
Percentage of investment
: 1,48 %1,48 %
Municipality
São Roque do Pico
:Approved amount
: 13799852 €,13 799 852,00 €
Amount spent
: 9123265 €,9 123 265,00 €
Percentage of investment
: 1,23 %1,23 %
Municipality
Horta
:Approved amount
: 92743868 €,92 743 868,00 €
Amount spent
: 72529314 €,72 529 314,00 €
Percentage of investment
: 8,26 %8,26 %
Municipality
Lajes das Flores
:Approved amount
: 2419429 €,2 419 429,00 €
Amount spent
: 1138272 €,1 138 272,00 €
Percentage of investment
: 0,22 %0,22 %
Municipality
Santa Cruz das Flores
:Approved amount
: 2721882 €,2 721 882,00 €
Amount spent
: 1312727 €,1 312 727,00 €
Percentage of investment
: 0,24 %0,24 %
Municipality
Corvo
:Approved amount
: 426969 €,426 969,00 €
Amount spent
: 178867 €,178 867,00 €
Percentage of investment
: 0,04 %0,04 %
Total
Approved amount
: 1122157733 €,1 122 157 733,00 €
Amount spent
: 710780608 €,710 780 608,00 €
Percentage of investment
Region
Autonomous Region of Madeira
:Sub-region
Autonomous Region of Madeira
:Municipality
Calheta
:Approved amount
: 12612913 €,12 612 913,00 €
Amount spent
: 4997586 €,4 997 586,00 €
Percentage of investment
: 1,27 %1,27 %
Municipality
Câmara de Lobos
:Approved amount
: 29868433 €,29 868 433,00 €
Amount spent
: 9233792 €,9 233 792,00 €
Percentage of investment
: 3,01 %3,01 %
Municipality
Funchal
:Approved amount
: 752470112 €,752 470 112,00 €
Amount spent
: 451422910 €,451 422 910,00 €
Percentage of investment
: 75,82 %75,82 %
Municipality
Machico
:Approved amount
: 49182822 €,49 182 822,00 €
Amount spent
: 11981176 €,11 981 176,00 €
Percentage of investment
: 4,96 %4,96 %
Municipality
Ponta do Sol
:Approved amount
: 21693893 €,21 693 893,00 €
Amount spent
: 7179285 €,7 179 285,00 €
Percentage of investment
: 2,19 %2,19 %
Municipality
Porto Moniz
:Approved amount
: 596718 €,596 718,00 €
Amount spent
: 328562 €,328 562,00 €
Percentage of investment
: 0,06 %0,06 %
Municipality
Ribeira Brava
:Approved amount
: 13898950 €,13 898 950,00 €
Amount spent
: 11520076 €,11 520 076,00 €
Percentage of investment
: 1,4 %1,40 %
Municipality
Santa Cruz
:Approved amount
: 28918939 €,28 918 939,00 €
Amount spent
: 13225398 €,13 225 398,00 €
Percentage of investment
: 2,91 %2,91 %
Municipality
Santana
:Approved amount
: 16763669 €,16 763 669,00 €
Amount spent
: 667313 €,667 313,00 €
Percentage of investment
: 1,69 %1,69 %
Municipality
São Vicente
:Approved amount
: 26172087 €,26 172 087,00 €
Amount spent
: 9217263 €,9 217 263,00 €
Percentage of investment
: 2,64 %2,64 %
Municipality
Porto Santo
:Approved amount
: 40273013 €,40 273 013,00 €
Amount spent
: 21218936 €,21 218 936,00 €
Percentage of investment
: 4,06 %4,06 %
Total
Approved amount
: 992451551 €,992 451 551,00 €
Amount spent
: 540992297 €,540 992 297,00 €
Percentage of investment
Region
Nation-wide investment
:Approved amount
: 3655353461 €,3 655 353 461,00 €
:Amount spent
: {{ regionNutsii.apoio_gasto|floatformat:'-2'|cut:' '|checkifdataisavailable|euro_symbol,2 654 617 913,00 €
:Comparison between realities
Assessing the impact of investments in the Recovery and Resilience Plan on the daily lives of populations is not a simple topic. It is necessary to analyze the context in a broader way and understand how investments can suppress everyday needs.
However, there are some indicators that can help to envision an equitable way in which investments are being distributed geographically.
How much is already approved to invest per inhabitant?
Number of inhabitants according to the 2021 Census
How much is already approved to invest per inhabitant?
Number of inhabitants according to the 2021 Census
| Municipality | Approved amount |
|---|---|
| Highest national value Vinhais | 14369 € 14 369,00 € |
| National average | 2427 € 2 427,00 € |
| Lowest national value Almeirim | 198 € 198,00 € |
How much is already approved to invest per inhabitant?
Municipality
Highest national value Vinhais
Approved amount
14369 €
14 369,00 €
Municipality
National average
Approved amount
2427 €
2 427,00 €
Municipality
Lowest national value Almeirim
Approved amount
198 €
198,00 €
How much is already approved to invest per km2?
How much is already approved to invest per km2?
| Municipality | Approved amount |
|---|---|
| Highest national value Porto | 34592761 € 34 592 761,00 € |
| National average | 272184 € 272 184,00 € |
| Lowest national value Crato | 1615 € 1 615,00 € |
How much is already approved to invest per km2?
Municipality
Highest national value Porto
Approved amount
34592761 €
34 592 761,00 €
Municipality
National average
Approved amount
272184 €
272 184,00 €
Municipality
Lowest national value Crato
Approved amount
1615 €
1 615,00 €
If you'd like to know more about a specific municipality, tell us which one...