Investment by regions
Discover how the investments already approved in the Recovery and Resilience Plan are distributed across the various regions of the country.
Recovery and Resilience Plan in numbers
22,2 billion €
Total investment to be applied by the Recovery and Resilience Plan
2,2 billion €
Total amount of funds already allocated to Nation-wide investments
10 billion €
Total amount of funds already invested in municipalities and regions
Geography of investments
The Recovery and Resilience Plan aims to provide the country with a set of tools for the future, seeking to ensure a more resilient economy, a more sustainable relationship with the environment, and more digital processes and functioning.
All of this is contributed by a broad geographical distribution of its investments and reforms, ensuring that both nationally implemented projects and resources applied in all municipalities of the country are invested where they have the greatest impact on the lives of the population.
Distribution of investment by regions
Distribution of investment by regions
| Region | Sub-region | Municipality | Approved amount | Amount spent | Percentage of investment |
|---|---|---|---|---|---|
| North |
Alto Minho
Cávado
Ave
Área Metropolitana do Porto
Alto Tâmega
Tâmega e Sousa
Douro
Terras de Trás-os-Montes
|
Arcos de Valdevez
Caminha
Melgaço
Monção
Paredes de Coura
Ponte da Barca
Ponte de Lima
Valença
Viana do Castelo
Vila Nova de Cerveira
Total
Amares
Barcelos
Braga
Esposende
Terras de Bouro
Vila Verde
Total
Cabeceiras de Basto
Fafe
Guimarães
Póvoa de Lanhoso
Vieira do Minho
Vila Nova de Famalicão
Vizela
Mondim de Basto
Total
Arouca
Espinho
Santa Maria da Feira
Oliveira de Azeméis
São João da Madeira
Vale de Cambra
Gondomar
Maia
Matosinhos
Paredes
Porto
Póvoa de Varzim
Santo Tirso
Valongo
Vila do Conde
Vila Nova de Gaia
Trofa
Total
Boticas
Chaves
Montalegre
Ribeira de Pena
Valpaços
Vila Pouca de Aguiar
Total
Castelo de Paiva
Celorico de Basto
Amarante
Baião
Felgueiras
Lousada
Marco de Canaveses
Paços de Ferreira
Penafiel
Cinfães
Resende
Total
Carrazeda de Ansiães
Freixo de Espada à Cinta
Torre de Moncorvo
Vila Nova de Foz Côa
Alijó
Mesão Frio
Murça
Peso da Régua
Sabrosa
Santa Marta de Penaguião
Vila Real
Armamar
Lamego
Moimenta da Beira
Penedono
São João da Pesqueira
Sernancelhe
Tabuaço
Tarouca
Total
Alfândega da Fé
Bragança
Macedo de Cavaleiros
Miranda do Douro
Mirandela
Mogadouro
Vila Flor
Vimioso
Vinhais
Total
|
28 687 922,00 €
13 124 993,00 €
20 396 673,00 €
29 918 889,00 €
6 627 670,00 €
9 658 783,00 €
30 807 491,00 €
35 274 598,00 €
172 204 226,00 €
18 574 867,00 €
365 276 113,00 €
15 033 825,00 €
170 005 378,00 €
481 589 022,00 €
42 236 231,00 €
3 451 073,00 €
32 783 271,00 €
745 098 800,00 €
14 253 827,00 €
45 418 063,00 €
467 559 977,00 €
23 025 959,00 €
6 340 697,00 €
302 996 971,00 €
26 137 082,00 €
9 750 120,00 €
895 482 695,00 €
27 239 927,00 €
23 793 460,00 €
150 732 934,00 €
78 932 370,00 €
71 187 911,00 €
34 796 751,00 €
99 732 012,00 €
272 325 565,00 €
707 179 600,00 €
90 753 279,00 €
1 522 301 965,00 €
79 930 203,00 €
88 827 092,00 €
71 591 852,00 €
152 458 895,00 €
324 436 584,00 €
87 990 754,00 €
3 884 211 156,00 €
5 516 520,00 €
51 629 272,00 €
4 429 247,00 €
12 732 606,00 €
5 993 660,00 €
19 091 346,00 €
99 392 650,00 €
26 356 692,00 €
35 177 007,00 €
61 917 617,00 €
49 027 456,00 €
53 309 957,00 €
49 798 716,00 €
34 849 677,00 €
88 921 788,00 €
144 613 077,00 €
16 414 733,00 €
6 530 307,00 €
566 917 027,00 €
5 723 164,00 €
7 811 424,00 €
5 051 290,00 €
9 976 443,00 €
13 228 391,00 €
1 426 662,00 €
3 819 148,00 €
23 316 596,00 €
12 423 509,00 €
11 346 685,00 €
198 563 269,00 €
4 169 285,00 €
32 481 289,00 €
14 893 100,00 €
6 187 856,00 €
10 666 105,00 €
8 877 894,00 €
4 934 684,00 €
5 668 307,00 €
380 565 098,00 €
15 386 808,00 €
106 349 477,00 €
14 584 770,00 €
3 405 344,00 €
22 784 291,00 €
11 450 960,00 €
1 493 404,00 €
2 678 764,00 €
39 270 777,00 €
217 404 594,00 €
|
12 207 068,00 €
5 157 522,00 €
16 236 713,00 €
11 290 575,00 €
3 217 418,00 €
4 687 565,00 €
16 093 463,00 €
12 645 103,00 €
99 455 808,00 €
7 292 423,00 €
188 283 657,00 €
6 213 163,00 €
74 467 099,00 €
237 514 848,00 €
14 603 131,00 €
1 694 362,00 €
18 524 971,00 €
353 017 573,00 €
4 222 747,00 €
18 736 430,00 €
226 533 879,00 €
8 295 452,00 €
2 478 957,00 €
145 841 690,00 €
18 825 677,00 €
3 084 289,00 €
428 019 121,00 €
13 649 244,00 €
5 267 916,00 €
57 034 685,00 €
29 181 749,00 €
34 812 090,00 €
14 854 943,00 €
34 486 485,00 €
125 195 042,00 €
370 735 043,00 €
49 628 008,00 €
722 208 606,00 €
55 659 881,00 €
56 225 354,00 €
30 038 567,00 €
78 808 366,00 €
116 446 028,00 €
59 924 138,00 €
1 854 156 144,00 €
2 893 796,00 €
21 278 989,00 €
2 219 591,00 €
7 859 421,00 €
3 191 938,00 €
7 930 531,00 €
45 374 266,00 €
12 202 737,00 €
12 419 172,00 €
30 106 349,00 €
38 091 988,00 €
24 714 345,00 €
29 260 940,00 €
21 066 911,00 €
42 831 267,00 €
92 741 578,00 €
7 137 320,00 €
3 080 600,00 €
313 653 207,00 €
1 864 059,00 €
2 487 945,00 €
2 565 523,00 €
3 634 626,00 €
8 711 422,00 €
566 571,00 €
1 433 164,00 €
12 071 094,00 €
5 539 218,00 €
3 340 806,00 €
101 528 519,00 €
1 713 376,00 €
14 945 901,00 €
6 509 350,00 €
2 322 203,00 €
3 733 929,00 €
4 514 778,00 €
1 664 776,00 €
2 956 598,00 €
182 103 858,00 €
6 156 253,00 €
49 770 846,00 €
7 276 554,00 €
1 596 494,00 €
11 688 557,00 €
5 022 989,00 €
1 002 339,00 €
1 542 030,00 €
108 132 473,00 €
192 188 535,00 €
|
7,85 %
3,59 %
5,58 %
8,19 %
1,81 %
2,64 %
8,43 %
9,66 %
47,14 %
5,09 %
2,02 %
22,82 %
64,63 %
5,67 %
0,46 %
4,40 %
1,59 %
5,07 %
52,21 %
2,57 %
0,71 %
33,84 %
2,92 %
1,09 %
0,70 %
0,61 %
3,88 %
2,03 %
1,83 %
0,90 %
2,57 %
7,01 %
18,21 %
2,34 %
39,19 %
2,06 %
2,29 %
1,84 %
3,93 %
8,35 %
2,27 %
5,55 %
51,94 %
4,46 %
12,81 %
6,03 %
19,21 %
4,65 %
6,20 %
10,92 %
8,65 %
9,40 %
8,78 %
6,15 %
15,69 %
25,51 %
2,90 %
1,15 %
1,50 %
2,05 %
1,33 %
2,62 %
3,48 %
0,37 %
1,00 %
6,13 %
3,26 %
2,98 %
52,18 %
1,10 %
8,54 %
3,91 %
1,63 %
2,80 %
2,33 %
1,30 %
1,49 %
7,08 %
48,92 %
6,71 %
1,57 %
10,48 %
5,27 %
0,69 %
1,23 %
18,06 %
|
| Center |
Oeste
Região de Aveiro
Região de Coimbra
Região de Leiria
Viseu Dão Lafões
Beira Baixa
Médio Tejo
Beiras e Serra da Estrela
|
Alcobaça
Bombarral
Caldas da Rainha
Nazaré
Óbidos
Peniche
Alenquer
Arruda dos Vinhos
Cadaval
Lourinhã
Sobral de Monte Agraço
Torres Vedras
Total
Águeda
Albergaria-a-Velha
Anadia
Aveiro
Estarreja
Ílhavo
Murtosa
Oliveira do Bairro
Ovar
Sever do Vouga
Vagos
Total
Mealhada
Arganil
Cantanhede
Coimbra
Condeixa-a-Nova
Figueira da Foz
Góis
Lousã
Mira
Miranda do Corvo
Montemor-o-Velho
Oliveira do Hospital
Pampilhosa da Serra
Penacova
Penela
Soure
Tábua
Vila Nova de Poiares
Mortágua
Total
Alvaiázere
Ansião
Batalha
Castanheira de Pêra
Figueiró dos Vinhos
Leiria
Marinha Grande
Pedrógão Grande
Pombal
Porto de Mós
Total
Aguiar da Beira
Carregal do Sal
Castro Daire
Mangualde
Nelas
Oliveira de Frades
Penalva do Castelo
Santa Comba Dão
São Pedro do Sul
Sátão
Tondela
Vila Nova de Paiva
Viseu
Vouzela
Total
Castelo Branco
Idanha-a-Nova
Oleiros
Penamacor
Proença-a-Nova
Vila Velha de Ródão
Total
Sertã
Vila de Rei
Abrantes
Alcanena
Constância
Entroncamento
Ferreira do Zêzere
Mação
Sardoal
Tomar
Torres Novas
Vila Nova da Barquinha
Ourém
Total
Belmonte
Covilhã
Fundão
Almeida
Celorico da Beira
Figueira de Castelo Rodrigo
Fornos de Algodres
Gouveia
Guarda
Manteigas
Mêda
Pinhel
Sabugal
Seia
Trancoso
Total
|
49 150 358,00 €
5 425 876,00 €
67 126 605,00 €
34 023 524,00 €
7 690 224,00 €
27 541 792,00 €
39 525 829,00 €
26 945 370,00 €
11 403 591,00 €
11 155 583,00 €
2 106 499,00 €
78 536 240,00 €
360 631 490,00 €
179 194 783,00 €
26 937 048,00 €
25 325 220,00 €
325 830 855,00 €
59 141 719,00 €
122 210 386,00 €
10 954 939,00 €
42 966 305,00 €
62 499 154,00 €
11 087 425,00 €
19 750 358,00 €
885 898 192,00 €
17 188 131,00 €
23 555 949,00 €
67 408 734,00 €
555 781 664,00 €
15 735 300,00 €
151 366 894,00 €
7 535 684,00 €
25 282 823,00 €
19 479 751,00 €
9 670 387,00 €
14 470 819,00 €
61 945 315,00 €
16 662 437,00 €
16 008 790,00 €
4 340 344,00 €
6 697 572,00 €
17 638 410,00 €
7 336 444,00 €
6 947 703,00 €
1 045 053 149,00 €
12 529 778,00 €
10 654 011,00 €
23 827 182,00 €
7 922 490,00 €
5 118 793,00 €
266 473 103,00 €
121 374 322,00 €
7 917 806,00 €
64 209 753,00 €
38 088 027,00 €
558 115 266,00 €
13 287 258,00 €
30 617 324,00 €
11 267 421,00 €
81 333 666,00 €
45 031 142,00 €
12 465 102,00 €
5 836 910,00 €
7 495 667,00 €
14 059 003,00 €
9 086 103,00 €
34 338 699,00 €
7 875 324,00 €
170 714 329,00 €
21 571 536,00 €
464 979 485,00 €
77 516 871,00 €
8 970 593,00 €
19 599 655,00 €
2 897 280,00 €
15 026 198,00 €
17 007 851,00 €
141 018 447,00 €
21 583 430,00 €
10 635 486,00 €
33 089 629,00 €
33 823 492,00 €
24 765 552,00 €
33 887 526,00 €
20 751 835,00 €
33 328 516,00 €
11 032 380,00 €
41 221 463,00 €
40 525 962,00 €
5 319 070,00 €
46 811 476,00 €
356 775 817,00 €
11 224 094,00 €
88 799 677,00 €
68 788 400,00 €
3 269 371,00 €
7 115 336,00 €
2 478 720,00 €
3 923 609,00 €
7 990 337,00 €
107 023 773,00 €
2 158 400,00 €
3 295 154,00 €
6 010 236,00 €
12 383 207,00 €
40 245 009,00 €
12 273 767,00 €
376 979 089,00 €
|
24 351 735,00 €
3 061 735,00 €
23 408 168,00 €
20 914 378,00 €
3 837 837,00 €
11 931 104,00 €
14 139 711,00 €
6 574 911,00 €
2 088 111,00 €
6 594 439,00 €
1 497 077,00 €
35 160 341,00 €
153 559 546,00 €
85 096 198,00 €
16 989 361,00 €
15 163 644,00 €
169 744 909,00 €
31 380 452,00 €
57 286 679,00 €
10 460 990,00 €
16 241 506,00 €
24 030 868,00 €
4 958 896,00 €
9 203 379,00 €
440 556 884,00 €
4 978 341,00 €
10 616 439,00 €
41 833 163,00 €
253 258 854,00 €
2 918 792,00 €
71 725 227,00 €
1 482 377,00 €
10 182 372,00 €
7 594 882,00 €
3 986 847,00 €
6 559 049,00 €
27 334 971,00 €
9 939 385,00 €
6 207 769,00 €
1 651 922,00 €
2 708 423,00 €
6 895 372,00 €
2 838 702,00 €
3 330 816,00 €
476 043 704,00 €
3 594 345,00 €
5 254 484,00 €
15 035 266,00 €
3 097 989,00 €
1 769 790,00 €
127 530 533,00 €
73 452 010,00 €
1 810 388,00 €
32 701 416,00 €
20 464 908,00 €
284 711 128,00 €
3 941 770,00 €
12 066 404,00 €
6 484 971,00 €
39 877 225,00 €
22 847 897,00 €
6 834 208,00 €
2 362 031,00 €
3 327 731,00 €
6 423 301,00 €
4 706 687,00 €
17 717 543,00 €
2 233 188,00 €
66 310 846,00 €
7 391 752,00 €
202 525 554,00 €
29 736 186,00 €
5 683 057,00 €
8 144 656,00 €
764 662,00 €
5 025 416,00 €
9 523 919,00 €
58 877 896,00 €
8 448 553,00 €
5 654 183,00 €
16 610 472,00 €
18 190 758,00 €
14 684 715,00 €
16 250 443,00 €
8 245 041,00 €
10 147 432,00 €
3 812 122,00 €
18 317 896,00 €
18 018 158,00 €
2 337 086,00 €
20 654 427,00 €
161 371 285,00 €
1 452 004,00 €
44 917 617,00 €
28 422 146,00 €
1 352 723,00 €
2 437 410,00 €
1 098 037,00 €
2 604 092,00 €
4 946 703,00 €
31 722 706,00 €
804 607,00 €
697 866,00 €
2 133 931,00 €
4 632 242,00 €
14 151 064,00 €
2 833 332,00 €
144 206 479,00 €
|
13,63 %
1,50 %
18,61 %
9,43 %
2,13 %
7,64 %
10,96 %
7,47 %
3,16 %
3,09 %
0,58 %
21,78 %
20,23 %
3,04 %
2,86 %
36,78 %
6,68 %
13,80 %
1,24 %
4,85 %
7,05 %
1,25 %
2,23 %
1,64 %
2,25 %
6,45 %
53,18 %
1,51 %
14,48 %
0,72 %
2,42 %
1,86 %
0,93 %
1,38 %
5,93 %
1,59 %
1,53 %
0,42 %
0,64 %
1,69 %
0,70 %
0,66 %
2,25 %
1,91 %
4,27 %
1,42 %
0,92 %
47,75 %
21,75 %
1,42 %
11,50 %
6,82 %
2,86 %
6,58 %
2,42 %
17,49 %
9,68 %
2,68 %
1,26 %
1,61 %
3,02 %
1,95 %
7,38 %
1,69 %
36,71 %
4,64 %
54,97 %
6,36 %
13,90 %
2,05 %
10,66 %
12,06 %
6,05 %
2,98 %
9,27 %
9,48 %
6,94 %
9,50 %
5,82 %
9,34 %
3,09 %
11,55 %
11,36 %
1,49 %
13,12 %
2,98 %
23,56 %
18,25 %
0,87 %
1,89 %
0,66 %
1,04 %
2,12 %
28,39 %
0,57 %
0,87 %
1,59 %
3,28 %
10,68 %
3,26 %
|
| Lisbon Metropolitan Area |
Lisbon Metropolitan Area
|
Cascais
Lisboa
Loures
Mafra
Oeiras
Sintra
Vila Franca de Xira
Amadora
Odivelas
Alcochete
Almada
Barreiro
Moita
Montijo
Palmela
Seixal
Sesimbra
Setúbal
Total
|
276 802 225,00 €
3 074 501 979,00 €
182 154 991,00 €
135 098 520,00 €
461 639 338,00 €
182 920 225,00 €
113 201 774,00 €
255 250 780,00 €
68 773 738,00 €
19 130 355,00 €
129 134 073,00 €
80 855 448,00 €
26 705 925,00 €
34 729 920,00 €
40 837 617,00 €
112 951 274,00 €
28 310 284,00 €
308 612 157,00 €
5 531 610 622,00 €
|
146 859 131,00 €
1 510 257 172,00 €
90 184 644,00 €
70 237 332,00 €
199 501 621,00 €
90 393 743,00 €
47 579 428,00 €
133 643 804,00 €
31 860 051,00 €
8 185 674,00 €
48 297 240,00 €
32 477 474,00 €
15 975 201,00 €
19 088 364,00 €
20 535 929,00 €
60 405 671,00 €
7 371 341,00 €
124 747 984,00 €
2 657 601 804,00 €
|
5,00 %
55,58 %
3,29 %
2,44 %
8,35 %
3,31 %
2,05 %
4,61 %
1,24 %
0,35 %
2,33 %
1,46 %
0,48 %
0,63 %
0,74 %
2,04 %
0,51 %
5,58 %
|
| Alentejo |
Alentejo Litoral
Baixo Alentejo
Lezíria do Tejo
Alto Alentejo
Alentejo Central
|
Odemira
Alcácer do Sal
Grândola
Santiago do Cacém
Sines
Total
Aljustrel
Almodôvar
Alvito
Barrancos
Beja
Castro Verde
Cuba
Ferreira do Alentejo
Mértola
Moura
Ourique
Serpa
Vidigueira
Total
Azambuja
Almeirim
Alpiarça
Benavente
Cartaxo
Chamusca
Coruche
Golegã
Rio Maior
Salvaterra de Magos
Santarém
Total
Alter do Chão
Arronches
Avis
Campo Maior
Castelo de Vide
Crato
Elvas
Fronteira
Gavião
Marvão
Monforte
Nisa
Ponte de Sor
Portalegre
Sousel
Total
Alandroal
Arraiolos
Borba
Estremoz
Évora
Montemor-o-Novo
Mora
Mourão
Portel
Redondo
Reguengos de Monsaraz
Vendas Novas
Viana do Alentejo
Vila Viçosa
Total
|
10 500 347,00 €
13 887 533,00 €
67 101 582,00 €
107 059 029,00 €
38 561 007,00 €
237 109 498,00 €
37 874 548,00 €
2 208 616,00 €
4 337 196,00 €
1 968 587,00 €
86 200 694,00 €
3 595 523,00 €
1 866 514,00 €
51 323 660,00 €
26 080 862,00 €
4 820 265,00 €
4 015 838,00 €
3 123 728,00 €
2 324 974,00 €
229 741 005,00 €
32 225 478,00 €
4 809 149,00 €
4 917 671,00 €
48 655 874,00 €
20 795 531,00 €
8 622 649,00 €
6 566 806,00 €
9 349 772,00 €
52 275 860,00 €
11 520 277,00 €
105 217 701,00 €
304 956 767,00 €
11 495 321,00 €
1 800 393,00 €
1 619 234,00 €
24 904 756,00 €
3 844 577,00 €
667 056,00 €
50 424 957,00 €
1 619 424,00 €
11 595 149,00 €
3 090 140,00 €
8 915 097,00 €
18 809 285,00 €
27 644 456,00 €
79 695 753,00 €
10 209 464,00 €
256 335 062,00 €
5 668 050,00 €
2 191 369,00 €
17 868 352,00 €
7 487 138,00 €
166 621 885,00 €
4 000 446,00 €
1 904 082,00 €
1 215 394,00 €
1 500 697,00 €
8 253 708,00 €
7 872 202,00 €
6 778 058,00 €
4 593 828,00 €
7 633 619,00 €
243 588 829,00 €
|
5 051 139,00 €
5 377 263,00 €
44 704 542,00 €
56 500 833,00 €
15 669 729,00 €
127 303 506,00 €
25 435 999,00 €
1 112 621,00 €
1 968 179,00 €
680 881,00 €
46 404 116,00 €
1 179 045,00 €
679 048,00 €
38 021 697,00 €
11 701 006,00 €
1 937 206,00 €
1 456 340,00 €
1 029 421,00 €
1 014 362,00 €
132 619 923,00 €
12 508 222,00 €
2 532 326,00 €
2 009 932,00 €
18 868 912,00 €
10 002 974,00 €
5 519 317,00 €
4 138 068,00 €
4 239 230,00 €
15 553 916,00 €
7 338 559,00 €
48 333 717,00 €
131 045 172,00 €
2 807 366,00 €
759 566,00 €
674 093,00 €
11 040 773,00 €
1 396 922,00 €
322 084,00 €
19 562 460,00 €
1 060 197,00 €
4 123 229,00 €
1 970 080,00 €
887 891,00 €
2 098 927,00 €
13 167 940,00 €
31 449 180,00 €
8 727 767,00 €
100 048 475,00 €
1 283 470,00 €
1 489 383,00 €
4 877 753,00 €
4 082 481,00 €
80 974 332,00 €
2 223 401,00 €
1 383 315,00 €
790 435,00 €
456 077,00 €
2 085 735,00 €
4 467 834,00 €
2 155 783,00 €
1 065 822,00 €
5 046 642,00 €
112 382 463,00 €
|
4,43 %
5,86 %
28,30 %
45,15 %
16,26 %
16,49 %
0,96 %
1,89 %
0,86 %
37,52 %
1,57 %
0,81 %
22,34 %
11,35 %
2,10 %
1,75 %
1,36 %
1,01 %
10,57 %
1,58 %
1,61 %
15,96 %
6,82 %
2,83 %
2,15 %
3,07 %
17,14 %
3,78 %
34,50 %
4,48 %
0,70 %
0,63 %
9,72 %
1,50 %
0,26 %
19,67 %
0,63 %
4,52 %
1,21 %
3,48 %
7,34 %
10,78 %
31,09 %
3,98 %
2,33 %
0,90 %
7,34 %
3,07 %
68,40 %
1,64 %
0,78 %
0,50 %
0,62 %
3,39 %
3,23 %
2,78 %
1,89 %
3,13 %
|
| Algarve |
Algarve
|
Albufeira
Alcoutim
Aljezur
Castro Marim
Faro
Lagoa
Lagos
Loulé
Monchique
Olhão
Portimão
São Brás de Alportel
Silves
Tavira
Vila do Bispo
Vila Real de Santo António
Total
|
48 784 581,00 €
35 289 252,00 €
5 334 271,00 €
4 068 127,00 €
148 616 798,00 €
19 726 461,00 €
45 494 841,00 €
53 080 381,00 €
17 389 094,00 €
55 221 982,00 €
64 258 796,00 €
7 645 138,00 €
29 406 676,00 €
21 488 099,00 €
8 109 827,00 €
111 589 632,00 €
675 503 955,00 €
|
26 728 600,00 €
6 839 860,00 €
1 133 025,00 €
1 730 387,00 €
76 275 964,00 €
12 815 488,00 €
16 480 274,00 €
35 267 384,00 €
6 413 668,00 €
27 847 472,00 €
23 109 483,00 €
4 523 733,00 €
16 383 622,00 €
11 633 412,00 €
2 977 396,00 €
38 291 092,00 €
308 450 860,00 €
|
7,22 %
5,22 %
0,79 %
0,60 %
22,00 %
2,92 %
6,73 %
7,86 %
2,57 %
8,17 %
9,51 %
1,13 %
4,35 %
3,18 %
1,20 %
16,52 %
|
| Autonomous Region of the Azores |
Autonomous Region of the Azores
|
Vila do Porto
Lagoa
Nordeste
Ponta Delgada
Povoação
Ribeira Grande
Vila Franca do Campo
Angra do Heroísmo
Vila da Praia da Vitória
Santa Cruz da Graciosa
Calheta
Velas
Lajes do Pico
Madalena
São Roque do Pico
Horta
Lajes das Flores
Santa Cruz das Flores
Corvo
Total
|
7 177 441,00 €
31 733 555,00 €
5 961 828,00 €
535 625 364,00 €
2 182 924,00 €
109 768 262,00 €
11 329 989,00 €
150 555 370,00 €
10 878 348,00 €
3 598 022,00 €
2 879 081,00 €
4 792 352,00 €
4 669 677,00 €
19 539 725,00 €
13 561 009,00 €
82 436 431,00 €
922 608,00 €
2 722 626,00 €
418 044,00 €
1 000 752 655,00 €
|
3 068 629,00 €
14 907 796,00 €
3 386 057,00 €
306 497 327,00 €
1 414 267,00 €
56 862 446,00 €
8 286 714,00 €
83 243 320,00 €
6 124 122,00 €
1 336 673,00 €
1 630 244,00 €
2 530 248,00 €
1 895 616,00 €
6 883 992,00 €
9 087 045,00 €
55 968 418,00 €
297 759,00 €
1 048 095,00 €
139 742,00 €
564 608 512,00 €
|
0,72 %
3,17 %
0,60 %
53,52 %
0,22 %
10,97 %
1,13 %
15,04 %
1,09 %
0,36 %
0,29 %
0,48 %
0,47 %
1,95 %
1,36 %
8,24 %
0,09 %
0,27 %
0,04 %
|
| Autonomous Region of Madeira |
Autonomous Region of Madeira
|
Calheta
Câmara de Lobos
Funchal
Machico
Ponta do Sol
Porto Moniz
Ribeira Brava
Santa Cruz
Santana
São Vicente
Porto Santo
Total
|
11 949 898,00 €
18 238 175,00 €
711 634 060,00 €
11 683 788,00 €
4 772 762,00 €
268 599,00 €
10 947 912,00 €
19 076 612,00 €
3 012 658,00 €
36 679 023,00 €
26 187 219,00 €
854 450 707,00 €
|
4 248 950,00 €
5 581 475,00 €
358 358 682,00 €
3 799 453,00 €
1 668 086,00 €
204 055,00 €
6 551 711,00 €
7 846 739,00 €
390 595,00 €
8 705 887,00 €
7 072 323,00 €
404 427 956,00 €
|
1,40 %
2,13 %
83,29 %
1,37 %
0,56 %
0,03 %
1,28 %
2,23 %
0,35 %
4,29 %
3,06 %
|
| Nation-wide investment |
|
|
3 845 640 730,00 €
|
2 219 347 149,00 €
|
|
Distribution of investment by regions
Region
North
:Sub-region
Alto Minho
:Municipality
Arcos de Valdevez
:Approved amount
: 28687922 €,28 687 922,00 €
Amount spent
: 12207068 €,12 207 068,00 €
Percentage of investment
: 7,85 %7,85 %
Municipality
Caminha
:Approved amount
: 13124993 €,13 124 993,00 €
Amount spent
: 5157522 €,5 157 522,00 €
Percentage of investment
: 3,59 %3,59 %
Municipality
Melgaço
:Approved amount
: 20396673 €,20 396 673,00 €
Amount spent
: 16236713 €,16 236 713,00 €
Percentage of investment
: 5,58 %5,58 %
Municipality
Monção
:Approved amount
: 29918889 €,29 918 889,00 €
Amount spent
: 11290575 €,11 290 575,00 €
Percentage of investment
: 8,19 %8,19 %
Municipality
Paredes de Coura
:Approved amount
: 6627670 €,6 627 670,00 €
Amount spent
: 3217418 €,3 217 418,00 €
Percentage of investment
: 1,81 %1,81 %
Municipality
Ponte da Barca
:Approved amount
: 9658783 €,9 658 783,00 €
Amount spent
: 4687565 €,4 687 565,00 €
Percentage of investment
: 2,64 %2,64 %
Municipality
Ponte de Lima
:Approved amount
: 30807491 €,30 807 491,00 €
Amount spent
: 16093463 €,16 093 463,00 €
Percentage of investment
: 8,43 %8,43 %
Municipality
Valença
:Approved amount
: 35274598 €,35 274 598,00 €
Amount spent
: 12645103 €,12 645 103,00 €
Percentage of investment
: 9,66 %9,66 %
Municipality
Viana do Castelo
:Approved amount
: 172204226 €,172 204 226,00 €
Amount spent
: 99455808 €,99 455 808,00 €
Percentage of investment
: 47,14 %47,14 %
Municipality
Vila Nova de Cerveira
:Approved amount
: 18574867 €,18 574 867,00 €
Amount spent
: 7292423 €,7 292 423,00 €
Percentage of investment
: 5,09 %5,09 %
Total
Approved amount
: 365276113 €,365 276 113,00 €
Amount spent
: 188283657 €,188 283 657,00 €
Percentage of investment
Sub-region
Cávado
:Municipality
Amares
:Approved amount
: 15033825 €,15 033 825,00 €
Amount spent
: 6213163 €,6 213 163,00 €
Percentage of investment
: 2,02 %2,02 %
Municipality
Barcelos
:Approved amount
: 170005378 €,170 005 378,00 €
Amount spent
: 74467099 €,74 467 099,00 €
Percentage of investment
: 22,82 %22,82 %
Municipality
Braga
:Approved amount
: 481589022 €,481 589 022,00 €
Amount spent
: 237514848 €,237 514 848,00 €
Percentage of investment
: 64,63 %64,63 %
Municipality
Esposende
:Approved amount
: 42236231 €,42 236 231,00 €
Amount spent
: 14603131 €,14 603 131,00 €
Percentage of investment
: 5,67 %5,67 %
Municipality
Terras de Bouro
:Approved amount
: 3451073 €,3 451 073,00 €
Amount spent
: 1694362 €,1 694 362,00 €
Percentage of investment
: 0,46 %0,46 %
Municipality
Vila Verde
:Approved amount
: 32783271 €,32 783 271,00 €
Amount spent
: 18524971 €,18 524 971,00 €
Percentage of investment
: 4,4 %4,40 %
Total
Approved amount
: 745098800 €,745 098 800,00 €
Amount spent
: 353017573 €,353 017 573,00 €
Percentage of investment
Sub-region
Ave
:Municipality
Cabeceiras de Basto
:Approved amount
: 14253827 €,14 253 827,00 €
Amount spent
: 4222747 €,4 222 747,00 €
Percentage of investment
: 1,59 %1,59 %
Municipality
Fafe
:Approved amount
: 45418063 €,45 418 063,00 €
Amount spent
: 18736430 €,18 736 430,00 €
Percentage of investment
: 5,07 %5,07 %
Municipality
Guimarães
:Approved amount
: 467559977 €,467 559 977,00 €
Amount spent
: 226533879 €,226 533 879,00 €
Percentage of investment
: 52,21 %52,21 %
Municipality
Póvoa de Lanhoso
:Approved amount
: 23025959 €,23 025 959,00 €
Amount spent
: 8295452 €,8 295 452,00 €
Percentage of investment
: 2,57 %2,57 %
Municipality
Vieira do Minho
:Approved amount
: 6340697 €,6 340 697,00 €
Amount spent
: 2478957 €,2 478 957,00 €
Percentage of investment
: 0,71 %0,71 %
Municipality
Vila Nova de Famalicão
:Approved amount
: 302996971 €,302 996 971,00 €
Amount spent
: 145841690 €,145 841 690,00 €
Percentage of investment
: 33,84 %33,84 %
Municipality
Vizela
:Approved amount
: 26137082 €,26 137 082,00 €
Amount spent
: 18825677 €,18 825 677,00 €
Percentage of investment
: 2,92 %2,92 %
Municipality
Mondim de Basto
:Approved amount
: 9750120 €,9 750 120,00 €
Amount spent
: 3084289 €,3 084 289,00 €
Percentage of investment
: 1,09 %1,09 %
Total
Approved amount
: 895482695 €,895 482 695,00 €
Amount spent
: 428019121 €,428 019 121,00 €
Percentage of investment
Sub-region
Área Metropolitana do Porto
:Municipality
Arouca
:Approved amount
: 27239927 €,27 239 927,00 €
Amount spent
: 13649244 €,13 649 244,00 €
Percentage of investment
: 0,7 %0,70 %
Municipality
Espinho
:Approved amount
: 23793460 €,23 793 460,00 €
Amount spent
: 5267916 €,5 267 916,00 €
Percentage of investment
: 0,61 %0,61 %
Municipality
Santa Maria da Feira
:Approved amount
: 150732934 €,150 732 934,00 €
Amount spent
: 57034685 €,57 034 685,00 €
Percentage of investment
: 3,88 %3,88 %
Municipality
Oliveira de Azeméis
:Approved amount
: 78932370 €,78 932 370,00 €
Amount spent
: 29181749 €,29 181 749,00 €
Percentage of investment
: 2,03 %2,03 %
Municipality
São João da Madeira
:Approved amount
: 71187911 €,71 187 911,00 €
Amount spent
: 34812090 €,34 812 090,00 €
Percentage of investment
: 1,83 %1,83 %
Municipality
Vale de Cambra
:Approved amount
: 34796751 €,34 796 751,00 €
Amount spent
: 14854943 €,14 854 943,00 €
Percentage of investment
: 0,9 %0,90 %
Municipality
Gondomar
:Approved amount
: 99732012 €,99 732 012,00 €
Amount spent
: 34486485 €,34 486 485,00 €
Percentage of investment
: 2,57 %2,57 %
Municipality
Maia
:Approved amount
: 272325565 €,272 325 565,00 €
Amount spent
: 125195042 €,125 195 042,00 €
Percentage of investment
: 7,01 %7,01 %
Municipality
Matosinhos
:Approved amount
: 707179600 €,707 179 600,00 €
Amount spent
: 370735043 €,370 735 043,00 €
Percentage of investment
: 18,21 %18,21 %
Municipality
Paredes
:Approved amount
: 90753279 €,90 753 279,00 €
Amount spent
: 49628008 €,49 628 008,00 €
Percentage of investment
: 2,34 %2,34 %
Municipality
Porto
:Approved amount
: 1522301965 €,1 522 301 965,00 €
Amount spent
: 722208606 €,722 208 606,00 €
Percentage of investment
: 39,19 %39,19 %
Municipality
Póvoa de Varzim
:Approved amount
: 79930203 €,79 930 203,00 €
Amount spent
: 55659881 €,55 659 881,00 €
Percentage of investment
: 2,06 %2,06 %
Municipality
Santo Tirso
:Approved amount
: 88827092 €,88 827 092,00 €
Amount spent
: 56225354 €,56 225 354,00 €
Percentage of investment
: 2,29 %2,29 %
Municipality
Valongo
:Approved amount
: 71591852 €,71 591 852,00 €
Amount spent
: 30038567 €,30 038 567,00 €
Percentage of investment
: 1,84 %1,84 %
Municipality
Vila do Conde
:Approved amount
: 152458895 €,152 458 895,00 €
Amount spent
: 78808366 €,78 808 366,00 €
Percentage of investment
: 3,93 %3,93 %
Municipality
Vila Nova de Gaia
:Approved amount
: 324436584 €,324 436 584,00 €
Amount spent
: 116446028 €,116 446 028,00 €
Percentage of investment
: 8,35 %8,35 %
Municipality
Trofa
:Approved amount
: 87990754 €,87 990 754,00 €
Amount spent
: 59924138 €,59 924 138,00 €
Percentage of investment
: 2,27 %2,27 %
Total
Approved amount
: 3884211156 €,3 884 211 156,00 €
Amount spent
: 1854156144 €,1 854 156 144,00 €
Percentage of investment
Sub-region
Alto Tâmega
:Municipality
Boticas
:Approved amount
: 5516520 €,5 516 520,00 €
Amount spent
: 2893796 €,2 893 796,00 €
Percentage of investment
: 5,55 %5,55 %
Municipality
Chaves
:Approved amount
: 51629272 €,51 629 272,00 €
Amount spent
: 21278989 €,21 278 989,00 €
Percentage of investment
: 51,94 %51,94 %
Municipality
Montalegre
:Approved amount
: 4429247 €,4 429 247,00 €
Amount spent
: 2219591 €,2 219 591,00 €
Percentage of investment
: 4,46 %4,46 %
Municipality
Ribeira de Pena
:Approved amount
: 12732606 €,12 732 606,00 €
Amount spent
: 7859421 €,7 859 421,00 €
Percentage of investment
: 12,81 %12,81 %
Municipality
Valpaços
:Approved amount
: 5993660 €,5 993 660,00 €
Amount spent
: 3191938 €,3 191 938,00 €
Percentage of investment
: 6,03 %6,03 %
Municipality
Vila Pouca de Aguiar
:Approved amount
: 19091346 €,19 091 346,00 €
Amount spent
: 7930531 €,7 930 531,00 €
Percentage of investment
: 19,21 %19,21 %
Total
Approved amount
: 99392650 €,99 392 650,00 €
Amount spent
: 45374266 €,45 374 266,00 €
Percentage of investment
Sub-region
Tâmega e Sousa
:Municipality
Castelo de Paiva
:Approved amount
: 26356692 €,26 356 692,00 €
Amount spent
: 12202737 €,12 202 737,00 €
Percentage of investment
: 4,65 %4,65 %
Municipality
Celorico de Basto
:Approved amount
: 35177007 €,35 177 007,00 €
Amount spent
: 12419172 €,12 419 172,00 €
Percentage of investment
: 6,2 %6,20 %
Municipality
Amarante
:Approved amount
: 61917617 €,61 917 617,00 €
Amount spent
: 30106349 €,30 106 349,00 €
Percentage of investment
: 10,92 %10,92 %
Municipality
Baião
:Approved amount
: 49027456 €,49 027 456,00 €
Amount spent
: 38091988 €,38 091 988,00 €
Percentage of investment
: 8,65 %8,65 %
Municipality
Felgueiras
:Approved amount
: 53309957 €,53 309 957,00 €
Amount spent
: 24714345 €,24 714 345,00 €
Percentage of investment
: 9,4 %9,40 %
Municipality
Lousada
:Approved amount
: 49798716 €,49 798 716,00 €
Amount spent
: 29260940 €,29 260 940,00 €
Percentage of investment
: 8,78 %8,78 %
Municipality
Marco de Canaveses
:Approved amount
: 34849677 €,34 849 677,00 €
Amount spent
: 21066911 €,21 066 911,00 €
Percentage of investment
: 6,15 %6,15 %
Municipality
Paços de Ferreira
:Approved amount
: 88921788 €,88 921 788,00 €
Amount spent
: 42831267 €,42 831 267,00 €
Percentage of investment
: 15,69 %15,69 %
Municipality
Penafiel
:Approved amount
: 144613077 €,144 613 077,00 €
Amount spent
: 92741578 €,92 741 578,00 €
Percentage of investment
: 25,51 %25,51 %
Municipality
Cinfães
:Approved amount
: 16414733 €,16 414 733,00 €
Amount spent
: 7137320 €,7 137 320,00 €
Percentage of investment
: 2,9 %2,90 %
Municipality
Resende
:Approved amount
: 6530307 €,6 530 307,00 €
Amount spent
: 3080600 €,3 080 600,00 €
Percentage of investment
: 1,15 %1,15 %
Total
Approved amount
: 566917027 €,566 917 027,00 €
Amount spent
: 313653207 €,313 653 207,00 €
Percentage of investment
Sub-region
Douro
:Municipality
Carrazeda de Ansiães
:Approved amount
: 5723164 €,5 723 164,00 €
Amount spent
: 1864059 €,1 864 059,00 €
Percentage of investment
: 1,5 %1,50 %
Municipality
Freixo de Espada à Cinta
:Approved amount
: 7811424 €,7 811 424,00 €
Amount spent
: 2487945 €,2 487 945,00 €
Percentage of investment
: 2,05 %2,05 %
Municipality
Torre de Moncorvo
:Approved amount
: 5051290 €,5 051 290,00 €
Amount spent
: 2565523 €,2 565 523,00 €
Percentage of investment
: 1,33 %1,33 %
Municipality
Vila Nova de Foz Côa
:Approved amount
: 9976443 €,9 976 443,00 €
Amount spent
: 3634626 €,3 634 626,00 €
Percentage of investment
: 2,62 %2,62 %
Municipality
Alijó
:Approved amount
: 13228391 €,13 228 391,00 €
Amount spent
: 8711422 €,8 711 422,00 €
Percentage of investment
: 3,48 %3,48 %
Municipality
Mesão Frio
:Approved amount
: 1426662 €,1 426 662,00 €
Amount spent
: 566571 €,566 571,00 €
Percentage of investment
: 0,37 %0,37 %
Municipality
Murça
:Approved amount
: 3819148 €,3 819 148,00 €
Amount spent
: 1433164 €,1 433 164,00 €
Percentage of investment
: 1 %1,00 %
Municipality
Peso da Régua
:Approved amount
: 23316596 €,23 316 596,00 €
Amount spent
: 12071094 €,12 071 094,00 €
Percentage of investment
: 6,13 %6,13 %
Municipality
Sabrosa
:Approved amount
: 12423509 €,12 423 509,00 €
Amount spent
: 5539218 €,5 539 218,00 €
Percentage of investment
: 3,26 %3,26 %
Municipality
Santa Marta de Penaguião
:Approved amount
: 11346685 €,11 346 685,00 €
Amount spent
: 3340806 €,3 340 806,00 €
Percentage of investment
: 2,98 %2,98 %
Municipality
Vila Real
:Approved amount
: 198563269 €,198 563 269,00 €
Amount spent
: 101528519 €,101 528 519,00 €
Percentage of investment
: 52,18 %52,18 %
Municipality
Armamar
:Approved amount
: 4169285 €,4 169 285,00 €
Amount spent
: 1713376 €,1 713 376,00 €
Percentage of investment
: 1,1 %1,10 %
Municipality
Lamego
:Approved amount
: 32481289 €,32 481 289,00 €
Amount spent
: 14945901 €,14 945 901,00 €
Percentage of investment
: 8,54 %8,54 %
Municipality
Moimenta da Beira
:Approved amount
: 14893100 €,14 893 100,00 €
Amount spent
: 6509350 €,6 509 350,00 €
Percentage of investment
: 3,91 %3,91 %
Municipality
Penedono
:Approved amount
: 6187856 €,6 187 856,00 €
Amount spent
: 2322203 €,2 322 203,00 €
Percentage of investment
: 1,63 %1,63 %
Municipality
São João da Pesqueira
:Approved amount
: 10666105 €,10 666 105,00 €
Amount spent
: 3733929 €,3 733 929,00 €
Percentage of investment
: 2,8 %2,80 %
Municipality
Sernancelhe
:Approved amount
: 8877894 €,8 877 894,00 €
Amount spent
: 4514778 €,4 514 778,00 €
Percentage of investment
: 2,33 %2,33 %
Municipality
Tabuaço
:Approved amount
: 4934684 €,4 934 684,00 €
Amount spent
: 1664776 €,1 664 776,00 €
Percentage of investment
: 1,3 %1,30 %
Municipality
Tarouca
:Approved amount
: 5668307 €,5 668 307,00 €
Amount spent
: 2956598 €,2 956 598,00 €
Percentage of investment
: 1,49 %1,49 %
Total
Approved amount
: 380565098 €,380 565 098,00 €
Amount spent
: 182103858 €,182 103 858,00 €
Percentage of investment
Sub-region
Terras de Trás-os-Montes
:Municipality
Alfândega da Fé
:Approved amount
: 15386808 €,15 386 808,00 €
Amount spent
: 6156253 €,6 156 253,00 €
Percentage of investment
: 7,08 %7,08 %
Municipality
Bragança
:Approved amount
: 106349477 €,106 349 477,00 €
Amount spent
: 49770846 €,49 770 846,00 €
Percentage of investment
: 48,92 %48,92 %
Municipality
Macedo de Cavaleiros
:Approved amount
: 14584770 €,14 584 770,00 €
Amount spent
: 7276554 €,7 276 554,00 €
Percentage of investment
: 6,71 %6,71 %
Municipality
Miranda do Douro
:Approved amount
: 3405344 €,3 405 344,00 €
Amount spent
: 1596494 €,1 596 494,00 €
Percentage of investment
: 1,57 %1,57 %
Municipality
Mirandela
:Approved amount
: 22784291 €,22 784 291,00 €
Amount spent
: 11688557 €,11 688 557,00 €
Percentage of investment
: 10,48 %10,48 %
Municipality
Mogadouro
:Approved amount
: 11450960 €,11 450 960,00 €
Amount spent
: 5022989 €,5 022 989,00 €
Percentage of investment
: 5,27 %5,27 %
Municipality
Vila Flor
:Approved amount
: 1493404 €,1 493 404,00 €
Amount spent
: 1002339 €,1 002 339,00 €
Percentage of investment
: 0,69 %0,69 %
Municipality
Vimioso
:Approved amount
: 2678764 €,2 678 764,00 €
Amount spent
: 1542030 €,1 542 030,00 €
Percentage of investment
: 1,23 %1,23 %
Municipality
Vinhais
:Approved amount
: 39270777 €,39 270 777,00 €
Amount spent
: 108132473 €,108 132 473,00 €
Percentage of investment
: 18,06 %18,06 %
Total
Approved amount
: 217404594 €,217 404 594,00 €
Amount spent
: 192188535 €,192 188 535,00 €
Percentage of investment
Region
Center
:Sub-region
Oeste
:Municipality
Alcobaça
:Approved amount
: 49150358 €,49 150 358,00 €
Amount spent
: 24351735 €,24 351 735,00 €
Percentage of investment
: 13,63 %13,63 %
Municipality
Bombarral
:Approved amount
: 5425876 €,5 425 876,00 €
Amount spent
: 3061735 €,3 061 735,00 €
Percentage of investment
: 1,5 %1,50 %
Municipality
Caldas da Rainha
:Approved amount
: 67126605 €,67 126 605,00 €
Amount spent
: 23408168 €,23 408 168,00 €
Percentage of investment
: 18,61 %18,61 %
Municipality
Nazaré
:Approved amount
: 34023524 €,34 023 524,00 €
Amount spent
: 20914378 €,20 914 378,00 €
Percentage of investment
: 9,43 %9,43 %
Municipality
Óbidos
:Approved amount
: 7690224 €,7 690 224,00 €
Amount spent
: 3837837 €,3 837 837,00 €
Percentage of investment
: 2,13 %2,13 %
Municipality
Peniche
:Approved amount
: 27541792 €,27 541 792,00 €
Amount spent
: 11931104 €,11 931 104,00 €
Percentage of investment
: 7,64 %7,64 %
Municipality
Alenquer
:Approved amount
: 39525829 €,39 525 829,00 €
Amount spent
: 14139711 €,14 139 711,00 €
Percentage of investment
: 10,96 %10,96 %
Municipality
Arruda dos Vinhos
:Approved amount
: 26945370 €,26 945 370,00 €
Amount spent
: 6574911 €,6 574 911,00 €
Percentage of investment
: 7,47 %7,47 %
Municipality
Cadaval
:Approved amount
: 11403591 €,11 403 591,00 €
Amount spent
: 2088111 €,2 088 111,00 €
Percentage of investment
: 3,16 %3,16 %
Municipality
Lourinhã
:Approved amount
: 11155583 €,11 155 583,00 €
Amount spent
: 6594439 €,6 594 439,00 €
Percentage of investment
: 3,09 %3,09 %
Municipality
Sobral de Monte Agraço
:Approved amount
: 2106499 €,2 106 499,00 €
Amount spent
: 1497077 €,1 497 077,00 €
Percentage of investment
: 0,58 %0,58 %
Municipality
Torres Vedras
:Approved amount
: 78536240 €,78 536 240,00 €
Amount spent
: 35160341 €,35 160 341,00 €
Percentage of investment
: 21,78 %21,78 %
Total
Approved amount
: 360631490 €,360 631 490,00 €
Amount spent
: 153559546 €,153 559 546,00 €
Percentage of investment
Sub-region
Região de Aveiro
:Municipality
Águeda
:Approved amount
: 179194783 €,179 194 783,00 €
Amount spent
: 85096198 €,85 096 198,00 €
Percentage of investment
: 20,23 %20,23 %
Municipality
Albergaria-a-Velha
:Approved amount
: 26937048 €,26 937 048,00 €
Amount spent
: 16989361 €,16 989 361,00 €
Percentage of investment
: 3,04 %3,04 %
Municipality
Anadia
:Approved amount
: 25325220 €,25 325 220,00 €
Amount spent
: 15163644 €,15 163 644,00 €
Percentage of investment
: 2,86 %2,86 %
Municipality
Aveiro
:Approved amount
: 325830855 €,325 830 855,00 €
Amount spent
: 169744909 €,169 744 909,00 €
Percentage of investment
: 36,78 %36,78 %
Municipality
Estarreja
:Approved amount
: 59141719 €,59 141 719,00 €
Amount spent
: 31380452 €,31 380 452,00 €
Percentage of investment
: 6,68 %6,68 %
Municipality
Ílhavo
:Approved amount
: 122210386 €,122 210 386,00 €
Amount spent
: 57286679 €,57 286 679,00 €
Percentage of investment
: 13,8 %13,80 %
Municipality
Murtosa
:Approved amount
: 10954939 €,10 954 939,00 €
Amount spent
: 10460990 €,10 460 990,00 €
Percentage of investment
: 1,24 %1,24 %
Municipality
Oliveira do Bairro
:Approved amount
: 42966305 €,42 966 305,00 €
Amount spent
: 16241506 €,16 241 506,00 €
Percentage of investment
: 4,85 %4,85 %
Municipality
Ovar
:Approved amount
: 62499154 €,62 499 154,00 €
Amount spent
: 24030868 €,24 030 868,00 €
Percentage of investment
: 7,05 %7,05 %
Municipality
Sever do Vouga
:Approved amount
: 11087425 €,11 087 425,00 €
Amount spent
: 4958896 €,4 958 896,00 €
Percentage of investment
: 1,25 %1,25 %
Municipality
Vagos
:Approved amount
: 19750358 €,19 750 358,00 €
Amount spent
: 9203379 €,9 203 379,00 €
Percentage of investment
: 2,23 %2,23 %
Total
Approved amount
: 885898192 €,885 898 192,00 €
Amount spent
: 440556884 €,440 556 884,00 €
Percentage of investment
Sub-region
Região de Coimbra
:Municipality
Mealhada
:Approved amount
: 17188131 €,17 188 131,00 €
Amount spent
: 4978341 €,4 978 341,00 €
Percentage of investment
: 1,64 %1,64 %
Municipality
Arganil
:Approved amount
: 23555949 €,23 555 949,00 €
Amount spent
: 10616439 €,10 616 439,00 €
Percentage of investment
: 2,25 %2,25 %
Municipality
Cantanhede
:Approved amount
: 67408734 €,67 408 734,00 €
Amount spent
: 41833163 €,41 833 163,00 €
Percentage of investment
: 6,45 %6,45 %
Municipality
Coimbra
:Approved amount
: 555781664 €,555 781 664,00 €
Amount spent
: 253258854 €,253 258 854,00 €
Percentage of investment
: 53,18 %53,18 %
Municipality
Condeixa-a-Nova
:Approved amount
: 15735300 €,15 735 300,00 €
Amount spent
: 2918792 €,2 918 792,00 €
Percentage of investment
: 1,51 %1,51 %
Municipality
Figueira da Foz
:Approved amount
: 151366894 €,151 366 894,00 €
Amount spent
: 71725227 €,71 725 227,00 €
Percentage of investment
: 14,48 %14,48 %
Municipality
Góis
:Approved amount
: 7535684 €,7 535 684,00 €
Amount spent
: 1482377 €,1 482 377,00 €
Percentage of investment
: 0,72 %0,72 %
Municipality
Lousã
:Approved amount
: 25282823 €,25 282 823,00 €
Amount spent
: 10182372 €,10 182 372,00 €
Percentage of investment
: 2,42 %2,42 %
Municipality
Mira
:Approved amount
: 19479751 €,19 479 751,00 €
Amount spent
: 7594882 €,7 594 882,00 €
Percentage of investment
: 1,86 %1,86 %
Municipality
Miranda do Corvo
:Approved amount
: 9670387 €,9 670 387,00 €
Amount spent
: 3986847 €,3 986 847,00 €
Percentage of investment
: 0,93 %0,93 %
Municipality
Montemor-o-Velho
:Approved amount
: 14470819 €,14 470 819,00 €
Amount spent
: 6559049 €,6 559 049,00 €
Percentage of investment
: 1,38 %1,38 %
Municipality
Oliveira do Hospital
:Approved amount
: 61945315 €,61 945 315,00 €
Amount spent
: 27334971 €,27 334 971,00 €
Percentage of investment
: 5,93 %5,93 %
Municipality
Pampilhosa da Serra
:Approved amount
: 16662437 €,16 662 437,00 €
Amount spent
: 9939385 €,9 939 385,00 €
Percentage of investment
: 1,59 %1,59 %
Municipality
Penacova
:Approved amount
: 16008790 €,16 008 790,00 €
Amount spent
: 6207769 €,6 207 769,00 €
Percentage of investment
: 1,53 %1,53 %
Municipality
Penela
:Approved amount
: 4340344 €,4 340 344,00 €
Amount spent
: 1651922 €,1 651 922,00 €
Percentage of investment
: 0,42 %0,42 %
Municipality
Soure
:Approved amount
: 6697572 €,6 697 572,00 €
Amount spent
: 2708423 €,2 708 423,00 €
Percentage of investment
: 0,64 %0,64 %
Municipality
Tábua
:Approved amount
: 17638410 €,17 638 410,00 €
Amount spent
: 6895372 €,6 895 372,00 €
Percentage of investment
: 1,69 %1,69 %
Municipality
Vila Nova de Poiares
:Approved amount
: 7336444 €,7 336 444,00 €
Amount spent
: 2838702 €,2 838 702,00 €
Percentage of investment
: 0,7 %0,70 %
Municipality
Mortágua
:Approved amount
: 6947703 €,6 947 703,00 €
Amount spent
: 3330816 €,3 330 816,00 €
Percentage of investment
: 0,66 %0,66 %
Total
Approved amount
: 1045053149 €,1 045 053 149,00 €
Amount spent
: 476043704 €,476 043 704,00 €
Percentage of investment
Sub-region
Região de Leiria
:Municipality
Alvaiázere
:Approved amount
: 12529778 €,12 529 778,00 €
Amount spent
: 3594345 €,3 594 345,00 €
Percentage of investment
: 2,25 %2,25 %
Municipality
Ansião
:Approved amount
: 10654011 €,10 654 011,00 €
Amount spent
: 5254484 €,5 254 484,00 €
Percentage of investment
: 1,91 %1,91 %
Municipality
Batalha
:Approved amount
: 23827182 €,23 827 182,00 €
Amount spent
: 15035266 €,15 035 266,00 €
Percentage of investment
: 4,27 %4,27 %
Municipality
Castanheira de Pêra
:Approved amount
: 7922490 €,7 922 490,00 €
Amount spent
: 3097989 €,3 097 989,00 €
Percentage of investment
: 1,42 %1,42 %
Municipality
Figueiró dos Vinhos
:Approved amount
: 5118793 €,5 118 793,00 €
Amount spent
: 1769790 €,1 769 790,00 €
Percentage of investment
: 0,92 %0,92 %
Municipality
Leiria
:Approved amount
: 266473103 €,266 473 103,00 €
Amount spent
: 127530533 €,127 530 533,00 €
Percentage of investment
: 47,75 %47,75 %
Municipality
Marinha Grande
:Approved amount
: 121374322 €,121 374 322,00 €
Amount spent
: 73452010 €,73 452 010,00 €
Percentage of investment
: 21,75 %21,75 %
Municipality
Pedrógão Grande
:Approved amount
: 7917806 €,7 917 806,00 €
Amount spent
: 1810388 €,1 810 388,00 €
Percentage of investment
: 1,42 %1,42 %
Municipality
Pombal
:Approved amount
: 64209753 €,64 209 753,00 €
Amount spent
: 32701416 €,32 701 416,00 €
Percentage of investment
: 11,5 %11,50 %
Municipality
Porto de Mós
:Approved amount
: 38088027 €,38 088 027,00 €
Amount spent
: 20464908 €,20 464 908,00 €
Percentage of investment
: 6,82 %6,82 %
Total
Approved amount
: 558115266 €,558 115 266,00 €
Amount spent
: 284711128 €,284 711 128,00 €
Percentage of investment
Sub-region
Viseu Dão Lafões
:Municipality
Aguiar da Beira
:Approved amount
: 13287258 €,13 287 258,00 €
Amount spent
: 3941770 €,3 941 770,00 €
Percentage of investment
: 2,86 %2,86 %
Municipality
Carregal do Sal
:Approved amount
: 30617324 €,30 617 324,00 €
Amount spent
: 12066404 €,12 066 404,00 €
Percentage of investment
: 6,58 %6,58 %
Municipality
Castro Daire
:Approved amount
: 11267421 €,11 267 421,00 €
Amount spent
: 6484971 €,6 484 971,00 €
Percentage of investment
: 2,42 %2,42 %
Municipality
Mangualde
:Approved amount
: 81333666 €,81 333 666,00 €
Amount spent
: 39877225 €,39 877 225,00 €
Percentage of investment
: 17,49 %17,49 %
Municipality
Nelas
:Approved amount
: 45031142 €,45 031 142,00 €
Amount spent
: 22847897 €,22 847 897,00 €
Percentage of investment
: 9,68 %9,68 %
Municipality
Oliveira de Frades
:Approved amount
: 12465102 €,12 465 102,00 €
Amount spent
: 6834208 €,6 834 208,00 €
Percentage of investment
: 2,68 %2,68 %
Municipality
Penalva do Castelo
:Approved amount
: 5836910 €,5 836 910,00 €
Amount spent
: 2362031 €,2 362 031,00 €
Percentage of investment
: 1,26 %1,26 %
Municipality
Santa Comba Dão
:Approved amount
: 7495667 €,7 495 667,00 €
Amount spent
: 3327731 €,3 327 731,00 €
Percentage of investment
: 1,61 %1,61 %
Municipality
São Pedro do Sul
:Approved amount
: 14059003 €,14 059 003,00 €
Amount spent
: 6423301 €,6 423 301,00 €
Percentage of investment
: 3,02 %3,02 %
Municipality
Sátão
:Approved amount
: 9086103 €,9 086 103,00 €
Amount spent
: 4706687 €,4 706 687,00 €
Percentage of investment
: 1,95 %1,95 %
Municipality
Tondela
:Approved amount
: 34338699 €,34 338 699,00 €
Amount spent
: 17717543 €,17 717 543,00 €
Percentage of investment
: 7,38 %7,38 %
Municipality
Vila Nova de Paiva
:Approved amount
: 7875324 €,7 875 324,00 €
Amount spent
: 2233188 €,2 233 188,00 €
Percentage of investment
: 1,69 %1,69 %
Municipality
Viseu
:Approved amount
: 170714329 €,170 714 329,00 €
Amount spent
: 66310846 €,66 310 846,00 €
Percentage of investment
: 36,71 %36,71 %
Municipality
Vouzela
:Approved amount
: 21571536 €,21 571 536,00 €
Amount spent
: 7391752 €,7 391 752,00 €
Percentage of investment
: 4,64 %4,64 %
Total
Approved amount
: 464979485 €,464 979 485,00 €
Amount spent
: 202525554 €,202 525 554,00 €
Percentage of investment
Sub-region
Beira Baixa
:Municipality
Castelo Branco
:Approved amount
: 77516871 €,77 516 871,00 €
Amount spent
: 29736186 €,29 736 186,00 €
Percentage of investment
: 54,97 %54,97 %
Municipality
Idanha-a-Nova
:Approved amount
: 8970593 €,8 970 593,00 €
Amount spent
: 5683057 €,5 683 057,00 €
Percentage of investment
: 6,36 %6,36 %
Municipality
Oleiros
:Approved amount
: 19599655 €,19 599 655,00 €
Amount spent
: 8144656 €,8 144 656,00 €
Percentage of investment
: 13,9 %13,90 %
Municipality
Penamacor
:Approved amount
: 2897280 €,2 897 280,00 €
Amount spent
: 764662 €,764 662,00 €
Percentage of investment
: 2,05 %2,05 %
Municipality
Proença-a-Nova
:Approved amount
: 15026198 €,15 026 198,00 €
Amount spent
: 5025416 €,5 025 416,00 €
Percentage of investment
: 10,66 %10,66 %
Municipality
Vila Velha de Ródão
:Approved amount
: 17007851 €,17 007 851,00 €
Amount spent
: 9523919 €,9 523 919,00 €
Percentage of investment
: 12,06 %12,06 %
Total
Approved amount
: 141018447 €,141 018 447,00 €
Amount spent
: 58877896 €,58 877 896,00 €
Percentage of investment
Sub-region
Médio Tejo
:Municipality
Sertã
:Approved amount
: 21583430 €,21 583 430,00 €
Amount spent
: 8448553 €,8 448 553,00 €
Percentage of investment
: 6,05 %6,05 %
Municipality
Vila de Rei
:Approved amount
: 10635486 €,10 635 486,00 €
Amount spent
: 5654183 €,5 654 183,00 €
Percentage of investment
: 2,98 %2,98 %
Municipality
Abrantes
:Approved amount
: 33089629 €,33 089 629,00 €
Amount spent
: 16610472 €,16 610 472,00 €
Percentage of investment
: 9,27 %9,27 %
Municipality
Alcanena
:Approved amount
: 33823492 €,33 823 492,00 €
Amount spent
: 18190758 €,18 190 758,00 €
Percentage of investment
: 9,48 %9,48 %
Municipality
Constância
:Approved amount
: 24765552 €,24 765 552,00 €
Amount spent
: 14684715 €,14 684 715,00 €
Percentage of investment
: 6,94 %6,94 %
Municipality
Entroncamento
:Approved amount
: 33887526 €,33 887 526,00 €
Amount spent
: 16250443 €,16 250 443,00 €
Percentage of investment
: 9,5 %9,50 %
Municipality
Ferreira do Zêzere
:Approved amount
: 20751835 €,20 751 835,00 €
Amount spent
: 8245041 €,8 245 041,00 €
Percentage of investment
: 5,82 %5,82 %
Municipality
Mação
:Approved amount
: 33328516 €,33 328 516,00 €
Amount spent
: 10147432 €,10 147 432,00 €
Percentage of investment
: 9,34 %9,34 %
Municipality
Sardoal
:Approved amount
: 11032380 €,11 032 380,00 €
Amount spent
: 3812122 €,3 812 122,00 €
Percentage of investment
: 3,09 %3,09 %
Municipality
Tomar
:Approved amount
: 41221463 €,41 221 463,00 €
Amount spent
: 18317896 €,18 317 896,00 €
Percentage of investment
: 11,55 %11,55 %
Municipality
Torres Novas
:Approved amount
: 40525962 €,40 525 962,00 €
Amount spent
: 18018158 €,18 018 158,00 €
Percentage of investment
: 11,36 %11,36 %
Municipality
Vila Nova da Barquinha
:Approved amount
: 5319070 €,5 319 070,00 €
Amount spent
: 2337086 €,2 337 086,00 €
Percentage of investment
: 1,49 %1,49 %
Municipality
Ourém
:Approved amount
: 46811476 €,46 811 476,00 €
Amount spent
: 20654427 €,20 654 427,00 €
Percentage of investment
: 13,12 %13,12 %
Total
Approved amount
: 356775817 €,356 775 817,00 €
Amount spent
: 161371285 €,161 371 285,00 €
Percentage of investment
Sub-region
Beiras e Serra da Estrela
:Municipality
Belmonte
:Approved amount
: 11224094 €,11 224 094,00 €
Amount spent
: 1452004 €,1 452 004,00 €
Percentage of investment
: 2,98 %2,98 %
Municipality
Covilhã
:Approved amount
: 88799677 €,88 799 677,00 €
Amount spent
: 44917617 €,44 917 617,00 €
Percentage of investment
: 23,56 %23,56 %
Municipality
Fundão
:Approved amount
: 68788400 €,68 788 400,00 €
Amount spent
: 28422146 €,28 422 146,00 €
Percentage of investment
: 18,25 %18,25 %
Municipality
Almeida
:Approved amount
: 3269371 €,3 269 371,00 €
Amount spent
: 1352723 €,1 352 723,00 €
Percentage of investment
: 0,87 %0,87 %
Municipality
Celorico da Beira
:Approved amount
: 7115336 €,7 115 336,00 €
Amount spent
: 2437410 €,2 437 410,00 €
Percentage of investment
: 1,89 %1,89 %
Municipality
Figueira de Castelo Rodrigo
:Approved amount
: 2478720 €,2 478 720,00 €
Amount spent
: 1098037 €,1 098 037,00 €
Percentage of investment
: 0,66 %0,66 %
Municipality
Fornos de Algodres
:Approved amount
: 3923609 €,3 923 609,00 €
Amount spent
: 2604092 €,2 604 092,00 €
Percentage of investment
: 1,04 %1,04 %
Municipality
Gouveia
:Approved amount
: 7990337 €,7 990 337,00 €
Amount spent
: 4946703 €,4 946 703,00 €
Percentage of investment
: 2,12 %2,12 %
Municipality
Guarda
:Approved amount
: 107023773 €,107 023 773,00 €
Amount spent
: 31722706 €,31 722 706,00 €
Percentage of investment
: 28,39 %28,39 %
Municipality
Manteigas
:Approved amount
: 2158400 €,2 158 400,00 €
Amount spent
: 804607 €,804 607,00 €
Percentage of investment
: 0,57 %0,57 %
Municipality
Mêda
:Approved amount
: 3295154 €,3 295 154,00 €
Amount spent
: 697866 €,697 866,00 €
Percentage of investment
: 0,87 %0,87 %
Municipality
Pinhel
:Approved amount
: 6010236 €,6 010 236,00 €
Amount spent
: 2133931 €,2 133 931,00 €
Percentage of investment
: 1,59 %1,59 %
Municipality
Sabugal
:Approved amount
: 12383207 €,12 383 207,00 €
Amount spent
: 4632242 €,4 632 242,00 €
Percentage of investment
: 3,28 %3,28 %
Municipality
Seia
:Approved amount
: 40245009 €,40 245 009,00 €
Amount spent
: 14151064 €,14 151 064,00 €
Percentage of investment
: 10,68 %10,68 %
Municipality
Trancoso
:Approved amount
: 12273767 €,12 273 767,00 €
Amount spent
: 2833332 €,2 833 332,00 €
Percentage of investment
: 3,26 %3,26 %
Total
Approved amount
: 376979089 €,376 979 089,00 €
Amount spent
: 144206479 €,144 206 479,00 €
Percentage of investment
Region
Lisbon Metropolitan Area
:Sub-region
Lisbon Metropolitan Area
:Municipality
Cascais
:Approved amount
: 276802225 €,276 802 225,00 €
Amount spent
: 146859131 €,146 859 131,00 €
Percentage of investment
: 5 %5,00 %
Municipality
Lisboa
:Approved amount
: 3074501979 €,3 074 501 979,00 €
Amount spent
: 1510257172 €,1 510 257 172,00 €
Percentage of investment
: 55,58 %55,58 %
Municipality
Loures
:Approved amount
: 182154991 €,182 154 991,00 €
Amount spent
: 90184644 €,90 184 644,00 €
Percentage of investment
: 3,29 %3,29 %
Municipality
Mafra
:Approved amount
: 135098520 €,135 098 520,00 €
Amount spent
: 70237332 €,70 237 332,00 €
Percentage of investment
: 2,44 %2,44 %
Municipality
Oeiras
:Approved amount
: 461639338 €,461 639 338,00 €
Amount spent
: 199501621 €,199 501 621,00 €
Percentage of investment
: 8,35 %8,35 %
Municipality
Sintra
:Approved amount
: 182920225 €,182 920 225,00 €
Amount spent
: 90393743 €,90 393 743,00 €
Percentage of investment
: 3,31 %3,31 %
Municipality
Vila Franca de Xira
:Approved amount
: 113201774 €,113 201 774,00 €
Amount spent
: 47579428 €,47 579 428,00 €
Percentage of investment
: 2,05 %2,05 %
Municipality
Amadora
:Approved amount
: 255250780 €,255 250 780,00 €
Amount spent
: 133643804 €,133 643 804,00 €
Percentage of investment
: 4,61 %4,61 %
Municipality
Odivelas
:Approved amount
: 68773738 €,68 773 738,00 €
Amount spent
: 31860051 €,31 860 051,00 €
Percentage of investment
: 1,24 %1,24 %
Municipality
Alcochete
:Approved amount
: 19130355 €,19 130 355,00 €
Amount spent
: 8185674 €,8 185 674,00 €
Percentage of investment
: 0,35 %0,35 %
Municipality
Almada
:Approved amount
: 129134073 €,129 134 073,00 €
Amount spent
: 48297240 €,48 297 240,00 €
Percentage of investment
: 2,33 %2,33 %
Municipality
Barreiro
:Approved amount
: 80855448 €,80 855 448,00 €
Amount spent
: 32477474 €,32 477 474,00 €
Percentage of investment
: 1,46 %1,46 %
Municipality
Moita
:Approved amount
: 26705925 €,26 705 925,00 €
Amount spent
: 15975201 €,15 975 201,00 €
Percentage of investment
: 0,48 %0,48 %
Municipality
Montijo
:Approved amount
: 34729920 €,34 729 920,00 €
Amount spent
: 19088364 €,19 088 364,00 €
Percentage of investment
: 0,63 %0,63 %
Municipality
Palmela
:Approved amount
: 40837617 €,40 837 617,00 €
Amount spent
: 20535929 €,20 535 929,00 €
Percentage of investment
: 0,74 %0,74 %
Municipality
Seixal
:Approved amount
: 112951274 €,112 951 274,00 €
Amount spent
: 60405671 €,60 405 671,00 €
Percentage of investment
: 2,04 %2,04 %
Municipality
Sesimbra
:Approved amount
: 28310284 €,28 310 284,00 €
Amount spent
: 7371341 €,7 371 341,00 €
Percentage of investment
: 0,51 %0,51 %
Municipality
Setúbal
:Approved amount
: 308612157 €,308 612 157,00 €
Amount spent
: 124747984 €,124 747 984,00 €
Percentage of investment
: 5,58 %5,58 %
Total
Approved amount
: 5531610622 €,5 531 610 622,00 €
Amount spent
: 2657601804 €,2 657 601 804,00 €
Percentage of investment
Region
Alentejo
:Sub-region
Alentejo Litoral
:Municipality
Odemira
:Approved amount
: 10500347 €,10 500 347,00 €
Amount spent
: 5051139 €,5 051 139,00 €
Percentage of investment
: 4,43 %4,43 %
Municipality
Alcácer do Sal
:Approved amount
: 13887533 €,13 887 533,00 €
Amount spent
: 5377263 €,5 377 263,00 €
Percentage of investment
: 5,86 %5,86 %
Municipality
Grândola
:Approved amount
: 67101582 €,67 101 582,00 €
Amount spent
: 44704542 €,44 704 542,00 €
Percentage of investment
: 28,3 %28,30 %
Municipality
Santiago do Cacém
:Approved amount
: 107059029 €,107 059 029,00 €
Amount spent
: 56500833 €,56 500 833,00 €
Percentage of investment
: 45,15 %45,15 %
Municipality
Sines
:Approved amount
: 38561007 €,38 561 007,00 €
Amount spent
: 15669729 €,15 669 729,00 €
Percentage of investment
: 16,26 %16,26 %
Total
Approved amount
: 237109498 €,237 109 498,00 €
Amount spent
: 127303506 €,127 303 506,00 €
Percentage of investment
Sub-region
Baixo Alentejo
:Municipality
Aljustrel
:Approved amount
: 37874548 €,37 874 548,00 €
Amount spent
: 25435999 €,25 435 999,00 €
Percentage of investment
: 16,49 %16,49 %
Municipality
Almodôvar
:Approved amount
: 2208616 €,2 208 616,00 €
Amount spent
: 1112621 €,1 112 621,00 €
Percentage of investment
: 0,96 %0,96 %
Municipality
Alvito
:Approved amount
: 4337196 €,4 337 196,00 €
Amount spent
: 1968179 €,1 968 179,00 €
Percentage of investment
: 1,89 %1,89 %
Municipality
Barrancos
:Approved amount
: 1968587 €,1 968 587,00 €
Amount spent
: 680881 €,680 881,00 €
Percentage of investment
: 0,86 %0,86 %
Municipality
Beja
:Approved amount
: 86200694 €,86 200 694,00 €
Amount spent
: 46404116 €,46 404 116,00 €
Percentage of investment
: 37,52 %37,52 %
Municipality
Castro Verde
:Approved amount
: 3595523 €,3 595 523,00 €
Amount spent
: 1179045 €,1 179 045,00 €
Percentage of investment
: 1,57 %1,57 %
Municipality
Cuba
:Approved amount
: 1866514 €,1 866 514,00 €
Amount spent
: 679048 €,679 048,00 €
Percentage of investment
: 0,81 %0,81 %
Municipality
Ferreira do Alentejo
:Approved amount
: 51323660 €,51 323 660,00 €
Amount spent
: 38021697 €,38 021 697,00 €
Percentage of investment
: 22,34 %22,34 %
Municipality
Mértola
:Approved amount
: 26080862 €,26 080 862,00 €
Amount spent
: 11701006 €,11 701 006,00 €
Percentage of investment
: 11,35 %11,35 %
Municipality
Moura
:Approved amount
: 4820265 €,4 820 265,00 €
Amount spent
: 1937206 €,1 937 206,00 €
Percentage of investment
: 2,1 %2,10 %
Municipality
Ourique
:Approved amount
: 4015838 €,4 015 838,00 €
Amount spent
: 1456340 €,1 456 340,00 €
Percentage of investment
: 1,75 %1,75 %
Municipality
Serpa
:Approved amount
: 3123728 €,3 123 728,00 €
Amount spent
: 1029421 €,1 029 421,00 €
Percentage of investment
: 1,36 %1,36 %
Municipality
Vidigueira
:Approved amount
: 2324974 €,2 324 974,00 €
Amount spent
: 1014362 €,1 014 362,00 €
Percentage of investment
: 1,01 %1,01 %
Total
Approved amount
: 229741005 €,229 741 005,00 €
Amount spent
: 132619923 €,132 619 923,00 €
Percentage of investment
Sub-region
Lezíria do Tejo
:Municipality
Azambuja
:Approved amount
: 32225478 €,32 225 478,00 €
Amount spent
: 12508222 €,12 508 222,00 €
Percentage of investment
: 10,57 %10,57 %
Municipality
Almeirim
:Approved amount
: 4809149 €,4 809 149,00 €
Amount spent
: 2532326 €,2 532 326,00 €
Percentage of investment
: 1,58 %1,58 %
Municipality
Alpiarça
:Approved amount
: 4917671 €,4 917 671,00 €
Amount spent
: 2009932 €,2 009 932,00 €
Percentage of investment
: 1,61 %1,61 %
Municipality
Benavente
:Approved amount
: 48655874 €,48 655 874,00 €
Amount spent
: 18868912 €,18 868 912,00 €
Percentage of investment
: 15,96 %15,96 %
Municipality
Cartaxo
:Approved amount
: 20795531 €,20 795 531,00 €
Amount spent
: 10002974 €,10 002 974,00 €
Percentage of investment
: 6,82 %6,82 %
Municipality
Chamusca
:Approved amount
: 8622649 €,8 622 649,00 €
Amount spent
: 5519317 €,5 519 317,00 €
Percentage of investment
: 2,83 %2,83 %
Municipality
Coruche
:Approved amount
: 6566806 €,6 566 806,00 €
Amount spent
: 4138068 €,4 138 068,00 €
Percentage of investment
: 2,15 %2,15 %
Municipality
Golegã
:Approved amount
: 9349772 €,9 349 772,00 €
Amount spent
: 4239230 €,4 239 230,00 €
Percentage of investment
: 3,07 %3,07 %
Municipality
Rio Maior
:Approved amount
: 52275860 €,52 275 860,00 €
Amount spent
: 15553916 €,15 553 916,00 €
Percentage of investment
: 17,14 %17,14 %
Municipality
Salvaterra de Magos
:Approved amount
: 11520277 €,11 520 277,00 €
Amount spent
: 7338559 €,7 338 559,00 €
Percentage of investment
: 3,78 %3,78 %
Municipality
Santarém
:Approved amount
: 105217701 €,105 217 701,00 €
Amount spent
: 48333717 €,48 333 717,00 €
Percentage of investment
: 34,5 %34,50 %
Total
Approved amount
: 304956767 €,304 956 767,00 €
Amount spent
: 131045172 €,131 045 172,00 €
Percentage of investment
Sub-region
Alto Alentejo
:Municipality
Alter do Chão
:Approved amount
: 11495321 €,11 495 321,00 €
Amount spent
: 2807366 €,2 807 366,00 €
Percentage of investment
: 4,48 %4,48 %
Municipality
Arronches
:Approved amount
: 1800393 €,1 800 393,00 €
Amount spent
: 759566 €,759 566,00 €
Percentage of investment
: 0,7 %0,70 %
Municipality
Avis
:Approved amount
: 1619234 €,1 619 234,00 €
Amount spent
: 674093 €,674 093,00 €
Percentage of investment
: 0,63 %0,63 %
Municipality
Campo Maior
:Approved amount
: 24904756 €,24 904 756,00 €
Amount spent
: 11040773 €,11 040 773,00 €
Percentage of investment
: 9,72 %9,72 %
Municipality
Castelo de Vide
:Approved amount
: 3844577 €,3 844 577,00 €
Amount spent
: 1396922 €,1 396 922,00 €
Percentage of investment
: 1,5 %1,50 %
Municipality
Crato
:Approved amount
: 667056 €,667 056,00 €
Amount spent
: 322084 €,322 084,00 €
Percentage of investment
: 0,26 %0,26 %
Municipality
Elvas
:Approved amount
: 50424957 €,50 424 957,00 €
Amount spent
: 19562460 €,19 562 460,00 €
Percentage of investment
: 19,67 %19,67 %
Municipality
Fronteira
:Approved amount
: 1619424 €,1 619 424,00 €
Amount spent
: 1060197 €,1 060 197,00 €
Percentage of investment
: 0,63 %0,63 %
Municipality
Gavião
:Approved amount
: 11595149 €,11 595 149,00 €
Amount spent
: 4123229 €,4 123 229,00 €
Percentage of investment
: 4,52 %4,52 %
Municipality
Marvão
:Approved amount
: 3090140 €,3 090 140,00 €
Amount spent
: 1970080 €,1 970 080,00 €
Percentage of investment
: 1,21 %1,21 %
Municipality
Monforte
:Approved amount
: 8915097 €,8 915 097,00 €
Amount spent
: 887891 €,887 891,00 €
Percentage of investment
: 3,48 %3,48 %
Municipality
Nisa
:Approved amount
: 18809285 €,18 809 285,00 €
Amount spent
: 2098927 €,2 098 927,00 €
Percentage of investment
: 7,34 %7,34 %
Municipality
Ponte de Sor
:Approved amount
: 27644456 €,27 644 456,00 €
Amount spent
: 13167940 €,13 167 940,00 €
Percentage of investment
: 10,78 %10,78 %
Municipality
Portalegre
:Approved amount
: 79695753 €,79 695 753,00 €
Amount spent
: 31449180 €,31 449 180,00 €
Percentage of investment
: 31,09 %31,09 %
Municipality
Sousel
:Approved amount
: 10209464 €,10 209 464,00 €
Amount spent
: 8727767 €,8 727 767,00 €
Percentage of investment
: 3,98 %3,98 %
Total
Approved amount
: 256335062 €,256 335 062,00 €
Amount spent
: 100048475 €,100 048 475,00 €
Percentage of investment
Sub-region
Alentejo Central
:Municipality
Alandroal
:Approved amount
: 5668050 €,5 668 050,00 €
Amount spent
: 1283470 €,1 283 470,00 €
Percentage of investment
: 2,33 %2,33 %
Municipality
Arraiolos
:Approved amount
: 2191369 €,2 191 369,00 €
Amount spent
: 1489383 €,1 489 383,00 €
Percentage of investment
: 0,9 %0,90 %
Municipality
Borba
:Approved amount
: 17868352 €,17 868 352,00 €
Amount spent
: 4877753 €,4 877 753,00 €
Percentage of investment
: 7,34 %7,34 %
Municipality
Estremoz
:Approved amount
: 7487138 €,7 487 138,00 €
Amount spent
: 4082481 €,4 082 481,00 €
Percentage of investment
: 3,07 %3,07 %
Municipality
Évora
:Approved amount
: 166621885 €,166 621 885,00 €
Amount spent
: 80974332 €,80 974 332,00 €
Percentage of investment
: 68,4 %68,40 %
Municipality
Montemor-o-Novo
:Approved amount
: 4000446 €,4 000 446,00 €
Amount spent
: 2223401 €,2 223 401,00 €
Percentage of investment
: 1,64 %1,64 %
Municipality
Mora
:Approved amount
: 1904082 €,1 904 082,00 €
Amount spent
: 1383315 €,1 383 315,00 €
Percentage of investment
: 0,78 %0,78 %
Municipality
Mourão
:Approved amount
: 1215394 €,1 215 394,00 €
Amount spent
: 790435 €,790 435,00 €
Percentage of investment
: 0,5 %0,50 %
Municipality
Portel
:Approved amount
: 1500697 €,1 500 697,00 €
Amount spent
: 456077 €,456 077,00 €
Percentage of investment
: 0,62 %0,62 %
Municipality
Redondo
:Approved amount
: 8253708 €,8 253 708,00 €
Amount spent
: 2085735 €,2 085 735,00 €
Percentage of investment
: 3,39 %3,39 %
Municipality
Reguengos de Monsaraz
:Approved amount
: 7872202 €,7 872 202,00 €
Amount spent
: 4467834 €,4 467 834,00 €
Percentage of investment
: 3,23 %3,23 %
Municipality
Vendas Novas
:Approved amount
: 6778058 €,6 778 058,00 €
Amount spent
: 2155783 €,2 155 783,00 €
Percentage of investment
: 2,78 %2,78 %
Municipality
Viana do Alentejo
:Approved amount
: 4593828 €,4 593 828,00 €
Amount spent
: 1065822 €,1 065 822,00 €
Percentage of investment
: 1,89 %1,89 %
Municipality
Vila Viçosa
:Approved amount
: 7633619 €,7 633 619,00 €
Amount spent
: 5046642 €,5 046 642,00 €
Percentage of investment
: 3,13 %3,13 %
Total
Approved amount
: 243588829 €,243 588 829,00 €
Amount spent
: 112382463 €,112 382 463,00 €
Percentage of investment
Region
Algarve
:Sub-region
Algarve
:Municipality
Albufeira
:Approved amount
: 48784581 €,48 784 581,00 €
Amount spent
: 26728600 €,26 728 600,00 €
Percentage of investment
: 7,22 %7,22 %
Municipality
Alcoutim
:Approved amount
: 35289252 €,35 289 252,00 €
Amount spent
: 6839860 €,6 839 860,00 €
Percentage of investment
: 5,22 %5,22 %
Municipality
Aljezur
:Approved amount
: 5334271 €,5 334 271,00 €
Amount spent
: 1133025 €,1 133 025,00 €
Percentage of investment
: 0,79 %0,79 %
Municipality
Castro Marim
:Approved amount
: 4068127 €,4 068 127,00 €
Amount spent
: 1730387 €,1 730 387,00 €
Percentage of investment
: 0,6 %0,60 %
Municipality
Faro
:Approved amount
: 148616798 €,148 616 798,00 €
Amount spent
: 76275964 €,76 275 964,00 €
Percentage of investment
: 22 %22,00 %
Municipality
Lagoa
:Approved amount
: 19726461 €,19 726 461,00 €
Amount spent
: 12815488 €,12 815 488,00 €
Percentage of investment
: 2,92 %2,92 %
Municipality
Lagos
:Approved amount
: 45494841 €,45 494 841,00 €
Amount spent
: 16480274 €,16 480 274,00 €
Percentage of investment
: 6,73 %6,73 %
Municipality
Loulé
:Approved amount
: 53080381 €,53 080 381,00 €
Amount spent
: 35267384 €,35 267 384,00 €
Percentage of investment
: 7,86 %7,86 %
Municipality
Monchique
:Approved amount
: 17389094 €,17 389 094,00 €
Amount spent
: 6413668 €,6 413 668,00 €
Percentage of investment
: 2,57 %2,57 %
Municipality
Olhão
:Approved amount
: 55221982 €,55 221 982,00 €
Amount spent
: 27847472 €,27 847 472,00 €
Percentage of investment
: 8,17 %8,17 %
Municipality
Portimão
:Approved amount
: 64258796 €,64 258 796,00 €
Amount spent
: 23109483 €,23 109 483,00 €
Percentage of investment
: 9,51 %9,51 %
Municipality
São Brás de Alportel
:Approved amount
: 7645138 €,7 645 138,00 €
Amount spent
: 4523733 €,4 523 733,00 €
Percentage of investment
: 1,13 %1,13 %
Municipality
Silves
:Approved amount
: 29406676 €,29 406 676,00 €
Amount spent
: 16383622 €,16 383 622,00 €
Percentage of investment
: 4,35 %4,35 %
Municipality
Tavira
:Approved amount
: 21488099 €,21 488 099,00 €
Amount spent
: 11633412 €,11 633 412,00 €
Percentage of investment
: 3,18 %3,18 %
Municipality
Vila do Bispo
:Approved amount
: 8109827 €,8 109 827,00 €
Amount spent
: 2977396 €,2 977 396,00 €
Percentage of investment
: 1,2 %1,20 %
Municipality
Vila Real de Santo António
:Approved amount
: 111589632 €,111 589 632,00 €
Amount spent
: 38291092 €,38 291 092,00 €
Percentage of investment
: 16,52 %16,52 %
Total
Approved amount
: 675503955 €,675 503 955,00 €
Amount spent
: 308450860 €,308 450 860,00 €
Percentage of investment
Region
Autonomous Region of the Azores
:Sub-region
Autonomous Region of the Azores
:Municipality
Vila do Porto
:Approved amount
: 7177441 €,7 177 441,00 €
Amount spent
: 3068629 €,3 068 629,00 €
Percentage of investment
: 0,72 %0,72 %
Municipality
Lagoa
:Approved amount
: 31733555 €,31 733 555,00 €
Amount spent
: 14907796 €,14 907 796,00 €
Percentage of investment
: 3,17 %3,17 %
Municipality
Nordeste
:Approved amount
: 5961828 €,5 961 828,00 €
Amount spent
: 3386057 €,3 386 057,00 €
Percentage of investment
: 0,6 %0,60 %
Municipality
Ponta Delgada
:Approved amount
: 535625364 €,535 625 364,00 €
Amount spent
: 306497327 €,306 497 327,00 €
Percentage of investment
: 53,52 %53,52 %
Municipality
Povoação
:Approved amount
: 2182924 €,2 182 924,00 €
Amount spent
: 1414267 €,1 414 267,00 €
Percentage of investment
: 0,22 %0,22 %
Municipality
Ribeira Grande
:Approved amount
: 109768262 €,109 768 262,00 €
Amount spent
: 56862446 €,56 862 446,00 €
Percentage of investment
: 10,97 %10,97 %
Municipality
Vila Franca do Campo
:Approved amount
: 11329989 €,11 329 989,00 €
Amount spent
: 8286714 €,8 286 714,00 €
Percentage of investment
: 1,13 %1,13 %
Municipality
Angra do Heroísmo
:Approved amount
: 150555370 €,150 555 370,00 €
Amount spent
: 83243320 €,83 243 320,00 €
Percentage of investment
: 15,04 %15,04 %
Municipality
Vila da Praia da Vitória
:Approved amount
: 10878348 €,10 878 348,00 €
Amount spent
: 6124122 €,6 124 122,00 €
Percentage of investment
: 1,09 %1,09 %
Municipality
Santa Cruz da Graciosa
:Approved amount
: 3598022 €,3 598 022,00 €
Amount spent
: 1336673 €,1 336 673,00 €
Percentage of investment
: 0,36 %0,36 %
Municipality
Calheta
:Approved amount
: 2879081 €,2 879 081,00 €
Amount spent
: 1630244 €,1 630 244,00 €
Percentage of investment
: 0,29 %0,29 %
Municipality
Velas
:Approved amount
: 4792352 €,4 792 352,00 €
Amount spent
: 2530248 €,2 530 248,00 €
Percentage of investment
: 0,48 %0,48 %
Municipality
Lajes do Pico
:Approved amount
: 4669677 €,4 669 677,00 €
Amount spent
: 1895616 €,1 895 616,00 €
Percentage of investment
: 0,47 %0,47 %
Municipality
Madalena
:Approved amount
: 19539725 €,19 539 725,00 €
Amount spent
: 6883992 €,6 883 992,00 €
Percentage of investment
: 1,95 %1,95 %
Municipality
São Roque do Pico
:Approved amount
: 13561009 €,13 561 009,00 €
Amount spent
: 9087045 €,9 087 045,00 €
Percentage of investment
: 1,36 %1,36 %
Municipality
Horta
:Approved amount
: 82436431 €,82 436 431,00 €
Amount spent
: 55968418 €,55 968 418,00 €
Percentage of investment
: 8,24 %8,24 %
Municipality
Lajes das Flores
:Approved amount
: 922608 €,922 608,00 €
Amount spent
: 297759 €,297 759,00 €
Percentage of investment
: 0,09 %0,09 %
Municipality
Santa Cruz das Flores
:Approved amount
: 2722626 €,2 722 626,00 €
Amount spent
: 1048095 €,1 048 095,00 €
Percentage of investment
: 0,27 %0,27 %
Municipality
Corvo
:Approved amount
: 418044 €,418 044,00 €
Amount spent
: 139742 €,139 742,00 €
Percentage of investment
: 0,04 %0,04 %
Total
Approved amount
: 1000752655 €,1 000 752 655,00 €
Amount spent
: 564608512 €,564 608 512,00 €
Percentage of investment
Region
Autonomous Region of Madeira
:Sub-region
Autonomous Region of Madeira
:Municipality
Calheta
:Approved amount
: 11949898 €,11 949 898,00 €
Amount spent
: 4248950 €,4 248 950,00 €
Percentage of investment
: 1,4 %1,40 %
Municipality
Câmara de Lobos
:Approved amount
: 18238175 €,18 238 175,00 €
Amount spent
: 5581475 €,5 581 475,00 €
Percentage of investment
: 2,13 %2,13 %
Municipality
Funchal
:Approved amount
: 711634060 €,711 634 060,00 €
Amount spent
: 358358682 €,358 358 682,00 €
Percentage of investment
: 83,29 %83,29 %
Municipality
Machico
:Approved amount
: 11683788 €,11 683 788,00 €
Amount spent
: 3799453 €,3 799 453,00 €
Percentage of investment
: 1,37 %1,37 %
Municipality
Ponta do Sol
:Approved amount
: 4772762 €,4 772 762,00 €
Amount spent
: 1668086 €,1 668 086,00 €
Percentage of investment
: 0,56 %0,56 %
Municipality
Porto Moniz
:Approved amount
: 268599 €,268 599,00 €
Amount spent
: 204055 €,204 055,00 €
Percentage of investment
: 0,03 %0,03 %
Municipality
Ribeira Brava
:Approved amount
: 10947912 €,10 947 912,00 €
Amount spent
: 6551711 €,6 551 711,00 €
Percentage of investment
: 1,28 %1,28 %
Municipality
Santa Cruz
:Approved amount
: 19076612 €,19 076 612,00 €
Amount spent
: 7846739 €,7 846 739,00 €
Percentage of investment
: 2,23 %2,23 %
Municipality
Santana
:Approved amount
: 3012658 €,3 012 658,00 €
Amount spent
: 390595 €,390 595,00 €
Percentage of investment
: 0,35 %0,35 %
Municipality
São Vicente
:Approved amount
: 36679023 €,36 679 023,00 €
Amount spent
: 8705887 €,8 705 887,00 €
Percentage of investment
: 4,29 %4,29 %
Municipality
Porto Santo
:Approved amount
: 26187219 €,26 187 219,00 €
Amount spent
: 7072323 €,7 072 323,00 €
Percentage of investment
: 3,06 %3,06 %
Total
Approved amount
: 854450707 €,854 450 707,00 €
Amount spent
: 404427956 €,404 427 956,00 €
Percentage of investment
Region
Nation-wide investment
:Approved amount
: 3845640730 €,3 845 640 730,00 €
:Amount spent
: {{ regionNutsii.apoio_gasto|floatformat:'-2'|cut:' '|checkifdataisavailable|euro_symbol,2 219 347 149,00 €
:Comparison between realities
Assessing the impact of investments in the Recovery and Resilience Plan on the daily lives of populations is not a simple topic. It is necessary to analyze the context in a broader way and understand how investments can suppress everyday needs.
However, there are some indicators that can help to envision an equitable way in which investments are being distributed geographically.
How much is already approved to invest per inhabitant?
Number of inhabitants according to the 2021 Census
How much is already approved to invest per inhabitant?
Number of inhabitants according to the 2021 Census
| Municipality | Approved amount |
|---|---|
| Highest national value Alcoutim | 13987 € 13 987,00 € |
| National average | 2371 € 2 371,00 € |
| Lowest national value Porto Moniz | 107 € 107,00 € |
How much is already approved to invest per inhabitant?
Municipality
Highest national value Alcoutim
Approved amount
13987 €
13 987,00 €
Municipality
National average
Approved amount
2371 €
2 371,00 €
Municipality
Lowest national value Porto Moniz
Approved amount
107 €
107,00 €
How much is already approved to invest per km2?
How much is already approved to invest per km2?
| Municipality | Approved amount |
|---|---|
| Highest national value Porto | 36752824 € 36 752 824,00 € |
| National average | 265909 € 265 909,00 € |
| Lowest national value Crato | 1676 € 1 676,00 € |
How much is already approved to invest per km2?
Municipality
Highest national value Porto
Approved amount
36752824 €
36 752 824,00 €
Municipality
National average
Approved amount
265909 €
265 909,00 €
Municipality
Lowest national value Crato
Approved amount
1676 €
1 676,00 €
If you'd like to know more about a specific municipality, tell us which one...