Recovery and Resilience Plan in numbers
21,9 billion €
Total investment to be applied by the Recovery and Resilience Plan
2,6 billion €
Total amount of funds already allocated to Nation-wide investments
11,9 billion €
Total amount of funds already invested in municipalities and regions
Geography of investments
The Recovery and Resilience Plan aims to provide the country with a set of tools for the future, seeking to ensure a more resilient economy, a more sustainable relationship with the environment, and more digital processes and functioning.
All of this is contributed by a broad geographical distribution of its investments and reforms, ensuring that both nationally implemented projects and resources applied in all municipalities of the country are invested where they have the greatest impact on the lives of the population.
Distribution of investment by regions
Distribution of investment by regions
| Region | Sub-region | Municipality | Approved amount | Amount spent | Percentage of investment |
|---|---|---|---|---|---|
| North |
Alto Minho
Cávado
Ave
Área Metropolitana do Porto
Alto Tâmega
Tâmega e Sousa
Douro
Terras de Trás-os-Montes
|
Arcos de Valdevez
Caminha
Melgaço
Monção
Paredes de Coura
Ponte da Barca
Ponte de Lima
Valença
Viana do Castelo
Vila Nova de Cerveira
Total
Amares
Barcelos
Braga
Esposende
Terras de Bouro
Vila Verde
Total
Cabeceiras de Basto
Fafe
Guimarães
Póvoa de Lanhoso
Vieira do Minho
Vila Nova de Famalicão
Vizela
Mondim de Basto
Total
Arouca
Espinho
Santa Maria da Feira
Oliveira de Azeméis
São João da Madeira
Vale de Cambra
Gondomar
Maia
Matosinhos
Paredes
Porto
Póvoa de Varzim
Santo Tirso
Valongo
Vila do Conde
Vila Nova de Gaia
Trofa
Total
Boticas
Chaves
Montalegre
Ribeira de Pena
Valpaços
Vila Pouca de Aguiar
Total
Castelo de Paiva
Celorico de Basto
Amarante
Baião
Felgueiras
Lousada
Marco de Canaveses
Paços de Ferreira
Penafiel
Cinfães
Resende
Total
Carrazeda de Ansiães
Freixo de Espada à Cinta
Torre de Moncorvo
Vila Nova de Foz Côa
Alijó
Mesão Frio
Murça
Peso da Régua
Sabrosa
Santa Marta de Penaguião
Vila Real
Armamar
Lamego
Moimenta da Beira
Penedono
São João da Pesqueira
Sernancelhe
Tabuaço
Tarouca
Total
Alfândega da Fé
Bragança
Macedo de Cavaleiros
Miranda do Douro
Mirandela
Mogadouro
Vila Flor
Vimioso
Vinhais
Total
|
29 962 759,00 €
13 788 222,00 €
20 409 759,00 €
31 321 901,00 €
6 898 936,00 €
9 754 815,00 €
31 871 979,00 €
35 459 683,00 €
182 555 236,00 €
19 281 918,00 €
381 305 206,00 €
12 180 878,00 €
185 307 599,00 €
430 061 268,00 €
52 231 214,00 €
4 568 850,00 €
36 069 469,00 €
720 419 278,00 €
13 483 816,00 €
47 041 161,00 €
460 668 381,00 €
25 795 444,00 €
6 560 189,00 €
313 739 031,00 €
28 413 057,00 €
9 750 717,00 €
905 451 795,00 €
28 283 346,00 €
23 759 583,00 €
131 755 825,00 €
88 555 787,00 €
72 042 694,00 €
35 258 373,00 €
89 223 167,00 €
278 936 351,00 €
706 775 067,00 €
92 627 556,00 €
1 403 597 887,00 €
83 900 118,00 €
91 743 233,00 €
72 301 958,00 €
152 676 359,00 €
331 596 616,00 €
96 589 138,00 €
3 779 623 058,00 €
6 158 419,00 €
51 902 583,00 €
4 531 521,00 €
14 024 445,00 €
5 978 784,00 €
20 439 901,00 €
103 035 653,00 €
26 275 575,00 €
25 072 292,00 €
61 110 281,00 €
49 003 524,00 €
44 449 852,00 €
51 021 071,00 €
33 231 801,00 €
90 779 308,00 €
146 708 785,00 €
16 918 759,00 €
6 155 739,00 €
550 726 988,00 €
5 709 955,00 €
7 542 357,00 €
4 071 139,00 €
10 360 307,00 €
13 333 004,00 €
1 439 780,00 €
4 450 494,00 €
23 908 855,00 €
12 733 588,00 €
10 960 616,00 €
201 344 576,00 €
4 187 711,00 €
32 438 398,00 €
16 457 997,00 €
6 191 072,00 €
10 718 434,00 €
9 470 319,00 €
5 071 895,00 €
5 912 505,00 €
386 303 003,00 €
15 786 119,00 €
90 561 065,00 €
14 015 802,00 €
3 608 008,00 €
23 776 016,00 €
12 488 929,00 €
1 954 042,00 €
2 701 956,00 €
111 709 965,00 €
276 601 902,00 €
|
16 413 704,00 €
5 768 591,00 €
17 133 825,00 €
17 946 348,00 €
3 621 074,00 €
5 042 392,00 €
18 808 310,00 €
15 729 300,00 €
124 337 485,00 €
12 253 578,00 €
237 054 608,00 €
7 411 090,00 €
84 080 797,00 €
273 237 383,00 €
18 570 252,00 €
2 195 081,00 €
21 192 413,00 €
406 687 016,00 €
5 182 309,00 €
27 354 417,00 €
271 168 399,00 €
9 450 050,00 €
2 834 690,00 €
186 681 671,00 €
20 693 007,00 €
3 427 226,00 €
526 791 769,00 €
14 866 752,00 €
7 824 308,00 €
75 336 405,00 €
39 147 405,00 €
37 778 445,00 €
19 445 982,00 €
50 044 626,00 €
162 529 426,00 €
432 054 224,00 €
54 917 803,00 €
883 966 622,00 €
62 458 983,00 €
61 990 226,00 €
34 592 489,00 €
92 035 055,00 €
141 150 416,00 €
71 534 915,00 €
2 241 674 081,00 €
3 690 702,00 €
23 987 934,00 €
2 346 071,00 €
9 098 076,00 €
3 539 762,00 €
8 913 554,00 €
51 576 099,00 €
14 826 208,00 €
17 200 500,00 €
34 207 810,00 €
43 245 876,00 €
27 698 858,00 €
31 924 235,00 €
23 536 704,00 €
50 333 664,00 €
107 185 510,00 €
13 696 948,00 €
3 548 109,00 €
367 404 421,00 €
2 138 957,00 €
2 998 000,00 €
2 791 154,00 €
4 048 075,00 €
9 332 317,00 €
751 608,00 €
1 545 923,00 €
15 189 308,00 €
6 518 433,00 €
3 842 231,00 €
114 456 105,00 €
1 856 970,00 €
16 680 167,00 €
7 603 352,00 €
2 925 183,00 €
4 446 857,00 €
5 204 635,00 €
2 147 487,00 €
3 499 573,00 €
207 976 336,00 €
7 972 045,00 €
54 241 945,00 €
8 200 556,00 €
1 849 877,00 €
14 602 324,00 €
5 884 787,00 €
1 165 858,00 €
1 956 746,00 €
108 858 831,00 €
204 732 968,00 €
|
7,86 %
3,62 %
5,35 %
8,21 %
1,81 %
2,56 %
8,36 %
9,30 %
47,88 %
5,06 %
1,69 %
25,72 %
59,70 %
7,25 %
0,63 %
5,01 %
1,49 %
5,20 %
50,88 %
2,85 %
0,72 %
34,65 %
3,14 %
1,08 %
0,75 %
0,63 %
3,49 %
2,34 %
1,91 %
0,93 %
2,36 %
7,38 %
18,70 %
2,45 %
37,14 %
2,22 %
2,43 %
1,91 %
4,04 %
8,77 %
2,56 %
5,98 %
50,37 %
4,40 %
13,61 %
5,80 %
19,84 %
4,77 %
4,55 %
11,10 %
8,90 %
8,07 %
9,26 %
6,03 %
16,48 %
26,64 %
3,07 %
1,12 %
1,48 %
1,95 %
1,05 %
2,68 %
3,45 %
0,37 %
1,15 %
6,19 %
3,30 %
2,84 %
52,12 %
1,08 %
8,40 %
4,26 %
1,60 %
2,77 %
2,45 %
1,31 %
1,53 %
5,71 %
32,74 %
5,07 %
1,30 %
8,60 %
4,52 %
0,71 %
0,98 %
40,39 %
|
| Center |
Oeste
Região de Aveiro
Região de Coimbra
Região de Leiria
Viseu Dão Lafões
Beira Baixa
Médio Tejo
Beiras e Serra da Estrela
|
Alcobaça
Bombarral
Caldas da Rainha
Nazaré
Óbidos
Peniche
Alenquer
Arruda dos Vinhos
Cadaval
Lourinhã
Sobral de Monte Agraço
Torres Vedras
Total
Águeda
Albergaria-a-Velha
Anadia
Aveiro
Estarreja
Ílhavo
Murtosa
Oliveira do Bairro
Ovar
Sever do Vouga
Vagos
Total
Mealhada
Arganil
Cantanhede
Coimbra
Condeixa-a-Nova
Figueira da Foz
Góis
Lousã
Mira
Miranda do Corvo
Montemor-o-Velho
Oliveira do Hospital
Pampilhosa da Serra
Penacova
Penela
Soure
Tábua
Vila Nova de Poiares
Mortágua
Total
Alvaiázere
Ansião
Batalha
Castanheira de Pêra
Figueiró dos Vinhos
Leiria
Marinha Grande
Pedrógão Grande
Pombal
Porto de Mós
Total
Aguiar da Beira
Carregal do Sal
Castro Daire
Mangualde
Nelas
Oliveira de Frades
Penalva do Castelo
Santa Comba Dão
São Pedro do Sul
Sátão
Tondela
Vila Nova de Paiva
Viseu
Vouzela
Total
Castelo Branco
Idanha-a-Nova
Oleiros
Penamacor
Proença-a-Nova
Vila Velha de Ródão
Total
Sertã
Vila de Rei
Abrantes
Alcanena
Constância
Entroncamento
Ferreira do Zêzere
Mação
Sardoal
Tomar
Torres Novas
Vila Nova da Barquinha
Ourém
Total
Belmonte
Covilhã
Fundão
Almeida
Celorico da Beira
Figueira de Castelo Rodrigo
Fornos de Algodres
Gouveia
Guarda
Manteigas
Mêda
Pinhel
Sabugal
Seia
Trancoso
Total
|
53 773 261,00 €
5 444 664,00 €
73 713 226,00 €
37 767 125,00 €
14 038 029,00 €
27 904 434,00 €
44 652 632,00 €
25 009 282,00 €
12 381 074,00 €
11 325 332,00 €
2 466 249,00 €
123 980 902,00 €
432 456 209,00 €
191 326 803,00 €
29 629 252,00 €
28 596 080,00 €
343 935 639,00 €
69 207 608,00 €
127 783 703,00 €
10 996 185,00 €
43 587 453,00 €
65 540 076,00 €
11 893 051,00 €
32 690 329,00 €
955 186 178,00 €
19 836 219,00 €
23 876 129,00 €
68 730 290,00 €
564 092 916,00 €
12 776 612,00 €
162 610 118,00 €
7 796 124,00 €
25 459 118,00 €
19 671 392,00 €
11 734 447,00 €
15 523 848,00 €
60 569 350,00 €
17 247 320,00 €
16 475 500,00 €
6 964 027,00 €
7 292 193,00 €
17 797 144,00 €
7 503 895,00 €
7 590 684,00 €
1 073 547 325,00 €
12 560 207,00 €
10 560 451,00 €
33 109 268,00 €
7 871 501,00 €
6 196 954,00 €
317 246 358,00 €
136 584 127,00 €
7 901 029,00 €
70 332 249,00 €
44 569 551,00 €
646 931 695,00 €
13 381 157,00 €
31 726 159,00 €
11 655 575,00 €
80 744 210,00 €
45 642 715,00 €
15 740 847,00 €
2 144 265,00 €
8 180 272,00 €
14 238 890,00 €
8 360 635,00 €
34 914 817,00 €
9 727 396,00 €
158 834 883,00 €
24 503 589,00 €
459 795 410,00 €
86 553 823,00 €
10 875 245,00 €
19 636 656,00 €
2 791 895,00 €
15 250 126,00 €
20 085 326,00 €
155 193 071,00 €
22 760 013,00 €
11 192 261,00 €
37 729 473,00 €
34 166 207,00 €
28 037 064,00 €
32 172 715,00 €
20 967 215,00 €
33 322 506,00 €
10 860 682,00 €
42 395 218,00 €
48 204 272,00 €
5 485 437,00 €
66 049 920,00 €
393 342 981,00 €
11 341 733,00 €
90 237 468,00 €
70 040 139,00 €
3 252 705,00 €
7 235 618,00 €
2 623 397,00 €
4 293 988,00 €
9 173 127,00 €
118 345 420,00 €
2 324 633,00 €
3 715 217,00 €
6 181 959,00 €
12 407 485,00 €
39 282 222,00 €
15 167 832,00 €
395 622 943,00 €
|
30 762 975,00 €
3 866 224,00 €
31 414 719,00 €
25 624 238,00 €
5 314 321,00 €
16 886 032,00 €
17 103 317,00 €
12 978 077,00 €
2 718 624,00 €
7 789 861,00 €
1 630 181,00 €
47 759 664,00 €
203 848 233,00 €
101 394 117,00 €
18 874 290,00 €
17 777 734,00 €
200 736 765,00 €
42 118 390,00 €
65 374 423,00 €
10 631 907,00 €
21 595 097,00 €
34 094 565,00 €
5 650 118,00 €
20 579 329,00 €
538 826 735,00 €
9 600 426,00 €
12 485 444,00 €
50 348 027,00 €
300 395 355,00 €
3 614 236,00 €
82 529 957,00 €
2 108 783,00 €
10 595 095,00 €
10 887 342,00 €
6 853 189,00 €
7 474 404,00 €
31 219 622,00 €
11 214 867,00 €
8 532 722,00 €
1 780 574,00 €
3 418 262,00 €
8 289 888,00 €
3 302 213,00 €
4 309 502,00 €
568 959 910,00 €
4 525 269,00 €
5 924 094,00 €
19 506 956,00 €
3 750 994,00 €
2 104 181,00 €
159 180 151,00 €
84 310 191,00 €
1 909 567,00 €
38 096 624,00 €
25 523 034,00 €
344 831 061,00 €
6 807 218,00 €
15 192 817,00 €
6 773 927,00 €
46 452 494,00 €
26 480 646,00 €
8 739 680,00 €
1 810 900,00 €
4 297 202,00 €
7 546 092,00 €
5 202 603,00 €
19 997 148,00 €
2 495 896,00 €
78 201 812,00 €
9 104 093,00 €
239 102 527,00 €
35 366 436,00 €
6 862 360,00 €
8 481 629,00 €
912 104,00 €
5 186 321,00 €
10 552 280,00 €
67 361 130,00 €
9 784 924,00 €
5 826 794,00 €
19 495 278,00 €
22 504 527,00 €
16 532 417,00 €
18 409 993,00 €
8 827 010,00 €
10 327 693,00 €
3 835 034,00 €
20 705 040,00 €
22 816 114,00 €
3 208 004,00 €
27 515 747,00 €
189 788 576,00 €
2 003 282,00 €
53 392 250,00 €
30 650 264,00 €
1 702 508,00 €
3 266 113,00 €
2 127 920,00 €
2 778 197,00 €
5 648 911,00 €
39 124 535,00 €
1 185 068,00 €
1 621 135,00 €
3 199 239,00 €
6 031 148,00 €
17 738 366,00 €
6 251 254,00 €
176 720 189,00 €
|
12,43 %
1,26 %
17,05 %
8,73 %
3,25 %
6,45 %
10,33 %
5,78 %
2,86 %
2,62 %
0,57 %
28,67 %
20,03 %
3,10 %
2,99 %
36,01 %
7,25 %
13,38 %
1,15 %
4,56 %
6,86 %
1,25 %
3,42 %
1,85 %
2,22 %
6,40 %
52,54 %
1,19 %
15,15 %
0,73 %
2,37 %
1,83 %
1,09 %
1,45 %
5,64 %
1,61 %
1,53 %
0,65 %
0,68 %
1,66 %
0,70 %
0,71 %
1,94 %
1,63 %
5,12 %
1,22 %
0,96 %
49,04 %
21,11 %
1,22 %
10,87 %
6,89 %
2,91 %
6,90 %
2,53 %
17,56 %
9,93 %
3,42 %
0,47 %
1,78 %
3,10 %
1,82 %
7,59 %
2,12 %
34,54 %
5,33 %
55,77 %
7,01 %
12,65 %
1,80 %
9,83 %
12,94 %
5,79 %
2,85 %
9,59 %
8,69 %
7,13 %
8,18 %
5,33 %
8,47 %
2,76 %
10,78 %
12,26 %
1,39 %
16,79 %
2,87 %
22,81 %
17,70 %
0,82 %
1,83 %
0,66 %
1,09 %
2,32 %
29,91 %
0,59 %
0,94 %
1,56 %
3,14 %
9,93 %
3,83 %
|
| Lisbon Metropolitan Area |
Lisbon Metropolitan Area
|
Cascais
Lisboa
Loures
Mafra
Oeiras
Sintra
Vila Franca de Xira
Amadora
Odivelas
Alcochete
Almada
Barreiro
Moita
Montijo
Palmela
Seixal
Sesimbra
Setúbal
Total
|
268 046 112,00 €
2 952 308 154,00 €
186 670 419,00 €
140 809 849,00 €
484 143 322,00 €
188 491 932,00 €
120 940 526,00 €
232 113 900,00 €
72 105 958,00 €
19 156 718,00 €
125 635 532,00 €
73 140 191,00 €
27 269 605,00 €
46 230 091,00 €
40 592 271,00 €
107 582 446,00 €
33 090 282,00 €
317 251 218,00 €
5 435 578 527,00 €
|
173 665 515,00 €
1 642 728 431,00 €
108 119 505,00 €
84 249 415,00 €
269 683 860,00 €
99 887 614,00 €
59 269 634,00 €
152 629 370,00 €
37 428 211,00 €
9 594 299,00 €
56 611 875,00 €
36 579 479,00 €
17 478 830,00 €
31 484 168,00 €
21 913 681,00 €
64 082 690,00 €
12 429 349,00 €
171 519 692,00 €
3 049 355 616,00 €
|
4,93 %
54,31 %
3,43 %
2,59 %
8,91 %
3,47 %
2,22 %
4,27 %
1,33 %
0,35 %
2,31 %
1,35 %
0,50 %
0,85 %
0,75 %
1,98 %
0,61 %
5,84 %
|
| Alentejo |
Alentejo Litoral
Baixo Alentejo
Lezíria do Tejo
Alto Alentejo
Alentejo Central
|
Odemira
Alcácer do Sal
Grândola
Santiago do Cacém
Sines
Total
Aljustrel
Almodôvar
Alvito
Barrancos
Beja
Castro Verde
Cuba
Ferreira do Alentejo
Mértola
Moura
Ourique
Serpa
Vidigueira
Total
Azambuja
Almeirim
Alpiarça
Benavente
Cartaxo
Chamusca
Coruche
Golegã
Rio Maior
Salvaterra de Magos
Santarém
Total
Alter do Chão
Arronches
Avis
Campo Maior
Castelo de Vide
Crato
Elvas
Fronteira
Gavião
Marvão
Monforte
Nisa
Ponte de Sor
Portalegre
Sousel
Total
Alandroal
Arraiolos
Borba
Estremoz
Évora
Montemor-o-Novo
Mora
Mourão
Portel
Redondo
Reguengos de Monsaraz
Vendas Novas
Viana do Alentejo
Vila Viçosa
Total
|
18 674 244,00 €
20 194 785,00 €
58 788 487,00 €
107 330 280,00 €
59 379 966,00 €
264 367 762,00 €
31 872 097,00 €
2 271 449,00 €
5 587 196,00 €
2 105 573,00 €
89 211 454,00 €
3 603 807,00 €
1 102 761,00 €
51 335 651,00 €
26 467 799,00 €
5 436 311,00 €
4 051 861,00 €
3 159 436,00 €
2 434 262,00 €
228 639 655,00 €
43 748 937,00 €
4 212 610,00 €
5 043 049,00 €
48 985 381,00 €
20 829 366,00 €
8 534 907,00 €
7 792 597,00 €
9 374 209,00 €
60 710 593,00 €
11 868 514,00 €
107 526 045,00 €
328 626 209,00 €
12 643 390,00 €
2 100 295,00 €
1 525 907,00 €
19 964 779,00 €
4 297 430,00 €
667 075,00 €
50 819 952,00 €
1 621 383,00 €
11 648 515,00 €
3 855 205,00 €
15 042 968,00 €
18 788 406,00 €
28 284 457,00 €
75 304 988,00 €
10 354 523,00 €
256 919 273,00 €
3 060 242,00 €
2 199 110,00 €
18 173 495,00 €
7 474 942,00 €
167 160 855,00 €
5 251 946,00 €
2 946 174,00 €
1 217 547,00 €
1 586 456,00 €
8 286 724,00 €
9 412 497,00 €
7 232 322,00 €
2 502 856,00 €
7 854 548,00 €
244 359 714,00 €
|
13 572 609,00 €
6 045 117,00 €
49 826 844,00 €
65 564 591,00 €
19 621 597,00 €
154 630 758,00 €
25 876 847,00 €
1 312 563,00 €
2 094 789,00 €
1 136 730,00 €
58 023 532,00 €
1 323 286,00 €
749 797,00 €
41 043 107,00 €
14 318 926,00 €
2 361 124,00 €
2 203 158,00 €
1 348 325,00 €
1 230 187,00 €
153 022 371,00 €
15 522 646,00 €
2 764 284,00 €
2 178 441,00 €
20 356 708,00 €
12 940 337,00 €
5 935 473,00 €
4 388 788,00 €
5 351 005,00 €
26 525 368,00 €
8 167 059,00 €
61 671 111,00 €
165 801 219,00 €
3 697 618,00 €
843 316,00 €
824 594,00 €
12 507 582,00 €
1 522 596,00 €
415 473,00 €
21 182 614,00 €
1 128 137,00 €
3 739 417,00 €
2 084 913,00 €
1 024 364,00 €
2 201 815,00 €
14 351 443,00 €
34 220 064,00 €
9 052 502,00 €
108 796 447,00 €
1 711 620,00 €
1 698 292,00 €
5 568 846,00 €
4 749 635,00 €
91 039 868,00 €
2 584 654,00 €
1 605 083,00 €
865 010,00 €
544 184,00 €
2 250 052,00 €
5 903 157,00 €
3 057 222,00 €
1 300 801,00 €
6 092 685,00 €
128 971 108,00 €
|
7,06 %
7,64 %
22,24 %
40,60 %
22,46 %
13,94 %
0,99 %
2,44 %
0,92 %
39,02 %
1,58 %
0,48 %
22,45 %
11,58 %
2,38 %
1,77 %
1,38 %
1,06 %
13,31 %
1,28 %
1,53 %
14,91 %
6,34 %
2,60 %
2,37 %
2,85 %
18,47 %
3,61 %
32,72 %
4,92 %
0,82 %
0,59 %
7,77 %
1,67 %
0,26 %
19,78 %
0,63 %
4,53 %
1,50 %
5,86 %
7,31 %
11,01 %
29,31 %
4,03 %
1,25 %
0,90 %
7,44 %
3,06 %
68,41 %
2,15 %
1,21 %
0,50 %
0,65 %
3,39 %
3,85 %
2,96 %
1,02 %
3,21 %
|
| Algarve |
Algarve
|
Albufeira
Alcoutim
Aljezur
Castro Marim
Faro
Lagoa
Lagos
Loulé
Monchique
Olhão
Portimão
São Brás de Alportel
Silves
Tavira
Vila do Bispo
Vila Real de Santo António
Total
|
49 887 205,00 €
35 347 604,00 €
5 317 830,00 €
3 541 841,00 €
149 505 297,00 €
20 100 416,00 €
46 237 475,00 €
58 440 317,00 €
17 806 069,00 €
53 994 303,00 €
65 466 608,00 €
7 734 275,00 €
29 561 854,00 €
23 553 800,00 €
8 107 394,00 €
109 989 219,00 €
684 591 507,00 €
|
32 943 271,00 €
7 569 223,00 €
3 325 434,00 €
1 868 688,00 €
84 268 036,00 €
13 935 833,00 €
24 536 019,00 €
36 913 338,00 €
7 851 422,00 €
31 601 073,00 €
29 770 538,00 €
4 956 673,00 €
18 320 754,00 €
12 141 929,00 €
3 123 854,00 €
63 598 084,00 €
376 724 172,00 €
|
7,29 %
5,16 %
0,78 %
0,52 %
21,84 %
2,94 %
6,75 %
8,54 %
2,60 %
7,89 %
9,56 %
1,13 %
4,32 %
3,44 %
1,18 %
16,07 %
|
| Autonomous Region of the Azores |
Autonomous Region of the Azores
|
Vila do Porto
Lagoa
Nordeste
Ponta Delgada
Povoação
Ribeira Grande
Vila Franca do Campo
Angra do Heroísmo
Vila da Praia da Vitória
Santa Cruz da Graciosa
Calheta
Velas
Lajes do Pico
Madalena
São Roque do Pico
Horta
Lajes das Flores
Santa Cruz das Flores
Corvo
Total
|
7 738 801,00 €
40 273 850,00 €
7 849 058,00 €
561 434 176,00 €
5 723 587,00 €
141 572 303,00 €
13 162 124,00 €
176 836 416,00 €
13 514 949,00 €
9 914 234,00 €
3 013 366,00 €
6 402 265,00 €
4 747 340,00 €
16 544 555,00 €
13 792 271,00 €
92 794 277,00 €
2 427 743,00 €
2 721 882,00 €
426 969,00 €
1 120 890 167,00 €
|
4 056 424,00 €
22 480 203,00 €
4 546 764,00 €
349 274 513,00 €
2 575 060,00 €
76 630 416,00 €
10 416 221,00 €
105 780 978,00 €
8 617 318,00 €
4 075 910,00 €
2 018 402,00 €
3 064 634,00 €
2 378 821,00 €
9 744 701,00 €
8 163 274,00 €
68 438 902,00 €
1 003 624,00 €
1 121 114,00 €
142 437,00 €
684 529 715,00 €
|
0,69 %
3,59 %
0,70 %
50,09 %
0,51 %
12,63 %
1,17 %
15,78 %
1,21 %
0,88 %
0,27 %
0,57 %
0,42 %
1,48 %
1,23 %
8,28 %
0,22 %
0,24 %
0,04 %
|
| Autonomous Region of Madeira |
Autonomous Region of Madeira
|
Calheta
Câmara de Lobos
Funchal
Machico
Ponta do Sol
Porto Moniz
Ribeira Brava
Santa Cruz
Santana
São Vicente
Porto Santo
Total
|
12 327 483,00 €
29 171 872,00 €
748 674 535,00 €
46 453 091,00 €
19 121 895,00 €
511 571,00 €
13 433 804,00 €
27 799 060,00 €
16 537 950,00 €
36 680 023,00 €
34 370 260,00 €
985 081 544,00 €
|
4 622 490,00 €
8 098 953,00 €
398 265 086,00 €
7 430 635,00 €
2 508 623,00 €
239 645,00 €
9 655 005,00 €
8 938 753,00 €
495 081,00 €
9 416 627,00 €
9 601 129,00 €
459 272 028,00 €
|
1,25 %
2,96 %
76,00 %
4,72 %
1,94 %
0,05 %
1,36 %
2,82 %
1,68 %
3,72 %
3,49 %
|
| Nation-wide investment |
|
|
3 655 353 461,00 €
|
2 600 331 066,00 €
|
|
Distribution of investment by regions
Region
North
:Sub-region
Alto Minho
:Municipality
Arcos de Valdevez
:Approved amount
: 29962759 €,29 962 759,00 €
Amount spent
: 16413704 €,16 413 704,00 €
Percentage of investment
: 7,86 %7,86 %
Municipality
Caminha
:Approved amount
: 13788222 €,13 788 222,00 €
Amount spent
: 5768591 €,5 768 591,00 €
Percentage of investment
: 3,62 %3,62 %
Municipality
Melgaço
:Approved amount
: 20409759 €,20 409 759,00 €
Amount spent
: 17133825 €,17 133 825,00 €
Percentage of investment
: 5,35 %5,35 %
Municipality
Monção
:Approved amount
: 31321901 €,31 321 901,00 €
Amount spent
: 17946348 €,17 946 348,00 €
Percentage of investment
: 8,21 %8,21 %
Municipality
Paredes de Coura
:Approved amount
: 6898936 €,6 898 936,00 €
Amount spent
: 3621074 €,3 621 074,00 €
Percentage of investment
: 1,81 %1,81 %
Municipality
Ponte da Barca
:Approved amount
: 9754815 €,9 754 815,00 €
Amount spent
: 5042392 €,5 042 392,00 €
Percentage of investment
: 2,56 %2,56 %
Municipality
Ponte de Lima
:Approved amount
: 31871979 €,31 871 979,00 €
Amount spent
: 18808310 €,18 808 310,00 €
Percentage of investment
: 8,36 %8,36 %
Municipality
Valença
:Approved amount
: 35459683 €,35 459 683,00 €
Amount spent
: 15729300 €,15 729 300,00 €
Percentage of investment
: 9,3 %9,30 %
Municipality
Viana do Castelo
:Approved amount
: 182555236 €,182 555 236,00 €
Amount spent
: 124337485 €,124 337 485,00 €
Percentage of investment
: 47,88 %47,88 %
Municipality
Vila Nova de Cerveira
:Approved amount
: 19281918 €,19 281 918,00 €
Amount spent
: 12253578 €,12 253 578,00 €
Percentage of investment
: 5,06 %5,06 %
Total
Approved amount
: 381305206 €,381 305 206,00 €
Amount spent
: 237054608 €,237 054 608,00 €
Percentage of investment
Sub-region
Cávado
:Municipality
Amares
:Approved amount
: 12180878 €,12 180 878,00 €
Amount spent
: 7411090 €,7 411 090,00 €
Percentage of investment
: 1,69 %1,69 %
Municipality
Barcelos
:Approved amount
: 185307599 €,185 307 599,00 €
Amount spent
: 84080797 €,84 080 797,00 €
Percentage of investment
: 25,72 %25,72 %
Municipality
Braga
:Approved amount
: 430061268 €,430 061 268,00 €
Amount spent
: 273237383 €,273 237 383,00 €
Percentage of investment
: 59,7 %59,70 %
Municipality
Esposende
:Approved amount
: 52231214 €,52 231 214,00 €
Amount spent
: 18570252 €,18 570 252,00 €
Percentage of investment
: 7,25 %7,25 %
Municipality
Terras de Bouro
:Approved amount
: 4568850 €,4 568 850,00 €
Amount spent
: 2195081 €,2 195 081,00 €
Percentage of investment
: 0,63 %0,63 %
Municipality
Vila Verde
:Approved amount
: 36069469 €,36 069 469,00 €
Amount spent
: 21192413 €,21 192 413,00 €
Percentage of investment
: 5,01 %5,01 %
Total
Approved amount
: 720419278 €,720 419 278,00 €
Amount spent
: 406687016 €,406 687 016,00 €
Percentage of investment
Sub-region
Ave
:Municipality
Cabeceiras de Basto
:Approved amount
: 13483816 €,13 483 816,00 €
Amount spent
: 5182309 €,5 182 309,00 €
Percentage of investment
: 1,49 %1,49 %
Municipality
Fafe
:Approved amount
: 47041161 €,47 041 161,00 €
Amount spent
: 27354417 €,27 354 417,00 €
Percentage of investment
: 5,2 %5,20 %
Municipality
Guimarães
:Approved amount
: 460668381 €,460 668 381,00 €
Amount spent
: 271168399 €,271 168 399,00 €
Percentage of investment
: 50,88 %50,88 %
Municipality
Póvoa de Lanhoso
:Approved amount
: 25795444 €,25 795 444,00 €
Amount spent
: 9450050 €,9 450 050,00 €
Percentage of investment
: 2,85 %2,85 %
Municipality
Vieira do Minho
:Approved amount
: 6560189 €,6 560 189,00 €
Amount spent
: 2834690 €,2 834 690,00 €
Percentage of investment
: 0,72 %0,72 %
Municipality
Vila Nova de Famalicão
:Approved amount
: 313739031 €,313 739 031,00 €
Amount spent
: 186681671 €,186 681 671,00 €
Percentage of investment
: 34,65 %34,65 %
Municipality
Vizela
:Approved amount
: 28413057 €,28 413 057,00 €
Amount spent
: 20693007 €,20 693 007,00 €
Percentage of investment
: 3,14 %3,14 %
Municipality
Mondim de Basto
:Approved amount
: 9750717 €,9 750 717,00 €
Amount spent
: 3427226 €,3 427 226,00 €
Percentage of investment
: 1,08 %1,08 %
Total
Approved amount
: 905451795 €,905 451 795,00 €
Amount spent
: 526791769 €,526 791 769,00 €
Percentage of investment
Sub-region
Área Metropolitana do Porto
:Municipality
Arouca
:Approved amount
: 28283346 €,28 283 346,00 €
Amount spent
: 14866752 €,14 866 752,00 €
Percentage of investment
: 0,75 %0,75 %
Municipality
Espinho
:Approved amount
: 23759583 €,23 759 583,00 €
Amount spent
: 7824308 €,7 824 308,00 €
Percentage of investment
: 0,63 %0,63 %
Municipality
Santa Maria da Feira
:Approved amount
: 131755825 €,131 755 825,00 €
Amount spent
: 75336405 €,75 336 405,00 €
Percentage of investment
: 3,49 %3,49 %
Municipality
Oliveira de Azeméis
:Approved amount
: 88555787 €,88 555 787,00 €
Amount spent
: 39147405 €,39 147 405,00 €
Percentage of investment
: 2,34 %2,34 %
Municipality
São João da Madeira
:Approved amount
: 72042694 €,72 042 694,00 €
Amount spent
: 37778445 €,37 778 445,00 €
Percentage of investment
: 1,91 %1,91 %
Municipality
Vale de Cambra
:Approved amount
: 35258373 €,35 258 373,00 €
Amount spent
: 19445982 €,19 445 982,00 €
Percentage of investment
: 0,93 %0,93 %
Municipality
Gondomar
:Approved amount
: 89223167 €,89 223 167,00 €
Amount spent
: 50044626 €,50 044 626,00 €
Percentage of investment
: 2,36 %2,36 %
Municipality
Maia
:Approved amount
: 278936351 €,278 936 351,00 €
Amount spent
: 162529426 €,162 529 426,00 €
Percentage of investment
: 7,38 %7,38 %
Municipality
Matosinhos
:Approved amount
: 706775067 €,706 775 067,00 €
Amount spent
: 432054224 €,432 054 224,00 €
Percentage of investment
: 18,7 %18,70 %
Municipality
Paredes
:Approved amount
: 92627556 €,92 627 556,00 €
Amount spent
: 54917803 €,54 917 803,00 €
Percentage of investment
: 2,45 %2,45 %
Municipality
Porto
:Approved amount
: 1403597887 €,1 403 597 887,00 €
Amount spent
: 883966622 €,883 966 622,00 €
Percentage of investment
: 37,14 %37,14 %
Municipality
Póvoa de Varzim
:Approved amount
: 83900118 €,83 900 118,00 €
Amount spent
: 62458983 €,62 458 983,00 €
Percentage of investment
: 2,22 %2,22 %
Municipality
Santo Tirso
:Approved amount
: 91743233 €,91 743 233,00 €
Amount spent
: 61990226 €,61 990 226,00 €
Percentage of investment
: 2,43 %2,43 %
Municipality
Valongo
:Approved amount
: 72301958 €,72 301 958,00 €
Amount spent
: 34592489 €,34 592 489,00 €
Percentage of investment
: 1,91 %1,91 %
Municipality
Vila do Conde
:Approved amount
: 152676359 €,152 676 359,00 €
Amount spent
: 92035055 €,92 035 055,00 €
Percentage of investment
: 4,04 %4,04 %
Municipality
Vila Nova de Gaia
:Approved amount
: 331596616 €,331 596 616,00 €
Amount spent
: 141150416 €,141 150 416,00 €
Percentage of investment
: 8,77 %8,77 %
Municipality
Trofa
:Approved amount
: 96589138 €,96 589 138,00 €
Amount spent
: 71534915 €,71 534 915,00 €
Percentage of investment
: 2,56 %2,56 %
Total
Approved amount
: 3779623058 €,3 779 623 058,00 €
Amount spent
: 2241674081 €,2 241 674 081,00 €
Percentage of investment
Sub-region
Alto Tâmega
:Municipality
Boticas
:Approved amount
: 6158419 €,6 158 419,00 €
Amount spent
: 3690702 €,3 690 702,00 €
Percentage of investment
: 5,98 %5,98 %
Municipality
Chaves
:Approved amount
: 51902583 €,51 902 583,00 €
Amount spent
: 23987934 €,23 987 934,00 €
Percentage of investment
: 50,37 %50,37 %
Municipality
Montalegre
:Approved amount
: 4531521 €,4 531 521,00 €
Amount spent
: 2346071 €,2 346 071,00 €
Percentage of investment
: 4,4 %4,40 %
Municipality
Ribeira de Pena
:Approved amount
: 14024445 €,14 024 445,00 €
Amount spent
: 9098076 €,9 098 076,00 €
Percentage of investment
: 13,61 %13,61 %
Municipality
Valpaços
:Approved amount
: 5978784 €,5 978 784,00 €
Amount spent
: 3539762 €,3 539 762,00 €
Percentage of investment
: 5,8 %5,80 %
Municipality
Vila Pouca de Aguiar
:Approved amount
: 20439901 €,20 439 901,00 €
Amount spent
: 8913554 €,8 913 554,00 €
Percentage of investment
: 19,84 %19,84 %
Total
Approved amount
: 103035653 €,103 035 653,00 €
Amount spent
: 51576099 €,51 576 099,00 €
Percentage of investment
Sub-region
Tâmega e Sousa
:Municipality
Castelo de Paiva
:Approved amount
: 26275575 €,26 275 575,00 €
Amount spent
: 14826208 €,14 826 208,00 €
Percentage of investment
: 4,77 %4,77 %
Municipality
Celorico de Basto
:Approved amount
: 25072292 €,25 072 292,00 €
Amount spent
: 17200500 €,17 200 500,00 €
Percentage of investment
: 4,55 %4,55 %
Municipality
Amarante
:Approved amount
: 61110281 €,61 110 281,00 €
Amount spent
: 34207810 €,34 207 810,00 €
Percentage of investment
: 11,1 %11,10 %
Municipality
Baião
:Approved amount
: 49003524 €,49 003 524,00 €
Amount spent
: 43245876 €,43 245 876,00 €
Percentage of investment
: 8,9 %8,90 %
Municipality
Felgueiras
:Approved amount
: 44449852 €,44 449 852,00 €
Amount spent
: 27698858 €,27 698 858,00 €
Percentage of investment
: 8,07 %8,07 %
Municipality
Lousada
:Approved amount
: 51021071 €,51 021 071,00 €
Amount spent
: 31924235 €,31 924 235,00 €
Percentage of investment
: 9,26 %9,26 %
Municipality
Marco de Canaveses
:Approved amount
: 33231801 €,33 231 801,00 €
Amount spent
: 23536704 €,23 536 704,00 €
Percentage of investment
: 6,03 %6,03 %
Municipality
Paços de Ferreira
:Approved amount
: 90779308 €,90 779 308,00 €
Amount spent
: 50333664 €,50 333 664,00 €
Percentage of investment
: 16,48 %16,48 %
Municipality
Penafiel
:Approved amount
: 146708785 €,146 708 785,00 €
Amount spent
: 107185510 €,107 185 510,00 €
Percentage of investment
: 26,64 %26,64 %
Municipality
Cinfães
:Approved amount
: 16918759 €,16 918 759,00 €
Amount spent
: 13696948 €,13 696 948,00 €
Percentage of investment
: 3,07 %3,07 %
Municipality
Resende
:Approved amount
: 6155739 €,6 155 739,00 €
Amount spent
: 3548109 €,3 548 109,00 €
Percentage of investment
: 1,12 %1,12 %
Total
Approved amount
: 550726988 €,550 726 988,00 €
Amount spent
: 367404421 €,367 404 421,00 €
Percentage of investment
Sub-region
Douro
:Municipality
Carrazeda de Ansiães
:Approved amount
: 5709955 €,5 709 955,00 €
Amount spent
: 2138957 €,2 138 957,00 €
Percentage of investment
: 1,48 %1,48 %
Municipality
Freixo de Espada à Cinta
:Approved amount
: 7542357 €,7 542 357,00 €
Amount spent
: 2998000 €,2 998 000,00 €
Percentage of investment
: 1,95 %1,95 %
Municipality
Torre de Moncorvo
:Approved amount
: 4071139 €,4 071 139,00 €
Amount spent
: 2791154 €,2 791 154,00 €
Percentage of investment
: 1,05 %1,05 %
Municipality
Vila Nova de Foz Côa
:Approved amount
: 10360307 €,10 360 307,00 €
Amount spent
: 4048075 €,4 048 075,00 €
Percentage of investment
: 2,68 %2,68 %
Municipality
Alijó
:Approved amount
: 13333004 €,13 333 004,00 €
Amount spent
: 9332317 €,9 332 317,00 €
Percentage of investment
: 3,45 %3,45 %
Municipality
Mesão Frio
:Approved amount
: 1439780 €,1 439 780,00 €
Amount spent
: 751608 €,751 608,00 €
Percentage of investment
: 0,37 %0,37 %
Municipality
Murça
:Approved amount
: 4450494 €,4 450 494,00 €
Amount spent
: 1545923 €,1 545 923,00 €
Percentage of investment
: 1,15 %1,15 %
Municipality
Peso da Régua
:Approved amount
: 23908855 €,23 908 855,00 €
Amount spent
: 15189308 €,15 189 308,00 €
Percentage of investment
: 6,19 %6,19 %
Municipality
Sabrosa
:Approved amount
: 12733588 €,12 733 588,00 €
Amount spent
: 6518433 €,6 518 433,00 €
Percentage of investment
: 3,3 %3,30 %
Municipality
Santa Marta de Penaguião
:Approved amount
: 10960616 €,10 960 616,00 €
Amount spent
: 3842231 €,3 842 231,00 €
Percentage of investment
: 2,84 %2,84 %
Municipality
Vila Real
:Approved amount
: 201344576 €,201 344 576,00 €
Amount spent
: 114456105 €,114 456 105,00 €
Percentage of investment
: 52,12 %52,12 %
Municipality
Armamar
:Approved amount
: 4187711 €,4 187 711,00 €
Amount spent
: 1856970 €,1 856 970,00 €
Percentage of investment
: 1,08 %1,08 %
Municipality
Lamego
:Approved amount
: 32438398 €,32 438 398,00 €
Amount spent
: 16680167 €,16 680 167,00 €
Percentage of investment
: 8,4 %8,40 %
Municipality
Moimenta da Beira
:Approved amount
: 16457997 €,16 457 997,00 €
Amount spent
: 7603352 €,7 603 352,00 €
Percentage of investment
: 4,26 %4,26 %
Municipality
Penedono
:Approved amount
: 6191072 €,6 191 072,00 €
Amount spent
: 2925183 €,2 925 183,00 €
Percentage of investment
: 1,6 %1,60 %
Municipality
São João da Pesqueira
:Approved amount
: 10718434 €,10 718 434,00 €
Amount spent
: 4446857 €,4 446 857,00 €
Percentage of investment
: 2,77 %2,77 %
Municipality
Sernancelhe
:Approved amount
: 9470319 €,9 470 319,00 €
Amount spent
: 5204635 €,5 204 635,00 €
Percentage of investment
: 2,45 %2,45 %
Municipality
Tabuaço
:Approved amount
: 5071895 €,5 071 895,00 €
Amount spent
: 2147487 €,2 147 487,00 €
Percentage of investment
: 1,31 %1,31 %
Municipality
Tarouca
:Approved amount
: 5912505 €,5 912 505,00 €
Amount spent
: 3499573 €,3 499 573,00 €
Percentage of investment
: 1,53 %1,53 %
Total
Approved amount
: 386303003 €,386 303 003,00 €
Amount spent
: 207976336 €,207 976 336,00 €
Percentage of investment
Sub-region
Terras de Trás-os-Montes
:Municipality
Alfândega da Fé
:Approved amount
: 15786119 €,15 786 119,00 €
Amount spent
: 7972045 €,7 972 045,00 €
Percentage of investment
: 5,71 %5,71 %
Municipality
Bragança
:Approved amount
: 90561065 €,90 561 065,00 €
Amount spent
: 54241945 €,54 241 945,00 €
Percentage of investment
: 32,74 %32,74 %
Municipality
Macedo de Cavaleiros
:Approved amount
: 14015802 €,14 015 802,00 €
Amount spent
: 8200556 €,8 200 556,00 €
Percentage of investment
: 5,07 %5,07 %
Municipality
Miranda do Douro
:Approved amount
: 3608008 €,3 608 008,00 €
Amount spent
: 1849877 €,1 849 877,00 €
Percentage of investment
: 1,3 %1,30 %
Municipality
Mirandela
:Approved amount
: 23776016 €,23 776 016,00 €
Amount spent
: 14602324 €,14 602 324,00 €
Percentage of investment
: 8,6 %8,60 %
Municipality
Mogadouro
:Approved amount
: 12488929 €,12 488 929,00 €
Amount spent
: 5884787 €,5 884 787,00 €
Percentage of investment
: 4,52 %4,52 %
Municipality
Vila Flor
:Approved amount
: 1954042 €,1 954 042,00 €
Amount spent
: 1165858 €,1 165 858,00 €
Percentage of investment
: 0,71 %0,71 %
Municipality
Vimioso
:Approved amount
: 2701956 €,2 701 956,00 €
Amount spent
: 1956746 €,1 956 746,00 €
Percentage of investment
: 0,98 %0,98 %
Municipality
Vinhais
:Approved amount
: 111709965 €,111 709 965,00 €
Amount spent
: 108858831 €,108 858 831,00 €
Percentage of investment
: 40,39 %40,39 %
Total
Approved amount
: 276601902 €,276 601 902,00 €
Amount spent
: 204732968 €,204 732 968,00 €
Percentage of investment
Region
Center
:Sub-region
Oeste
:Municipality
Alcobaça
:Approved amount
: 53773261 €,53 773 261,00 €
Amount spent
: 30762975 €,30 762 975,00 €
Percentage of investment
: 12,43 %12,43 %
Municipality
Bombarral
:Approved amount
: 5444664 €,5 444 664,00 €
Amount spent
: 3866224 €,3 866 224,00 €
Percentage of investment
: 1,26 %1,26 %
Municipality
Caldas da Rainha
:Approved amount
: 73713226 €,73 713 226,00 €
Amount spent
: 31414719 €,31 414 719,00 €
Percentage of investment
: 17,05 %17,05 %
Municipality
Nazaré
:Approved amount
: 37767125 €,37 767 125,00 €
Amount spent
: 25624238 €,25 624 238,00 €
Percentage of investment
: 8,73 %8,73 %
Municipality
Óbidos
:Approved amount
: 14038029 €,14 038 029,00 €
Amount spent
: 5314321 €,5 314 321,00 €
Percentage of investment
: 3,25 %3,25 %
Municipality
Peniche
:Approved amount
: 27904434 €,27 904 434,00 €
Amount spent
: 16886032 €,16 886 032,00 €
Percentage of investment
: 6,45 %6,45 %
Municipality
Alenquer
:Approved amount
: 44652632 €,44 652 632,00 €
Amount spent
: 17103317 €,17 103 317,00 €
Percentage of investment
: 10,33 %10,33 %
Municipality
Arruda dos Vinhos
:Approved amount
: 25009282 €,25 009 282,00 €
Amount spent
: 12978077 €,12 978 077,00 €
Percentage of investment
: 5,78 %5,78 %
Municipality
Cadaval
:Approved amount
: 12381074 €,12 381 074,00 €
Amount spent
: 2718624 €,2 718 624,00 €
Percentage of investment
: 2,86 %2,86 %
Municipality
Lourinhã
:Approved amount
: 11325332 €,11 325 332,00 €
Amount spent
: 7789861 €,7 789 861,00 €
Percentage of investment
: 2,62 %2,62 %
Municipality
Sobral de Monte Agraço
:Approved amount
: 2466249 €,2 466 249,00 €
Amount spent
: 1630181 €,1 630 181,00 €
Percentage of investment
: 0,57 %0,57 %
Municipality
Torres Vedras
:Approved amount
: 123980902 €,123 980 902,00 €
Amount spent
: 47759664 €,47 759 664,00 €
Percentage of investment
: 28,67 %28,67 %
Total
Approved amount
: 432456209 €,432 456 209,00 €
Amount spent
: 203848233 €,203 848 233,00 €
Percentage of investment
Sub-region
Região de Aveiro
:Municipality
Águeda
:Approved amount
: 191326803 €,191 326 803,00 €
Amount spent
: 101394117 €,101 394 117,00 €
Percentage of investment
: 20,03 %20,03 %
Municipality
Albergaria-a-Velha
:Approved amount
: 29629252 €,29 629 252,00 €
Amount spent
: 18874290 €,18 874 290,00 €
Percentage of investment
: 3,1 %3,10 %
Municipality
Anadia
:Approved amount
: 28596080 €,28 596 080,00 €
Amount spent
: 17777734 €,17 777 734,00 €
Percentage of investment
: 2,99 %2,99 %
Municipality
Aveiro
:Approved amount
: 343935639 €,343 935 639,00 €
Amount spent
: 200736765 €,200 736 765,00 €
Percentage of investment
: 36,01 %36,01 %
Municipality
Estarreja
:Approved amount
: 69207608 €,69 207 608,00 €
Amount spent
: 42118390 €,42 118 390,00 €
Percentage of investment
: 7,25 %7,25 %
Municipality
Ílhavo
:Approved amount
: 127783703 €,127 783 703,00 €
Amount spent
: 65374423 €,65 374 423,00 €
Percentage of investment
: 13,38 %13,38 %
Municipality
Murtosa
:Approved amount
: 10996185 €,10 996 185,00 €
Amount spent
: 10631907 €,10 631 907,00 €
Percentage of investment
: 1,15 %1,15 %
Municipality
Oliveira do Bairro
:Approved amount
: 43587453 €,43 587 453,00 €
Amount spent
: 21595097 €,21 595 097,00 €
Percentage of investment
: 4,56 %4,56 %
Municipality
Ovar
:Approved amount
: 65540076 €,65 540 076,00 €
Amount spent
: 34094565 €,34 094 565,00 €
Percentage of investment
: 6,86 %6,86 %
Municipality
Sever do Vouga
:Approved amount
: 11893051 €,11 893 051,00 €
Amount spent
: 5650118 €,5 650 118,00 €
Percentage of investment
: 1,25 %1,25 %
Municipality
Vagos
:Approved amount
: 32690329 €,32 690 329,00 €
Amount spent
: 20579329 €,20 579 329,00 €
Percentage of investment
: 3,42 %3,42 %
Total
Approved amount
: 955186178 €,955 186 178,00 €
Amount spent
: 538826735 €,538 826 735,00 €
Percentage of investment
Sub-region
Região de Coimbra
:Municipality
Mealhada
:Approved amount
: 19836219 €,19 836 219,00 €
Amount spent
: 9600426 €,9 600 426,00 €
Percentage of investment
: 1,85 %1,85 %
Municipality
Arganil
:Approved amount
: 23876129 €,23 876 129,00 €
Amount spent
: 12485444 €,12 485 444,00 €
Percentage of investment
: 2,22 %2,22 %
Municipality
Cantanhede
:Approved amount
: 68730290 €,68 730 290,00 €
Amount spent
: 50348027 €,50 348 027,00 €
Percentage of investment
: 6,4 %6,40 %
Municipality
Coimbra
:Approved amount
: 564092916 €,564 092 916,00 €
Amount spent
: 300395355 €,300 395 355,00 €
Percentage of investment
: 52,54 %52,54 %
Municipality
Condeixa-a-Nova
:Approved amount
: 12776612 €,12 776 612,00 €
Amount spent
: 3614236 €,3 614 236,00 €
Percentage of investment
: 1,19 %1,19 %
Municipality
Figueira da Foz
:Approved amount
: 162610118 €,162 610 118,00 €
Amount spent
: 82529957 €,82 529 957,00 €
Percentage of investment
: 15,15 %15,15 %
Municipality
Góis
:Approved amount
: 7796124 €,7 796 124,00 €
Amount spent
: 2108783 €,2 108 783,00 €
Percentage of investment
: 0,73 %0,73 %
Municipality
Lousã
:Approved amount
: 25459118 €,25 459 118,00 €
Amount spent
: 10595095 €,10 595 095,00 €
Percentage of investment
: 2,37 %2,37 %
Municipality
Mira
:Approved amount
: 19671392 €,19 671 392,00 €
Amount spent
: 10887342 €,10 887 342,00 €
Percentage of investment
: 1,83 %1,83 %
Municipality
Miranda do Corvo
:Approved amount
: 11734447 €,11 734 447,00 €
Amount spent
: 6853189 €,6 853 189,00 €
Percentage of investment
: 1,09 %1,09 %
Municipality
Montemor-o-Velho
:Approved amount
: 15523848 €,15 523 848,00 €
Amount spent
: 7474404 €,7 474 404,00 €
Percentage of investment
: 1,45 %1,45 %
Municipality
Oliveira do Hospital
:Approved amount
: 60569350 €,60 569 350,00 €
Amount spent
: 31219622 €,31 219 622,00 €
Percentage of investment
: 5,64 %5,64 %
Municipality
Pampilhosa da Serra
:Approved amount
: 17247320 €,17 247 320,00 €
Amount spent
: 11214867 €,11 214 867,00 €
Percentage of investment
: 1,61 %1,61 %
Municipality
Penacova
:Approved amount
: 16475500 €,16 475 500,00 €
Amount spent
: 8532722 €,8 532 722,00 €
Percentage of investment
: 1,53 %1,53 %
Municipality
Penela
:Approved amount
: 6964027 €,6 964 027,00 €
Amount spent
: 1780574 €,1 780 574,00 €
Percentage of investment
: 0,65 %0,65 %
Municipality
Soure
:Approved amount
: 7292193 €,7 292 193,00 €
Amount spent
: 3418262 €,3 418 262,00 €
Percentage of investment
: 0,68 %0,68 %
Municipality
Tábua
:Approved amount
: 17797144 €,17 797 144,00 €
Amount spent
: 8289888 €,8 289 888,00 €
Percentage of investment
: 1,66 %1,66 %
Municipality
Vila Nova de Poiares
:Approved amount
: 7503895 €,7 503 895,00 €
Amount spent
: 3302213 €,3 302 213,00 €
Percentage of investment
: 0,7 %0,70 %
Municipality
Mortágua
:Approved amount
: 7590684 €,7 590 684,00 €
Amount spent
: 4309502 €,4 309 502,00 €
Percentage of investment
: 0,71 %0,71 %
Total
Approved amount
: 1073547325 €,1 073 547 325,00 €
Amount spent
: 568959910 €,568 959 910,00 €
Percentage of investment
Sub-region
Região de Leiria
:Municipality
Alvaiázere
:Approved amount
: 12560207 €,12 560 207,00 €
Amount spent
: 4525269 €,4 525 269,00 €
Percentage of investment
: 1,94 %1,94 %
Municipality
Ansião
:Approved amount
: 10560451 €,10 560 451,00 €
Amount spent
: 5924094 €,5 924 094,00 €
Percentage of investment
: 1,63 %1,63 %
Municipality
Batalha
:Approved amount
: 33109268 €,33 109 268,00 €
Amount spent
: 19506956 €,19 506 956,00 €
Percentage of investment
: 5,12 %5,12 %
Municipality
Castanheira de Pêra
:Approved amount
: 7871501 €,7 871 501,00 €
Amount spent
: 3750994 €,3 750 994,00 €
Percentage of investment
: 1,22 %1,22 %
Municipality
Figueiró dos Vinhos
:Approved amount
: 6196954 €,6 196 954,00 €
Amount spent
: 2104181 €,2 104 181,00 €
Percentage of investment
: 0,96 %0,96 %
Municipality
Leiria
:Approved amount
: 317246358 €,317 246 358,00 €
Amount spent
: 159180151 €,159 180 151,00 €
Percentage of investment
: 49,04 %49,04 %
Municipality
Marinha Grande
:Approved amount
: 136584127 €,136 584 127,00 €
Amount spent
: 84310191 €,84 310 191,00 €
Percentage of investment
: 21,11 %21,11 %
Municipality
Pedrógão Grande
:Approved amount
: 7901029 €,7 901 029,00 €
Amount spent
: 1909567 €,1 909 567,00 €
Percentage of investment
: 1,22 %1,22 %
Municipality
Pombal
:Approved amount
: 70332249 €,70 332 249,00 €
Amount spent
: 38096624 €,38 096 624,00 €
Percentage of investment
: 10,87 %10,87 %
Municipality
Porto de Mós
:Approved amount
: 44569551 €,44 569 551,00 €
Amount spent
: 25523034 €,25 523 034,00 €
Percentage of investment
: 6,89 %6,89 %
Total
Approved amount
: 646931695 €,646 931 695,00 €
Amount spent
: 344831061 €,344 831 061,00 €
Percentage of investment
Sub-region
Viseu Dão Lafões
:Municipality
Aguiar da Beira
:Approved amount
: 13381157 €,13 381 157,00 €
Amount spent
: 6807218 €,6 807 218,00 €
Percentage of investment
: 2,91 %2,91 %
Municipality
Carregal do Sal
:Approved amount
: 31726159 €,31 726 159,00 €
Amount spent
: 15192817 €,15 192 817,00 €
Percentage of investment
: 6,9 %6,90 %
Municipality
Castro Daire
:Approved amount
: 11655575 €,11 655 575,00 €
Amount spent
: 6773927 €,6 773 927,00 €
Percentage of investment
: 2,53 %2,53 %
Municipality
Mangualde
:Approved amount
: 80744210 €,80 744 210,00 €
Amount spent
: 46452494 €,46 452 494,00 €
Percentage of investment
: 17,56 %17,56 %
Municipality
Nelas
:Approved amount
: 45642715 €,45 642 715,00 €
Amount spent
: 26480646 €,26 480 646,00 €
Percentage of investment
: 9,93 %9,93 %
Municipality
Oliveira de Frades
:Approved amount
: 15740847 €,15 740 847,00 €
Amount spent
: 8739680 €,8 739 680,00 €
Percentage of investment
: 3,42 %3,42 %
Municipality
Penalva do Castelo
:Approved amount
: 2144265 €,2 144 265,00 €
Amount spent
: 1810900 €,1 810 900,00 €
Percentage of investment
: 0,47 %0,47 %
Municipality
Santa Comba Dão
:Approved amount
: 8180272 €,8 180 272,00 €
Amount spent
: 4297202 €,4 297 202,00 €
Percentage of investment
: 1,78 %1,78 %
Municipality
São Pedro do Sul
:Approved amount
: 14238890 €,14 238 890,00 €
Amount spent
: 7546092 €,7 546 092,00 €
Percentage of investment
: 3,1 %3,10 %
Municipality
Sátão
:Approved amount
: 8360635 €,8 360 635,00 €
Amount spent
: 5202603 €,5 202 603,00 €
Percentage of investment
: 1,82 %1,82 %
Municipality
Tondela
:Approved amount
: 34914817 €,34 914 817,00 €
Amount spent
: 19997148 €,19 997 148,00 €
Percentage of investment
: 7,59 %7,59 %
Municipality
Vila Nova de Paiva
:Approved amount
: 9727396 €,9 727 396,00 €
Amount spent
: 2495896 €,2 495 896,00 €
Percentage of investment
: 2,12 %2,12 %
Municipality
Viseu
:Approved amount
: 158834883 €,158 834 883,00 €
Amount spent
: 78201812 €,78 201 812,00 €
Percentage of investment
: 34,54 %34,54 %
Municipality
Vouzela
:Approved amount
: 24503589 €,24 503 589,00 €
Amount spent
: 9104093 €,9 104 093,00 €
Percentage of investment
: 5,33 %5,33 %
Total
Approved amount
: 459795410 €,459 795 410,00 €
Amount spent
: 239102527 €,239 102 527,00 €
Percentage of investment
Sub-region
Beira Baixa
:Municipality
Castelo Branco
:Approved amount
: 86553823 €,86 553 823,00 €
Amount spent
: 35366436 €,35 366 436,00 €
Percentage of investment
: 55,77 %55,77 %
Municipality
Idanha-a-Nova
:Approved amount
: 10875245 €,10 875 245,00 €
Amount spent
: 6862360 €,6 862 360,00 €
Percentage of investment
: 7,01 %7,01 %
Municipality
Oleiros
:Approved amount
: 19636656 €,19 636 656,00 €
Amount spent
: 8481629 €,8 481 629,00 €
Percentage of investment
: 12,65 %12,65 %
Municipality
Penamacor
:Approved amount
: 2791895 €,2 791 895,00 €
Amount spent
: 912104 €,912 104,00 €
Percentage of investment
: 1,8 %1,80 %
Municipality
Proença-a-Nova
:Approved amount
: 15250126 €,15 250 126,00 €
Amount spent
: 5186321 €,5 186 321,00 €
Percentage of investment
: 9,83 %9,83 %
Municipality
Vila Velha de Ródão
:Approved amount
: 20085326 €,20 085 326,00 €
Amount spent
: 10552280 €,10 552 280,00 €
Percentage of investment
: 12,94 %12,94 %
Total
Approved amount
: 155193071 €,155 193 071,00 €
Amount spent
: 67361130 €,67 361 130,00 €
Percentage of investment
Sub-region
Médio Tejo
:Municipality
Sertã
:Approved amount
: 22760013 €,22 760 013,00 €
Amount spent
: 9784924 €,9 784 924,00 €
Percentage of investment
: 5,79 %5,79 %
Municipality
Vila de Rei
:Approved amount
: 11192261 €,11 192 261,00 €
Amount spent
: 5826794 €,5 826 794,00 €
Percentage of investment
: 2,85 %2,85 %
Municipality
Abrantes
:Approved amount
: 37729473 €,37 729 473,00 €
Amount spent
: 19495278 €,19 495 278,00 €
Percentage of investment
: 9,59 %9,59 %
Municipality
Alcanena
:Approved amount
: 34166207 €,34 166 207,00 €
Amount spent
: 22504527 €,22 504 527,00 €
Percentage of investment
: 8,69 %8,69 %
Municipality
Constância
:Approved amount
: 28037064 €,28 037 064,00 €
Amount spent
: 16532417 €,16 532 417,00 €
Percentage of investment
: 7,13 %7,13 %
Municipality
Entroncamento
:Approved amount
: 32172715 €,32 172 715,00 €
Amount spent
: 18409993 €,18 409 993,00 €
Percentage of investment
: 8,18 %8,18 %
Municipality
Ferreira do Zêzere
:Approved amount
: 20967215 €,20 967 215,00 €
Amount spent
: 8827010 €,8 827 010,00 €
Percentage of investment
: 5,33 %5,33 %
Municipality
Mação
:Approved amount
: 33322506 €,33 322 506,00 €
Amount spent
: 10327693 €,10 327 693,00 €
Percentage of investment
: 8,47 %8,47 %
Municipality
Sardoal
:Approved amount
: 10860682 €,10 860 682,00 €
Amount spent
: 3835034 €,3 835 034,00 €
Percentage of investment
: 2,76 %2,76 %
Municipality
Tomar
:Approved amount
: 42395218 €,42 395 218,00 €
Amount spent
: 20705040 €,20 705 040,00 €
Percentage of investment
: 10,78 %10,78 %
Municipality
Torres Novas
:Approved amount
: 48204272 €,48 204 272,00 €
Amount spent
: 22816114 €,22 816 114,00 €
Percentage of investment
: 12,26 %12,26 %
Municipality
Vila Nova da Barquinha
:Approved amount
: 5485437 €,5 485 437,00 €
Amount spent
: 3208004 €,3 208 004,00 €
Percentage of investment
: 1,39 %1,39 %
Municipality
Ourém
:Approved amount
: 66049920 €,66 049 920,00 €
Amount spent
: 27515747 €,27 515 747,00 €
Percentage of investment
: 16,79 %16,79 %
Total
Approved amount
: 393342981 €,393 342 981,00 €
Amount spent
: 189788576 €,189 788 576,00 €
Percentage of investment
Sub-region
Beiras e Serra da Estrela
:Municipality
Belmonte
:Approved amount
: 11341733 €,11 341 733,00 €
Amount spent
: 2003282 €,2 003 282,00 €
Percentage of investment
: 2,87 %2,87 %
Municipality
Covilhã
:Approved amount
: 90237468 €,90 237 468,00 €
Amount spent
: 53392250 €,53 392 250,00 €
Percentage of investment
: 22,81 %22,81 %
Municipality
Fundão
:Approved amount
: 70040139 €,70 040 139,00 €
Amount spent
: 30650264 €,30 650 264,00 €
Percentage of investment
: 17,7 %17,70 %
Municipality
Almeida
:Approved amount
: 3252705 €,3 252 705,00 €
Amount spent
: 1702508 €,1 702 508,00 €
Percentage of investment
: 0,82 %0,82 %
Municipality
Celorico da Beira
:Approved amount
: 7235618 €,7 235 618,00 €
Amount spent
: 3266113 €,3 266 113,00 €
Percentage of investment
: 1,83 %1,83 %
Municipality
Figueira de Castelo Rodrigo
:Approved amount
: 2623397 €,2 623 397,00 €
Amount spent
: 2127920 €,2 127 920,00 €
Percentage of investment
: 0,66 %0,66 %
Municipality
Fornos de Algodres
:Approved amount
: 4293988 €,4 293 988,00 €
Amount spent
: 2778197 €,2 778 197,00 €
Percentage of investment
: 1,09 %1,09 %
Municipality
Gouveia
:Approved amount
: 9173127 €,9 173 127,00 €
Amount spent
: 5648911 €,5 648 911,00 €
Percentage of investment
: 2,32 %2,32 %
Municipality
Guarda
:Approved amount
: 118345420 €,118 345 420,00 €
Amount spent
: 39124535 €,39 124 535,00 €
Percentage of investment
: 29,91 %29,91 %
Municipality
Manteigas
:Approved amount
: 2324633 €,2 324 633,00 €
Amount spent
: 1185068 €,1 185 068,00 €
Percentage of investment
: 0,59 %0,59 %
Municipality
Mêda
:Approved amount
: 3715217 €,3 715 217,00 €
Amount spent
: 1621135 €,1 621 135,00 €
Percentage of investment
: 0,94 %0,94 %
Municipality
Pinhel
:Approved amount
: 6181959 €,6 181 959,00 €
Amount spent
: 3199239 €,3 199 239,00 €
Percentage of investment
: 1,56 %1,56 %
Municipality
Sabugal
:Approved amount
: 12407485 €,12 407 485,00 €
Amount spent
: 6031148 €,6 031 148,00 €
Percentage of investment
: 3,14 %3,14 %
Municipality
Seia
:Approved amount
: 39282222 €,39 282 222,00 €
Amount spent
: 17738366 €,17 738 366,00 €
Percentage of investment
: 9,93 %9,93 %
Municipality
Trancoso
:Approved amount
: 15167832 €,15 167 832,00 €
Amount spent
: 6251254 €,6 251 254,00 €
Percentage of investment
: 3,83 %3,83 %
Total
Approved amount
: 395622943 €,395 622 943,00 €
Amount spent
: 176720189 €,176 720 189,00 €
Percentage of investment
Region
Lisbon Metropolitan Area
:Sub-region
Lisbon Metropolitan Area
:Municipality
Cascais
:Approved amount
: 268046112 €,268 046 112,00 €
Amount spent
: 173665515 €,173 665 515,00 €
Percentage of investment
: 4,93 %4,93 %
Municipality
Lisboa
:Approved amount
: 2952308154 €,2 952 308 154,00 €
Amount spent
: 1642728431 €,1 642 728 431,00 €
Percentage of investment
: 54,31 %54,31 %
Municipality
Loures
:Approved amount
: 186670419 €,186 670 419,00 €
Amount spent
: 108119505 €,108 119 505,00 €
Percentage of investment
: 3,43 %3,43 %
Municipality
Mafra
:Approved amount
: 140809849 €,140 809 849,00 €
Amount spent
: 84249415 €,84 249 415,00 €
Percentage of investment
: 2,59 %2,59 %
Municipality
Oeiras
:Approved amount
: 484143322 €,484 143 322,00 €
Amount spent
: 269683860 €,269 683 860,00 €
Percentage of investment
: 8,91 %8,91 %
Municipality
Sintra
:Approved amount
: 188491932 €,188 491 932,00 €
Amount spent
: 99887614 €,99 887 614,00 €
Percentage of investment
: 3,47 %3,47 %
Municipality
Vila Franca de Xira
:Approved amount
: 120940526 €,120 940 526,00 €
Amount spent
: 59269634 €,59 269 634,00 €
Percentage of investment
: 2,22 %2,22 %
Municipality
Amadora
:Approved amount
: 232113900 €,232 113 900,00 €
Amount spent
: 152629370 €,152 629 370,00 €
Percentage of investment
: 4,27 %4,27 %
Municipality
Odivelas
:Approved amount
: 72105958 €,72 105 958,00 €
Amount spent
: 37428211 €,37 428 211,00 €
Percentage of investment
: 1,33 %1,33 %
Municipality
Alcochete
:Approved amount
: 19156718 €,19 156 718,00 €
Amount spent
: 9594299 €,9 594 299,00 €
Percentage of investment
: 0,35 %0,35 %
Municipality
Almada
:Approved amount
: 125635532 €,125 635 532,00 €
Amount spent
: 56611875 €,56 611 875,00 €
Percentage of investment
: 2,31 %2,31 %
Municipality
Barreiro
:Approved amount
: 73140191 €,73 140 191,00 €
Amount spent
: 36579479 €,36 579 479,00 €
Percentage of investment
: 1,35 %1,35 %
Municipality
Moita
:Approved amount
: 27269605 €,27 269 605,00 €
Amount spent
: 17478830 €,17 478 830,00 €
Percentage of investment
: 0,5 %0,50 %
Municipality
Montijo
:Approved amount
: 46230091 €,46 230 091,00 €
Amount spent
: 31484168 €,31 484 168,00 €
Percentage of investment
: 0,85 %0,85 %
Municipality
Palmela
:Approved amount
: 40592271 €,40 592 271,00 €
Amount spent
: 21913681 €,21 913 681,00 €
Percentage of investment
: 0,75 %0,75 %
Municipality
Seixal
:Approved amount
: 107582446 €,107 582 446,00 €
Amount spent
: 64082690 €,64 082 690,00 €
Percentage of investment
: 1,98 %1,98 %
Municipality
Sesimbra
:Approved amount
: 33090282 €,33 090 282,00 €
Amount spent
: 12429349 €,12 429 349,00 €
Percentage of investment
: 0,61 %0,61 %
Municipality
Setúbal
:Approved amount
: 317251218 €,317 251 218,00 €
Amount spent
: 171519692 €,171 519 692,00 €
Percentage of investment
: 5,84 %5,84 %
Total
Approved amount
: 5435578527 €,5 435 578 527,00 €
Amount spent
: 3049355616 €,3 049 355 616,00 €
Percentage of investment
Region
Alentejo
:Sub-region
Alentejo Litoral
:Municipality
Odemira
:Approved amount
: 18674244 €,18 674 244,00 €
Amount spent
: 13572609 €,13 572 609,00 €
Percentage of investment
: 7,06 %7,06 %
Municipality
Alcácer do Sal
:Approved amount
: 20194785 €,20 194 785,00 €
Amount spent
: 6045117 €,6 045 117,00 €
Percentage of investment
: 7,64 %7,64 %
Municipality
Grândola
:Approved amount
: 58788487 €,58 788 487,00 €
Amount spent
: 49826844 €,49 826 844,00 €
Percentage of investment
: 22,24 %22,24 %
Municipality
Santiago do Cacém
:Approved amount
: 107330280 €,107 330 280,00 €
Amount spent
: 65564591 €,65 564 591,00 €
Percentage of investment
: 40,6 %40,60 %
Municipality
Sines
:Approved amount
: 59379966 €,59 379 966,00 €
Amount spent
: 19621597 €,19 621 597,00 €
Percentage of investment
: 22,46 %22,46 %
Total
Approved amount
: 264367762 €,264 367 762,00 €
Amount spent
: 154630758 €,154 630 758,00 €
Percentage of investment
Sub-region
Baixo Alentejo
:Municipality
Aljustrel
:Approved amount
: 31872097 €,31 872 097,00 €
Amount spent
: 25876847 €,25 876 847,00 €
Percentage of investment
: 13,94 %13,94 %
Municipality
Almodôvar
:Approved amount
: 2271449 €,2 271 449,00 €
Amount spent
: 1312563 €,1 312 563,00 €
Percentage of investment
: 0,99 %0,99 %
Municipality
Alvito
:Approved amount
: 5587196 €,5 587 196,00 €
Amount spent
: 2094789 €,2 094 789,00 €
Percentage of investment
: 2,44 %2,44 %
Municipality
Barrancos
:Approved amount
: 2105573 €,2 105 573,00 €
Amount spent
: 1136730 €,1 136 730,00 €
Percentage of investment
: 0,92 %0,92 %
Municipality
Beja
:Approved amount
: 89211454 €,89 211 454,00 €
Amount spent
: 58023532 €,58 023 532,00 €
Percentage of investment
: 39,02 %39,02 %
Municipality
Castro Verde
:Approved amount
: 3603807 €,3 603 807,00 €
Amount spent
: 1323286 €,1 323 286,00 €
Percentage of investment
: 1,58 %1,58 %
Municipality
Cuba
:Approved amount
: 1102761 €,1 102 761,00 €
Amount spent
: 749797 €,749 797,00 €
Percentage of investment
: 0,48 %0,48 %
Municipality
Ferreira do Alentejo
:Approved amount
: 51335651 €,51 335 651,00 €
Amount spent
: 41043107 €,41 043 107,00 €
Percentage of investment
: 22,45 %22,45 %
Municipality
Mértola
:Approved amount
: 26467799 €,26 467 799,00 €
Amount spent
: 14318926 €,14 318 926,00 €
Percentage of investment
: 11,58 %11,58 %
Municipality
Moura
:Approved amount
: 5436311 €,5 436 311,00 €
Amount spent
: 2361124 €,2 361 124,00 €
Percentage of investment
: 2,38 %2,38 %
Municipality
Ourique
:Approved amount
: 4051861 €,4 051 861,00 €
Amount spent
: 2203158 €,2 203 158,00 €
Percentage of investment
: 1,77 %1,77 %
Municipality
Serpa
:Approved amount
: 3159436 €,3 159 436,00 €
Amount spent
: 1348325 €,1 348 325,00 €
Percentage of investment
: 1,38 %1,38 %
Municipality
Vidigueira
:Approved amount
: 2434262 €,2 434 262,00 €
Amount spent
: 1230187 €,1 230 187,00 €
Percentage of investment
: 1,06 %1,06 %
Total
Approved amount
: 228639655 €,228 639 655,00 €
Amount spent
: 153022371 €,153 022 371,00 €
Percentage of investment
Sub-region
Lezíria do Tejo
:Municipality
Azambuja
:Approved amount
: 43748937 €,43 748 937,00 €
Amount spent
: 15522646 €,15 522 646,00 €
Percentage of investment
: 13,31 %13,31 %
Municipality
Almeirim
:Approved amount
: 4212610 €,4 212 610,00 €
Amount spent
: 2764284 €,2 764 284,00 €
Percentage of investment
: 1,28 %1,28 %
Municipality
Alpiarça
:Approved amount
: 5043049 €,5 043 049,00 €
Amount spent
: 2178441 €,2 178 441,00 €
Percentage of investment
: 1,53 %1,53 %
Municipality
Benavente
:Approved amount
: 48985381 €,48 985 381,00 €
Amount spent
: 20356708 €,20 356 708,00 €
Percentage of investment
: 14,91 %14,91 %
Municipality
Cartaxo
:Approved amount
: 20829366 €,20 829 366,00 €
Amount spent
: 12940337 €,12 940 337,00 €
Percentage of investment
: 6,34 %6,34 %
Municipality
Chamusca
:Approved amount
: 8534907 €,8 534 907,00 €
Amount spent
: 5935473 €,5 935 473,00 €
Percentage of investment
: 2,6 %2,60 %
Municipality
Coruche
:Approved amount
: 7792597 €,7 792 597,00 €
Amount spent
: 4388788 €,4 388 788,00 €
Percentage of investment
: 2,37 %2,37 %
Municipality
Golegã
:Approved amount
: 9374209 €,9 374 209,00 €
Amount spent
: 5351005 €,5 351 005,00 €
Percentage of investment
: 2,85 %2,85 %
Municipality
Rio Maior
:Approved amount
: 60710593 €,60 710 593,00 €
Amount spent
: 26525368 €,26 525 368,00 €
Percentage of investment
: 18,47 %18,47 %
Municipality
Salvaterra de Magos
:Approved amount
: 11868514 €,11 868 514,00 €
Amount spent
: 8167059 €,8 167 059,00 €
Percentage of investment
: 3,61 %3,61 %
Municipality
Santarém
:Approved amount
: 107526045 €,107 526 045,00 €
Amount spent
: 61671111 €,61 671 111,00 €
Percentage of investment
: 32,72 %32,72 %
Total
Approved amount
: 328626209 €,328 626 209,00 €
Amount spent
: 165801219 €,165 801 219,00 €
Percentage of investment
Sub-region
Alto Alentejo
:Municipality
Alter do Chão
:Approved amount
: 12643390 €,12 643 390,00 €
Amount spent
: 3697618 €,3 697 618,00 €
Percentage of investment
: 4,92 %4,92 %
Municipality
Arronches
:Approved amount
: 2100295 €,2 100 295,00 €
Amount spent
: 843316 €,843 316,00 €
Percentage of investment
: 0,82 %0,82 %
Municipality
Avis
:Approved amount
: 1525907 €,1 525 907,00 €
Amount spent
: 824594 €,824 594,00 €
Percentage of investment
: 0,59 %0,59 %
Municipality
Campo Maior
:Approved amount
: 19964779 €,19 964 779,00 €
Amount spent
: 12507582 €,12 507 582,00 €
Percentage of investment
: 7,77 %7,77 %
Municipality
Castelo de Vide
:Approved amount
: 4297430 €,4 297 430,00 €
Amount spent
: 1522596 €,1 522 596,00 €
Percentage of investment
: 1,67 %1,67 %
Municipality
Crato
:Approved amount
: 667075 €,667 075,00 €
Amount spent
: 415473 €,415 473,00 €
Percentage of investment
: 0,26 %0,26 %
Municipality
Elvas
:Approved amount
: 50819952 €,50 819 952,00 €
Amount spent
: 21182614 €,21 182 614,00 €
Percentage of investment
: 19,78 %19,78 %
Municipality
Fronteira
:Approved amount
: 1621383 €,1 621 383,00 €
Amount spent
: 1128137 €,1 128 137,00 €
Percentage of investment
: 0,63 %0,63 %
Municipality
Gavião
:Approved amount
: 11648515 €,11 648 515,00 €
Amount spent
: 3739417 €,3 739 417,00 €
Percentage of investment
: 4,53 %4,53 %
Municipality
Marvão
:Approved amount
: 3855205 €,3 855 205,00 €
Amount spent
: 2084913 €,2 084 913,00 €
Percentage of investment
: 1,5 %1,50 %
Municipality
Monforte
:Approved amount
: 15042968 €,15 042 968,00 €
Amount spent
: 1024364 €,1 024 364,00 €
Percentage of investment
: 5,86 %5,86 %
Municipality
Nisa
:Approved amount
: 18788406 €,18 788 406,00 €
Amount spent
: 2201815 €,2 201 815,00 €
Percentage of investment
: 7,31 %7,31 %
Municipality
Ponte de Sor
:Approved amount
: 28284457 €,28 284 457,00 €
Amount spent
: 14351443 €,14 351 443,00 €
Percentage of investment
: 11,01 %11,01 %
Municipality
Portalegre
:Approved amount
: 75304988 €,75 304 988,00 €
Amount spent
: 34220064 €,34 220 064,00 €
Percentage of investment
: 29,31 %29,31 %
Municipality
Sousel
:Approved amount
: 10354523 €,10 354 523,00 €
Amount spent
: 9052502 €,9 052 502,00 €
Percentage of investment
: 4,03 %4,03 %
Total
Approved amount
: 256919273 €,256 919 273,00 €
Amount spent
: 108796447 €,108 796 447,00 €
Percentage of investment
Sub-region
Alentejo Central
:Municipality
Alandroal
:Approved amount
: 3060242 €,3 060 242,00 €
Amount spent
: 1711620 €,1 711 620,00 €
Percentage of investment
: 1,25 %1,25 %
Municipality
Arraiolos
:Approved amount
: 2199110 €,2 199 110,00 €
Amount spent
: 1698292 €,1 698 292,00 €
Percentage of investment
: 0,9 %0,90 %
Municipality
Borba
:Approved amount
: 18173495 €,18 173 495,00 €
Amount spent
: 5568846 €,5 568 846,00 €
Percentage of investment
: 7,44 %7,44 %
Municipality
Estremoz
:Approved amount
: 7474942 €,7 474 942,00 €
Amount spent
: 4749635 €,4 749 635,00 €
Percentage of investment
: 3,06 %3,06 %
Municipality
Évora
:Approved amount
: 167160855 €,167 160 855,00 €
Amount spent
: 91039868 €,91 039 868,00 €
Percentage of investment
: 68,41 %68,41 %
Municipality
Montemor-o-Novo
:Approved amount
: 5251946 €,5 251 946,00 €
Amount spent
: 2584654 €,2 584 654,00 €
Percentage of investment
: 2,15 %2,15 %
Municipality
Mora
:Approved amount
: 2946174 €,2 946 174,00 €
Amount spent
: 1605083 €,1 605 083,00 €
Percentage of investment
: 1,21 %1,21 %
Municipality
Mourão
:Approved amount
: 1217547 €,1 217 547,00 €
Amount spent
: 865010 €,865 010,00 €
Percentage of investment
: 0,5 %0,50 %
Municipality
Portel
:Approved amount
: 1586456 €,1 586 456,00 €
Amount spent
: 544184 €,544 184,00 €
Percentage of investment
: 0,65 %0,65 %
Municipality
Redondo
:Approved amount
: 8286724 €,8 286 724,00 €
Amount spent
: 2250052 €,2 250 052,00 €
Percentage of investment
: 3,39 %3,39 %
Municipality
Reguengos de Monsaraz
:Approved amount
: 9412497 €,9 412 497,00 €
Amount spent
: 5903157 €,5 903 157,00 €
Percentage of investment
: 3,85 %3,85 %
Municipality
Vendas Novas
:Approved amount
: 7232322 €,7 232 322,00 €
Amount spent
: 3057222 €,3 057 222,00 €
Percentage of investment
: 2,96 %2,96 %
Municipality
Viana do Alentejo
:Approved amount
: 2502856 €,2 502 856,00 €
Amount spent
: 1300801 €,1 300 801,00 €
Percentage of investment
: 1,02 %1,02 %
Municipality
Vila Viçosa
:Approved amount
: 7854548 €,7 854 548,00 €
Amount spent
: 6092685 €,6 092 685,00 €
Percentage of investment
: 3,21 %3,21 %
Total
Approved amount
: 244359714 €,244 359 714,00 €
Amount spent
: 128971108 €,128 971 108,00 €
Percentage of investment
Region
Algarve
:Sub-region
Algarve
:Municipality
Albufeira
:Approved amount
: 49887205 €,49 887 205,00 €
Amount spent
: 32943271 €,32 943 271,00 €
Percentage of investment
: 7,29 %7,29 %
Municipality
Alcoutim
:Approved amount
: 35347604 €,35 347 604,00 €
Amount spent
: 7569223 €,7 569 223,00 €
Percentage of investment
: 5,16 %5,16 %
Municipality
Aljezur
:Approved amount
: 5317830 €,5 317 830,00 €
Amount spent
: 3325434 €,3 325 434,00 €
Percentage of investment
: 0,78 %0,78 %
Municipality
Castro Marim
:Approved amount
: 3541841 €,3 541 841,00 €
Amount spent
: 1868688 €,1 868 688,00 €
Percentage of investment
: 0,52 %0,52 %
Municipality
Faro
:Approved amount
: 149505297 €,149 505 297,00 €
Amount spent
: 84268036 €,84 268 036,00 €
Percentage of investment
: 21,84 %21,84 %
Municipality
Lagoa
:Approved amount
: 20100416 €,20 100 416,00 €
Amount spent
: 13935833 €,13 935 833,00 €
Percentage of investment
: 2,94 %2,94 %
Municipality
Lagos
:Approved amount
: 46237475 €,46 237 475,00 €
Amount spent
: 24536019 €,24 536 019,00 €
Percentage of investment
: 6,75 %6,75 %
Municipality
Loulé
:Approved amount
: 58440317 €,58 440 317,00 €
Amount spent
: 36913338 €,36 913 338,00 €
Percentage of investment
: 8,54 %8,54 %
Municipality
Monchique
:Approved amount
: 17806069 €,17 806 069,00 €
Amount spent
: 7851422 €,7 851 422,00 €
Percentage of investment
: 2,6 %2,60 %
Municipality
Olhão
:Approved amount
: 53994303 €,53 994 303,00 €
Amount spent
: 31601073 €,31 601 073,00 €
Percentage of investment
: 7,89 %7,89 %
Municipality
Portimão
:Approved amount
: 65466608 €,65 466 608,00 €
Amount spent
: 29770538 €,29 770 538,00 €
Percentage of investment
: 9,56 %9,56 %
Municipality
São Brás de Alportel
:Approved amount
: 7734275 €,7 734 275,00 €
Amount spent
: 4956673 €,4 956 673,00 €
Percentage of investment
: 1,13 %1,13 %
Municipality
Silves
:Approved amount
: 29561854 €,29 561 854,00 €
Amount spent
: 18320754 €,18 320 754,00 €
Percentage of investment
: 4,32 %4,32 %
Municipality
Tavira
:Approved amount
: 23553800 €,23 553 800,00 €
Amount spent
: 12141929 €,12 141 929,00 €
Percentage of investment
: 3,44 %3,44 %
Municipality
Vila do Bispo
:Approved amount
: 8107394 €,8 107 394,00 €
Amount spent
: 3123854 €,3 123 854,00 €
Percentage of investment
: 1,18 %1,18 %
Municipality
Vila Real de Santo António
:Approved amount
: 109989219 €,109 989 219,00 €
Amount spent
: 63598084 €,63 598 084,00 €
Percentage of investment
: 16,07 %16,07 %
Total
Approved amount
: 684591507 €,684 591 507,00 €
Amount spent
: 376724172 €,376 724 172,00 €
Percentage of investment
Region
Autonomous Region of the Azores
:Sub-region
Autonomous Region of the Azores
:Municipality
Vila do Porto
:Approved amount
: 7738801 €,7 738 801,00 €
Amount spent
: 4056424 €,4 056 424,00 €
Percentage of investment
: 0,69 %0,69 %
Municipality
Lagoa
:Approved amount
: 40273850 €,40 273 850,00 €
Amount spent
: 22480203 €,22 480 203,00 €
Percentage of investment
: 3,59 %3,59 %
Municipality
Nordeste
:Approved amount
: 7849058 €,7 849 058,00 €
Amount spent
: 4546764 €,4 546 764,00 €
Percentage of investment
: 0,7 %0,70 %
Municipality
Ponta Delgada
:Approved amount
: 561434176 €,561 434 176,00 €
Amount spent
: 349274513 €,349 274 513,00 €
Percentage of investment
: 50,09 %50,09 %
Municipality
Povoação
:Approved amount
: 5723587 €,5 723 587,00 €
Amount spent
: 2575060 €,2 575 060,00 €
Percentage of investment
: 0,51 %0,51 %
Municipality
Ribeira Grande
:Approved amount
: 141572303 €,141 572 303,00 €
Amount spent
: 76630416 €,76 630 416,00 €
Percentage of investment
: 12,63 %12,63 %
Municipality
Vila Franca do Campo
:Approved amount
: 13162124 €,13 162 124,00 €
Amount spent
: 10416221 €,10 416 221,00 €
Percentage of investment
: 1,17 %1,17 %
Municipality
Angra do Heroísmo
:Approved amount
: 176836416 €,176 836 416,00 €
Amount spent
: 105780978 €,105 780 978,00 €
Percentage of investment
: 15,78 %15,78 %
Municipality
Vila da Praia da Vitória
:Approved amount
: 13514949 €,13 514 949,00 €
Amount spent
: 8617318 €,8 617 318,00 €
Percentage of investment
: 1,21 %1,21 %
Municipality
Santa Cruz da Graciosa
:Approved amount
: 9914234 €,9 914 234,00 €
Amount spent
: 4075910 €,4 075 910,00 €
Percentage of investment
: 0,88 %0,88 %
Municipality
Calheta
:Approved amount
: 3013366 €,3 013 366,00 €
Amount spent
: 2018402 €,2 018 402,00 €
Percentage of investment
: 0,27 %0,27 %
Municipality
Velas
:Approved amount
: 6402265 €,6 402 265,00 €
Amount spent
: 3064634 €,3 064 634,00 €
Percentage of investment
: 0,57 %0,57 %
Municipality
Lajes do Pico
:Approved amount
: 4747340 €,4 747 340,00 €
Amount spent
: 2378821 €,2 378 821,00 €
Percentage of investment
: 0,42 %0,42 %
Municipality
Madalena
:Approved amount
: 16544555 €,16 544 555,00 €
Amount spent
: 9744701 €,9 744 701,00 €
Percentage of investment
: 1,48 %1,48 %
Municipality
São Roque do Pico
:Approved amount
: 13792271 €,13 792 271,00 €
Amount spent
: 8163274 €,8 163 274,00 €
Percentage of investment
: 1,23 %1,23 %
Municipality
Horta
:Approved amount
: 92794277 €,92 794 277,00 €
Amount spent
: 68438902 €,68 438 902,00 €
Percentage of investment
: 8,28 %8,28 %
Municipality
Lajes das Flores
:Approved amount
: 2427743 €,2 427 743,00 €
Amount spent
: 1003624 €,1 003 624,00 €
Percentage of investment
: 0,22 %0,22 %
Municipality
Santa Cruz das Flores
:Approved amount
: 2721882 €,2 721 882,00 €
Amount spent
: 1121114 €,1 121 114,00 €
Percentage of investment
: 0,24 %0,24 %
Municipality
Corvo
:Approved amount
: 426969 €,426 969,00 €
Amount spent
: 142437 €,142 437,00 €
Percentage of investment
: 0,04 %0,04 %
Total
Approved amount
: 1120890167 €,1 120 890 167,00 €
Amount spent
: 684529715 €,684 529 715,00 €
Percentage of investment
Region
Autonomous Region of Madeira
:Sub-region
Autonomous Region of Madeira
:Municipality
Calheta
:Approved amount
: 12327483 €,12 327 483,00 €
Amount spent
: 4622490 €,4 622 490,00 €
Percentage of investment
: 1,25 %1,25 %
Municipality
Câmara de Lobos
:Approved amount
: 29171872 €,29 171 872,00 €
Amount spent
: 8098953 €,8 098 953,00 €
Percentage of investment
: 2,96 %2,96 %
Municipality
Funchal
:Approved amount
: 748674535 €,748 674 535,00 €
Amount spent
: 398265086 €,398 265 086,00 €
Percentage of investment
: 76 %76,00 %
Municipality
Machico
:Approved amount
: 46453091 €,46 453 091,00 €
Amount spent
: 7430635 €,7 430 635,00 €
Percentage of investment
: 4,72 %4,72 %
Municipality
Ponta do Sol
:Approved amount
: 19121895 €,19 121 895,00 €
Amount spent
: 2508623 €,2 508 623,00 €
Percentage of investment
: 1,94 %1,94 %
Municipality
Porto Moniz
:Approved amount
: 511571 €,511 571,00 €
Amount spent
: 239645 €,239 645,00 €
Percentage of investment
: 0,05 %0,05 %
Municipality
Ribeira Brava
:Approved amount
: 13433804 €,13 433 804,00 €
Amount spent
: 9655005 €,9 655 005,00 €
Percentage of investment
: 1,36 %1,36 %
Municipality
Santa Cruz
:Approved amount
: 27799060 €,27 799 060,00 €
Amount spent
: 8938753 €,8 938 753,00 €
Percentage of investment
: 2,82 %2,82 %
Municipality
Santana
:Approved amount
: 16537950 €,16 537 950,00 €
Amount spent
: 495081 €,495 081,00 €
Percentage of investment
: 1,68 %1,68 %
Municipality
São Vicente
:Approved amount
: 36680023 €,36 680 023,00 €
Amount spent
: 9416627 €,9 416 627,00 €
Percentage of investment
: 3,72 %3,72 %
Municipality
Porto Santo
:Approved amount
: 34370260 €,34 370 260,00 €
Amount spent
: 9601129 €,9 601 129,00 €
Percentage of investment
: 3,49 %3,49 %
Total
Approved amount
: 985081544 €,985 081 544,00 €
Amount spent
: 459272028 €,459 272 028,00 €
Percentage of investment
Region
Nation-wide investment
:Approved amount
: 3655353461 €,3 655 353 461,00 €
:Amount spent
: {{ regionNutsii.apoio_gasto|floatformat:'-2'|cut:' '|checkifdataisavailable|euro_symbol,2 600 331 066,00 €
:Comparison between realities
Assessing the impact of investments in the Recovery and Resilience Plan on the daily lives of populations is not a simple topic. It is necessary to analyze the context in a broader way and understand how investments can suppress everyday needs.
However, there are some indicators that can help to envision an equitable way in which investments are being distributed geographically.
How much is already approved to invest per inhabitant?
Number of inhabitants according to the 2021 Census
How much is already approved to invest per inhabitant?
Number of inhabitants according to the 2021 Census
| Municipality | Approved amount |
|---|---|
| Highest national value Vinhais | 14381 € 14 381,00 € |
| National average | 2400 € 2 400,00 € |
| Lowest national value Almeirim | 191 € 191,00 € |
How much is already approved to invest per inhabitant?
Municipality
Highest national value Vinhais
Approved amount
14381 €
14 381,00 €
Municipality
National average
Approved amount
2400 €
2 400,00 €
Municipality
Lowest national value Almeirim
Approved amount
191 €
191,00 €
How much is already approved to invest per km2?
How much is already approved to invest per km2?
| Municipality | Approved amount |
|---|---|
| Highest national value Porto | 33886960 € 33 886 960,00 € |
| National average | 269123 € 269 123,00 € |
| Lowest national value Crato | 1676 € 1 676,00 € |
How much is already approved to invest per km2?
Municipality
Highest national value Porto
Approved amount
33886960 €
33 886 960,00 €
Municipality
National average
Approved amount
269123 €
269 123,00 €
Municipality
Lowest national value Crato
Approved amount
1676 €
1 676,00 €