Investment by regions
Discover how the investments already approved in the Recovery and Resilience Plan are distributed across the various regions of the country.
Recovery and Resilience Plan in numbers
21,9 billion €
Total investment to be applied by the Recovery and Resilience Plan
2,7 billion €
Total amount of funds already allocated to Nation-wide investments
12,8 billion €
Total amount of funds already invested in municipalities and regions
Geography of investments
The Recovery and Resilience Plan aims to provide the country with a set of tools for the future, seeking to ensure a more resilient economy, a more sustainable relationship with the environment, and more digital processes and functioning.
All of this is contributed by a broad geographical distribution of its investments and reforms, ensuring that both nationally implemented projects and resources applied in all municipalities of the country are invested where they have the greatest impact on the lives of the population.
Distribution of investment by regions
Distribution of investment by regions
| Region | Sub-region | Municipality | Approved amount | Amount spent | Percentage of investment |
|---|---|---|---|---|---|
| North |
Alto Minho
Cávado
Ave
Área Metropolitana do Porto
Alto Tâmega
Tâmega e Sousa
Douro
Terras de Trás-os-Montes
|
Arcos de Valdevez
Caminha
Melgaço
Monção
Paredes de Coura
Ponte da Barca
Ponte de Lima
Valença
Viana do Castelo
Vila Nova de Cerveira
Total
Amares
Barcelos
Braga
Esposende
Terras de Bouro
Vila Verde
Total
Cabeceiras de Basto
Fafe
Guimarães
Póvoa de Lanhoso
Vieira do Minho
Vila Nova de Famalicão
Vizela
Mondim de Basto
Total
Arouca
Espinho
Santa Maria da Feira
Oliveira de Azeméis
São João da Madeira
Vale de Cambra
Gondomar
Maia
Matosinhos
Paredes
Porto
Póvoa de Varzim
Santo Tirso
Valongo
Vila do Conde
Vila Nova de Gaia
Trofa
Total
Boticas
Chaves
Montalegre
Ribeira de Pena
Valpaços
Vila Pouca de Aguiar
Total
Castelo de Paiva
Celorico de Basto
Amarante
Baião
Felgueiras
Lousada
Marco de Canaveses
Paços de Ferreira
Penafiel
Cinfães
Resende
Total
Carrazeda de Ansiães
Freixo de Espada à Cinta
Torre de Moncorvo
Vila Nova de Foz Côa
Alijó
Mesão Frio
Murça
Peso da Régua
Sabrosa
Santa Marta de Penaguião
Vila Real
Armamar
Lamego
Moimenta da Beira
Penedono
São João da Pesqueira
Sernancelhe
Tabuaço
Tarouca
Total
Alfândega da Fé
Bragança
Macedo de Cavaleiros
Miranda do Douro
Mirandela
Mogadouro
Vila Flor
Vimioso
Vinhais
Total
|
29 849 253,00 €
14 077 378,00 €
20 288 535,00 €
31 480 870,00 €
6 652 213,00 €
9 972 963,00 €
31 779 206,00 €
35 337 307,00 €
185 831 671,00 €
19 470 692,00 €
384 740 086,00 €
12 181 088,00 €
187 012 728,00 €
436 299 205,00 €
52 495 324,00 €
4 585 357,00 €
34 053 163,00 €
726 626 865,00 €
13 523 638,00 €
51 968 343,00 €
453 293 552,00 €
26 367 737,00 €
6 430 972,00 €
314 378 220,00 €
28 370 372,00 €
9 997 598,00 €
904 330 431,00 €
28 240 669,00 €
22 151 856,00 €
133 224 652,00 €
83 605 442,00 €
72 550 216,00 €
35 074 301,00 €
88 176 572,00 €
279 764 150,00 €
707 624 246,00 €
96 542 681,00 €
1 432 016 795,00 €
84 797 882,00 €
91 208 159,00 €
72 486 971,00 €
154 355 823,00 €
347 520 689,00 €
94 918 965,00 €
3 824 260 069,00 €
6 152 620,00 €
52 460 628,00 €
7 381 477,00 €
14 019 351,00 €
5 952 016,00 €
20 331 770,00 €
106 297 861,00 €
26 186 059,00 €
25 247 702,00 €
64 167 984,00 €
48 917 496,00 €
46 957 817,00 €
50 769 771,00 €
35 073 649,00 €
90 778 710,00 €
148 059 608,00 €
17 409 304,00 €
6 100 071,00 €
559 668 170,00 €
5 718 530,00 €
7 540 857,00 €
3 990 514,00 €
10 584 815,00 €
13 460 957,00 €
1 433 547,00 €
4 440 910,00 €
23 901 670,00 €
13 459 082,00 €
10 953 046,00 €
203 709 585,00 €
4 194 890,00 €
34 264 100,00 €
16 318 637,00 €
6 189 634,00 €
11 350 464,00 €
12 245 568,00 €
4 678 474,00 €
10 827 101,00 €
399 262 382,00 €
15 764 636,00 €
109 880 864,00 €
14 016 187,00 €
3 577 376,00 €
24 161 432,00 €
12 487 369,00 €
1 993 172,00 €
2 688 515,00 €
111 610 338,00 €
296 179 889,00 €
|
17 232 793,00 €
6 503 522,00 €
18 176 977,00 €
18 574 065,00 €
3 649 558,00 €
5 178 077,00 €
19 303 330,00 €
16 743 020,00 €
128 537 869,00 €
13 279 880,00 €
247 179 091,00 €
7 959 801,00 €
93 940 279,00 €
292 171 756,00 €
22 180 840,00 €
2 430 307,00 €
22 121 471,00 €
440 804 452,00 €
5 534 615,00 €
30 425 078,00 €
287 624 568,00 €
12 379 357,00 €
3 708 184,00 €
200 985 982,00 €
20 886 065,00 €
4 281 229,00 €
565 825 078,00 €
16 075 416,00 €
8 533 598,00 €
81 936 950,00 €
42 017 319,00 €
45 767 369,00 €
21 980 858,00 €
54 539 179,00 €
175 162 090,00 €
460 193 452,00 €
58 577 964,00 €
957 795 293,00 €
64 107 808,00 €
63 214 676,00 €
35 317 980,00 €
99 887 689,00 €
189 403 219,00 €
73 208 217,00 €
2 447 719 078,00 €
3 854 053,00 €
25 253 842,00 €
3 005 891,00 €
9 536 188,00 €
3 599 733,00 €
9 214 413,00 €
54 464 118,00 €
16 650 629,00 €
19 063 882,00 €
37 006 396,00 €
43 608 730,00 €
29 645 567,00 €
36 468 514,00 €
24 371 305,00 €
60 882 628,00 €
116 473 861,00 €
13 766 427,00 €
3 693 477,00 €
401 631 416,00 €
2 276 773,00 €
3 016 232,00 €
2 794 799,00 €
4 187 361,00 €
9 798 824,00 €
782 673,00 €
1 576 427,00 €
17 086 985,00 €
7 065 262,00 €
4 008 845,00 €
121 729 502,00 €
1 869 324,00 €
16 708 808,00 €
8 911 841,00 €
2 926 660,00 €
6 147 217,00 €
6 554 051,00 €
2 422 082,00 €
3 792 675,00 €
223 656 340,00 €
8 875 181,00 €
60 101 230,00 €
8 493 675,00 €
1 858 248,00 €
14 797 628,00 €
6 763 275,00 €
1 277 709,00 €
2 197 113,00 €
108 838 623,00 €
213 202 682,00 €
|
7,76 %
3,66 %
5,27 %
8,18 %
1,73 %
2,59 %
8,26 %
9,18 %
48,30 %
5,06 %
1,68 %
25,74 %
60,04 %
7,22 %
0,63 %
4,69 %
1,50 %
5,75 %
50,12 %
2,92 %
0,71 %
34,76 %
3,14 %
1,11 %
0,74 %
0,58 %
3,48 %
2,19 %
1,90 %
0,92 %
2,31 %
7,32 %
18,50 %
2,52 %
37,45 %
2,22 %
2,38 %
1,90 %
4,04 %
9,09 %
2,48 %
5,79 %
49,35 %
6,94 %
13,19 %
5,60 %
19,13 %
4,68 %
4,51 %
11,47 %
8,74 %
8,39 %
9,07 %
6,27 %
16,22 %
26,45 %
3,11 %
1,09 %
1,43 %
1,89 %
1,00 %
2,65 %
3,37 %
0,36 %
1,11 %
5,99 %
3,37 %
2,74 %
51,02 %
1,05 %
8,58 %
4,09 %
1,55 %
2,84 %
3,07 %
1,17 %
2,71 %
5,32 %
37,10 %
4,73 %
1,21 %
8,16 %
4,22 %
0,67 %
0,91 %
37,68 %
|
| Center |
Oeste
Região de Aveiro
Região de Coimbra
Região de Leiria
Viseu Dão Lafões
Beira Baixa
Médio Tejo
Beiras e Serra da Estrela
|
Alcobaça
Bombarral
Caldas da Rainha
Nazaré
Óbidos
Peniche
Alenquer
Arruda dos Vinhos
Cadaval
Lourinhã
Sobral de Monte Agraço
Torres Vedras
Total
Águeda
Albergaria-a-Velha
Anadia
Aveiro
Estarreja
Ílhavo
Murtosa
Oliveira do Bairro
Ovar
Sever do Vouga
Vagos
Total
Mealhada
Arganil
Cantanhede
Coimbra
Condeixa-a-Nova
Figueira da Foz
Góis
Lousã
Mira
Miranda do Corvo
Montemor-o-Velho
Oliveira do Hospital
Pampilhosa da Serra
Penacova
Penela
Soure
Tábua
Vila Nova de Poiares
Mortágua
Total
Alvaiázere
Ansião
Batalha
Castanheira de Pêra
Figueiró dos Vinhos
Leiria
Marinha Grande
Pedrógão Grande
Pombal
Porto de Mós
Total
Aguiar da Beira
Carregal do Sal
Castro Daire
Mangualde
Nelas
Oliveira de Frades
Penalva do Castelo
Santa Comba Dão
São Pedro do Sul
Sátão
Tondela
Vila Nova de Paiva
Viseu
Vouzela
Total
Castelo Branco
Idanha-a-Nova
Oleiros
Penamacor
Proença-a-Nova
Vila Velha de Ródão
Total
Sertã
Vila de Rei
Abrantes
Alcanena
Constância
Entroncamento
Ferreira do Zêzere
Mação
Sardoal
Tomar
Torres Novas
Vila Nova da Barquinha
Ourém
Total
Belmonte
Covilhã
Fundão
Almeida
Celorico da Beira
Figueira de Castelo Rodrigo
Fornos de Algodres
Gouveia
Guarda
Manteigas
Mêda
Pinhel
Sabugal
Seia
Trancoso
Total
|
58 515 270,00 €
5 480 621,00 €
72 303 576,00 €
38 677 830,00 €
14 981 299,00 €
28 570 089,00 €
51 435 904,00 €
25 220 625,00 €
12 912 881,00 €
11 839 306,00 €
2 452 630,00 €
124 136 632,00 €
446 526 664,00 €
192 554 354,00 €
29 957 359,00 €
28 720 894,00 €
345 898 172,00 €
69 351 350,00 €
130 120 666,00 €
10 997 566,00 €
43 628 457,00 €
65 450 557,00 €
11 728 504,00 €
32 674 786,00 €
961 082 665,00 €
20 103 105,00 €
25 353 307,00 €
69 737 198,00 €
571 161 612,00 €
12 734 755,00 €
163 655 772,00 €
9 626 633,00 €
25 840 286,00 €
19 649 471,00 €
13 068 399,00 €
15 791 337,00 €
60 345 092,00 €
17 228 717,00 €
16 455 271,00 €
7 056 819,00 €
7 504 719,00 €
17 486 407,00 €
7 501 111,00 €
7 577 676,00 €
1 087 877 685,00 €
12 702 158,00 €
10 144 277,00 €
34 545 251,00 €
7 058 490,00 €
6 460 821,00 €
345 879 267,00 €
144 759 138,00 €
8 132 315,00 €
82 072 003,00 €
45 159 842,00 €
696 913 560,00 €
13 343 840,00 €
31 543 168,00 €
11 638 508,00 €
81 018 955,00 €
45 616 369,00 €
15 920 566,00 €
2 145 592,00 €
8 131 764,00 €
14 212 366,00 €
8 343 201,00 €
35 342 935,00 €
9 720 528,00 €
162 744 364,00 €
24 455 445,00 €
464 177 601,00 €
87 343 260,00 €
10 866 827,00 €
20 195 740,00 €
12 872 166,00 €
23 192 169,00 €
20 488 693,00 €
174 958 856,00 €
26 661 291,00 €
11 545 012,00 €
38 121 661,00 €
34 141 460,00 €
28 029 654,00 €
32 562 006,00 €
22 271 364,00 €
34 123 105,00 €
10 856 775,00 €
40 461 103,00 €
47 915 623,00 €
5 471 356,00 €
70 338 167,00 €
402 498 577,00 €
11 330 326,00 €
93 185 514,00 €
77 199 405,00 €
3 255 096,00 €
7 724 499,00 €
2 617 904,00 €
4 141 857,00 €
9 145 346,00 €
114 264 733,00 €
2 423 055,00 €
3 715 185,00 €
6 115 761,00 €
12 699 718,00 €
39 403 115,00 €
15 160 619,00 €
402 382 131,00 €
|
34 793 631,00 €
3 913 080,00 €
32 617 615,00 €
27 206 677,00 €
7 135 608,00 €
19 045 645,00 €
17 427 266,00 €
13 867 602,00 €
4 102 825,00 €
8 447 765,00 €
1 678 604,00 €
51 886 360,00 €
222 122 678,00 €
110 974 498,00 €
19 904 733,00 €
19 041 101,00 €
218 631 237,00 €
43 511 748,00 €
71 410 113,00 €
10 648 491,00 €
23 008 290,00 €
36 477 616,00 €
5 876 212,00 €
21 749 868,00 €
581 233 908,00 €
11 456 442,00 €
15 518 293,00 €
52 625 557,00 €
329 917 301,00 €
4 474 951,00 €
86 330 566,00 €
2 438 474,00 €
12 043 000,00 €
11 672 168,00 €
7 296 605,00 €
8 552 039,00 €
36 680 713,00 €
11 261 968,00 €
9 476 619,00 €
2 184 257,00 €
3 642 550,00 €
8 688 060,00 €
3 907 602,00 €
4 376 909,00 €
622 544 072,00 €
7 653 225,00 €
6 287 704,00 €
21 118 801,00 €
4 038 540,00 €
2 314 605,00 €
187 228 811,00 €
93 153 097,00 €
2 827 612,00 €
45 179 717,00 €
29 126 341,00 €
398 928 454,00 €
9 161 603,00 €
16 539 883,00 €
6 877 999,00 €
52 416 072,00 €
27 779 346,00 €
9 085 008,00 €
1 844 112,00 €
4 881 454,00 €
8 310 229,00 €
5 478 717,00 €
20 729 602,00 €
2 898 339,00 €
87 695 701,00 €
13 395 734,00 €
267 093 799,00 €
39 306 135,00 €
7 307 968,00 €
9 350 679,00 €
919 783,00 €
6 668 148,00 €
10 900 498,00 €
74 453 211,00 €
12 202 841,00 €
6 204 244,00 €
23 315 119,00 €
25 030 792,00 €
19 014 454,00 €
20 610 339,00 €
11 032 530,00 €
10 617 700,00 €
3 849 031,00 €
21 978 025,00 €
23 693 355,00 €
3 325 668,00 €
34 742 740,00 €
215 616 839,00 €
2 634 566,00 €
57 305 375,00 €
33 356 360,00 €
1 709 346,00 €
3 337 320,00 €
2 146 151,00 €
2 807 941,00 €
5 909 469,00 €
41 791 121,00 €
1 177 291,00 €
1 852 265,00 €
3 195 000,00 €
6 191 029,00 €
20 401 365,00 €
6 331 486,00 €
190 146 085,00 €
|
13,10 %
1,23 %
16,19 %
8,66 %
3,36 %
6,40 %
11,52 %
5,65 %
2,89 %
2,65 %
0,55 %
27,80 %
20,04 %
3,12 %
2,99 %
35,99 %
7,22 %
13,54 %
1,14 %
4,54 %
6,81 %
1,22 %
3,40 %
1,85 %
2,33 %
6,41 %
52,50 %
1,17 %
15,04 %
0,88 %
2,38 %
1,81 %
1,20 %
1,45 %
5,55 %
1,58 %
1,51 %
0,65 %
0,69 %
1,61 %
0,69 %
0,70 %
1,82 %
1,46 %
4,96 %
1,01 %
0,93 %
49,63 %
20,77 %
1,17 %
11,78 %
6,48 %
2,87 %
6,80 %
2,51 %
17,45 %
9,83 %
3,43 %
0,46 %
1,75 %
3,06 %
1,80 %
7,61 %
2,09 %
35,06 %
5,27 %
49,92 %
6,21 %
11,54 %
7,36 %
13,26 %
11,71 %
6,62 %
2,87 %
9,47 %
8,48 %
6,96 %
8,09 %
5,53 %
8,48 %
2,70 %
10,05 %
11,90 %
1,36 %
17,48 %
2,82 %
23,16 %
19,19 %
0,81 %
1,92 %
0,65 %
1,03 %
2,27 %
28,40 %
0,60 %
0,92 %
1,52 %
3,16 %
9,79 %
3,77 %
|
| Lisbon Metropolitan Area |
Lisbon Metropolitan Area
|
Cascais
Lisboa
Loures
Mafra
Oeiras
Sintra
Vila Franca de Xira
Amadora
Odivelas
Alcochete
Almada
Barreiro
Moita
Montijo
Palmela
Seixal
Sesimbra
Setúbal
Total
|
275 246 711,00 €
2 964 866 349,00 €
181 943 262,00 €
141 622 576,00 €
482 397 770,00 €
192 682 693,00 €
122 750 588,00 €
231 006 869,00 €
72 208 494,00 €
19 137 127,00 €
130 411 332,00 €
73 047 675,00 €
27 164 054,00 €
46 665 878,00 €
40 906 386,00 €
108 672 781,00 €
33 103 934,00 €
318 700 470,00 €
5 462 534 950,00 €
|
180 276 148,00 €
1 748 497 025,00 €
113 912 763,00 €
88 978 421,00 €
288 945 760,00 €
104 347 970,00 €
62 472 327,00 €
162 203 993,00 €
38 726 555,00 €
9 608 976,00 €
66 457 170,00 €
39 478 202,00 €
18 295 798,00 €
31 483 918,00 €
23 982 238,00 €
67 376 123,00 €
27 254 825,00 €
175 029 414,00 €
3 247 327 626,00 €
|
5,04 %
54,28 %
3,33 %
2,59 %
8,83 %
3,53 %
2,25 %
4,23 %
1,32 %
0,35 %
2,39 %
1,34 %
0,50 %
0,85 %
0,75 %
1,99 %
0,61 %
5,83 %
|
| Alentejo |
Alentejo Litoral
Baixo Alentejo
Lezíria do Tejo
Alto Alentejo
Alentejo Central
|
Odemira
Alcácer do Sal
Grândola
Santiago do Cacém
Sines
Total
Aljustrel
Almodôvar
Alvito
Barrancos
Beja
Castro Verde
Cuba
Ferreira do Alentejo
Mértola
Moura
Ourique
Serpa
Vidigueira
Total
Azambuja
Almeirim
Alpiarça
Benavente
Cartaxo
Chamusca
Coruche
Golegã
Rio Maior
Salvaterra de Magos
Santarém
Total
Alter do Chão
Arronches
Avis
Campo Maior
Castelo de Vide
Crato
Elvas
Fronteira
Gavião
Marvão
Monforte
Nisa
Ponte de Sor
Portalegre
Sousel
Total
Alandroal
Arraiolos
Borba
Estremoz
Évora
Montemor-o-Novo
Mora
Mourão
Portel
Redondo
Reguengos de Monsaraz
Vendas Novas
Viana do Alentejo
Vila Viçosa
Total
|
20 389 114,00 €
21 386 488,00 €
60 316 285,00 €
114 169 359,00 €
59 375 550,00 €
275 636 795,00 €
31 859 411,00 €
2 265 144,00 €
5 916 598,00 €
2 102 732,00 €
89 862 787,00 €
1 452 177,00 €
1 262 841,00 €
51 331 249,00 €
22 481 087,00 €
3 441 150,00 €
4 550 409,00 €
3 151 995,00 €
2 417 814,00 €
222 095 394,00 €
43 747 649,00 €
4 308 849,00 €
6 935 846,00 €
50 151 893,00 €
20 765 573,00 €
8 772 303,00 €
7 342 231,00 €
10 397 741,00 €
61 042 053,00 €
12 440 801,00 €
108 612 749,00 €
334 517 688,00 €
12 601 338,00 €
2 098 854,00 €
1 245 196,00 €
19 956 174,00 €
4 194 647,00 €
634 682,00 €
50 622 197,00 €
1 615 592,00 €
20 320 101,00 €
3 854 033,00 €
16 369 186,00 €
18 774 827,00 €
14 328 054,00 €
75 780 787,00 €
10 351 521,00 €
252 747 190,00 €
3 776 688,00 €
2 178 887,00 €
18 216 013,00 €
7 493 177,00 €
168 782 401,00 €
5 239 257,00 €
2 935 048,00 €
1 215 414,00 €
1 570 513,00 €
8 402 794,00 €
9 393 928,00 €
7 190 067,00 €
2 492 975,00 €
7 807 864,00 €
246 695 024,00 €
|
13 702 206,00 €
6 060 937,00 €
50 325 929,00 €
73 413 014,00 €
21 440 895,00 €
164 942 981,00 €
26 932 540,00 €
1 444 309,00 €
2 238 856,00 €
1 660 247,00 €
63 084 065,00 €
930 485,00 €
805 145,00 €
41 051 574,00 €
14 687 092,00 €
2 149 100,00 €
2 256 476,00 €
1 479 039,00 €
1 378 365,00 €
160 097 292,00 €
20 375 077,00 €
2 850 962,00 €
4 198 532,00 €
22 796 653,00 €
14 947 396,00 €
6 330 025,00 €
4 362 270,00 €
5 774 709,00 €
26 869 858,00 €
8 370 253,00 €
66 056 665,00 €
182 932 400,00 €
4 050 588,00 €
1 402 945,00 €
748 076,00 €
12 768 038,00 €
1 534 023,00 €
423 424,00 €
21 758 868,00 €
1 131 712,00 €
3 798 943,00 €
2 096 415,00 €
1 045 223,00 €
2 221 471,00 €
7 929 690,00 €
36 718 387,00 €
9 110 442,00 €
106 738 245,00 €
2 505 050,00 €
1 704 517,00 €
5 584 244,00 €
4 924 316,00 €
99 088 376,00 €
2 596 872,00 €
1 609 623,00 €
867 824,00 €
712 904,00 €
2 314 206,00 €
6 346 168,00 €
3 124 543,00 €
1 557 449,00 €
6 139 431,00 €
139 075 522,00 €
|
7,40 %
7,76 %
21,88 %
41,42 %
21,54 %
14,34 %
1,02 %
2,66 %
0,95 %
40,46 %
0,65 %
0,57 %
23,11 %
10,12 %
1,55 %
2,05 %
1,42 %
1,09 %
13,08 %
1,29 %
2,07 %
14,99 %
6,21 %
2,62 %
2,19 %
3,11 %
18,25 %
3,72 %
32,47 %
4,99 %
0,83 %
0,49 %
7,90 %
1,66 %
0,25 %
20,03 %
0,64 %
8,04 %
1,52 %
6,48 %
7,43 %
5,67 %
29,98 %
4,10 %
1,53 %
0,88 %
7,38 %
3,04 %
68,42 %
2,12 %
1,19 %
0,49 %
0,64 %
3,41 %
3,81 %
2,91 %
1,01 %
3,16 %
|
| Algarve |
Algarve
|
Albufeira
Alcoutim
Aljezur
Castro Marim
Faro
Lagoa
Lagos
Loulé
Monchique
Olhão
Portimão
São Brás de Alportel
Silves
Tavira
Vila do Bispo
Vila Real de Santo António
Total
|
45 118 555,00 €
35 247 434,00 €
7 810 705,00 €
3 374 656,00 €
153 138 271,00 €
20 469 092,00 €
45 743 052,00 €
63 803 038,00 €
17 795 680,00 €
54 548 741,00 €
65 200 088,00 €
7 726 804,00 €
30 951 664,00 €
19 171 336,00 €
7 660 946,00 €
109 864 976,00 €
687 625 038,00 €
|
32 806 758,00 €
7 555 895,00 €
3 328 700,00 €
1 867 957,00 €
86 131 511,00 €
13 981 532,00 €
29 232 886,00 €
39 309 222,00 €
7 996 791,00 €
36 400 241,00 €
31 396 445,00 €
5 593 980,00 €
18 375 815,00 €
11 687 750,00 €
3 211 845,00 €
90 270 511,00 €
419 147 838,00 €
|
6,56 %
5,13 %
1,14 %
0,49 %
22,27 %
2,98 %
6,65 %
9,28 %
2,59 %
7,93 %
9,48 %
1,12 %
4,50 %
2,79 %
1,11 %
15,98 %
|
| Autonomous Region of the Azores |
Autonomous Region of the Azores
|
Vila do Porto
Lagoa
Nordeste
Ponta Delgada
Povoação
Ribeira Grande
Vila Franca do Campo
Angra do Heroísmo
Vila da Praia da Vitória
Santa Cruz da Graciosa
Calheta
Velas
Lajes do Pico
Madalena
São Roque do Pico
Horta
Lajes das Flores
Santa Cruz das Flores
Corvo
Total
|
7 742 923,00 €
39 904 612,00 €
7 820 898,00 €
560 869 816,00 €
5 730 887,00 €
141 503 250,00 €
13 411 106,00 €
176 791 985,00 €
13 486 993,00 €
10 801 997,00 €
3 013 392,00 €
6 382 463,00 €
4 578 961,00 €
16 552 661,00 €
13 789 388,00 €
92 777 531,00 €
2 419 429,00 €
2 721 812,00 €
426 969,00 €
1 120 727 076,00 €
|
4 072 868,00 €
22 883 561,00 €
4 583 195,00 €
364 735 089,00 €
2 656 426,00 €
77 697 165,00 €
10 592 954,00 €
113 065 425,00 €
9 185 559,00 €
4 311 018,00 €
2 187 790,00 €
3 770 633,00 €
2 585 989,00 €
11 340 179,00 €
9 133 296,00 €
73 244 822,00 €
1 138 272,00 €
1 317 727,00 €
340 867,00 €
718 842 832,00 €
|
0,69 %
3,56 %
0,70 %
50,05 %
0,51 %
12,63 %
1,20 %
15,77 %
1,20 %
0,96 %
0,27 %
0,57 %
0,41 %
1,48 %
1,23 %
8,28 %
0,22 %
0,24 %
0,04 %
|
| Autonomous Region of Madeira |
Autonomous Region of Madeira
|
Calheta
Câmara de Lobos
Funchal
Machico
Ponta do Sol
Porto Moniz
Ribeira Brava
Santa Cruz
Santana
São Vicente
Porto Santo
Total
|
12 613 566,00 €
29 871 393,00 €
675 885 165,00 €
49 184 129,00 €
21 694 546,00 €
596 718,00 €
13 901 603,00 €
28 058 939,00 €
16 764 322,00 €
26 172 087,00 €
40 274 320,00 €
915 016 788,00 €
|
5 003 556,00 €
9 381 323,00 €
450 126 102,00 €
11 988 077,00 €
7 179 938,00 €
328 562,00 €
11 520 729,00 €
13 069 941,00 €
667 966,00 €
9 217 263,00 €
21 220 242,00 €
539 703 700,00 €
|
1,38 %
3,26 %
73,87 %
5,38 %
2,37 %
0,07 %
1,52 %
3,07 %
1,83 %
2,86 %
4,40 %
|
| Nation-wide investment |
|
|
3 655 353 461,00 €
|
2 651 943 060,00 €
|
|
Distribution of investment by regions
Region
North
:Sub-region
Alto Minho
:Municipality
Arcos de Valdevez
:Approved amount
: 29849253 €,29 849 253,00 €
Amount spent
: 17232793 €,17 232 793,00 €
Percentage of investment
: 7,76 %7,76 %
Municipality
Caminha
:Approved amount
: 14077378 €,14 077 378,00 €
Amount spent
: 6503522 €,6 503 522,00 €
Percentage of investment
: 3,66 %3,66 %
Municipality
Melgaço
:Approved amount
: 20288535 €,20 288 535,00 €
Amount spent
: 18176977 €,18 176 977,00 €
Percentage of investment
: 5,27 %5,27 %
Municipality
Monção
:Approved amount
: 31480870 €,31 480 870,00 €
Amount spent
: 18574065 €,18 574 065,00 €
Percentage of investment
: 8,18 %8,18 %
Municipality
Paredes de Coura
:Approved amount
: 6652213 €,6 652 213,00 €
Amount spent
: 3649558 €,3 649 558,00 €
Percentage of investment
: 1,73 %1,73 %
Municipality
Ponte da Barca
:Approved amount
: 9972963 €,9 972 963,00 €
Amount spent
: 5178077 €,5 178 077,00 €
Percentage of investment
: 2,59 %2,59 %
Municipality
Ponte de Lima
:Approved amount
: 31779206 €,31 779 206,00 €
Amount spent
: 19303330 €,19 303 330,00 €
Percentage of investment
: 8,26 %8,26 %
Municipality
Valença
:Approved amount
: 35337307 €,35 337 307,00 €
Amount spent
: 16743020 €,16 743 020,00 €
Percentage of investment
: 9,18 %9,18 %
Municipality
Viana do Castelo
:Approved amount
: 185831671 €,185 831 671,00 €
Amount spent
: 128537869 €,128 537 869,00 €
Percentage of investment
: 48,3 %48,30 %
Municipality
Vila Nova de Cerveira
:Approved amount
: 19470692 €,19 470 692,00 €
Amount spent
: 13279880 €,13 279 880,00 €
Percentage of investment
: 5,06 %5,06 %
Total
Approved amount
: 384740086 €,384 740 086,00 €
Amount spent
: 247179091 €,247 179 091,00 €
Percentage of investment
Sub-region
Cávado
:Municipality
Amares
:Approved amount
: 12181088 €,12 181 088,00 €
Amount spent
: 7959801 €,7 959 801,00 €
Percentage of investment
: 1,68 %1,68 %
Municipality
Barcelos
:Approved amount
: 187012728 €,187 012 728,00 €
Amount spent
: 93940279 €,93 940 279,00 €
Percentage of investment
: 25,74 %25,74 %
Municipality
Braga
:Approved amount
: 436299205 €,436 299 205,00 €
Amount spent
: 292171756 €,292 171 756,00 €
Percentage of investment
: 60,04 %60,04 %
Municipality
Esposende
:Approved amount
: 52495324 €,52 495 324,00 €
Amount spent
: 22180840 €,22 180 840,00 €
Percentage of investment
: 7,22 %7,22 %
Municipality
Terras de Bouro
:Approved amount
: 4585357 €,4 585 357,00 €
Amount spent
: 2430307 €,2 430 307,00 €
Percentage of investment
: 0,63 %0,63 %
Municipality
Vila Verde
:Approved amount
: 34053163 €,34 053 163,00 €
Amount spent
: 22121471 €,22 121 471,00 €
Percentage of investment
: 4,69 %4,69 %
Total
Approved amount
: 726626865 €,726 626 865,00 €
Amount spent
: 440804452 €,440 804 452,00 €
Percentage of investment
Sub-region
Ave
:Municipality
Cabeceiras de Basto
:Approved amount
: 13523638 €,13 523 638,00 €
Amount spent
: 5534615 €,5 534 615,00 €
Percentage of investment
: 1,5 %1,50 %
Municipality
Fafe
:Approved amount
: 51968343 €,51 968 343,00 €
Amount spent
: 30425078 €,30 425 078,00 €
Percentage of investment
: 5,75 %5,75 %
Municipality
Guimarães
:Approved amount
: 453293552 €,453 293 552,00 €
Amount spent
: 287624568 €,287 624 568,00 €
Percentage of investment
: 50,12 %50,12 %
Municipality
Póvoa de Lanhoso
:Approved amount
: 26367737 €,26 367 737,00 €
Amount spent
: 12379357 €,12 379 357,00 €
Percentage of investment
: 2,92 %2,92 %
Municipality
Vieira do Minho
:Approved amount
: 6430972 €,6 430 972,00 €
Amount spent
: 3708184 €,3 708 184,00 €
Percentage of investment
: 0,71 %0,71 %
Municipality
Vila Nova de Famalicão
:Approved amount
: 314378220 €,314 378 220,00 €
Amount spent
: 200985982 €,200 985 982,00 €
Percentage of investment
: 34,76 %34,76 %
Municipality
Vizela
:Approved amount
: 28370372 €,28 370 372,00 €
Amount spent
: 20886065 €,20 886 065,00 €
Percentage of investment
: 3,14 %3,14 %
Municipality
Mondim de Basto
:Approved amount
: 9997598 €,9 997 598,00 €
Amount spent
: 4281229 €,4 281 229,00 €
Percentage of investment
: 1,11 %1,11 %
Total
Approved amount
: 904330431 €,904 330 431,00 €
Amount spent
: 565825078 €,565 825 078,00 €
Percentage of investment
Sub-region
Área Metropolitana do Porto
:Municipality
Arouca
:Approved amount
: 28240669 €,28 240 669,00 €
Amount spent
: 16075416 €,16 075 416,00 €
Percentage of investment
: 0,74 %0,74 %
Municipality
Espinho
:Approved amount
: 22151856 €,22 151 856,00 €
Amount spent
: 8533598 €,8 533 598,00 €
Percentage of investment
: 0,58 %0,58 %
Municipality
Santa Maria da Feira
:Approved amount
: 133224652 €,133 224 652,00 €
Amount spent
: 81936950 €,81 936 950,00 €
Percentage of investment
: 3,48 %3,48 %
Municipality
Oliveira de Azeméis
:Approved amount
: 83605442 €,83 605 442,00 €
Amount spent
: 42017319 €,42 017 319,00 €
Percentage of investment
: 2,19 %2,19 %
Municipality
São João da Madeira
:Approved amount
: 72550216 €,72 550 216,00 €
Amount spent
: 45767369 €,45 767 369,00 €
Percentage of investment
: 1,9 %1,90 %
Municipality
Vale de Cambra
:Approved amount
: 35074301 €,35 074 301,00 €
Amount spent
: 21980858 €,21 980 858,00 €
Percentage of investment
: 0,92 %0,92 %
Municipality
Gondomar
:Approved amount
: 88176572 €,88 176 572,00 €
Amount spent
: 54539179 €,54 539 179,00 €
Percentage of investment
: 2,31 %2,31 %
Municipality
Maia
:Approved amount
: 279764150 €,279 764 150,00 €
Amount spent
: 175162090 €,175 162 090,00 €
Percentage of investment
: 7,32 %7,32 %
Municipality
Matosinhos
:Approved amount
: 707624246 €,707 624 246,00 €
Amount spent
: 460193452 €,460 193 452,00 €
Percentage of investment
: 18,5 %18,50 %
Municipality
Paredes
:Approved amount
: 96542681 €,96 542 681,00 €
Amount spent
: 58577964 €,58 577 964,00 €
Percentage of investment
: 2,52 %2,52 %
Municipality
Porto
:Approved amount
: 1432016795 €,1 432 016 795,00 €
Amount spent
: 957795293 €,957 795 293,00 €
Percentage of investment
: 37,45 %37,45 %
Municipality
Póvoa de Varzim
:Approved amount
: 84797882 €,84 797 882,00 €
Amount spent
: 64107808 €,64 107 808,00 €
Percentage of investment
: 2,22 %2,22 %
Municipality
Santo Tirso
:Approved amount
: 91208159 €,91 208 159,00 €
Amount spent
: 63214676 €,63 214 676,00 €
Percentage of investment
: 2,38 %2,38 %
Municipality
Valongo
:Approved amount
: 72486971 €,72 486 971,00 €
Amount spent
: 35317980 €,35 317 980,00 €
Percentage of investment
: 1,9 %1,90 %
Municipality
Vila do Conde
:Approved amount
: 154355823 €,154 355 823,00 €
Amount spent
: 99887689 €,99 887 689,00 €
Percentage of investment
: 4,04 %4,04 %
Municipality
Vila Nova de Gaia
:Approved amount
: 347520689 €,347 520 689,00 €
Amount spent
: 189403219 €,189 403 219,00 €
Percentage of investment
: 9,09 %9,09 %
Municipality
Trofa
:Approved amount
: 94918965 €,94 918 965,00 €
Amount spent
: 73208217 €,73 208 217,00 €
Percentage of investment
: 2,48 %2,48 %
Total
Approved amount
: 3824260069 €,3 824 260 069,00 €
Amount spent
: 2447719078 €,2 447 719 078,00 €
Percentage of investment
Sub-region
Alto Tâmega
:Municipality
Boticas
:Approved amount
: 6152620 €,6 152 620,00 €
Amount spent
: 3854053 €,3 854 053,00 €
Percentage of investment
: 5,79 %5,79 %
Municipality
Chaves
:Approved amount
: 52460628 €,52 460 628,00 €
Amount spent
: 25253842 €,25 253 842,00 €
Percentage of investment
: 49,35 %49,35 %
Municipality
Montalegre
:Approved amount
: 7381477 €,7 381 477,00 €
Amount spent
: 3005891 €,3 005 891,00 €
Percentage of investment
: 6,94 %6,94 %
Municipality
Ribeira de Pena
:Approved amount
: 14019351 €,14 019 351,00 €
Amount spent
: 9536188 €,9 536 188,00 €
Percentage of investment
: 13,19 %13,19 %
Municipality
Valpaços
:Approved amount
: 5952016 €,5 952 016,00 €
Amount spent
: 3599733 €,3 599 733,00 €
Percentage of investment
: 5,6 %5,60 %
Municipality
Vila Pouca de Aguiar
:Approved amount
: 20331770 €,20 331 770,00 €
Amount spent
: 9214413 €,9 214 413,00 €
Percentage of investment
: 19,13 %19,13 %
Total
Approved amount
: 106297861 €,106 297 861,00 €
Amount spent
: 54464118 €,54 464 118,00 €
Percentage of investment
Sub-region
Tâmega e Sousa
:Municipality
Castelo de Paiva
:Approved amount
: 26186059 €,26 186 059,00 €
Amount spent
: 16650629 €,16 650 629,00 €
Percentage of investment
: 4,68 %4,68 %
Municipality
Celorico de Basto
:Approved amount
: 25247702 €,25 247 702,00 €
Amount spent
: 19063882 €,19 063 882,00 €
Percentage of investment
: 4,51 %4,51 %
Municipality
Amarante
:Approved amount
: 64167984 €,64 167 984,00 €
Amount spent
: 37006396 €,37 006 396,00 €
Percentage of investment
: 11,47 %11,47 %
Municipality
Baião
:Approved amount
: 48917496 €,48 917 496,00 €
Amount spent
: 43608730 €,43 608 730,00 €
Percentage of investment
: 8,74 %8,74 %
Municipality
Felgueiras
:Approved amount
: 46957817 €,46 957 817,00 €
Amount spent
: 29645567 €,29 645 567,00 €
Percentage of investment
: 8,39 %8,39 %
Municipality
Lousada
:Approved amount
: 50769771 €,50 769 771,00 €
Amount spent
: 36468514 €,36 468 514,00 €
Percentage of investment
: 9,07 %9,07 %
Municipality
Marco de Canaveses
:Approved amount
: 35073649 €,35 073 649,00 €
Amount spent
: 24371305 €,24 371 305,00 €
Percentage of investment
: 6,27 %6,27 %
Municipality
Paços de Ferreira
:Approved amount
: 90778710 €,90 778 710,00 €
Amount spent
: 60882628 €,60 882 628,00 €
Percentage of investment
: 16,22 %16,22 %
Municipality
Penafiel
:Approved amount
: 148059608 €,148 059 608,00 €
Amount spent
: 116473861 €,116 473 861,00 €
Percentage of investment
: 26,45 %26,45 %
Municipality
Cinfães
:Approved amount
: 17409304 €,17 409 304,00 €
Amount spent
: 13766427 €,13 766 427,00 €
Percentage of investment
: 3,11 %3,11 %
Municipality
Resende
:Approved amount
: 6100071 €,6 100 071,00 €
Amount spent
: 3693477 €,3 693 477,00 €
Percentage of investment
: 1,09 %1,09 %
Total
Approved amount
: 559668170 €,559 668 170,00 €
Amount spent
: 401631416 €,401 631 416,00 €
Percentage of investment
Sub-region
Douro
:Municipality
Carrazeda de Ansiães
:Approved amount
: 5718530 €,5 718 530,00 €
Amount spent
: 2276773 €,2 276 773,00 €
Percentage of investment
: 1,43 %1,43 %
Municipality
Freixo de Espada à Cinta
:Approved amount
: 7540857 €,7 540 857,00 €
Amount spent
: 3016232 €,3 016 232,00 €
Percentage of investment
: 1,89 %1,89 %
Municipality
Torre de Moncorvo
:Approved amount
: 3990514 €,3 990 514,00 €
Amount spent
: 2794799 €,2 794 799,00 €
Percentage of investment
: 1 %1,00 %
Municipality
Vila Nova de Foz Côa
:Approved amount
: 10584815 €,10 584 815,00 €
Amount spent
: 4187361 €,4 187 361,00 €
Percentage of investment
: 2,65 %2,65 %
Municipality
Alijó
:Approved amount
: 13460957 €,13 460 957,00 €
Amount spent
: 9798824 €,9 798 824,00 €
Percentage of investment
: 3,37 %3,37 %
Municipality
Mesão Frio
:Approved amount
: 1433547 €,1 433 547,00 €
Amount spent
: 782673 €,782 673,00 €
Percentage of investment
: 0,36 %0,36 %
Municipality
Murça
:Approved amount
: 4440910 €,4 440 910,00 €
Amount spent
: 1576427 €,1 576 427,00 €
Percentage of investment
: 1,11 %1,11 %
Municipality
Peso da Régua
:Approved amount
: 23901670 €,23 901 670,00 €
Amount spent
: 17086985 €,17 086 985,00 €
Percentage of investment
: 5,99 %5,99 %
Municipality
Sabrosa
:Approved amount
: 13459082 €,13 459 082,00 €
Amount spent
: 7065262 €,7 065 262,00 €
Percentage of investment
: 3,37 %3,37 %
Municipality
Santa Marta de Penaguião
:Approved amount
: 10953046 €,10 953 046,00 €
Amount spent
: 4008845 €,4 008 845,00 €
Percentage of investment
: 2,74 %2,74 %
Municipality
Vila Real
:Approved amount
: 203709585 €,203 709 585,00 €
Amount spent
: 121729502 €,121 729 502,00 €
Percentage of investment
: 51,02 %51,02 %
Municipality
Armamar
:Approved amount
: 4194890 €,4 194 890,00 €
Amount spent
: 1869324 €,1 869 324,00 €
Percentage of investment
: 1,05 %1,05 %
Municipality
Lamego
:Approved amount
: 34264100 €,34 264 100,00 €
Amount spent
: 16708808 €,16 708 808,00 €
Percentage of investment
: 8,58 %8,58 %
Municipality
Moimenta da Beira
:Approved amount
: 16318637 €,16 318 637,00 €
Amount spent
: 8911841 €,8 911 841,00 €
Percentage of investment
: 4,09 %4,09 %
Municipality
Penedono
:Approved amount
: 6189634 €,6 189 634,00 €
Amount spent
: 2926660 €,2 926 660,00 €
Percentage of investment
: 1,55 %1,55 %
Municipality
São João da Pesqueira
:Approved amount
: 11350464 €,11 350 464,00 €
Amount spent
: 6147217 €,6 147 217,00 €
Percentage of investment
: 2,84 %2,84 %
Municipality
Sernancelhe
:Approved amount
: 12245568 €,12 245 568,00 €
Amount spent
: 6554051 €,6 554 051,00 €
Percentage of investment
: 3,07 %3,07 %
Municipality
Tabuaço
:Approved amount
: 4678474 €,4 678 474,00 €
Amount spent
: 2422082 €,2 422 082,00 €
Percentage of investment
: 1,17 %1,17 %
Municipality
Tarouca
:Approved amount
: 10827101 €,10 827 101,00 €
Amount spent
: 3792675 €,3 792 675,00 €
Percentage of investment
: 2,71 %2,71 %
Total
Approved amount
: 399262382 €,399 262 382,00 €
Amount spent
: 223656340 €,223 656 340,00 €
Percentage of investment
Sub-region
Terras de Trás-os-Montes
:Municipality
Alfândega da Fé
:Approved amount
: 15764636 €,15 764 636,00 €
Amount spent
: 8875181 €,8 875 181,00 €
Percentage of investment
: 5,32 %5,32 %
Municipality
Bragança
:Approved amount
: 109880864 €,109 880 864,00 €
Amount spent
: 60101230 €,60 101 230,00 €
Percentage of investment
: 37,1 %37,10 %
Municipality
Macedo de Cavaleiros
:Approved amount
: 14016187 €,14 016 187,00 €
Amount spent
: 8493675 €,8 493 675,00 €
Percentage of investment
: 4,73 %4,73 %
Municipality
Miranda do Douro
:Approved amount
: 3577376 €,3 577 376,00 €
Amount spent
: 1858248 €,1 858 248,00 €
Percentage of investment
: 1,21 %1,21 %
Municipality
Mirandela
:Approved amount
: 24161432 €,24 161 432,00 €
Amount spent
: 14797628 €,14 797 628,00 €
Percentage of investment
: 8,16 %8,16 %
Municipality
Mogadouro
:Approved amount
: 12487369 €,12 487 369,00 €
Amount spent
: 6763275 €,6 763 275,00 €
Percentage of investment
: 4,22 %4,22 %
Municipality
Vila Flor
:Approved amount
: 1993172 €,1 993 172,00 €
Amount spent
: 1277709 €,1 277 709,00 €
Percentage of investment
: 0,67 %0,67 %
Municipality
Vimioso
:Approved amount
: 2688515 €,2 688 515,00 €
Amount spent
: 2197113 €,2 197 113,00 €
Percentage of investment
: 0,91 %0,91 %
Municipality
Vinhais
:Approved amount
: 111610338 €,111 610 338,00 €
Amount spent
: 108838623 €,108 838 623,00 €
Percentage of investment
: 37,68 %37,68 %
Total
Approved amount
: 296179889 €,296 179 889,00 €
Amount spent
: 213202682 €,213 202 682,00 €
Percentage of investment
Region
Center
:Sub-region
Oeste
:Municipality
Alcobaça
:Approved amount
: 58515270 €,58 515 270,00 €
Amount spent
: 34793631 €,34 793 631,00 €
Percentage of investment
: 13,1 %13,10 %
Municipality
Bombarral
:Approved amount
: 5480621 €,5 480 621,00 €
Amount spent
: 3913080 €,3 913 080,00 €
Percentage of investment
: 1,23 %1,23 %
Municipality
Caldas da Rainha
:Approved amount
: 72303576 €,72 303 576,00 €
Amount spent
: 32617615 €,32 617 615,00 €
Percentage of investment
: 16,19 %16,19 %
Municipality
Nazaré
:Approved amount
: 38677830 €,38 677 830,00 €
Amount spent
: 27206677 €,27 206 677,00 €
Percentage of investment
: 8,66 %8,66 %
Municipality
Óbidos
:Approved amount
: 14981299 €,14 981 299,00 €
Amount spent
: 7135608 €,7 135 608,00 €
Percentage of investment
: 3,36 %3,36 %
Municipality
Peniche
:Approved amount
: 28570089 €,28 570 089,00 €
Amount spent
: 19045645 €,19 045 645,00 €
Percentage of investment
: 6,4 %6,40 %
Municipality
Alenquer
:Approved amount
: 51435904 €,51 435 904,00 €
Amount spent
: 17427266 €,17 427 266,00 €
Percentage of investment
: 11,52 %11,52 %
Municipality
Arruda dos Vinhos
:Approved amount
: 25220625 €,25 220 625,00 €
Amount spent
: 13867602 €,13 867 602,00 €
Percentage of investment
: 5,65 %5,65 %
Municipality
Cadaval
:Approved amount
: 12912881 €,12 912 881,00 €
Amount spent
: 4102825 €,4 102 825,00 €
Percentage of investment
: 2,89 %2,89 %
Municipality
Lourinhã
:Approved amount
: 11839306 €,11 839 306,00 €
Amount spent
: 8447765 €,8 447 765,00 €
Percentage of investment
: 2,65 %2,65 %
Municipality
Sobral de Monte Agraço
:Approved amount
: 2452630 €,2 452 630,00 €
Amount spent
: 1678604 €,1 678 604,00 €
Percentage of investment
: 0,55 %0,55 %
Municipality
Torres Vedras
:Approved amount
: 124136632 €,124 136 632,00 €
Amount spent
: 51886360 €,51 886 360,00 €
Percentage of investment
: 27,8 %27,80 %
Total
Approved amount
: 446526664 €,446 526 664,00 €
Amount spent
: 222122678 €,222 122 678,00 €
Percentage of investment
Sub-region
Região de Aveiro
:Municipality
Águeda
:Approved amount
: 192554354 €,192 554 354,00 €
Amount spent
: 110974498 €,110 974 498,00 €
Percentage of investment
: 20,04 %20,04 %
Municipality
Albergaria-a-Velha
:Approved amount
: 29957359 €,29 957 359,00 €
Amount spent
: 19904733 €,19 904 733,00 €
Percentage of investment
: 3,12 %3,12 %
Municipality
Anadia
:Approved amount
: 28720894 €,28 720 894,00 €
Amount spent
: 19041101 €,19 041 101,00 €
Percentage of investment
: 2,99 %2,99 %
Municipality
Aveiro
:Approved amount
: 345898172 €,345 898 172,00 €
Amount spent
: 218631237 €,218 631 237,00 €
Percentage of investment
: 35,99 %35,99 %
Municipality
Estarreja
:Approved amount
: 69351350 €,69 351 350,00 €
Amount spent
: 43511748 €,43 511 748,00 €
Percentage of investment
: 7,22 %7,22 %
Municipality
Ílhavo
:Approved amount
: 130120666 €,130 120 666,00 €
Amount spent
: 71410113 €,71 410 113,00 €
Percentage of investment
: 13,54 %13,54 %
Municipality
Murtosa
:Approved amount
: 10997566 €,10 997 566,00 €
Amount spent
: 10648491 €,10 648 491,00 €
Percentage of investment
: 1,14 %1,14 %
Municipality
Oliveira do Bairro
:Approved amount
: 43628457 €,43 628 457,00 €
Amount spent
: 23008290 €,23 008 290,00 €
Percentage of investment
: 4,54 %4,54 %
Municipality
Ovar
:Approved amount
: 65450557 €,65 450 557,00 €
Amount spent
: 36477616 €,36 477 616,00 €
Percentage of investment
: 6,81 %6,81 %
Municipality
Sever do Vouga
:Approved amount
: 11728504 €,11 728 504,00 €
Amount spent
: 5876212 €,5 876 212,00 €
Percentage of investment
: 1,22 %1,22 %
Municipality
Vagos
:Approved amount
: 32674786 €,32 674 786,00 €
Amount spent
: 21749868 €,21 749 868,00 €
Percentage of investment
: 3,4 %3,40 %
Total
Approved amount
: 961082665 €,961 082 665,00 €
Amount spent
: 581233908 €,581 233 908,00 €
Percentage of investment
Sub-region
Região de Coimbra
:Municipality
Mealhada
:Approved amount
: 20103105 €,20 103 105,00 €
Amount spent
: 11456442 €,11 456 442,00 €
Percentage of investment
: 1,85 %1,85 %
Municipality
Arganil
:Approved amount
: 25353307 €,25 353 307,00 €
Amount spent
: 15518293 €,15 518 293,00 €
Percentage of investment
: 2,33 %2,33 %
Municipality
Cantanhede
:Approved amount
: 69737198 €,69 737 198,00 €
Amount spent
: 52625557 €,52 625 557,00 €
Percentage of investment
: 6,41 %6,41 %
Municipality
Coimbra
:Approved amount
: 571161612 €,571 161 612,00 €
Amount spent
: 329917301 €,329 917 301,00 €
Percentage of investment
: 52,5 %52,50 %
Municipality
Condeixa-a-Nova
:Approved amount
: 12734755 €,12 734 755,00 €
Amount spent
: 4474951 €,4 474 951,00 €
Percentage of investment
: 1,17 %1,17 %
Municipality
Figueira da Foz
:Approved amount
: 163655772 €,163 655 772,00 €
Amount spent
: 86330566 €,86 330 566,00 €
Percentage of investment
: 15,04 %15,04 %
Municipality
Góis
:Approved amount
: 9626633 €,9 626 633,00 €
Amount spent
: 2438474 €,2 438 474,00 €
Percentage of investment
: 0,88 %0,88 %
Municipality
Lousã
:Approved amount
: 25840286 €,25 840 286,00 €
Amount spent
: 12043000 €,12 043 000,00 €
Percentage of investment
: 2,38 %2,38 %
Municipality
Mira
:Approved amount
: 19649471 €,19 649 471,00 €
Amount spent
: 11672168 €,11 672 168,00 €
Percentage of investment
: 1,81 %1,81 %
Municipality
Miranda do Corvo
:Approved amount
: 13068399 €,13 068 399,00 €
Amount spent
: 7296605 €,7 296 605,00 €
Percentage of investment
: 1,2 %1,20 %
Municipality
Montemor-o-Velho
:Approved amount
: 15791337 €,15 791 337,00 €
Amount spent
: 8552039 €,8 552 039,00 €
Percentage of investment
: 1,45 %1,45 %
Municipality
Oliveira do Hospital
:Approved amount
: 60345092 €,60 345 092,00 €
Amount spent
: 36680713 €,36 680 713,00 €
Percentage of investment
: 5,55 %5,55 %
Municipality
Pampilhosa da Serra
:Approved amount
: 17228717 €,17 228 717,00 €
Amount spent
: 11261968 €,11 261 968,00 €
Percentage of investment
: 1,58 %1,58 %
Municipality
Penacova
:Approved amount
: 16455271 €,16 455 271,00 €
Amount spent
: 9476619 €,9 476 619,00 €
Percentage of investment
: 1,51 %1,51 %
Municipality
Penela
:Approved amount
: 7056819 €,7 056 819,00 €
Amount spent
: 2184257 €,2 184 257,00 €
Percentage of investment
: 0,65 %0,65 %
Municipality
Soure
:Approved amount
: 7504719 €,7 504 719,00 €
Amount spent
: 3642550 €,3 642 550,00 €
Percentage of investment
: 0,69 %0,69 %
Municipality
Tábua
:Approved amount
: 17486407 €,17 486 407,00 €
Amount spent
: 8688060 €,8 688 060,00 €
Percentage of investment
: 1,61 %1,61 %
Municipality
Vila Nova de Poiares
:Approved amount
: 7501111 €,7 501 111,00 €
Amount spent
: 3907602 €,3 907 602,00 €
Percentage of investment
: 0,69 %0,69 %
Municipality
Mortágua
:Approved amount
: 7577676 €,7 577 676,00 €
Amount spent
: 4376909 €,4 376 909,00 €
Percentage of investment
: 0,7 %0,70 %
Total
Approved amount
: 1087877685 €,1 087 877 685,00 €
Amount spent
: 622544072 €,622 544 072,00 €
Percentage of investment
Sub-region
Região de Leiria
:Municipality
Alvaiázere
:Approved amount
: 12702158 €,12 702 158,00 €
Amount spent
: 7653225 €,7 653 225,00 €
Percentage of investment
: 1,82 %1,82 %
Municipality
Ansião
:Approved amount
: 10144277 €,10 144 277,00 €
Amount spent
: 6287704 €,6 287 704,00 €
Percentage of investment
: 1,46 %1,46 %
Municipality
Batalha
:Approved amount
: 34545251 €,34 545 251,00 €
Amount spent
: 21118801 €,21 118 801,00 €
Percentage of investment
: 4,96 %4,96 %
Municipality
Castanheira de Pêra
:Approved amount
: 7058490 €,7 058 490,00 €
Amount spent
: 4038540 €,4 038 540,00 €
Percentage of investment
: 1,01 %1,01 %
Municipality
Figueiró dos Vinhos
:Approved amount
: 6460821 €,6 460 821,00 €
Amount spent
: 2314605 €,2 314 605,00 €
Percentage of investment
: 0,93 %0,93 %
Municipality
Leiria
:Approved amount
: 345879267 €,345 879 267,00 €
Amount spent
: 187228811 €,187 228 811,00 €
Percentage of investment
: 49,63 %49,63 %
Municipality
Marinha Grande
:Approved amount
: 144759138 €,144 759 138,00 €
Amount spent
: 93153097 €,93 153 097,00 €
Percentage of investment
: 20,77 %20,77 %
Municipality
Pedrógão Grande
:Approved amount
: 8132315 €,8 132 315,00 €
Amount spent
: 2827612 €,2 827 612,00 €
Percentage of investment
: 1,17 %1,17 %
Municipality
Pombal
:Approved amount
: 82072003 €,82 072 003,00 €
Amount spent
: 45179717 €,45 179 717,00 €
Percentage of investment
: 11,78 %11,78 %
Municipality
Porto de Mós
:Approved amount
: 45159842 €,45 159 842,00 €
Amount spent
: 29126341 €,29 126 341,00 €
Percentage of investment
: 6,48 %6,48 %
Total
Approved amount
: 696913560 €,696 913 560,00 €
Amount spent
: 398928454 €,398 928 454,00 €
Percentage of investment
Sub-region
Viseu Dão Lafões
:Municipality
Aguiar da Beira
:Approved amount
: 13343840 €,13 343 840,00 €
Amount spent
: 9161603 €,9 161 603,00 €
Percentage of investment
: 2,87 %2,87 %
Municipality
Carregal do Sal
:Approved amount
: 31543168 €,31 543 168,00 €
Amount spent
: 16539883 €,16 539 883,00 €
Percentage of investment
: 6,8 %6,80 %
Municipality
Castro Daire
:Approved amount
: 11638508 €,11 638 508,00 €
Amount spent
: 6877999 €,6 877 999,00 €
Percentage of investment
: 2,51 %2,51 %
Municipality
Mangualde
:Approved amount
: 81018955 €,81 018 955,00 €
Amount spent
: 52416072 €,52 416 072,00 €
Percentage of investment
: 17,45 %17,45 %
Municipality
Nelas
:Approved amount
: 45616369 €,45 616 369,00 €
Amount spent
: 27779346 €,27 779 346,00 €
Percentage of investment
: 9,83 %9,83 %
Municipality
Oliveira de Frades
:Approved amount
: 15920566 €,15 920 566,00 €
Amount spent
: 9085008 €,9 085 008,00 €
Percentage of investment
: 3,43 %3,43 %
Municipality
Penalva do Castelo
:Approved amount
: 2145592 €,2 145 592,00 €
Amount spent
: 1844112 €,1 844 112,00 €
Percentage of investment
: 0,46 %0,46 %
Municipality
Santa Comba Dão
:Approved amount
: 8131764 €,8 131 764,00 €
Amount spent
: 4881454 €,4 881 454,00 €
Percentage of investment
: 1,75 %1,75 %
Municipality
São Pedro do Sul
:Approved amount
: 14212366 €,14 212 366,00 €
Amount spent
: 8310229 €,8 310 229,00 €
Percentage of investment
: 3,06 %3,06 %
Municipality
Sátão
:Approved amount
: 8343201 €,8 343 201,00 €
Amount spent
: 5478717 €,5 478 717,00 €
Percentage of investment
: 1,8 %1,80 %
Municipality
Tondela
:Approved amount
: 35342935 €,35 342 935,00 €
Amount spent
: 20729602 €,20 729 602,00 €
Percentage of investment
: 7,61 %7,61 %
Municipality
Vila Nova de Paiva
:Approved amount
: 9720528 €,9 720 528,00 €
Amount spent
: 2898339 €,2 898 339,00 €
Percentage of investment
: 2,09 %2,09 %
Municipality
Viseu
:Approved amount
: 162744364 €,162 744 364,00 €
Amount spent
: 87695701 €,87 695 701,00 €
Percentage of investment
: 35,06 %35,06 %
Municipality
Vouzela
:Approved amount
: 24455445 €,24 455 445,00 €
Amount spent
: 13395734 €,13 395 734,00 €
Percentage of investment
: 5,27 %5,27 %
Total
Approved amount
: 464177601 €,464 177 601,00 €
Amount spent
: 267093799 €,267 093 799,00 €
Percentage of investment
Sub-region
Beira Baixa
:Municipality
Castelo Branco
:Approved amount
: 87343260 €,87 343 260,00 €
Amount spent
: 39306135 €,39 306 135,00 €
Percentage of investment
: 49,92 %49,92 %
Municipality
Idanha-a-Nova
:Approved amount
: 10866827 €,10 866 827,00 €
Amount spent
: 7307968 €,7 307 968,00 €
Percentage of investment
: 6,21 %6,21 %
Municipality
Oleiros
:Approved amount
: 20195740 €,20 195 740,00 €
Amount spent
: 9350679 €,9 350 679,00 €
Percentage of investment
: 11,54 %11,54 %
Municipality
Penamacor
:Approved amount
: 12872166 €,12 872 166,00 €
Amount spent
: 919783 €,919 783,00 €
Percentage of investment
: 7,36 %7,36 %
Municipality
Proença-a-Nova
:Approved amount
: 23192169 €,23 192 169,00 €
Amount spent
: 6668148 €,6 668 148,00 €
Percentage of investment
: 13,26 %13,26 %
Municipality
Vila Velha de Ródão
:Approved amount
: 20488693 €,20 488 693,00 €
Amount spent
: 10900498 €,10 900 498,00 €
Percentage of investment
: 11,71 %11,71 %
Total
Approved amount
: 174958856 €,174 958 856,00 €
Amount spent
: 74453211 €,74 453 211,00 €
Percentage of investment
Sub-region
Médio Tejo
:Municipality
Sertã
:Approved amount
: 26661291 €,26 661 291,00 €
Amount spent
: 12202841 €,12 202 841,00 €
Percentage of investment
: 6,62 %6,62 %
Municipality
Vila de Rei
:Approved amount
: 11545012 €,11 545 012,00 €
Amount spent
: 6204244 €,6 204 244,00 €
Percentage of investment
: 2,87 %2,87 %
Municipality
Abrantes
:Approved amount
: 38121661 €,38 121 661,00 €
Amount spent
: 23315119 €,23 315 119,00 €
Percentage of investment
: 9,47 %9,47 %
Municipality
Alcanena
:Approved amount
: 34141460 €,34 141 460,00 €
Amount spent
: 25030792 €,25 030 792,00 €
Percentage of investment
: 8,48 %8,48 %
Municipality
Constância
:Approved amount
: 28029654 €,28 029 654,00 €
Amount spent
: 19014454 €,19 014 454,00 €
Percentage of investment
: 6,96 %6,96 %
Municipality
Entroncamento
:Approved amount
: 32562006 €,32 562 006,00 €
Amount spent
: 20610339 €,20 610 339,00 €
Percentage of investment
: 8,09 %8,09 %
Municipality
Ferreira do Zêzere
:Approved amount
: 22271364 €,22 271 364,00 €
Amount spent
: 11032530 €,11 032 530,00 €
Percentage of investment
: 5,53 %5,53 %
Municipality
Mação
:Approved amount
: 34123105 €,34 123 105,00 €
Amount spent
: 10617700 €,10 617 700,00 €
Percentage of investment
: 8,48 %8,48 %
Municipality
Sardoal
:Approved amount
: 10856775 €,10 856 775,00 €
Amount spent
: 3849031 €,3 849 031,00 €
Percentage of investment
: 2,7 %2,70 %
Municipality
Tomar
:Approved amount
: 40461103 €,40 461 103,00 €
Amount spent
: 21978025 €,21 978 025,00 €
Percentage of investment
: 10,05 %10,05 %
Municipality
Torres Novas
:Approved amount
: 47915623 €,47 915 623,00 €
Amount spent
: 23693355 €,23 693 355,00 €
Percentage of investment
: 11,9 %11,90 %
Municipality
Vila Nova da Barquinha
:Approved amount
: 5471356 €,5 471 356,00 €
Amount spent
: 3325668 €,3 325 668,00 €
Percentage of investment
: 1,36 %1,36 %
Municipality
Ourém
:Approved amount
: 70338167 €,70 338 167,00 €
Amount spent
: 34742740 €,34 742 740,00 €
Percentage of investment
: 17,48 %17,48 %
Total
Approved amount
: 402498577 €,402 498 577,00 €
Amount spent
: 215616839 €,215 616 839,00 €
Percentage of investment
Sub-region
Beiras e Serra da Estrela
:Municipality
Belmonte
:Approved amount
: 11330326 €,11 330 326,00 €
Amount spent
: 2634566 €,2 634 566,00 €
Percentage of investment
: 2,82 %2,82 %
Municipality
Covilhã
:Approved amount
: 93185514 €,93 185 514,00 €
Amount spent
: 57305375 €,57 305 375,00 €
Percentage of investment
: 23,16 %23,16 %
Municipality
Fundão
:Approved amount
: 77199405 €,77 199 405,00 €
Amount spent
: 33356360 €,33 356 360,00 €
Percentage of investment
: 19,19 %19,19 %
Municipality
Almeida
:Approved amount
: 3255096 €,3 255 096,00 €
Amount spent
: 1709346 €,1 709 346,00 €
Percentage of investment
: 0,81 %0,81 %
Municipality
Celorico da Beira
:Approved amount
: 7724499 €,7 724 499,00 €
Amount spent
: 3337320 €,3 337 320,00 €
Percentage of investment
: 1,92 %1,92 %
Municipality
Figueira de Castelo Rodrigo
:Approved amount
: 2617904 €,2 617 904,00 €
Amount spent
: 2146151 €,2 146 151,00 €
Percentage of investment
: 0,65 %0,65 %
Municipality
Fornos de Algodres
:Approved amount
: 4141857 €,4 141 857,00 €
Amount spent
: 2807941 €,2 807 941,00 €
Percentage of investment
: 1,03 %1,03 %
Municipality
Gouveia
:Approved amount
: 9145346 €,9 145 346,00 €
Amount spent
: 5909469 €,5 909 469,00 €
Percentage of investment
: 2,27 %2,27 %
Municipality
Guarda
:Approved amount
: 114264733 €,114 264 733,00 €
Amount spent
: 41791121 €,41 791 121,00 €
Percentage of investment
: 28,4 %28,40 %
Municipality
Manteigas
:Approved amount
: 2423055 €,2 423 055,00 €
Amount spent
: 1177291 €,1 177 291,00 €
Percentage of investment
: 0,6 %0,60 %
Municipality
Mêda
:Approved amount
: 3715185 €,3 715 185,00 €
Amount spent
: 1852265 €,1 852 265,00 €
Percentage of investment
: 0,92 %0,92 %
Municipality
Pinhel
:Approved amount
: 6115761 €,6 115 761,00 €
Amount spent
: 3195000 €,3 195 000,00 €
Percentage of investment
: 1,52 %1,52 %
Municipality
Sabugal
:Approved amount
: 12699718 €,12 699 718,00 €
Amount spent
: 6191029 €,6 191 029,00 €
Percentage of investment
: 3,16 %3,16 %
Municipality
Seia
:Approved amount
: 39403115 €,39 403 115,00 €
Amount spent
: 20401365 €,20 401 365,00 €
Percentage of investment
: 9,79 %9,79 %
Municipality
Trancoso
:Approved amount
: 15160619 €,15 160 619,00 €
Amount spent
: 6331486 €,6 331 486,00 €
Percentage of investment
: 3,77 %3,77 %
Total
Approved amount
: 402382131 €,402 382 131,00 €
Amount spent
: 190146085 €,190 146 085,00 €
Percentage of investment
Region
Lisbon Metropolitan Area
:Sub-region
Lisbon Metropolitan Area
:Municipality
Cascais
:Approved amount
: 275246711 €,275 246 711,00 €
Amount spent
: 180276148 €,180 276 148,00 €
Percentage of investment
: 5,04 %5,04 %
Municipality
Lisboa
:Approved amount
: 2964866349 €,2 964 866 349,00 €
Amount spent
: 1748497025 €,1 748 497 025,00 €
Percentage of investment
: 54,28 %54,28 %
Municipality
Loures
:Approved amount
: 181943262 €,181 943 262,00 €
Amount spent
: 113912763 €,113 912 763,00 €
Percentage of investment
: 3,33 %3,33 %
Municipality
Mafra
:Approved amount
: 141622576 €,141 622 576,00 €
Amount spent
: 88978421 €,88 978 421,00 €
Percentage of investment
: 2,59 %2,59 %
Municipality
Oeiras
:Approved amount
: 482397770 €,482 397 770,00 €
Amount spent
: 288945760 €,288 945 760,00 €
Percentage of investment
: 8,83 %8,83 %
Municipality
Sintra
:Approved amount
: 192682693 €,192 682 693,00 €
Amount spent
: 104347970 €,104 347 970,00 €
Percentage of investment
: 3,53 %3,53 %
Municipality
Vila Franca de Xira
:Approved amount
: 122750588 €,122 750 588,00 €
Amount spent
: 62472327 €,62 472 327,00 €
Percentage of investment
: 2,25 %2,25 %
Municipality
Amadora
:Approved amount
: 231006869 €,231 006 869,00 €
Amount spent
: 162203993 €,162 203 993,00 €
Percentage of investment
: 4,23 %4,23 %
Municipality
Odivelas
:Approved amount
: 72208494 €,72 208 494,00 €
Amount spent
: 38726555 €,38 726 555,00 €
Percentage of investment
: 1,32 %1,32 %
Municipality
Alcochete
:Approved amount
: 19137127 €,19 137 127,00 €
Amount spent
: 9608976 €,9 608 976,00 €
Percentage of investment
: 0,35 %0,35 %
Municipality
Almada
:Approved amount
: 130411332 €,130 411 332,00 €
Amount spent
: 66457170 €,66 457 170,00 €
Percentage of investment
: 2,39 %2,39 %
Municipality
Barreiro
:Approved amount
: 73047675 €,73 047 675,00 €
Amount spent
: 39478202 €,39 478 202,00 €
Percentage of investment
: 1,34 %1,34 %
Municipality
Moita
:Approved amount
: 27164054 €,27 164 054,00 €
Amount spent
: 18295798 €,18 295 798,00 €
Percentage of investment
: 0,5 %0,50 %
Municipality
Montijo
:Approved amount
: 46665878 €,46 665 878,00 €
Amount spent
: 31483918 €,31 483 918,00 €
Percentage of investment
: 0,85 %0,85 %
Municipality
Palmela
:Approved amount
: 40906386 €,40 906 386,00 €
Amount spent
: 23982238 €,23 982 238,00 €
Percentage of investment
: 0,75 %0,75 %
Municipality
Seixal
:Approved amount
: 108672781 €,108 672 781,00 €
Amount spent
: 67376123 €,67 376 123,00 €
Percentage of investment
: 1,99 %1,99 %
Municipality
Sesimbra
:Approved amount
: 33103934 €,33 103 934,00 €
Amount spent
: 27254825 €,27 254 825,00 €
Percentage of investment
: 0,61 %0,61 %
Municipality
Setúbal
:Approved amount
: 318700470 €,318 700 470,00 €
Amount spent
: 175029414 €,175 029 414,00 €
Percentage of investment
: 5,83 %5,83 %
Total
Approved amount
: 5462534950 €,5 462 534 950,00 €
Amount spent
: 3247327626 €,3 247 327 626,00 €
Percentage of investment
Region
Alentejo
:Sub-region
Alentejo Litoral
:Municipality
Odemira
:Approved amount
: 20389114 €,20 389 114,00 €
Amount spent
: 13702206 €,13 702 206,00 €
Percentage of investment
: 7,4 %7,40 %
Municipality
Alcácer do Sal
:Approved amount
: 21386488 €,21 386 488,00 €
Amount spent
: 6060937 €,6 060 937,00 €
Percentage of investment
: 7,76 %7,76 %
Municipality
Grândola
:Approved amount
: 60316285 €,60 316 285,00 €
Amount spent
: 50325929 €,50 325 929,00 €
Percentage of investment
: 21,88 %21,88 %
Municipality
Santiago do Cacém
:Approved amount
: 114169359 €,114 169 359,00 €
Amount spent
: 73413014 €,73 413 014,00 €
Percentage of investment
: 41,42 %41,42 %
Municipality
Sines
:Approved amount
: 59375550 €,59 375 550,00 €
Amount spent
: 21440895 €,21 440 895,00 €
Percentage of investment
: 21,54 %21,54 %
Total
Approved amount
: 275636795 €,275 636 795,00 €
Amount spent
: 164942981 €,164 942 981,00 €
Percentage of investment
Sub-region
Baixo Alentejo
:Municipality
Aljustrel
:Approved amount
: 31859411 €,31 859 411,00 €
Amount spent
: 26932540 €,26 932 540,00 €
Percentage of investment
: 14,34 %14,34 %
Municipality
Almodôvar
:Approved amount
: 2265144 €,2 265 144,00 €
Amount spent
: 1444309 €,1 444 309,00 €
Percentage of investment
: 1,02 %1,02 %
Municipality
Alvito
:Approved amount
: 5916598 €,5 916 598,00 €
Amount spent
: 2238856 €,2 238 856,00 €
Percentage of investment
: 2,66 %2,66 %
Municipality
Barrancos
:Approved amount
: 2102732 €,2 102 732,00 €
Amount spent
: 1660247 €,1 660 247,00 €
Percentage of investment
: 0,95 %0,95 %
Municipality
Beja
:Approved amount
: 89862787 €,89 862 787,00 €
Amount spent
: 63084065 €,63 084 065,00 €
Percentage of investment
: 40,46 %40,46 %
Municipality
Castro Verde
:Approved amount
: 1452177 €,1 452 177,00 €
Amount spent
: 930485 €,930 485,00 €
Percentage of investment
: 0,65 %0,65 %
Municipality
Cuba
:Approved amount
: 1262841 €,1 262 841,00 €
Amount spent
: 805145 €,805 145,00 €
Percentage of investment
: 0,57 %0,57 %
Municipality
Ferreira do Alentejo
:Approved amount
: 51331249 €,51 331 249,00 €
Amount spent
: 41051574 €,41 051 574,00 €
Percentage of investment
: 23,11 %23,11 %
Municipality
Mértola
:Approved amount
: 22481087 €,22 481 087,00 €
Amount spent
: 14687092 €,14 687 092,00 €
Percentage of investment
: 10,12 %10,12 %
Municipality
Moura
:Approved amount
: 3441150 €,3 441 150,00 €
Amount spent
: 2149100 €,2 149 100,00 €
Percentage of investment
: 1,55 %1,55 %
Municipality
Ourique
:Approved amount
: 4550409 €,4 550 409,00 €
Amount spent
: 2256476 €,2 256 476,00 €
Percentage of investment
: 2,05 %2,05 %
Municipality
Serpa
:Approved amount
: 3151995 €,3 151 995,00 €
Amount spent
: 1479039 €,1 479 039,00 €
Percentage of investment
: 1,42 %1,42 %
Municipality
Vidigueira
:Approved amount
: 2417814 €,2 417 814,00 €
Amount spent
: 1378365 €,1 378 365,00 €
Percentage of investment
: 1,09 %1,09 %
Total
Approved amount
: 222095394 €,222 095 394,00 €
Amount spent
: 160097292 €,160 097 292,00 €
Percentage of investment
Sub-region
Lezíria do Tejo
:Municipality
Azambuja
:Approved amount
: 43747649 €,43 747 649,00 €
Amount spent
: 20375077 €,20 375 077,00 €
Percentage of investment
: 13,08 %13,08 %
Municipality
Almeirim
:Approved amount
: 4308849 €,4 308 849,00 €
Amount spent
: 2850962 €,2 850 962,00 €
Percentage of investment
: 1,29 %1,29 %
Municipality
Alpiarça
:Approved amount
: 6935846 €,6 935 846,00 €
Amount spent
: 4198532 €,4 198 532,00 €
Percentage of investment
: 2,07 %2,07 %
Municipality
Benavente
:Approved amount
: 50151893 €,50 151 893,00 €
Amount spent
: 22796653 €,22 796 653,00 €
Percentage of investment
: 14,99 %14,99 %
Municipality
Cartaxo
:Approved amount
: 20765573 €,20 765 573,00 €
Amount spent
: 14947396 €,14 947 396,00 €
Percentage of investment
: 6,21 %6,21 %
Municipality
Chamusca
:Approved amount
: 8772303 €,8 772 303,00 €
Amount spent
: 6330025 €,6 330 025,00 €
Percentage of investment
: 2,62 %2,62 %
Municipality
Coruche
:Approved amount
: 7342231 €,7 342 231,00 €
Amount spent
: 4362270 €,4 362 270,00 €
Percentage of investment
: 2,19 %2,19 %
Municipality
Golegã
:Approved amount
: 10397741 €,10 397 741,00 €
Amount spent
: 5774709 €,5 774 709,00 €
Percentage of investment
: 3,11 %3,11 %
Municipality
Rio Maior
:Approved amount
: 61042053 €,61 042 053,00 €
Amount spent
: 26869858 €,26 869 858,00 €
Percentage of investment
: 18,25 %18,25 %
Municipality
Salvaterra de Magos
:Approved amount
: 12440801 €,12 440 801,00 €
Amount spent
: 8370253 €,8 370 253,00 €
Percentage of investment
: 3,72 %3,72 %
Municipality
Santarém
:Approved amount
: 108612749 €,108 612 749,00 €
Amount spent
: 66056665 €,66 056 665,00 €
Percentage of investment
: 32,47 %32,47 %
Total
Approved amount
: 334517688 €,334 517 688,00 €
Amount spent
: 182932400 €,182 932 400,00 €
Percentage of investment
Sub-region
Alto Alentejo
:Municipality
Alter do Chão
:Approved amount
: 12601338 €,12 601 338,00 €
Amount spent
: 4050588 €,4 050 588,00 €
Percentage of investment
: 4,99 %4,99 %
Municipality
Arronches
:Approved amount
: 2098854 €,2 098 854,00 €
Amount spent
: 1402945 €,1 402 945,00 €
Percentage of investment
: 0,83 %0,83 %
Municipality
Avis
:Approved amount
: 1245196 €,1 245 196,00 €
Amount spent
: 748076 €,748 076,00 €
Percentage of investment
: 0,49 %0,49 %
Municipality
Campo Maior
:Approved amount
: 19956174 €,19 956 174,00 €
Amount spent
: 12768038 €,12 768 038,00 €
Percentage of investment
: 7,9 %7,90 %
Municipality
Castelo de Vide
:Approved amount
: 4194647 €,4 194 647,00 €
Amount spent
: 1534023 €,1 534 023,00 €
Percentage of investment
: 1,66 %1,66 %
Municipality
Crato
:Approved amount
: 634682 €,634 682,00 €
Amount spent
: 423424 €,423 424,00 €
Percentage of investment
: 0,25 %0,25 %
Municipality
Elvas
:Approved amount
: 50622197 €,50 622 197,00 €
Amount spent
: 21758868 €,21 758 868,00 €
Percentage of investment
: 20,03 %20,03 %
Municipality
Fronteira
:Approved amount
: 1615592 €,1 615 592,00 €
Amount spent
: 1131712 €,1 131 712,00 €
Percentage of investment
: 0,64 %0,64 %
Municipality
Gavião
:Approved amount
: 20320101 €,20 320 101,00 €
Amount spent
: 3798943 €,3 798 943,00 €
Percentage of investment
: 8,04 %8,04 %
Municipality
Marvão
:Approved amount
: 3854033 €,3 854 033,00 €
Amount spent
: 2096415 €,2 096 415,00 €
Percentage of investment
: 1,52 %1,52 %
Municipality
Monforte
:Approved amount
: 16369186 €,16 369 186,00 €
Amount spent
: 1045223 €,1 045 223,00 €
Percentage of investment
: 6,48 %6,48 %
Municipality
Nisa
:Approved amount
: 18774827 €,18 774 827,00 €
Amount spent
: 2221471 €,2 221 471,00 €
Percentage of investment
: 7,43 %7,43 %
Municipality
Ponte de Sor
:Approved amount
: 14328054 €,14 328 054,00 €
Amount spent
: 7929690 €,7 929 690,00 €
Percentage of investment
: 5,67 %5,67 %
Municipality
Portalegre
:Approved amount
: 75780787 €,75 780 787,00 €
Amount spent
: 36718387 €,36 718 387,00 €
Percentage of investment
: 29,98 %29,98 %
Municipality
Sousel
:Approved amount
: 10351521 €,10 351 521,00 €
Amount spent
: 9110442 €,9 110 442,00 €
Percentage of investment
: 4,1 %4,10 %
Total
Approved amount
: 252747190 €,252 747 190,00 €
Amount spent
: 106738245 €,106 738 245,00 €
Percentage of investment
Sub-region
Alentejo Central
:Municipality
Alandroal
:Approved amount
: 3776688 €,3 776 688,00 €
Amount spent
: 2505050 €,2 505 050,00 €
Percentage of investment
: 1,53 %1,53 %
Municipality
Arraiolos
:Approved amount
: 2178887 €,2 178 887,00 €
Amount spent
: 1704517 €,1 704 517,00 €
Percentage of investment
: 0,88 %0,88 %
Municipality
Borba
:Approved amount
: 18216013 €,18 216 013,00 €
Amount spent
: 5584244 €,5 584 244,00 €
Percentage of investment
: 7,38 %7,38 %
Municipality
Estremoz
:Approved amount
: 7493177 €,7 493 177,00 €
Amount spent
: 4924316 €,4 924 316,00 €
Percentage of investment
: 3,04 %3,04 %
Municipality
Évora
:Approved amount
: 168782401 €,168 782 401,00 €
Amount spent
: 99088376 €,99 088 376,00 €
Percentage of investment
: 68,42 %68,42 %
Municipality
Montemor-o-Novo
:Approved amount
: 5239257 €,5 239 257,00 €
Amount spent
: 2596872 €,2 596 872,00 €
Percentage of investment
: 2,12 %2,12 %
Municipality
Mora
:Approved amount
: 2935048 €,2 935 048,00 €
Amount spent
: 1609623 €,1 609 623,00 €
Percentage of investment
: 1,19 %1,19 %
Municipality
Mourão
:Approved amount
: 1215414 €,1 215 414,00 €
Amount spent
: 867824 €,867 824,00 €
Percentage of investment
: 0,49 %0,49 %
Municipality
Portel
:Approved amount
: 1570513 €,1 570 513,00 €
Amount spent
: 712904 €,712 904,00 €
Percentage of investment
: 0,64 %0,64 %
Municipality
Redondo
:Approved amount
: 8402794 €,8 402 794,00 €
Amount spent
: 2314206 €,2 314 206,00 €
Percentage of investment
: 3,41 %3,41 %
Municipality
Reguengos de Monsaraz
:Approved amount
: 9393928 €,9 393 928,00 €
Amount spent
: 6346168 €,6 346 168,00 €
Percentage of investment
: 3,81 %3,81 %
Municipality
Vendas Novas
:Approved amount
: 7190067 €,7 190 067,00 €
Amount spent
: 3124543 €,3 124 543,00 €
Percentage of investment
: 2,91 %2,91 %
Municipality
Viana do Alentejo
:Approved amount
: 2492975 €,2 492 975,00 €
Amount spent
: 1557449 €,1 557 449,00 €
Percentage of investment
: 1,01 %1,01 %
Municipality
Vila Viçosa
:Approved amount
: 7807864 €,7 807 864,00 €
Amount spent
: 6139431 €,6 139 431,00 €
Percentage of investment
: 3,16 %3,16 %
Total
Approved amount
: 246695024 €,246 695 024,00 €
Amount spent
: 139075522 €,139 075 522,00 €
Percentage of investment
Region
Algarve
:Sub-region
Algarve
:Municipality
Albufeira
:Approved amount
: 45118555 €,45 118 555,00 €
Amount spent
: 32806758 €,32 806 758,00 €
Percentage of investment
: 6,56 %6,56 %
Municipality
Alcoutim
:Approved amount
: 35247434 €,35 247 434,00 €
Amount spent
: 7555895 €,7 555 895,00 €
Percentage of investment
: 5,13 %5,13 %
Municipality
Aljezur
:Approved amount
: 7810705 €,7 810 705,00 €
Amount spent
: 3328700 €,3 328 700,00 €
Percentage of investment
: 1,14 %1,14 %
Municipality
Castro Marim
:Approved amount
: 3374656 €,3 374 656,00 €
Amount spent
: 1867957 €,1 867 957,00 €
Percentage of investment
: 0,49 %0,49 %
Municipality
Faro
:Approved amount
: 153138271 €,153 138 271,00 €
Amount spent
: 86131511 €,86 131 511,00 €
Percentage of investment
: 22,27 %22,27 %
Municipality
Lagoa
:Approved amount
: 20469092 €,20 469 092,00 €
Amount spent
: 13981532 €,13 981 532,00 €
Percentage of investment
: 2,98 %2,98 %
Municipality
Lagos
:Approved amount
: 45743052 €,45 743 052,00 €
Amount spent
: 29232886 €,29 232 886,00 €
Percentage of investment
: 6,65 %6,65 %
Municipality
Loulé
:Approved amount
: 63803038 €,63 803 038,00 €
Amount spent
: 39309222 €,39 309 222,00 €
Percentage of investment
: 9,28 %9,28 %
Municipality
Monchique
:Approved amount
: 17795680 €,17 795 680,00 €
Amount spent
: 7996791 €,7 996 791,00 €
Percentage of investment
: 2,59 %2,59 %
Municipality
Olhão
:Approved amount
: 54548741 €,54 548 741,00 €
Amount spent
: 36400241 €,36 400 241,00 €
Percentage of investment
: 7,93 %7,93 %
Municipality
Portimão
:Approved amount
: 65200088 €,65 200 088,00 €
Amount spent
: 31396445 €,31 396 445,00 €
Percentage of investment
: 9,48 %9,48 %
Municipality
São Brás de Alportel
:Approved amount
: 7726804 €,7 726 804,00 €
Amount spent
: 5593980 €,5 593 980,00 €
Percentage of investment
: 1,12 %1,12 %
Municipality
Silves
:Approved amount
: 30951664 €,30 951 664,00 €
Amount spent
: 18375815 €,18 375 815,00 €
Percentage of investment
: 4,5 %4,50 %
Municipality
Tavira
:Approved amount
: 19171336 €,19 171 336,00 €
Amount spent
: 11687750 €,11 687 750,00 €
Percentage of investment
: 2,79 %2,79 %
Municipality
Vila do Bispo
:Approved amount
: 7660946 €,7 660 946,00 €
Amount spent
: 3211845 €,3 211 845,00 €
Percentage of investment
: 1,11 %1,11 %
Municipality
Vila Real de Santo António
:Approved amount
: 109864976 €,109 864 976,00 €
Amount spent
: 90270511 €,90 270 511,00 €
Percentage of investment
: 15,98 %15,98 %
Total
Approved amount
: 687625038 €,687 625 038,00 €
Amount spent
: 419147838 €,419 147 838,00 €
Percentage of investment
Region
Autonomous Region of the Azores
:Sub-region
Autonomous Region of the Azores
:Municipality
Vila do Porto
:Approved amount
: 7742923 €,7 742 923,00 €
Amount spent
: 4072868 €,4 072 868,00 €
Percentage of investment
: 0,69 %0,69 %
Municipality
Lagoa
:Approved amount
: 39904612 €,39 904 612,00 €
Amount spent
: 22883561 €,22 883 561,00 €
Percentage of investment
: 3,56 %3,56 %
Municipality
Nordeste
:Approved amount
: 7820898 €,7 820 898,00 €
Amount spent
: 4583195 €,4 583 195,00 €
Percentage of investment
: 0,7 %0,70 %
Municipality
Ponta Delgada
:Approved amount
: 560869816 €,560 869 816,00 €
Amount spent
: 364735089 €,364 735 089,00 €
Percentage of investment
: 50,05 %50,05 %
Municipality
Povoação
:Approved amount
: 5730887 €,5 730 887,00 €
Amount spent
: 2656426 €,2 656 426,00 €
Percentage of investment
: 0,51 %0,51 %
Municipality
Ribeira Grande
:Approved amount
: 141503250 €,141 503 250,00 €
Amount spent
: 77697165 €,77 697 165,00 €
Percentage of investment
: 12,63 %12,63 %
Municipality
Vila Franca do Campo
:Approved amount
: 13411106 €,13 411 106,00 €
Amount spent
: 10592954 €,10 592 954,00 €
Percentage of investment
: 1,2 %1,20 %
Municipality
Angra do Heroísmo
:Approved amount
: 176791985 €,176 791 985,00 €
Amount spent
: 113065425 €,113 065 425,00 €
Percentage of investment
: 15,77 %15,77 %
Municipality
Vila da Praia da Vitória
:Approved amount
: 13486993 €,13 486 993,00 €
Amount spent
: 9185559 €,9 185 559,00 €
Percentage of investment
: 1,2 %1,20 %
Municipality
Santa Cruz da Graciosa
:Approved amount
: 10801997 €,10 801 997,00 €
Amount spent
: 4311018 €,4 311 018,00 €
Percentage of investment
: 0,96 %0,96 %
Municipality
Calheta
:Approved amount
: 3013392 €,3 013 392,00 €
Amount spent
: 2187790 €,2 187 790,00 €
Percentage of investment
: 0,27 %0,27 %
Municipality
Velas
:Approved amount
: 6382463 €,6 382 463,00 €
Amount spent
: 3770633 €,3 770 633,00 €
Percentage of investment
: 0,57 %0,57 %
Municipality
Lajes do Pico
:Approved amount
: 4578961 €,4 578 961,00 €
Amount spent
: 2585989 €,2 585 989,00 €
Percentage of investment
: 0,41 %0,41 %
Municipality
Madalena
:Approved amount
: 16552661 €,16 552 661,00 €
Amount spent
: 11340179 €,11 340 179,00 €
Percentage of investment
: 1,48 %1,48 %
Municipality
São Roque do Pico
:Approved amount
: 13789388 €,13 789 388,00 €
Amount spent
: 9133296 €,9 133 296,00 €
Percentage of investment
: 1,23 %1,23 %
Municipality
Horta
:Approved amount
: 92777531 €,92 777 531,00 €
Amount spent
: 73244822 €,73 244 822,00 €
Percentage of investment
: 8,28 %8,28 %
Municipality
Lajes das Flores
:Approved amount
: 2419429 €,2 419 429,00 €
Amount spent
: 1138272 €,1 138 272,00 €
Percentage of investment
: 0,22 %0,22 %
Municipality
Santa Cruz das Flores
:Approved amount
: 2721812 €,2 721 812,00 €
Amount spent
: 1317727 €,1 317 727,00 €
Percentage of investment
: 0,24 %0,24 %
Municipality
Corvo
:Approved amount
: 426969 €,426 969,00 €
Amount spent
: 340867 €,340 867,00 €
Percentage of investment
: 0,04 %0,04 %
Total
Approved amount
: 1120727076 €,1 120 727 076,00 €
Amount spent
: 718842832 €,718 842 832,00 €
Percentage of investment
Region
Autonomous Region of Madeira
:Sub-region
Autonomous Region of Madeira
:Municipality
Calheta
:Approved amount
: 12613566 €,12 613 566,00 €
Amount spent
: 5003556 €,5 003 556,00 €
Percentage of investment
: 1,38 %1,38 %
Municipality
Câmara de Lobos
:Approved amount
: 29871393 €,29 871 393,00 €
Amount spent
: 9381323 €,9 381 323,00 €
Percentage of investment
: 3,26 %3,26 %
Municipality
Funchal
:Approved amount
: 675885165 €,675 885 165,00 €
Amount spent
: 450126102 €,450 126 102,00 €
Percentage of investment
: 73,87 %73,87 %
Municipality
Machico
:Approved amount
: 49184129 €,49 184 129,00 €
Amount spent
: 11988077 €,11 988 077,00 €
Percentage of investment
: 5,38 %5,38 %
Municipality
Ponta do Sol
:Approved amount
: 21694546 €,21 694 546,00 €
Amount spent
: 7179938 €,7 179 938,00 €
Percentage of investment
: 2,37 %2,37 %
Municipality
Porto Moniz
:Approved amount
: 596718 €,596 718,00 €
Amount spent
: 328562 €,328 562,00 €
Percentage of investment
: 0,07 %0,07 %
Municipality
Ribeira Brava
:Approved amount
: 13901603 €,13 901 603,00 €
Amount spent
: 11520729 €,11 520 729,00 €
Percentage of investment
: 1,52 %1,52 %
Municipality
Santa Cruz
:Approved amount
: 28058939 €,28 058 939,00 €
Amount spent
: 13069941 €,13 069 941,00 €
Percentage of investment
: 3,07 %3,07 %
Municipality
Santana
:Approved amount
: 16764322 €,16 764 322,00 €
Amount spent
: 667966 €,667 966,00 €
Percentage of investment
: 1,83 %1,83 %
Municipality
São Vicente
:Approved amount
: 26172087 €,26 172 087,00 €
Amount spent
: 9217263 €,9 217 263,00 €
Percentage of investment
: 2,86 %2,86 %
Municipality
Porto Santo
:Approved amount
: 40274320 €,40 274 320,00 €
Amount spent
: 21220242 €,21 220 242,00 €
Percentage of investment
: 4,4 %4,40 %
Total
Approved amount
: 915016788 €,915 016 788,00 €
Amount spent
: 539703700 €,539 703 700,00 €
Percentage of investment
Region
Nation-wide investment
:Approved amount
: 3655353461 €,3 655 353 461,00 €
:Amount spent
: {{ regionNutsii.apoio_gasto|floatformat:'-2'|cut:' '|checkifdataisavailable|euro_symbol,2 651 943 060,00 €
:Comparison between realities
Assessing the impact of investments in the Recovery and Resilience Plan on the daily lives of populations is not a simple topic. It is necessary to analyze the context in a broader way and understand how investments can suppress everyday needs.
However, there are some indicators that can help to envision an equitable way in which investments are being distributed geographically.
How much is already approved to invest per inhabitant?
Number of inhabitants according to the 2021 Census
How much is already approved to invest per inhabitant?
Number of inhabitants according to the 2021 Census
| Municipality | Approved amount |
|---|---|
| Highest national value Vinhais | 14368 € 14 368,00 € |
| National average | 2418 € 2 418,00 € |
| Lowest national value Almeirim | 196 € 196,00 € |
How much is already approved to invest per inhabitant?
Municipality
Highest national value Vinhais
Approved amount
14368 €
14 368,00 €
Municipality
National average
Approved amount
2418 €
2 418,00 €
Municipality
Lowest national value Almeirim
Approved amount
196 €
196,00 €
How much is already approved to invest per km2?
How much is already approved to invest per km2?
| Municipality | Approved amount |
|---|---|
| Highest national value Porto | 34573076 € 34 573 076,00 € |
| National average | 271192 € 271 192,00 € |
| Lowest national value Crato | 1594 € 1 594,00 € |
How much is already approved to invest per km2?
Municipality
Highest national value Porto
Approved amount
34573076 €
34 573 076,00 €
Municipality
National average
Approved amount
271192 €
271 192,00 €
Municipality
Lowest national value Crato
Approved amount
1594 €
1 594,00 €
If you'd like to know more about a specific municipality, tell us which one...