Investment by regions
Discover how the investments already approved in the Recovery and Resilience Plan are distributed across the various regions of the country.
Recovery and Resilience Plan in numbers
22,2 billion €
Total investment to be applied by the Recovery and Resilience Plan
1,2 billion €
Total amount of funds already allocated to Nation-wide investments
3,6 billion €
Total amount of funds already invested in municipalities and regions
Geography of investments
The Recovery and Resilience Plan aims to provide the country with a set of tools for the future, seeking to ensure a more resilient economy, a more sustainable relationship with the environment, and more digital processes and functioning.
All of this is contributed by a broad geographical distribution of its investments and reforms, ensuring that both nationally implemented projects and resources applied in all municipalities of the country are invested where they have the greatest impact on the lives of the population.
Distribution of investment by regions
Distribution of investment by regions
Region | Sub-region | Municipality | Approved amount | Amount spent | Percentage of investment |
---|---|---|---|---|---|
North |
Alto Minho
Cávado
Ave
Área Metropolitana do Porto
Alto Tâmega
Tâmega e Sousa
Douro
Terras de Trás-os-Montes
|
Arcos de Valdevez
Caminha
Melgaço
Monção
Paredes de Coura
Ponte da Barca
Ponte de Lima
Valença
Viana do Castelo
Vila Nova de Cerveira
Total
Amares
Barcelos
Braga
Esposende
Terras de Bouro
Vila Verde
Total
Cabeceiras de Basto
Fafe
Guimarães
Póvoa de Lanhoso
Vieira do Minho
Vila Nova de Famalicão
Vizela
Mondim de Basto
Total
Arouca
Espinho
Santa Maria da Feira
Oliveira de Azeméis
São João da Madeira
Vale de Cambra
Gondomar
Maia
Matosinhos
Paredes
Porto
Póvoa de Varzim
Santo Tirso
Valongo
Vila do Conde
Vila Nova de Gaia
Trofa
Total
Boticas
Chaves
Montalegre
Ribeira de Pena
Valpaços
Vila Pouca de Aguiar
Total
Castelo de Paiva
Celorico de Basto
Amarante
Baião
Felgueiras
Lousada
Marco de Canaveses
Paços de Ferreira
Penafiel
Cinfães
Resende
Total
Carrazeda de Ansiães
Freixo de Espada à Cinta
Torre de Moncorvo
Vila Nova de Foz Côa
Alijó
Mesão Frio
Murça
Peso da Régua
Sabrosa
Santa Marta de Penaguião
Vila Real
Armamar
Lamego
Moimenta da Beira
Penedono
São João da Pesqueira
Sernancelhe
Tabuaço
Tarouca
Total
Alfândega da Fé
Bragança
Macedo de Cavaleiros
Miranda do Douro
Mirandela
Mogadouro
Vila Flor
Vimioso
Vinhais
Total
|
10 526 699,00 €
1 486 833,00 €
17 037 762,00 €
14 166 343,00 €
4 140 316,00 €
5 395 679,00 €
19 213 909,00 €
11 048 194,00 €
110 856 032,00 €
14 540 391,00 €
208 412 159,00 €
3 524 580,00 €
82 943 732,00 €
388 572 780,00 €
27 188 650,00 €
2 026 059,00 €
21 349 950,00 €
525 605 752,00 €
3 108 772,00 €
16 242 771,00 €
172 035 182,00 €
5 967 188,00 €
1 512 292,00 €
184 324 424,00 €
14 889 694,00 €
6 234 970,00 €
404 315 293,00 €
19 704 129,00 €
9 406 703,00 €
105 784 097,00 €
51 638 693,00 €
50 407 024,00 €
21 298 913,00 €
72 999 930,00 €
217 783 076,00 €
494 556 850,00 €
43 133 800,00 €
893 474 897,00 €
61 084 978,00 €
61 455 687,00 €
51 824 483,00 €
71 057 441,00 €
423 305 673,00 €
63 428 278,00 €
2 712 344 654,00 €
2 496 948,00 €
37 170 413,00 €
1 886 739,00 €
9 131 069,00 €
2 668 559,00 €
8 155 888,00 €
61 509 615,00 €
12 963 988,00 €
20 278 162,00 €
16 361 421,00 €
43 863 296,00 €
42 528 542,00 €
39 803 545,00 €
17 364 491,00 €
66 417 254,00 €
103 882 285,00 €
7 801 687,00 €
2 362 337,00 €
373 627 007,00 €
2 019 541,00 €
1 881 687,00 €
2 824 241,00 €
2 741 258,00 €
10 138 071,00 €
384 960,00 €
2 002 958,00 €
15 271 787,00 €
1 170 496,00 €
7 622 402,00 €
129 689 564,00 €
2 721 138,00 €
9 986 842,00 €
4 615 747,00 €
1 324 923,00 €
6 242 923,00 €
2 140 730,00 €
1 471 744,00 €
2 103 288,00 €
206 354 297,00 €
6 975 312,00 €
71 229 820,00 €
6 631 270,00 €
1 755 162,00 €
16 149 762,00 €
3 969 939,00 €
794 159,00 €
1 677 891,00 €
36 078 863,00 €
145 262 179,00 €
|
3 243 033,00 €
640 782,00 €
2 909 700,00 €
3 787 621,00 €
1 526 299,00 €
1 050 915,00 €
7 407 651,00 €
2 838 600,00 €
23 955 874,00 €
3 081 372,00 €
50 441 847,00 €
1 906 497,00 €
35 451 635,00 €
95 087 509,00 €
3 355 957,00 €
750 435,00 €
5 585 468,00 €
142 137 501,00 €
1 529 742,00 €
7 355 671,00 €
57 595 559,00 €
2 979 098,00 €
832 452,00 €
61 603 887,00 €
7 515 970,00 €
1 598 453,00 €
141 010 832,00 €
3 166 239,00 €
2 189 971,00 €
24 038 825,00 €
16 332 110,00 €
10 920 094,00 €
5 398 050,00 €
14 403 575,00 €
51 415 130,00 €
149 745 023,00 €
15 558 191,00 €
251 100 294,00 €
19 211 437,00 €
11 670 854,00 €
6 723 192,00 €
22 950 970,00 €
84 122 549,00 €
18 454 345,00 €
707 400 850,00 €
698 735,00 €
7 339 986,00 €
1 012 198,00 €
2 485 770,00 €
1 250 454,00 €
1 997 128,00 €
14 784 272,00 €
4 415 913,00 €
5 984 437,00 €
4 800 973,00 €
12 054 869,00 €
14 322 086,00 €
13 527 173,00 €
6 304 949,00 €
13 515 783,00 €
27 854 270,00 €
1 465 203,00 €
1 283 308,00 €
105 528 964,00 €
337 280,00 €
236 303,00 €
1 233 138,00 €
497 149,00 €
2 357 025,00 €
261 573,00 €
584 560,00 €
3 388 966,00 €
407 994,00 €
830 914,00 €
32 272 121,00 €
483 052,00 €
2 801 934,00 €
1 357 862,00 €
306 060,00 €
1 740 621,00 €
747 671,00 €
485 257,00 €
1 067 407,00 €
51 396 889,00 €
2 088 479,00 €
18 538 058,00 €
1 855 538,00 €
688 193,00 €
5 936 478,00 €
1 346 898,00 €
517 950,00 €
385 106,00 €
5 280 316,00 €
36 637 017,00 €
|
5,05 %
0,71 %
8,18 %
6,80 %
1,99 %
2,59 %
9,22 %
5,30 %
53,19 %
6,98 %
0,67 %
15,78 %
73,93 %
5,17 %
0,39 %
4,06 %
0,77 %
4,02 %
42,55 %
1,48 %
0,37 %
45,59 %
3,68 %
1,54 %
0,73 %
0,35 %
3,90 %
1,90 %
1,86 %
0,79 %
2,69 %
8,03 %
18,23 %
1,59 %
32,94 %
2,25 %
2,27 %
1,91 %
2,62 %
15,61 %
2,34 %
4,06 %
60,43 %
3,07 %
14,84 %
4,34 %
13,26 %
3,47 %
5,43 %
4,38 %
11,74 %
11,38 %
10,65 %
4,65 %
17,78 %
27,80 %
2,09 %
0,63 %
0,98 %
0,91 %
1,37 %
1,33 %
4,91 %
0,19 %
0,97 %
7,40 %
0,57 %
3,69 %
62,85 %
1,32 %
4,84 %
2,24 %
0,64 %
3,03 %
1,04 %
0,71 %
1,02 %
4,80 %
49,04 %
4,57 %
1,21 %
11,12 %
2,73 %
0,55 %
1,16 %
24,84 %
|
Center |
Oeste
Região de Aveiro
Região de Coimbra
Região de Leiria
Viseu Dão Lafões
Beira Baixa
Médio Tejo
Beiras e Serra da Estrela
|
Alcobaça
Bombarral
Caldas da Rainha
Nazaré
Óbidos
Peniche
Alenquer
Arruda dos Vinhos
Cadaval
Lourinhã
Sobral de Monte Agraço
Torres Vedras
Total
Águeda
Albergaria-a-Velha
Anadia
Aveiro
Estarreja
Ílhavo
Murtosa
Oliveira do Bairro
Ovar
Sever do Vouga
Vagos
Total
Mealhada
Arganil
Cantanhede
Coimbra
Condeixa-a-Nova
Figueira da Foz
Góis
Lousã
Mira
Miranda do Corvo
Montemor-o-Velho
Oliveira do Hospital
Pampilhosa da Serra
Penacova
Penela
Soure
Tábua
Vila Nova de Poiares
Mortágua
Total
Alvaiázere
Ansião
Batalha
Castanheira de Pêra
Figueiró dos Vinhos
Leiria
Marinha Grande
Pedrógão Grande
Pombal
Porto de Mós
Total
Aguiar da Beira
Carregal do Sal
Castro Daire
Mangualde
Nelas
Oliveira de Frades
Penalva do Castelo
Santa Comba Dão
São Pedro do Sul
Sátão
Tondela
Vila Nova de Paiva
Viseu
Vouzela
Total
Castelo Branco
Idanha-a-Nova
Oleiros
Penamacor
Proença-a-Nova
Vila Velha de Ródão
Total
Sertã
Vila de Rei
Abrantes
Alcanena
Constância
Entroncamento
Ferreira do Zêzere
Mação
Sardoal
Tomar
Torres Novas
Vila Nova da Barquinha
Ourém
Total
Belmonte
Covilhã
Fundão
Almeida
Celorico da Beira
Figueira de Castelo Rodrigo
Fornos de Algodres
Gouveia
Guarda
Manteigas
Mêda
Pinhel
Sabugal
Seia
Trancoso
Total
|
31 535 832,00 €
4 805 181,00 €
43 476 960,00 €
22 686 185,00 €
6 682 545,00 €
23 463 373,00 €
25 686 289,00 €
17 770 368,00 €
2 731 866,00 €
5 184 736,00 €
1 003 759,00 €
37 572 267,00 €
222 599 361,00 €
151 562 237,00 €
18 448 321,00 €
22 523 651,00 €
243 792 966,00 €
134 845 978,00 €
105 324 262,00 €
10 576 200,00 €
27 107 263,00 €
36 095 069,00 €
6 833 217,00 €
12 295 357,00 €
769 404 521,00 €
7 300 333,00 €
14 654 196,00 €
25 172 808,00 €
344 441 586,00 €
9 664 894,00 €
106 619 879,00 €
1 613 691,00 €
14 616 473,00 €
12 864 379,00 €
2 648 028,00 €
10 402 605,00 €
38 987 321,00 €
9 493 507,00 €
6 457 173,00 €
883 289,00 €
2 364 377,00 €
13 398 314,00 €
3 397 056,00 €
4 370 605,00 €
629 350 513,00 €
8 316 161,00 €
7 536 367,00 €
22 205 930,00 €
3 274 763,00 €
1 989 989,00 €
162 726 577,00 €
99 925 929,00 €
2 743 358,00 €
45 615 297,00 €
29 706 935,00 €
384 041 307,00 €
4 063 231,00 €
10 549 035,00 €
8 029 009,00 €
80 098 092,00 €
8 226 000,00 €
15 685 163,00 €
5 219 885,00 €
1 620 730,00 €
7 718 581,00 €
6 077 096,00 €
25 740 303,00 €
2 157 343,00 €
97 946 005,00 €
14 401 742,00 €
287 532 215,00 €
44 383 668,00 €
7 388 962,00 €
14 340 701,00 €
1 107 065,00 €
2 102 742,00 €
30 515 271,00 €
99 838 409,00 €
5 615 596,00 €
5 246 239,00 €
15 658 322,00 €
27 972 692,00 €
34 100 837,00 €
30 808 606,00 €
14 536 452,00 €
7 722 497,00 €
2 269 934,00 €
31 833 889,00 €
25 918 502,00 €
3 090 740,00 €
25 434 454,00 €
230 208 760,00 €
1 685 223,00 €
61 709 213,00 €
39 708 212,00 €
4 402 408,00 €
4 769 974,00 €
939 564,00 €
3 945 595,00 €
3 848 436,00 €
47 150 011,00 €
1 012 501,00 €
822 350,00 €
2 608 443,00 €
8 210 738,00 €
29 682 012,00 €
4 385 043,00 €
214 879 721,00 €
|
9 115 664,00 €
1 295 992,00 €
12 045 660,00 €
3 869 579,00 €
2 134 797,00 €
5 700 997,00 €
4 913 826,00 €
5 431 722,00 €
1 278 792,00 €
1 760 680,00 €
556 307,00 €
8 381 264,00 €
56 485 280,00 €
37 477 458,00 €
4 823 509,00 €
6 784 763,00 €
66 531 662,00 €
29 974 418,00 €
23 942 384,00 €
10 106 305,00 €
5 864 925,00 €
9 235 804,00 €
2 137 321,00 €
3 433 653,00 €
200 312 199,00 €
952 207,00 €
2 300 793,00 €
8 483 583,00 €
87 929 097,00 €
1 624 867,00 €
22 846 047,00 €
437 302,00 €
1 559 656,00 €
2 729 659,00 €
936 894,00 €
2 329 761,00 €
9 481 308,00 €
2 686 914,00 €
2 219 119,00 €
454 085,00 €
1 063 820,00 €
1 705 950,00 €
938 170,00 €
1 537 468,00 €
152 216 700,00 €
502 407,00 €
1 776 219,00 €
8 180 856,00 €
411 297,00 €
633 960,00 €
59 119 429,00 €
27 162 570,00 €
778 234,00 €
11 681 357,00 €
6 927 757,00 €
117 174 085,00 €
690 403,00 €
1 212 005,00 €
2 104 166,00 €
24 905 152,00 €
2 477 403,00 €
4 244 481,00 €
1 878 555,00 €
630 086,00 €
2 587 945,00 €
1 136 810,00 €
7 066 216,00 €
492 464,00 €
30 108 250,00 €
3 759 195,00 €
83 293 132,00 €
10 909 911,00 €
2 074 657,00 €
3 349 263,00 €
386 026,00 €
886 937,00 €
2 768 212,00 €
20 375 006,00 €
1 778 790,00 €
1 723 208,00 €
9 470 363,00 €
7 673 174,00 €
9 478 591,00 €
7 702 392,00 €
4 540 616,00 €
2 472 975,00 €
631 867,00 €
8 939 033,00 €
6 859 042,00 €
1 183 008,00 €
8 754 710,00 €
71 207 770,00 €
465 502,00 €
18 029 236,00 €
10 332 017,00 €
835 625,00 €
633 769,00 €
465 753,00 €
1 045 912,00 €
1 242 110,00 €
10 106 756,00 €
275 341,00 €
438 366,00 €
909 077,00 €
2 419 839,00 €
4 501 331,00 €
1 077 824,00 €
52 778 458,00 €
|
14,17 %
2,16 %
19,53 %
10,19 %
3,00 %
10,54 %
11,54 %
7,98 %
1,23 %
2,33 %
0,45 %
16,88 %
19,70 %
2,40 %
2,93 %
31,69 %
17,53 %
13,69 %
1,37 %
3,52 %
4,69 %
0,89 %
1,60 %
1,16 %
2,33 %
4,00 %
54,73 %
1,54 %
16,94 %
0,26 %
2,32 %
2,04 %
0,42 %
1,65 %
6,19 %
1,51 %
1,03 %
0,14 %
0,38 %
2,13 %
0,54 %
0,69 %
2,17 %
1,96 %
5,78 %
0,85 %
0,52 %
42,37 %
26,02 %
0,71 %
11,88 %
7,74 %
1,41 %
3,67 %
2,79 %
27,86 %
2,86 %
5,46 %
1,82 %
0,56 %
2,68 %
2,11 %
8,95 %
0,75 %
34,06 %
5,01 %
44,46 %
7,40 %
14,36 %
1,11 %
2,11 %
30,56 %
2,44 %
2,28 %
6,80 %
12,15 %
14,81 %
13,38 %
6,31 %
3,35 %
0,99 %
13,83 %
11,26 %
1,34 %
11,05 %
0,78 %
28,72 %
18,48 %
2,05 %
2,22 %
0,44 %
1,84 %
1,79 %
21,94 %
0,47 %
0,38 %
1,21 %
3,82 %
13,81 %
2,04 %
|
Lisbon Metropolitan Area |
Lisbon Metropolitan Area
|
Cascais
Lisboa
Loures
Mafra
Oeiras
Sintra
Vila Franca de Xira
Amadora
Odivelas
Alcochete
Almada
Barreiro
Moita
Montijo
Palmela
Seixal
Sesimbra
Setúbal
Total
|
87 094 439,00 €
2 113 448 864,00 €
319 477 443,00 €
90 336 171,00 €
250 169 631,00 €
132 897 180,00 €
93 897 816,00 €
136 077 468,00 €
233 951 213,00 €
13 192 804,00 €
70 841 665,00 €
54 971 030,00 €
20 884 779,00 €
23 561 244,00 €
48 720 675,00 €
88 802 209,00 €
10 954 700,00 €
213 098 816,00 €
4 002 378 147,00 €
|
27 021 280,00 €
551 081 975,00 €
37 902 827,00 €
17 675 961,00 €
63 083 468,00 €
36 393 730,00 €
20 665 946,00 €
50 754 615,00 €
27 197 826,00 €
3 341 341,00 €
17 093 963,00 €
15 095 358,00 €
5 136 455,00 €
4 591 684,00 €
10 224 125,00 €
30 841 182,00 €
3 969 451,00 €
51 060 099,00 €
973 131 287,00 €
|
2,18 %
52,80 %
7,98 %
2,26 %
6,25 %
3,32 %
2,35 %
3,40 %
5,85 %
0,33 %
1,77 %
1,37 %
0,52 %
0,59 %
1,22 %
2,22 %
0,27 %
5,32 %
|
Alentejo |
Alentejo Litoral
Baixo Alentejo
Lezíria do Tejo
Alto Alentejo
Alentejo Central
|
Odemira
Alcácer do Sal
Grândola
Santiago do Cacém
Sines
Total
Aljustrel
Almodôvar
Alvito
Barrancos
Beja
Castro Verde
Cuba
Ferreira do Alentejo
Mértola
Moura
Ourique
Serpa
Vidigueira
Total
Azambuja
Almeirim
Alpiarça
Benavente
Cartaxo
Chamusca
Coruche
Golegã
Rio Maior
Salvaterra de Magos
Santarém
Total
Alter do Chão
Arronches
Avis
Campo Maior
Castelo de Vide
Crato
Elvas
Fronteira
Gavião
Marvão
Monforte
Nisa
Ponte de Sôr
Portalegre
Sousel
Total
Alandroal
Arraiolos
Borba
Estremoz
Évora
Montemor-o-Novo
Mora
Mourão
Portel
Redondo
Reguengos de Monsaraz
Vendas Novas
Viana do Alentejo
Vila Viçosa
Total
|
6 017 960,00 €
7 588 731,00 €
52 719 411,00 €
66 607 893,00 €
39 910 380,00 €
172 844 375,00 €
38 515 766,00 €
5 077 467,00 €
2 980 879,00 €
1 684 237,00 €
74 476 844,00 €
30 923 893,00 €
978 330,00 €
24 201 501,00 €
67 663 332,00 €
2 077 818,00 €
2 395 153,00 €
1 501 795,00 €
1 845 485,00 €
254 322 501,00 €
11 083 255,00 €
1 731 414,00 €
4 153 597,00 €
36 445 566,00 €
7 337 302,00 €
6 442 555,00 €
4 235 252,00 €
7 278 675,00 €
30 566 544,00 €
4 440 917,00 €
73 960 830,00 €
187 675 908,00 €
5 955 061,00 €
1 338 847,00 €
657 773,00 €
20 447 261,00 €
499 083,00 €
612 472,00 €
26 569 093,00 €
1 022 833,00 €
787 379,00 €
2 611 851,00 €
1 180 070,00 €
11 218 125,00 €
21 226 899,00 €
187 474 251,00 €
856 502,00 €
282 457 501,00 €
2 740 117,00 €
1 971 513,00 €
1 312 015,00 €
4 354 155,00 €
118 538 014,00 €
8 739 424,00 €
1 711 560,00 €
1 060 221,00 €
893 406,00 €
3 783 752,00 €
6 687 929,00 €
3 469 793,00 €
1 045 468,00 €
4 894 375,00 €
161 201 742,00 €
|
2 053 077,00 €
738 847,00 €
15 400 952,00 €
16 756 632,00 €
10 066 478,00 €
45 015 985,00 €
9 142 614,00 €
536 197,00 €
474 867,00 €
106 169,00 €
16 528 475,00 €
439 265,00 €
330 912,00 €
6 943 191,00 €
7 199 808,00 €
896 187,00 €
494 741,00 €
620 018,00 €
616 429,00 €
44 328 873,00 €
3 812 035,00 €
880 241,00 €
793 785,00 €
7 428 019,00 €
1 451 315,00 €
2 141 945,00 €
2 458 499,00 €
715 175,00 €
5 573 170,00 €
1 282 332,00 €
18 345 149,00 €
44 881 665,00 €
166 846,00 €
191 331,00 €
241 681,00 €
3 777 492,00 €
255 261,00 €
281 586,00 €
5 127 115,00 €
180 128,00 €
365 465,00 €
273 058,00 €
346 048,00 €
994 378,00 €
3 673 531,00 €
26 285 383,00 €
341 602,00 €
42 500 904,00 €
617 603,00 €
797 489,00 €
623 098,00 €
1 907 254,00 €
30 601 298,00 €
999 824,00 €
561 095,00 €
258 718,00 €
376 607,00 €
436 105,00 €
1 820 889,00 €
1 211 526,00 €
417 781,00 €
1 425 018,00 €
42 054 305,00 €
|
3,48 %
4,39 %
30,50 %
38,54 %
23,09 %
15,14 %
2,00 %
1,17 %
0,66 %
29,28 %
12,16 %
0,38 %
9,52 %
26,61 %
0,82 %
0,94 %
0,59 %
0,73 %
5,91 %
0,92 %
2,21 %
19,42 %
3,91 %
3,43 %
2,26 %
3,88 %
16,29 %
2,37 %
39,41 %
2,11 %
0,47 %
0,23 %
7,24 %
0,18 %
0,22 %
9,41 %
0,36 %
0,28 %
0,92 %
0,42 %
3,97 %
7,52 %
66,37 %
0,30 %
1,70 %
1,22 %
0,81 %
2,70 %
73,53 %
5,42 %
1,06 %
0,66 %
0,55 %
2,35 %
4,15 %
2,15 %
0,65 %
3,04 %
|
Algarve |
Algarve
|
Albufeira
Alcoutim
Aljezur
Castro Marim
Faro
Lagoa
Lagos
Loulé
Monchique
Olhão
Portimão
São Brás de Alportel
Silves
Tavira
Vila do Bispo
Vila Real de Santo António
Total
|
78 926 807,00 €
12 725 615,00 €
789 262,00 €
5 086 811,00 €
128 002 572,00 €
15 687 699,00 €
20 207 889,00 €
42 276 447,00 €
9 911 209,00 €
44 016 145,00 €
34 227 839,00 €
4 619 471,00 €
31 734 372,00 €
17 500 227,00 €
3 790 974,00 €
31 050 220,00 €
480 553 556,00 €
|
13 196 776,00 €
1 330 707,00 €
370 870,00 €
753 986,00 €
24 407 521,00 €
2 276 016,00 €
2 921 137,00 €
12 009 182,00 €
129 101,00 €
10 897 895,00 €
4 928 780,00 €
798 882,00 €
3 731 100,00 €
2 697 912,00 €
494 440,00 €
14 084 961,00 €
95 029 268,00 €
|
16,42 %
2,65 %
0,16 %
1,06 %
26,64 %
3,26 %
4,21 %
8,80 %
2,06 %
9,16 %
7,12 %
0,96 %
6,60 %
3,64 %
0,79 %
6,46 %
|
Autonomous Region of the Azores |
Autonomous Region of the Azores
|
Vila do Porto
Lagoa
Nordeste
Ponta Delgada
Povoação
Ribeira Grande
Vila Franca do Campo
Angra do Heroísmo
Praia da Vitória
Santa Cruz da Graciosa
Calheta
Velas
Lajes do Pico
Madalena
São Roque do Pico
Horta
Lajes das Flores
Santa Cruz das Flores
Corvo
Total
|
8 243 602,00 €
17 900 303,00 €
4 132 712,00 €
447 778 106,00 €
799 399,00 €
83 129 385,00 €
7 544 455,00 €
121 444 433,00 €
4 967 342,00 €
1 235 026,00 €
495 382,00 €
915 653,00 €
1 257 532,00 €
8 797 200,00 €
378 051,00 €
61 196 979,00 €
709 418,00 €
779 080,00 €
80 765,00 €
771 784 822,00 €
|
3 303 862,00 €
4 981 496,00 €
1 065 086,00 €
116 604 888,00 €
301 948,00 €
10 503 635,00 €
1 191 308,00 €
40 804 610,00 €
1 621 829,00 €
358 035,00 €
344 579,00 €
488 723,00 €
201 952,00 €
1 472 001,00 €
226 129,00 €
22 150 332,00 €
44 841,00 €
135 144,00 €
62 632,00 €
205 863 027,00 €
|
1,07 %
2,32 %
0,54 %
58,02 %
0,10 %
10,77 %
0,98 %
15,74 %
0,64 %
0,16 %
0,06 %
0,12 %
0,16 %
1,14 %
0,05 %
7,93 %
0,09 %
0,10 %
0,01 %
|
Autonomous Region of Madeira |
Autonomous Region of Madeira
|
Calheta
Câmara de Lobos
Funchal
Machico
Ponta do Sol
Porto Moniz
Ribeira Brava
Santa Cruz
Santana
São Vicente
Porto Santo
Total
|
835 954,00 €
13 599 494,00 €
580 678 696,00 €
2 379 298,00 €
3 920 595,00 €
115 500,00 €
4 392 679,00 €
19 183 626,00 €
259 475,00 €
36 625 502,00 €
18 779 263,00 €
680 770 080,00 €
|
309 404,00 €
918 298,00 €
110 877 520,00 €
651 237,00 €
710 885,00 €
32 102,00 €
1 358 494,00 €
2 881 306,00 €
104 147,00 €
7 006 525,00 €
4 508 324,00 €
129 358 241,00 €
|
0,12 %
2,00 %
85,30 %
0,35 %
0,58 %
0,02 %
0,65 %
2,82 %
0,04 %
5,38 %
2,76 %
|
Nation-wide investment |
|
|
4 280 107 189,00 €
|
1 192 108 220,00 €
|
|
Distribution of investment by regions
Region
North
:Sub-region
Alto Minho
:Municipality
Arcos de Valdevez
:Approved amount
: 10526699 €,10 526 699,00 €
Amount spent
: 3243033 €,3 243 033,00 €
Percentage of investment
: 5,05 %5,05 %
Municipality
Caminha
:Approved amount
: 1486833 €,1 486 833,00 €
Amount spent
: 640782 €,640 782,00 €
Percentage of investment
: 0,71 %0,71 %
Municipality
Melgaço
:Approved amount
: 17037762 €,17 037 762,00 €
Amount spent
: 2909700 €,2 909 700,00 €
Percentage of investment
: 8,18 %8,18 %
Municipality
Monção
:Approved amount
: 14166343 €,14 166 343,00 €
Amount spent
: 3787621 €,3 787 621,00 €
Percentage of investment
: 6,8 %6,80 %
Municipality
Paredes de Coura
:Approved amount
: 4140316 €,4 140 316,00 €
Amount spent
: 1526299 €,1 526 299,00 €
Percentage of investment
: 1,99 %1,99 %
Municipality
Ponte da Barca
:Approved amount
: 5395679 €,5 395 679,00 €
Amount spent
: 1050915 €,1 050 915,00 €
Percentage of investment
: 2,59 %2,59 %
Municipality
Ponte de Lima
:Approved amount
: 19213909 €,19 213 909,00 €
Amount spent
: 7407651 €,7 407 651,00 €
Percentage of investment
: 9,22 %9,22 %
Municipality
Valença
:Approved amount
: 11048194 €,11 048 194,00 €
Amount spent
: 2838600 €,2 838 600,00 €
Percentage of investment
: 5,3 %5,30 %
Municipality
Viana do Castelo
:Approved amount
: 110856032 €,110 856 032,00 €
Amount spent
: 23955874 €,23 955 874,00 €
Percentage of investment
: 53,19 %53,19 %
Municipality
Vila Nova de Cerveira
:Approved amount
: 14540391 €,14 540 391,00 €
Amount spent
: 3081372 €,3 081 372,00 €
Percentage of investment
: 6,98 %6,98 %
Total
Approved amount
: 208412159 €,208 412 159,00 €
Amount spent
: 50441847 €,50 441 847,00 €
Percentage of investment
Sub-region
Cávado
:Municipality
Amares
:Approved amount
: 3524580 €,3 524 580,00 €
Amount spent
: 1906497 €,1 906 497,00 €
Percentage of investment
: 0,67 %0,67 %
Municipality
Barcelos
:Approved amount
: 82943732 €,82 943 732,00 €
Amount spent
: 35451635 €,35 451 635,00 €
Percentage of investment
: 15,78 %15,78 %
Municipality
Braga
:Approved amount
: 388572780 €,388 572 780,00 €
Amount spent
: 95087509 €,95 087 509,00 €
Percentage of investment
: 73,93 %73,93 %
Municipality
Esposende
:Approved amount
: 27188650 €,27 188 650,00 €
Amount spent
: 3355957 €,3 355 957,00 €
Percentage of investment
: 5,17 %5,17 %
Municipality
Terras de Bouro
:Approved amount
: 2026059 €,2 026 059,00 €
Amount spent
: 750435 €,750 435,00 €
Percentage of investment
: 0,39 %0,39 %
Municipality
Vila Verde
:Approved amount
: 21349950 €,21 349 950,00 €
Amount spent
: 5585468 €,5 585 468,00 €
Percentage of investment
: 4,06 %4,06 %
Total
Approved amount
: 525605752 €,525 605 752,00 €
Amount spent
: 142137501 €,142 137 501,00 €
Percentage of investment
Sub-region
Ave
:Municipality
Cabeceiras de Basto
:Approved amount
: 3108772 €,3 108 772,00 €
Amount spent
: 1529742 €,1 529 742,00 €
Percentage of investment
: 0,77 %0,77 %
Municipality
Fafe
:Approved amount
: 16242771 €,16 242 771,00 €
Amount spent
: 7355671 €,7 355 671,00 €
Percentage of investment
: 4,02 %4,02 %
Municipality
Guimarães
:Approved amount
: 172035182 €,172 035 182,00 €
Amount spent
: 57595559 €,57 595 559,00 €
Percentage of investment
: 42,55 %42,55 %
Municipality
Póvoa de Lanhoso
:Approved amount
: 5967188 €,5 967 188,00 €
Amount spent
: 2979098 €,2 979 098,00 €
Percentage of investment
: 1,48 %1,48 %
Municipality
Vieira do Minho
:Approved amount
: 1512292 €,1 512 292,00 €
Amount spent
: 832452 €,832 452,00 €
Percentage of investment
: 0,37 %0,37 %
Municipality
Vila Nova de Famalicão
:Approved amount
: 184324424 €,184 324 424,00 €
Amount spent
: 61603887 €,61 603 887,00 €
Percentage of investment
: 45,59 %45,59 %
Municipality
Vizela
:Approved amount
: 14889694 €,14 889 694,00 €
Amount spent
: 7515970 €,7 515 970,00 €
Percentage of investment
: 3,68 %3,68 %
Municipality
Mondim de Basto
:Approved amount
: 6234970 €,6 234 970,00 €
Amount spent
: 1598453 €,1 598 453,00 €
Percentage of investment
: 1,54 %1,54 %
Total
Approved amount
: 404315293 €,404 315 293,00 €
Amount spent
: 141010832 €,141 010 832,00 €
Percentage of investment
Sub-region
Área Metropolitana do Porto
:Municipality
Arouca
:Approved amount
: 19704129 €,19 704 129,00 €
Amount spent
: 3166239 €,3 166 239,00 €
Percentage of investment
: 0,73 %0,73 %
Municipality
Espinho
:Approved amount
: 9406703 €,9 406 703,00 €
Amount spent
: 2189971 €,2 189 971,00 €
Percentage of investment
: 0,35 %0,35 %
Municipality
Santa Maria da Feira
:Approved amount
: 105784097 €,105 784 097,00 €
Amount spent
: 24038825 €,24 038 825,00 €
Percentage of investment
: 3,9 %3,90 %
Municipality
Oliveira de Azeméis
:Approved amount
: 51638693 €,51 638 693,00 €
Amount spent
: 16332110 €,16 332 110,00 €
Percentage of investment
: 1,9 %1,90 %
Municipality
São João da Madeira
:Approved amount
: 50407024 €,50 407 024,00 €
Amount spent
: 10920094 €,10 920 094,00 €
Percentage of investment
: 1,86 %1,86 %
Municipality
Vale de Cambra
:Approved amount
: 21298913 €,21 298 913,00 €
Amount spent
: 5398050 €,5 398 050,00 €
Percentage of investment
: 0,79 %0,79 %
Municipality
Gondomar
:Approved amount
: 72999930 €,72 999 930,00 €
Amount spent
: 14403575 €,14 403 575,00 €
Percentage of investment
: 2,69 %2,69 %
Municipality
Maia
:Approved amount
: 217783076 €,217 783 076,00 €
Amount spent
: 51415130 €,51 415 130,00 €
Percentage of investment
: 8,03 %8,03 %
Municipality
Matosinhos
:Approved amount
: 494556850 €,494 556 850,00 €
Amount spent
: 149745023 €,149 745 023,00 €
Percentage of investment
: 18,23 %18,23 %
Municipality
Paredes
:Approved amount
: 43133800 €,43 133 800,00 €
Amount spent
: 15558191 €,15 558 191,00 €
Percentage of investment
: 1,59 %1,59 %
Municipality
Porto
:Approved amount
: 893474897 €,893 474 897,00 €
Amount spent
: 251100294 €,251 100 294,00 €
Percentage of investment
: 32,94 %32,94 %
Municipality
Póvoa de Varzim
:Approved amount
: 61084978 €,61 084 978,00 €
Amount spent
: 19211437 €,19 211 437,00 €
Percentage of investment
: 2,25 %2,25 %
Municipality
Santo Tirso
:Approved amount
: 61455687 €,61 455 687,00 €
Amount spent
: 11670854 €,11 670 854,00 €
Percentage of investment
: 2,27 %2,27 %
Municipality
Valongo
:Approved amount
: 51824483 €,51 824 483,00 €
Amount spent
: 6723192 €,6 723 192,00 €
Percentage of investment
: 1,91 %1,91 %
Municipality
Vila do Conde
:Approved amount
: 71057441 €,71 057 441,00 €
Amount spent
: 22950970 €,22 950 970,00 €
Percentage of investment
: 2,62 %2,62 %
Municipality
Vila Nova de Gaia
:Approved amount
: 423305673 €,423 305 673,00 €
Amount spent
: 84122549 €,84 122 549,00 €
Percentage of investment
: 15,61 %15,61 %
Municipality
Trofa
:Approved amount
: 63428278 €,63 428 278,00 €
Amount spent
: 18454345 €,18 454 345,00 €
Percentage of investment
: 2,34 %2,34 %
Total
Approved amount
: 2712344654 €,2 712 344 654,00 €
Amount spent
: 707400850 €,707 400 850,00 €
Percentage of investment
Sub-region
Alto Tâmega
:Municipality
Boticas
:Approved amount
: 2496948 €,2 496 948,00 €
Amount spent
: 698735 €,698 735,00 €
Percentage of investment
: 4,06 %4,06 %
Municipality
Chaves
:Approved amount
: 37170413 €,37 170 413,00 €
Amount spent
: 7339986 €,7 339 986,00 €
Percentage of investment
: 60,43 %60,43 %
Municipality
Montalegre
:Approved amount
: 1886739 €,1 886 739,00 €
Amount spent
: 1012198 €,1 012 198,00 €
Percentage of investment
: 3,07 %3,07 %
Municipality
Ribeira de Pena
:Approved amount
: 9131069 €,9 131 069,00 €
Amount spent
: 2485770 €,2 485 770,00 €
Percentage of investment
: 14,84 %14,84 %
Municipality
Valpaços
:Approved amount
: 2668559 €,2 668 559,00 €
Amount spent
: 1250454 €,1 250 454,00 €
Percentage of investment
: 4,34 %4,34 %
Municipality
Vila Pouca de Aguiar
:Approved amount
: 8155888 €,8 155 888,00 €
Amount spent
: 1997128 €,1 997 128,00 €
Percentage of investment
: 13,26 %13,26 %
Total
Approved amount
: 61509615 €,61 509 615,00 €
Amount spent
: 14784272 €,14 784 272,00 €
Percentage of investment
Sub-region
Tâmega e Sousa
:Municipality
Castelo de Paiva
:Approved amount
: 12963988 €,12 963 988,00 €
Amount spent
: 4415913 €,4 415 913,00 €
Percentage of investment
: 3,47 %3,47 %
Municipality
Celorico de Basto
:Approved amount
: 20278162 €,20 278 162,00 €
Amount spent
: 5984437 €,5 984 437,00 €
Percentage of investment
: 5,43 %5,43 %
Municipality
Amarante
:Approved amount
: 16361421 €,16 361 421,00 €
Amount spent
: 4800973 €,4 800 973,00 €
Percentage of investment
: 4,38 %4,38 %
Municipality
Baião
:Approved amount
: 43863296 €,43 863 296,00 €
Amount spent
: 12054869 €,12 054 869,00 €
Percentage of investment
: 11,74 %11,74 %
Municipality
Felgueiras
:Approved amount
: 42528542 €,42 528 542,00 €
Amount spent
: 14322086 €,14 322 086,00 €
Percentage of investment
: 11,38 %11,38 %
Municipality
Lousada
:Approved amount
: 39803545 €,39 803 545,00 €
Amount spent
: 13527173 €,13 527 173,00 €
Percentage of investment
: 10,65 %10,65 %
Municipality
Marco de Canaveses
:Approved amount
: 17364491 €,17 364 491,00 €
Amount spent
: 6304949 €,6 304 949,00 €
Percentage of investment
: 4,65 %4,65 %
Municipality
Paços de Ferreira
:Approved amount
: 66417254 €,66 417 254,00 €
Amount spent
: 13515783 €,13 515 783,00 €
Percentage of investment
: 17,78 %17,78 %
Municipality
Penafiel
:Approved amount
: 103882285 €,103 882 285,00 €
Amount spent
: 27854270 €,27 854 270,00 €
Percentage of investment
: 27,8 %27,80 %
Municipality
Cinfães
:Approved amount
: 7801687 €,7 801 687,00 €
Amount spent
: 1465203 €,1 465 203,00 €
Percentage of investment
: 2,09 %2,09 %
Municipality
Resende
:Approved amount
: 2362337 €,2 362 337,00 €
Amount spent
: 1283308 €,1 283 308,00 €
Percentage of investment
: 0,63 %0,63 %
Total
Approved amount
: 373627007 €,373 627 007,00 €
Amount spent
: 105528964 €,105 528 964,00 €
Percentage of investment
Sub-region
Douro
:Municipality
Carrazeda de Ansiães
:Approved amount
: 2019541 €,2 019 541,00 €
Amount spent
: 337280 €,337 280,00 €
Percentage of investment
: 0,98 %0,98 %
Municipality
Freixo de Espada à Cinta
:Approved amount
: 1881687 €,1 881 687,00 €
Amount spent
: 236303 €,236 303,00 €
Percentage of investment
: 0,91 %0,91 %
Municipality
Torre de Moncorvo
:Approved amount
: 2824241 €,2 824 241,00 €
Amount spent
: 1233138 €,1 233 138,00 €
Percentage of investment
: 1,37 %1,37 %
Municipality
Vila Nova de Foz Côa
:Approved amount
: 2741258 €,2 741 258,00 €
Amount spent
: 497149 €,497 149,00 €
Percentage of investment
: 1,33 %1,33 %
Municipality
Alijó
:Approved amount
: 10138071 €,10 138 071,00 €
Amount spent
: 2357025 €,2 357 025,00 €
Percentage of investment
: 4,91 %4,91 %
Municipality
Mesão Frio
:Approved amount
: 384960 €,384 960,00 €
Amount spent
: 261573 €,261 573,00 €
Percentage of investment
: 0,19 %0,19 %
Municipality
Murça
:Approved amount
: 2002958 €,2 002 958,00 €
Amount spent
: 584560 €,584 560,00 €
Percentage of investment
: 0,97 %0,97 %
Municipality
Peso da Régua
:Approved amount
: 15271787 €,15 271 787,00 €
Amount spent
: 3388966 €,3 388 966,00 €
Percentage of investment
: 7,4 %7,40 %
Municipality
Sabrosa
:Approved amount
: 1170496 €,1 170 496,00 €
Amount spent
: 407994 €,407 994,00 €
Percentage of investment
: 0,57 %0,57 %
Municipality
Santa Marta de Penaguião
:Approved amount
: 7622402 €,7 622 402,00 €
Amount spent
: 830914 €,830 914,00 €
Percentage of investment
: 3,69 %3,69 %
Municipality
Vila Real
:Approved amount
: 129689564 €,129 689 564,00 €
Amount spent
: 32272121 €,32 272 121,00 €
Percentage of investment
: 62,85 %62,85 %
Municipality
Armamar
:Approved amount
: 2721138 €,2 721 138,00 €
Amount spent
: 483052 €,483 052,00 €
Percentage of investment
: 1,32 %1,32 %
Municipality
Lamego
:Approved amount
: 9986842 €,9 986 842,00 €
Amount spent
: 2801934 €,2 801 934,00 €
Percentage of investment
: 4,84 %4,84 %
Municipality
Moimenta da Beira
:Approved amount
: 4615747 €,4 615 747,00 €
Amount spent
: 1357862 €,1 357 862,00 €
Percentage of investment
: 2,24 %2,24 %
Municipality
Penedono
:Approved amount
: 1324923 €,1 324 923,00 €
Amount spent
: 306060 €,306 060,00 €
Percentage of investment
: 0,64 %0,64 %
Municipality
São João da Pesqueira
:Approved amount
: 6242923 €,6 242 923,00 €
Amount spent
: 1740621 €,1 740 621,00 €
Percentage of investment
: 3,03 %3,03 %
Municipality
Sernancelhe
:Approved amount
: 2140730 €,2 140 730,00 €
Amount spent
: 747671 €,747 671,00 €
Percentage of investment
: 1,04 %1,04 %
Municipality
Tabuaço
:Approved amount
: 1471744 €,1 471 744,00 €
Amount spent
: 485257 €,485 257,00 €
Percentage of investment
: 0,71 %0,71 %
Municipality
Tarouca
:Approved amount
: 2103288 €,2 103 288,00 €
Amount spent
: 1067407 €,1 067 407,00 €
Percentage of investment
: 1,02 %1,02 %
Total
Approved amount
: 206354297 €,206 354 297,00 €
Amount spent
: 51396889 €,51 396 889,00 €
Percentage of investment
Sub-region
Terras de Trás-os-Montes
:Municipality
Alfândega da Fé
:Approved amount
: 6975312 €,6 975 312,00 €
Amount spent
: 2088479 €,2 088 479,00 €
Percentage of investment
: 4,8 %4,80 %
Municipality
Bragança
:Approved amount
: 71229820 €,71 229 820,00 €
Amount spent
: 18538058 €,18 538 058,00 €
Percentage of investment
: 49,04 %49,04 %
Municipality
Macedo de Cavaleiros
:Approved amount
: 6631270 €,6 631 270,00 €
Amount spent
: 1855538 €,1 855 538,00 €
Percentage of investment
: 4,57 %4,57 %
Municipality
Miranda do Douro
:Approved amount
: 1755162 €,1 755 162,00 €
Amount spent
: 688193 €,688 193,00 €
Percentage of investment
: 1,21 %1,21 %
Municipality
Mirandela
:Approved amount
: 16149762 €,16 149 762,00 €
Amount spent
: 5936478 €,5 936 478,00 €
Percentage of investment
: 11,12 %11,12 %
Municipality
Mogadouro
:Approved amount
: 3969939 €,3 969 939,00 €
Amount spent
: 1346898 €,1 346 898,00 €
Percentage of investment
: 2,73 %2,73 %
Municipality
Vila Flor
:Approved amount
: 794159 €,794 159,00 €
Amount spent
: 517950 €,517 950,00 €
Percentage of investment
: 0,55 %0,55 %
Municipality
Vimioso
:Approved amount
: 1677891 €,1 677 891,00 €
Amount spent
: 385106 €,385 106,00 €
Percentage of investment
: 1,16 %1,16 %
Municipality
Vinhais
:Approved amount
: 36078863 €,36 078 863,00 €
Amount spent
: 5280316 €,5 280 316,00 €
Percentage of investment
: 24,84 %24,84 %
Total
Approved amount
: 145262179 €,145 262 179,00 €
Amount spent
: 36637017 €,36 637 017,00 €
Percentage of investment
Region
Center
:Sub-region
Oeste
:Municipality
Alcobaça
:Approved amount
: 31535832 €,31 535 832,00 €
Amount spent
: 9115664 €,9 115 664,00 €
Percentage of investment
: 14,17 %14,17 %
Municipality
Bombarral
:Approved amount
: 4805181 €,4 805 181,00 €
Amount spent
: 1295992 €,1 295 992,00 €
Percentage of investment
: 2,16 %2,16 %
Municipality
Caldas da Rainha
:Approved amount
: 43476960 €,43 476 960,00 €
Amount spent
: 12045660 €,12 045 660,00 €
Percentage of investment
: 19,53 %19,53 %
Municipality
Nazaré
:Approved amount
: 22686185 €,22 686 185,00 €
Amount spent
: 3869579 €,3 869 579,00 €
Percentage of investment
: 10,19 %10,19 %
Municipality
Óbidos
:Approved amount
: 6682545 €,6 682 545,00 €
Amount spent
: 2134797 €,2 134 797,00 €
Percentage of investment
: 3 %3,00 %
Municipality
Peniche
:Approved amount
: 23463373 €,23 463 373,00 €
Amount spent
: 5700997 €,5 700 997,00 €
Percentage of investment
: 10,54 %10,54 %
Municipality
Alenquer
:Approved amount
: 25686289 €,25 686 289,00 €
Amount spent
: 4913826 €,4 913 826,00 €
Percentage of investment
: 11,54 %11,54 %
Municipality
Arruda dos Vinhos
:Approved amount
: 17770368 €,17 770 368,00 €
Amount spent
: 5431722 €,5 431 722,00 €
Percentage of investment
: 7,98 %7,98 %
Municipality
Cadaval
:Approved amount
: 2731866 €,2 731 866,00 €
Amount spent
: 1278792 €,1 278 792,00 €
Percentage of investment
: 1,23 %1,23 %
Municipality
Lourinhã
:Approved amount
: 5184736 €,5 184 736,00 €
Amount spent
: 1760680 €,1 760 680,00 €
Percentage of investment
: 2,33 %2,33 %
Municipality
Sobral de Monte Agraço
:Approved amount
: 1003759 €,1 003 759,00 €
Amount spent
: 556307 €,556 307,00 €
Percentage of investment
: 0,45 %0,45 %
Municipality
Torres Vedras
:Approved amount
: 37572267 €,37 572 267,00 €
Amount spent
: 8381264 €,8 381 264,00 €
Percentage of investment
: 16,88 %16,88 %
Total
Approved amount
: 222599361 €,222 599 361,00 €
Amount spent
: 56485280 €,56 485 280,00 €
Percentage of investment
Sub-region
Região de Aveiro
:Municipality
Águeda
:Approved amount
: 151562237 €,151 562 237,00 €
Amount spent
: 37477458 €,37 477 458,00 €
Percentage of investment
: 19,7 %19,70 %
Municipality
Albergaria-a-Velha
:Approved amount
: 18448321 €,18 448 321,00 €
Amount spent
: 4823509 €,4 823 509,00 €
Percentage of investment
: 2,4 %2,40 %
Municipality
Anadia
:Approved amount
: 22523651 €,22 523 651,00 €
Amount spent
: 6784763 €,6 784 763,00 €
Percentage of investment
: 2,93 %2,93 %
Municipality
Aveiro
:Approved amount
: 243792966 €,243 792 966,00 €
Amount spent
: 66531662 €,66 531 662,00 €
Percentage of investment
: 31,69 %31,69 %
Municipality
Estarreja
:Approved amount
: 134845978 €,134 845 978,00 €
Amount spent
: 29974418 €,29 974 418,00 €
Percentage of investment
: 17,53 %17,53 %
Municipality
Ílhavo
:Approved amount
: 105324262 €,105 324 262,00 €
Amount spent
: 23942384 €,23 942 384,00 €
Percentage of investment
: 13,69 %13,69 %
Municipality
Murtosa
:Approved amount
: 10576200 €,10 576 200,00 €
Amount spent
: 10106305 €,10 106 305,00 €
Percentage of investment
: 1,37 %1,37 %
Municipality
Oliveira do Bairro
:Approved amount
: 27107263 €,27 107 263,00 €
Amount spent
: 5864925 €,5 864 925,00 €
Percentage of investment
: 3,52 %3,52 %
Municipality
Ovar
:Approved amount
: 36095069 €,36 095 069,00 €
Amount spent
: 9235804 €,9 235 804,00 €
Percentage of investment
: 4,69 %4,69 %
Municipality
Sever do Vouga
:Approved amount
: 6833217 €,6 833 217,00 €
Amount spent
: 2137321 €,2 137 321,00 €
Percentage of investment
: 0,89 %0,89 %
Municipality
Vagos
:Approved amount
: 12295357 €,12 295 357,00 €
Amount spent
: 3433653 €,3 433 653,00 €
Percentage of investment
: 1,6 %1,60 %
Total
Approved amount
: 769404521 €,769 404 521,00 €
Amount spent
: 200312199 €,200 312 199,00 €
Percentage of investment
Sub-region
Região de Coimbra
:Municipality
Mealhada
:Approved amount
: 7300333 €,7 300 333,00 €
Amount spent
: 952207 €,952 207,00 €
Percentage of investment
: 1,16 %1,16 %
Municipality
Arganil
:Approved amount
: 14654196 €,14 654 196,00 €
Amount spent
: 2300793 €,2 300 793,00 €
Percentage of investment
: 2,33 %2,33 %
Municipality
Cantanhede
:Approved amount
: 25172808 €,25 172 808,00 €
Amount spent
: 8483583 €,8 483 583,00 €
Percentage of investment
: 4 %4,00 %
Municipality
Coimbra
:Approved amount
: 344441586 €,344 441 586,00 €
Amount spent
: 87929097 €,87 929 097,00 €
Percentage of investment
: 54,73 %54,73 %
Municipality
Condeixa-a-Nova
:Approved amount
: 9664894 €,9 664 894,00 €
Amount spent
: 1624867 €,1 624 867,00 €
Percentage of investment
: 1,54 %1,54 %
Municipality
Figueira da Foz
:Approved amount
: 106619879 €,106 619 879,00 €
Amount spent
: 22846047 €,22 846 047,00 €
Percentage of investment
: 16,94 %16,94 %
Municipality
Góis
:Approved amount
: 1613691 €,1 613 691,00 €
Amount spent
: 437302 €,437 302,00 €
Percentage of investment
: 0,26 %0,26 %
Municipality
Lousã
:Approved amount
: 14616473 €,14 616 473,00 €
Amount spent
: 1559656 €,1 559 656,00 €
Percentage of investment
: 2,32 %2,32 %
Municipality
Mira
:Approved amount
: 12864379 €,12 864 379,00 €
Amount spent
: 2729659 €,2 729 659,00 €
Percentage of investment
: 2,04 %2,04 %
Municipality
Miranda do Corvo
:Approved amount
: 2648028 €,2 648 028,00 €
Amount spent
: 936894 €,936 894,00 €
Percentage of investment
: 0,42 %0,42 %
Municipality
Montemor-o-Velho
:Approved amount
: 10402605 €,10 402 605,00 €
Amount spent
: 2329761 €,2 329 761,00 €
Percentage of investment
: 1,65 %1,65 %
Municipality
Oliveira do Hospital
:Approved amount
: 38987321 €,38 987 321,00 €
Amount spent
: 9481308 €,9 481 308,00 €
Percentage of investment
: 6,19 %6,19 %
Municipality
Pampilhosa da Serra
:Approved amount
: 9493507 €,9 493 507,00 €
Amount spent
: 2686914 €,2 686 914,00 €
Percentage of investment
: 1,51 %1,51 %
Municipality
Penacova
:Approved amount
: 6457173 €,6 457 173,00 €
Amount spent
: 2219119 €,2 219 119,00 €
Percentage of investment
: 1,03 %1,03 %
Municipality
Penela
:Approved amount
: 883289 €,883 289,00 €
Amount spent
: 454085 €,454 085,00 €
Percentage of investment
: 0,14 %0,14 %
Municipality
Soure
:Approved amount
: 2364377 €,2 364 377,00 €
Amount spent
: 1063820 €,1 063 820,00 €
Percentage of investment
: 0,38 %0,38 %
Municipality
Tábua
:Approved amount
: 13398314 €,13 398 314,00 €
Amount spent
: 1705950 €,1 705 950,00 €
Percentage of investment
: 2,13 %2,13 %
Municipality
Vila Nova de Poiares
:Approved amount
: 3397056 €,3 397 056,00 €
Amount spent
: 938170 €,938 170,00 €
Percentage of investment
: 0,54 %0,54 %
Municipality
Mortágua
:Approved amount
: 4370605 €,4 370 605,00 €
Amount spent
: 1537468 €,1 537 468,00 €
Percentage of investment
: 0,69 %0,69 %
Total
Approved amount
: 629350513 €,629 350 513,00 €
Amount spent
: 152216700 €,152 216 700,00 €
Percentage of investment
Sub-region
Região de Leiria
:Municipality
Alvaiázere
:Approved amount
: 8316161 €,8 316 161,00 €
Amount spent
: 502407 €,502 407,00 €
Percentage of investment
: 2,17 %2,17 %
Municipality
Ansião
:Approved amount
: 7536367 €,7 536 367,00 €
Amount spent
: 1776219 €,1 776 219,00 €
Percentage of investment
: 1,96 %1,96 %
Municipality
Batalha
:Approved amount
: 22205930 €,22 205 930,00 €
Amount spent
: 8180856 €,8 180 856,00 €
Percentage of investment
: 5,78 %5,78 %
Municipality
Castanheira de Pêra
:Approved amount
: 3274763 €,3 274 763,00 €
Amount spent
: 411297 €,411 297,00 €
Percentage of investment
: 0,85 %0,85 %
Municipality
Figueiró dos Vinhos
:Approved amount
: 1989989 €,1 989 989,00 €
Amount spent
: 633960 €,633 960,00 €
Percentage of investment
: 0,52 %0,52 %
Municipality
Leiria
:Approved amount
: 162726577 €,162 726 577,00 €
Amount spent
: 59119429 €,59 119 429,00 €
Percentage of investment
: 42,37 %42,37 %
Municipality
Marinha Grande
:Approved amount
: 99925929 €,99 925 929,00 €
Amount spent
: 27162570 €,27 162 570,00 €
Percentage of investment
: 26,02 %26,02 %
Municipality
Pedrógão Grande
:Approved amount
: 2743358 €,2 743 358,00 €
Amount spent
: 778234 €,778 234,00 €
Percentage of investment
: 0,71 %0,71 %
Municipality
Pombal
:Approved amount
: 45615297 €,45 615 297,00 €
Amount spent
: 11681357 €,11 681 357,00 €
Percentage of investment
: 11,88 %11,88 %
Municipality
Porto de Mós
:Approved amount
: 29706935 €,29 706 935,00 €
Amount spent
: 6927757 €,6 927 757,00 €
Percentage of investment
: 7,74 %7,74 %
Total
Approved amount
: 384041307 €,384 041 307,00 €
Amount spent
: 117174085 €,117 174 085,00 €
Percentage of investment
Sub-region
Viseu Dão Lafões
:Municipality
Aguiar da Beira
:Approved amount
: 4063231 €,4 063 231,00 €
Amount spent
: 690403 €,690 403,00 €
Percentage of investment
: 1,41 %1,41 %
Municipality
Carregal do Sal
:Approved amount
: 10549035 €,10 549 035,00 €
Amount spent
: 1212005 €,1 212 005,00 €
Percentage of investment
: 3,67 %3,67 %
Municipality
Castro Daire
:Approved amount
: 8029009 €,8 029 009,00 €
Amount spent
: 2104166 €,2 104 166,00 €
Percentage of investment
: 2,79 %2,79 %
Municipality
Mangualde
:Approved amount
: 80098092 €,80 098 092,00 €
Amount spent
: 24905152 €,24 905 152,00 €
Percentage of investment
: 27,86 %27,86 %
Municipality
Nelas
:Approved amount
: 8226000 €,8 226 000,00 €
Amount spent
: 2477403 €,2 477 403,00 €
Percentage of investment
: 2,86 %2,86 %
Municipality
Oliveira de Frades
:Approved amount
: 15685163 €,15 685 163,00 €
Amount spent
: 4244481 €,4 244 481,00 €
Percentage of investment
: 5,46 %5,46 %
Municipality
Penalva do Castelo
:Approved amount
: 5219885 €,5 219 885,00 €
Amount spent
: 1878555 €,1 878 555,00 €
Percentage of investment
: 1,82 %1,82 %
Municipality
Santa Comba Dão
:Approved amount
: 1620730 €,1 620 730,00 €
Amount spent
: 630086 €,630 086,00 €
Percentage of investment
: 0,56 %0,56 %
Municipality
São Pedro do Sul
:Approved amount
: 7718581 €,7 718 581,00 €
Amount spent
: 2587945 €,2 587 945,00 €
Percentage of investment
: 2,68 %2,68 %
Municipality
Sátão
:Approved amount
: 6077096 €,6 077 096,00 €
Amount spent
: 1136810 €,1 136 810,00 €
Percentage of investment
: 2,11 %2,11 %
Municipality
Tondela
:Approved amount
: 25740303 €,25 740 303,00 €
Amount spent
: 7066216 €,7 066 216,00 €
Percentage of investment
: 8,95 %8,95 %
Municipality
Vila Nova de Paiva
:Approved amount
: 2157343 €,2 157 343,00 €
Amount spent
: 492464 €,492 464,00 €
Percentage of investment
: 0,75 %0,75 %
Municipality
Viseu
:Approved amount
: 97946005 €,97 946 005,00 €
Amount spent
: 30108250 €,30 108 250,00 €
Percentage of investment
: 34,06 %34,06 %
Municipality
Vouzela
:Approved amount
: 14401742 €,14 401 742,00 €
Amount spent
: 3759195 €,3 759 195,00 €
Percentage of investment
: 5,01 %5,01 %
Total
Approved amount
: 287532215 €,287 532 215,00 €
Amount spent
: 83293132 €,83 293 132,00 €
Percentage of investment
Sub-region
Beira Baixa
:Municipality
Castelo Branco
:Approved amount
: 44383668 €,44 383 668,00 €
Amount spent
: 10909911 €,10 909 911,00 €
Percentage of investment
: 44,46 %44,46 %
Municipality
Idanha-a-Nova
:Approved amount
: 7388962 €,7 388 962,00 €
Amount spent
: 2074657 €,2 074 657,00 €
Percentage of investment
: 7,4 %7,40 %
Municipality
Oleiros
:Approved amount
: 14340701 €,14 340 701,00 €
Amount spent
: 3349263 €,3 349 263,00 €
Percentage of investment
: 14,36 %14,36 %
Municipality
Penamacor
:Approved amount
: 1107065 €,1 107 065,00 €
Amount spent
: 386026 €,386 026,00 €
Percentage of investment
: 1,11 %1,11 %
Municipality
Proença-a-Nova
:Approved amount
: 2102742 €,2 102 742,00 €
Amount spent
: 886937 €,886 937,00 €
Percentage of investment
: 2,11 %2,11 %
Municipality
Vila Velha de Ródão
:Approved amount
: 30515271 €,30 515 271,00 €
Amount spent
: 2768212 €,2 768 212,00 €
Percentage of investment
: 30,56 %30,56 %
Total
Approved amount
: 99838409 €,99 838 409,00 €
Amount spent
: 20375006 €,20 375 006,00 €
Percentage of investment
Sub-region
Médio Tejo
:Municipality
Sertã
:Approved amount
: 5615596 €,5 615 596,00 €
Amount spent
: 1778790 €,1 778 790,00 €
Percentage of investment
: 2,44 %2,44 %
Municipality
Vila de Rei
:Approved amount
: 5246239 €,5 246 239,00 €
Amount spent
: 1723208 €,1 723 208,00 €
Percentage of investment
: 2,28 %2,28 %
Municipality
Abrantes
:Approved amount
: 15658322 €,15 658 322,00 €
Amount spent
: 9470363 €,9 470 363,00 €
Percentage of investment
: 6,8 %6,80 %
Municipality
Alcanena
:Approved amount
: 27972692 €,27 972 692,00 €
Amount spent
: 7673174 €,7 673 174,00 €
Percentage of investment
: 12,15 %12,15 %
Municipality
Constância
:Approved amount
: 34100837 €,34 100 837,00 €
Amount spent
: 9478591 €,9 478 591,00 €
Percentage of investment
: 14,81 %14,81 %
Municipality
Entroncamento
:Approved amount
: 30808606 €,30 808 606,00 €
Amount spent
: 7702392 €,7 702 392,00 €
Percentage of investment
: 13,38 %13,38 %
Municipality
Ferreira do Zêzere
:Approved amount
: 14536452 €,14 536 452,00 €
Amount spent
: 4540616 €,4 540 616,00 €
Percentage of investment
: 6,31 %6,31 %
Municipality
Mação
:Approved amount
: 7722497 €,7 722 497,00 €
Amount spent
: 2472975 €,2 472 975,00 €
Percentage of investment
: 3,35 %3,35 %
Municipality
Sardoal
:Approved amount
: 2269934 €,2 269 934,00 €
Amount spent
: 631867 €,631 867,00 €
Percentage of investment
: 0,99 %0,99 %
Municipality
Tomar
:Approved amount
: 31833889 €,31 833 889,00 €
Amount spent
: 8939033 €,8 939 033,00 €
Percentage of investment
: 13,83 %13,83 %
Municipality
Torres Novas
:Approved amount
: 25918502 €,25 918 502,00 €
Amount spent
: 6859042 €,6 859 042,00 €
Percentage of investment
: 11,26 %11,26 %
Municipality
Vila Nova da Barquinha
:Approved amount
: 3090740 €,3 090 740,00 €
Amount spent
: 1183008 €,1 183 008,00 €
Percentage of investment
: 1,34 %1,34 %
Municipality
Ourém
:Approved amount
: 25434454 €,25 434 454,00 €
Amount spent
: 8754710 €,8 754 710,00 €
Percentage of investment
: 11,05 %11,05 %
Total
Approved amount
: 230208760 €,230 208 760,00 €
Amount spent
: 71207770 €,71 207 770,00 €
Percentage of investment
Sub-region
Beiras e Serra da Estrela
:Municipality
Belmonte
:Approved amount
: 1685223 €,1 685 223,00 €
Amount spent
: 465502 €,465 502,00 €
Percentage of investment
: 0,78 %0,78 %
Municipality
Covilhã
:Approved amount
: 61709213 €,61 709 213,00 €
Amount spent
: 18029236 €,18 029 236,00 €
Percentage of investment
: 28,72 %28,72 %
Municipality
Fundão
:Approved amount
: 39708212 €,39 708 212,00 €
Amount spent
: 10332017 €,10 332 017,00 €
Percentage of investment
: 18,48 %18,48 %
Municipality
Almeida
:Approved amount
: 4402408 €,4 402 408,00 €
Amount spent
: 835625 €,835 625,00 €
Percentage of investment
: 2,05 %2,05 %
Municipality
Celorico da Beira
:Approved amount
: 4769974 €,4 769 974,00 €
Amount spent
: 633769 €,633 769,00 €
Percentage of investment
: 2,22 %2,22 %
Municipality
Figueira de Castelo Rodrigo
:Approved amount
: 939564 €,939 564,00 €
Amount spent
: 465753 €,465 753,00 €
Percentage of investment
: 0,44 %0,44 %
Municipality
Fornos de Algodres
:Approved amount
: 3945595 €,3 945 595,00 €
Amount spent
: 1045912 €,1 045 912,00 €
Percentage of investment
: 1,84 %1,84 %
Municipality
Gouveia
:Approved amount
: 3848436 €,3 848 436,00 €
Amount spent
: 1242110 €,1 242 110,00 €
Percentage of investment
: 1,79 %1,79 %
Municipality
Guarda
:Approved amount
: 47150011 €,47 150 011,00 €
Amount spent
: 10106756 €,10 106 756,00 €
Percentage of investment
: 21,94 %21,94 %
Municipality
Manteigas
:Approved amount
: 1012501 €,1 012 501,00 €
Amount spent
: 275341 €,275 341,00 €
Percentage of investment
: 0,47 %0,47 %
Municipality
Mêda
:Approved amount
: 822350 €,822 350,00 €
Amount spent
: 438366 €,438 366,00 €
Percentage of investment
: 0,38 %0,38 %
Municipality
Pinhel
:Approved amount
: 2608443 €,2 608 443,00 €
Amount spent
: 909077 €,909 077,00 €
Percentage of investment
: 1,21 %1,21 %
Municipality
Sabugal
:Approved amount
: 8210738 €,8 210 738,00 €
Amount spent
: 2419839 €,2 419 839,00 €
Percentage of investment
: 3,82 %3,82 %
Municipality
Seia
:Approved amount
: 29682012 €,29 682 012,00 €
Amount spent
: 4501331 €,4 501 331,00 €
Percentage of investment
: 13,81 %13,81 %
Municipality
Trancoso
:Approved amount
: 4385043 €,4 385 043,00 €
Amount spent
: 1077824 €,1 077 824,00 €
Percentage of investment
: 2,04 %2,04 %
Total
Approved amount
: 214879721 €,214 879 721,00 €
Amount spent
: 52778458 €,52 778 458,00 €
Percentage of investment
Region
Lisbon Metropolitan Area
:Sub-region
Lisbon Metropolitan Area
:Municipality
Cascais
:Approved amount
: 87094439 €,87 094 439,00 €
Amount spent
: 27021280 €,27 021 280,00 €
Percentage of investment
: 2,18 %2,18 %
Municipality
Lisboa
:Approved amount
: 2113448864 €,2 113 448 864,00 €
Amount spent
: 551081975 €,551 081 975,00 €
Percentage of investment
: 52,8 %52,80 %
Municipality
Loures
:Approved amount
: 319477443 €,319 477 443,00 €
Amount spent
: 37902827 €,37 902 827,00 €
Percentage of investment
: 7,98 %7,98 %
Municipality
Mafra
:Approved amount
: 90336171 €,90 336 171,00 €
Amount spent
: 17675961 €,17 675 961,00 €
Percentage of investment
: 2,26 %2,26 %
Municipality
Oeiras
:Approved amount
: 250169631 €,250 169 631,00 €
Amount spent
: 63083468 €,63 083 468,00 €
Percentage of investment
: 6,25 %6,25 %
Municipality
Sintra
:Approved amount
: 132897180 €,132 897 180,00 €
Amount spent
: 36393730 €,36 393 730,00 €
Percentage of investment
: 3,32 %3,32 %
Municipality
Vila Franca de Xira
:Approved amount
: 93897816 €,93 897 816,00 €
Amount spent
: 20665946 €,20 665 946,00 €
Percentage of investment
: 2,35 %2,35 %
Municipality
Amadora
:Approved amount
: 136077468 €,136 077 468,00 €
Amount spent
: 50754615 €,50 754 615,00 €
Percentage of investment
: 3,4 %3,40 %
Municipality
Odivelas
:Approved amount
: 233951213 €,233 951 213,00 €
Amount spent
: 27197826 €,27 197 826,00 €
Percentage of investment
: 5,85 %5,85 %
Municipality
Alcochete
:Approved amount
: 13192804 €,13 192 804,00 €
Amount spent
: 3341341 €,3 341 341,00 €
Percentage of investment
: 0,33 %0,33 %
Municipality
Almada
:Approved amount
: 70841665 €,70 841 665,00 €
Amount spent
: 17093963 €,17 093 963,00 €
Percentage of investment
: 1,77 %1,77 %
Municipality
Barreiro
:Approved amount
: 54971030 €,54 971 030,00 €
Amount spent
: 15095358 €,15 095 358,00 €
Percentage of investment
: 1,37 %1,37 %
Municipality
Moita
:Approved amount
: 20884779 €,20 884 779,00 €
Amount spent
: 5136455 €,5 136 455,00 €
Percentage of investment
: 0,52 %0,52 %
Municipality
Montijo
:Approved amount
: 23561244 €,23 561 244,00 €
Amount spent
: 4591684 €,4 591 684,00 €
Percentage of investment
: 0,59 %0,59 %
Municipality
Palmela
:Approved amount
: 48720675 €,48 720 675,00 €
Amount spent
: 10224125 €,10 224 125,00 €
Percentage of investment
: 1,22 %1,22 %
Municipality
Seixal
:Approved amount
: 88802209 €,88 802 209,00 €
Amount spent
: 30841182 €,30 841 182,00 €
Percentage of investment
: 2,22 %2,22 %
Municipality
Sesimbra
:Approved amount
: 10954700 €,10 954 700,00 €
Amount spent
: 3969451 €,3 969 451,00 €
Percentage of investment
: 0,27 %0,27 %
Municipality
Setúbal
:Approved amount
: 213098816 €,213 098 816,00 €
Amount spent
: 51060099 €,51 060 099,00 €
Percentage of investment
: 5,32 %5,32 %
Total
Approved amount
: 4002378147 €,4 002 378 147,00 €
Amount spent
: 973131287 €,973 131 287,00 €
Percentage of investment
Region
Alentejo
:Sub-region
Alentejo Litoral
:Municipality
Odemira
:Approved amount
: 6017960 €,6 017 960,00 €
Amount spent
: 2053077 €,2 053 077,00 €
Percentage of investment
: 3,48 %3,48 %
Municipality
Alcácer do Sal
:Approved amount
: 7588731 €,7 588 731,00 €
Amount spent
: 738847 €,738 847,00 €
Percentage of investment
: 4,39 %4,39 %
Municipality
Grândola
:Approved amount
: 52719411 €,52 719 411,00 €
Amount spent
: 15400952 €,15 400 952,00 €
Percentage of investment
: 30,5 %30,50 %
Municipality
Santiago do Cacém
:Approved amount
: 66607893 €,66 607 893,00 €
Amount spent
: 16756632 €,16 756 632,00 €
Percentage of investment
: 38,54 %38,54 %
Municipality
Sines
:Approved amount
: 39910380 €,39 910 380,00 €
Amount spent
: 10066478 €,10 066 478,00 €
Percentage of investment
: 23,09 %23,09 %
Total
Approved amount
: 172844375 €,172 844 375,00 €
Amount spent
: 45015985 €,45 015 985,00 €
Percentage of investment
Sub-region
Baixo Alentejo
:Municipality
Aljustrel
:Approved amount
: 38515766 €,38 515 766,00 €
Amount spent
: 9142614 €,9 142 614,00 €
Percentage of investment
: 15,14 %15,14 %
Municipality
Almodôvar
:Approved amount
: 5077467 €,5 077 467,00 €
Amount spent
: 536197 €,536 197,00 €
Percentage of investment
: 2 %2,00 %
Municipality
Alvito
:Approved amount
: 2980879 €,2 980 879,00 €
Amount spent
: 474867 €,474 867,00 €
Percentage of investment
: 1,17 %1,17 %
Municipality
Barrancos
:Approved amount
: 1684237 €,1 684 237,00 €
Amount spent
: 106169 €,106 169,00 €
Percentage of investment
: 0,66 %0,66 %
Municipality
Beja
:Approved amount
: 74476844 €,74 476 844,00 €
Amount spent
: 16528475 €,16 528 475,00 €
Percentage of investment
: 29,28 %29,28 %
Municipality
Castro Verde
:Approved amount
: 30923893 €,30 923 893,00 €
Amount spent
: 439265 €,439 265,00 €
Percentage of investment
: 12,16 %12,16 %
Municipality
Cuba
:Approved amount
: 978330 €,978 330,00 €
Amount spent
: 330912 €,330 912,00 €
Percentage of investment
: 0,38 %0,38 %
Municipality
Ferreira do Alentejo
:Approved amount
: 24201501 €,24 201 501,00 €
Amount spent
: 6943191 €,6 943 191,00 €
Percentage of investment
: 9,52 %9,52 %
Municipality
Mértola
:Approved amount
: 67663332 €,67 663 332,00 €
Amount spent
: 7199808 €,7 199 808,00 €
Percentage of investment
: 26,61 %26,61 %
Municipality
Moura
:Approved amount
: 2077818 €,2 077 818,00 €
Amount spent
: 896187 €,896 187,00 €
Percentage of investment
: 0,82 %0,82 %
Municipality
Ourique
:Approved amount
: 2395153 €,2 395 153,00 €
Amount spent
: 494741 €,494 741,00 €
Percentage of investment
: 0,94 %0,94 %
Municipality
Serpa
:Approved amount
: 1501795 €,1 501 795,00 €
Amount spent
: 620018 €,620 018,00 €
Percentage of investment
: 0,59 %0,59 %
Municipality
Vidigueira
:Approved amount
: 1845485 €,1 845 485,00 €
Amount spent
: 616429 €,616 429,00 €
Percentage of investment
: 0,73 %0,73 %
Total
Approved amount
: 254322501 €,254 322 501,00 €
Amount spent
: 44328873 €,44 328 873,00 €
Percentage of investment
Sub-region
Lezíria do Tejo
:Municipality
Azambuja
:Approved amount
: 11083255 €,11 083 255,00 €
Amount spent
: 3812035 €,3 812 035,00 €
Percentage of investment
: 5,91 %5,91 %
Municipality
Almeirim
:Approved amount
: 1731414 €,1 731 414,00 €
Amount spent
: 880241 €,880 241,00 €
Percentage of investment
: 0,92 %0,92 %
Municipality
Alpiarça
:Approved amount
: 4153597 €,4 153 597,00 €
Amount spent
: 793785 €,793 785,00 €
Percentage of investment
: 2,21 %2,21 %
Municipality
Benavente
:Approved amount
: 36445566 €,36 445 566,00 €
Amount spent
: 7428019 €,7 428 019,00 €
Percentage of investment
: 19,42 %19,42 %
Municipality
Cartaxo
:Approved amount
: 7337302 €,7 337 302,00 €
Amount spent
: 1451315 €,1 451 315,00 €
Percentage of investment
: 3,91 %3,91 %
Municipality
Chamusca
:Approved amount
: 6442555 €,6 442 555,00 €
Amount spent
: 2141945 €,2 141 945,00 €
Percentage of investment
: 3,43 %3,43 %
Municipality
Coruche
:Approved amount
: 4235252 €,4 235 252,00 €
Amount spent
: 2458499 €,2 458 499,00 €
Percentage of investment
: 2,26 %2,26 %
Municipality
Golegã
:Approved amount
: 7278675 €,7 278 675,00 €
Amount spent
: 715175 €,715 175,00 €
Percentage of investment
: 3,88 %3,88 %
Municipality
Rio Maior
:Approved amount
: 30566544 €,30 566 544,00 €
Amount spent
: 5573170 €,5 573 170,00 €
Percentage of investment
: 16,29 %16,29 %
Municipality
Salvaterra de Magos
:Approved amount
: 4440917 €,4 440 917,00 €
Amount spent
: 1282332 €,1 282 332,00 €
Percentage of investment
: 2,37 %2,37 %
Municipality
Santarém
:Approved amount
: 73960830 €,73 960 830,00 €
Amount spent
: 18345149 €,18 345 149,00 €
Percentage of investment
: 39,41 %39,41 %
Total
Approved amount
: 187675908 €,187 675 908,00 €
Amount spent
: 44881665 €,44 881 665,00 €
Percentage of investment
Sub-region
Alto Alentejo
:Municipality
Alter do Chão
:Approved amount
: 5955061 €,5 955 061,00 €
Amount spent
: 166846 €,166 846,00 €
Percentage of investment
: 2,11 %2,11 %
Municipality
Arronches
:Approved amount
: 1338847 €,1 338 847,00 €
Amount spent
: 191331 €,191 331,00 €
Percentage of investment
: 0,47 %0,47 %
Municipality
Avis
:Approved amount
: 657773 €,657 773,00 €
Amount spent
: 241681 €,241 681,00 €
Percentage of investment
: 0,23 %0,23 %
Municipality
Campo Maior
:Approved amount
: 20447261 €,20 447 261,00 €
Amount spent
: 3777492 €,3 777 492,00 €
Percentage of investment
: 7,24 %7,24 %
Municipality
Castelo de Vide
:Approved amount
: 499083 €,499 083,00 €
Amount spent
: 255261 €,255 261,00 €
Percentage of investment
: 0,18 %0,18 %
Municipality
Crato
:Approved amount
: 612472 €,612 472,00 €
Amount spent
: 281586 €,281 586,00 €
Percentage of investment
: 0,22 %0,22 %
Municipality
Elvas
:Approved amount
: 26569093 €,26 569 093,00 €
Amount spent
: 5127115 €,5 127 115,00 €
Percentage of investment
: 9,41 %9,41 %
Municipality
Fronteira
:Approved amount
: 1022833 €,1 022 833,00 €
Amount spent
: 180128 €,180 128,00 €
Percentage of investment
: 0,36 %0,36 %
Municipality
Gavião
:Approved amount
: 787379 €,787 379,00 €
Amount spent
: 365465 €,365 465,00 €
Percentage of investment
: 0,28 %0,28 %
Municipality
Marvão
:Approved amount
: 2611851 €,2 611 851,00 €
Amount spent
: 273058 €,273 058,00 €
Percentage of investment
: 0,92 %0,92 %
Municipality
Monforte
:Approved amount
: 1180070 €,1 180 070,00 €
Amount spent
: 346048 €,346 048,00 €
Percentage of investment
: 0,42 %0,42 %
Municipality
Nisa
:Approved amount
: 11218125 €,11 218 125,00 €
Amount spent
: 994378 €,994 378,00 €
Percentage of investment
: 3,97 %3,97 %
Municipality
Ponte de Sôr
:Approved amount
: 21226899 €,21 226 899,00 €
Amount spent
: 3673531 €,3 673 531,00 €
Percentage of investment
: 7,52 %7,52 %
Municipality
Portalegre
:Approved amount
: 187474251 €,187 474 251,00 €
Amount spent
: 26285383 €,26 285 383,00 €
Percentage of investment
: 66,37 %66,37 %
Municipality
Sousel
:Approved amount
: 856502 €,856 502,00 €
Amount spent
: 341602 €,341 602,00 €
Percentage of investment
: 0,3 %0,30 %
Total
Approved amount
: 282457501 €,282 457 501,00 €
Amount spent
: 42500904 €,42 500 904,00 €
Percentage of investment
Sub-region
Alentejo Central
:Municipality
Alandroal
:Approved amount
: 2740117 €,2 740 117,00 €
Amount spent
: 617603 €,617 603,00 €
Percentage of investment
: 1,7 %1,70 %
Municipality
Arraiolos
:Approved amount
: 1971513 €,1 971 513,00 €
Amount spent
: 797489 €,797 489,00 €
Percentage of investment
: 1,22 %1,22 %
Municipality
Borba
:Approved amount
: 1312015 €,1 312 015,00 €
Amount spent
: 623098 €,623 098,00 €
Percentage of investment
: 0,81 %0,81 %
Municipality
Estremoz
:Approved amount
: 4354155 €,4 354 155,00 €
Amount spent
: 1907254 €,1 907 254,00 €
Percentage of investment
: 2,7 %2,70 %
Municipality
Évora
:Approved amount
: 118538014 €,118 538 014,00 €
Amount spent
: 30601298 €,30 601 298,00 €
Percentage of investment
: 73,53 %73,53 %
Municipality
Montemor-o-Novo
:Approved amount
: 8739424 €,8 739 424,00 €
Amount spent
: 999824 €,999 824,00 €
Percentage of investment
: 5,42 %5,42 %
Municipality
Mora
:Approved amount
: 1711560 €,1 711 560,00 €
Amount spent
: 561095 €,561 095,00 €
Percentage of investment
: 1,06 %1,06 %
Municipality
Mourão
:Approved amount
: 1060221 €,1 060 221,00 €
Amount spent
: 258718 €,258 718,00 €
Percentage of investment
: 0,66 %0,66 %
Municipality
Portel
:Approved amount
: 893406 €,893 406,00 €
Amount spent
: 376607 €,376 607,00 €
Percentage of investment
: 0,55 %0,55 %
Municipality
Redondo
:Approved amount
: 3783752 €,3 783 752,00 €
Amount spent
: 436105 €,436 105,00 €
Percentage of investment
: 2,35 %2,35 %
Municipality
Reguengos de Monsaraz
:Approved amount
: 6687929 €,6 687 929,00 €
Amount spent
: 1820889 €,1 820 889,00 €
Percentage of investment
: 4,15 %4,15 %
Municipality
Vendas Novas
:Approved amount
: 3469793 €,3 469 793,00 €
Amount spent
: 1211526 €,1 211 526,00 €
Percentage of investment
: 2,15 %2,15 %
Municipality
Viana do Alentejo
:Approved amount
: 1045468 €,1 045 468,00 €
Amount spent
: 417781 €,417 781,00 €
Percentage of investment
: 0,65 %0,65 %
Municipality
Vila Viçosa
:Approved amount
: 4894375 €,4 894 375,00 €
Amount spent
: 1425018 €,1 425 018,00 €
Percentage of investment
: 3,04 %3,04 %
Total
Approved amount
: 161201742 €,161 201 742,00 €
Amount spent
: 42054305 €,42 054 305,00 €
Percentage of investment
Region
Algarve
:Sub-region
Algarve
:Municipality
Albufeira
:Approved amount
: 78926807 €,78 926 807,00 €
Amount spent
: 13196776 €,13 196 776,00 €
Percentage of investment
: 16,42 %16,42 %
Municipality
Alcoutim
:Approved amount
: 12725615 €,12 725 615,00 €
Amount spent
: 1330707 €,1 330 707,00 €
Percentage of investment
: 2,65 %2,65 %
Municipality
Aljezur
:Approved amount
: 789262 €,789 262,00 €
Amount spent
: 370870 €,370 870,00 €
Percentage of investment
: 0,16 %0,16 %
Municipality
Castro Marim
:Approved amount
: 5086811 €,5 086 811,00 €
Amount spent
: 753986 €,753 986,00 €
Percentage of investment
: 1,06 %1,06 %
Municipality
Faro
:Approved amount
: 128002572 €,128 002 572,00 €
Amount spent
: 24407521 €,24 407 521,00 €
Percentage of investment
: 26,64 %26,64 %
Municipality
Lagoa
:Approved amount
: 15687699 €,15 687 699,00 €
Amount spent
: 2276016 €,2 276 016,00 €
Percentage of investment
: 3,26 %3,26 %
Municipality
Lagos
:Approved amount
: 20207889 €,20 207 889,00 €
Amount spent
: 2921137 €,2 921 137,00 €
Percentage of investment
: 4,21 %4,21 %
Municipality
Loulé
:Approved amount
: 42276447 €,42 276 447,00 €
Amount spent
: 12009182 €,12 009 182,00 €
Percentage of investment
: 8,8 %8,80 %
Municipality
Monchique
:Approved amount
: 9911209 €,9 911 209,00 €
Amount spent
: 129101 €,129 101,00 €
Percentage of investment
: 2,06 %2,06 %
Municipality
Olhão
:Approved amount
: 44016145 €,44 016 145,00 €
Amount spent
: 10897895 €,10 897 895,00 €
Percentage of investment
: 9,16 %9,16 %
Municipality
Portimão
:Approved amount
: 34227839 €,34 227 839,00 €
Amount spent
: 4928780 €,4 928 780,00 €
Percentage of investment
: 7,12 %7,12 %
Municipality
São Brás de Alportel
:Approved amount
: 4619471 €,4 619 471,00 €
Amount spent
: 798882 €,798 882,00 €
Percentage of investment
: 0,96 %0,96 %
Municipality
Silves
:Approved amount
: 31734372 €,31 734 372,00 €
Amount spent
: 3731100 €,3 731 100,00 €
Percentage of investment
: 6,6 %6,60 %
Municipality
Tavira
:Approved amount
: 17500227 €,17 500 227,00 €
Amount spent
: 2697912 €,2 697 912,00 €
Percentage of investment
: 3,64 %3,64 %
Municipality
Vila do Bispo
:Approved amount
: 3790974 €,3 790 974,00 €
Amount spent
: 494440 €,494 440,00 €
Percentage of investment
: 0,79 %0,79 %
Municipality
Vila Real de Santo António
:Approved amount
: 31050220 €,31 050 220,00 €
Amount spent
: 14084961 €,14 084 961,00 €
Percentage of investment
: 6,46 %6,46 %
Total
Approved amount
: 480553556 €,480 553 556,00 €
Amount spent
: 95029268 €,95 029 268,00 €
Percentage of investment
Region
Autonomous Region of the Azores
:Sub-region
Autonomous Region of the Azores
:Municipality
Vila do Porto
:Approved amount
: 8243602 €,8 243 602,00 €
Amount spent
: 3303862 €,3 303 862,00 €
Percentage of investment
: 1,07 %1,07 %
Municipality
Lagoa
:Approved amount
: 17900303 €,17 900 303,00 €
Amount spent
: 4981496 €,4 981 496,00 €
Percentage of investment
: 2,32 %2,32 %
Municipality
Nordeste
:Approved amount
: 4132712 €,4 132 712,00 €
Amount spent
: 1065086 €,1 065 086,00 €
Percentage of investment
: 0,54 %0,54 %
Municipality
Ponta Delgada
:Approved amount
: 447778106 €,447 778 106,00 €
Amount spent
: 116604888 €,116 604 888,00 €
Percentage of investment
: 58,02 %58,02 %
Municipality
Povoação
:Approved amount
: 799399 €,799 399,00 €
Amount spent
: 301948 €,301 948,00 €
Percentage of investment
: 0,1 %0,10 %
Municipality
Ribeira Grande
:Approved amount
: 83129385 €,83 129 385,00 €
Amount spent
: 10503635 €,10 503 635,00 €
Percentage of investment
: 10,77 %10,77 %
Municipality
Vila Franca do Campo
:Approved amount
: 7544455 €,7 544 455,00 €
Amount spent
: 1191308 €,1 191 308,00 €
Percentage of investment
: 0,98 %0,98 %
Municipality
Angra do Heroísmo
:Approved amount
: 121444433 €,121 444 433,00 €
Amount spent
: 40804610 €,40 804 610,00 €
Percentage of investment
: 15,74 %15,74 %
Municipality
Praia da Vitória
:Approved amount
: 4967342 €,4 967 342,00 €
Amount spent
: 1621829 €,1 621 829,00 €
Percentage of investment
: 0,64 %0,64 %
Municipality
Santa Cruz da Graciosa
:Approved amount
: 1235026 €,1 235 026,00 €
Amount spent
: 358035 €,358 035,00 €
Percentage of investment
: 0,16 %0,16 %
Municipality
Calheta
:Approved amount
: 495382 €,495 382,00 €
Amount spent
: 344579 €,344 579,00 €
Percentage of investment
: 0,06 %0,06 %
Municipality
Velas
:Approved amount
: 915653 €,915 653,00 €
Amount spent
: 488723 €,488 723,00 €
Percentage of investment
: 0,12 %0,12 %
Municipality
Lajes do Pico
:Approved amount
: 1257532 €,1 257 532,00 €
Amount spent
: 201952 €,201 952,00 €
Percentage of investment
: 0,16 %0,16 %
Municipality
Madalena
:Approved amount
: 8797200 €,8 797 200,00 €
Amount spent
: 1472001 €,1 472 001,00 €
Percentage of investment
: 1,14 %1,14 %
Municipality
São Roque do Pico
:Approved amount
: 378051 €,378 051,00 €
Amount spent
: 226129 €,226 129,00 €
Percentage of investment
: 0,05 %0,05 %
Municipality
Horta
:Approved amount
: 61196979 €,61 196 979,00 €
Amount spent
: 22150332 €,22 150 332,00 €
Percentage of investment
: 7,93 %7,93 %
Municipality
Lajes das Flores
:Approved amount
: 709418 €,709 418,00 €
Amount spent
: 44841 €,44 841,00 €
Percentage of investment
: 0,09 %0,09 %
Municipality
Santa Cruz das Flores
:Approved amount
: 779080 €,779 080,00 €
Amount spent
: 135144 €,135 144,00 €
Percentage of investment
: 0,1 %0,10 %
Municipality
Corvo
:Approved amount
: 80765 €,80 765,00 €
Amount spent
: 62632 €,62 632,00 €
Percentage of investment
: 0,01 %0,01 %
Total
Approved amount
: 771784822 €,771 784 822,00 €
Amount spent
: 205863027 €,205 863 027,00 €
Percentage of investment
Region
Autonomous Region of Madeira
:Sub-region
Autonomous Region of Madeira
:Municipality
Calheta
:Approved amount
: 835954 €,835 954,00 €
Amount spent
: 309404 €,309 404,00 €
Percentage of investment
: 0,12 %0,12 %
Municipality
Câmara de Lobos
:Approved amount
: 13599494 €,13 599 494,00 €
Amount spent
: 918298 €,918 298,00 €
Percentage of investment
: 2 %2,00 %
Municipality
Funchal
:Approved amount
: 580678696 €,580 678 696,00 €
Amount spent
: 110877520 €,110 877 520,00 €
Percentage of investment
: 85,3 %85,30 %
Municipality
Machico
:Approved amount
: 2379298 €,2 379 298,00 €
Amount spent
: 651237 €,651 237,00 €
Percentage of investment
: 0,35 %0,35 %
Municipality
Ponta do Sol
:Approved amount
: 3920595 €,3 920 595,00 €
Amount spent
: 710885 €,710 885,00 €
Percentage of investment
: 0,58 %0,58 %
Municipality
Porto Moniz
:Approved amount
: 115500 €,115 500,00 €
Amount spent
: 32102 €,32 102,00 €
Percentage of investment
: 0,02 %0,02 %
Municipality
Ribeira Brava
:Approved amount
: 4392679 €,4 392 679,00 €
Amount spent
: 1358494 €,1 358 494,00 €
Percentage of investment
: 0,65 %0,65 %
Municipality
Santa Cruz
:Approved amount
: 19183626 €,19 183 626,00 €
Amount spent
: 2881306 €,2 881 306,00 €
Percentage of investment
: 2,82 %2,82 %
Municipality
Santana
:Approved amount
: 259475 €,259 475,00 €
Amount spent
: 104147 €,104 147,00 €
Percentage of investment
: 0,04 %0,04 %
Municipality
São Vicente
:Approved amount
: 36625502 €,36 625 502,00 €
Amount spent
: 7006525 €,7 006 525,00 €
Percentage of investment
: 5,38 %5,38 %
Municipality
Porto Santo
:Approved amount
: 18779263 €,18 779 263,00 €
Amount spent
: 4508324 €,4 508 324,00 €
Percentage of investment
: 2,76 %2,76 %
Total
Approved amount
: 680770080 €,680 770 080,00 €
Amount spent
: 129358241 €,129 358 241,00 €
Percentage of investment
Region
Nation-wide investment
:Approved amount
: 4280107189 €,4 280 107 189,00 €
:Amount spent
: {{ regionNutsii.apoio_gasto|floatformat:'-2'|cut:' '|checkifdataisavailable|euro_symbol,1 192 108 220,00 €
:Comparison between realities
Assessing the impact of investments in the Recovery and Resilience Plan on the daily lives of populations is not a simple topic. It is necessary to analyze the context in a broader way and understand how investments can suppress everyday needs.
However, there are some indicators that can help to envision an equitable way in which investments are being distributed geographically.
How much is already approved to invest per inhabitant?
How much is already approved to invest per inhabitant?
Municipality | Approved amount |
---|---|
Highest national value Mértola | 9596 € 9 596,00 € |
National average | 1823 € 1 823,00 € |
Lowest national value Santana | 35 € 35,00 € |
How much is already approved to invest per inhabitant?
Municipality
Highest national value Mértola
Approved amount
9596 €
9 596,00 €
Municipality
National average
Approved amount
1823 €
1 823,00 €
Municipality
Lowest national value Santana
Approved amount
35 €
35,00 €
How much is already approved to invest per km2?
How much is already approved to invest per km2?
Municipality | Approved amount |
---|---|
Highest national value Lisboa | 24880695 € 24 880 695,00 € |
National average | 203329 € 203 329,00 € |
Lowest national value Avis | 1085 € 1 085,00 € |
How much is already approved to invest per km2?
Municipality
Highest national value Lisboa
Approved amount
24880695 €
24 880 695,00 €
Municipality
National average
Approved amount
203329 €
203 329,00 €
Municipality
Lowest national value Avis
Approved amount
1085 €
1 085,00 €
If you'd like to know more about a specific municipality, tell us which one...