Investment by regions
Discover how the investments already approved in the Recovery and Resilience Plan are distributed across the various regions of the country.
Recovery and Resilience Plan in numbers
21,9 billion €
Total investment to be applied by the Recovery and Resilience Plan
2,6 billion €
Total amount of funds already allocated to Nation-wide investments
12,3 billion €
Total amount of funds already invested in municipalities and regions
Geography of investments
The Recovery and Resilience Plan aims to provide the country with a set of tools for the future, seeking to ensure a more resilient economy, a more sustainable relationship with the environment, and more digital processes and functioning.
All of this is contributed by a broad geographical distribution of its investments and reforms, ensuring that both nationally implemented projects and resources applied in all municipalities of the country are invested where they have the greatest impact on the lives of the population.
Distribution of investment by regions
Distribution of investment by regions
| Region | Sub-region | Municipality | Approved amount | Amount spent | Percentage of investment |
|---|---|---|---|---|---|
| North |
Alto Minho
Cávado
Ave
Área Metropolitana do Porto
Alto Tâmega
Tâmega e Sousa
Douro
Terras de Trás-os-Montes
|
Arcos de Valdevez
Caminha
Melgaço
Monção
Paredes de Coura
Ponte da Barca
Ponte de Lima
Valença
Viana do Castelo
Vila Nova de Cerveira
Total
Amares
Barcelos
Braga
Esposende
Terras de Bouro
Vila Verde
Total
Cabeceiras de Basto
Fafe
Guimarães
Póvoa de Lanhoso
Vieira do Minho
Vila Nova de Famalicão
Vizela
Mondim de Basto
Total
Arouca
Espinho
Santa Maria da Feira
Oliveira de Azeméis
São João da Madeira
Vale de Cambra
Gondomar
Maia
Matosinhos
Paredes
Porto
Póvoa de Varzim
Santo Tirso
Valongo
Vila do Conde
Vila Nova de Gaia
Trofa
Total
Boticas
Chaves
Montalegre
Ribeira de Pena
Valpaços
Vila Pouca de Aguiar
Total
Castelo de Paiva
Celorico de Basto
Amarante
Baião
Felgueiras
Lousada
Marco de Canaveses
Paços de Ferreira
Penafiel
Cinfães
Resende
Total
Carrazeda de Ansiães
Freixo de Espada à Cinta
Torre de Moncorvo
Vila Nova de Foz Côa
Alijó
Mesão Frio
Murça
Peso da Régua
Sabrosa
Santa Marta de Penaguião
Vila Real
Armamar
Lamego
Moimenta da Beira
Penedono
São João da Pesqueira
Sernancelhe
Tabuaço
Tarouca
Total
Alfândega da Fé
Bragança
Macedo de Cavaleiros
Miranda do Douro
Mirandela
Mogadouro
Vila Flor
Vimioso
Vinhais
Total
|
29 975 412,00 €
14 200 547,00 €
20 409 759,00 €
31 611 754,00 €
6 917 242,00 €
10 096 968,00 €
31 927 388,00 €
35 475 564,00 €
186 312 665,00 €
19 283 918,00 €
386 211 216,00 €
12 193 031,00 €
187 170 838,00 €
434 466 196,00 €
52 519 495,00 €
4 588 157,00 €
36 003 131,00 €
726 940 848,00 €
13 564 868,00 €
51 782 873,00 €
462 614 685,00 €
26 398 614,00 €
6 560 842,00 €
314 356 284,00 €
28 395 976,00 €
9 755 217,00 €
913 429 360,00 €
28 298 652,00 €
23 772 114,00 €
133 912 896,00 €
88 666 236,00 €
72 604 897,00 €
35 261 679,00 €
92 224 734,00 €
278 992 373,00 €
707 603 609,00 €
96 599 867,00 €
1 418 243 470,00 €
84 823 108,00 €
92 733 959,00 €
72 188 073,00 €
153 514 257,00 €
343 783 535,00 €
96 602 945,00 €
3 819 826 405,00 €
6 162 572,00 €
51 912 849,00 €
7 395 524,00 €
14 029 711,00 €
4 597 683,00 €
20 439 932,00 €
104 538 270,00 €
26 279 841,00 €
25 282 987,00 €
64 120 610,00 €
49 008 830,00 €
47 063 490,00 €
50 833 676,00 €
35 193 627,00 €
90 820 943,00 €
148 274 946,00 €
17 503 159,00 €
6 155 739,00 €
560 537 850,00 €
5 713 415,00 €
7 543 857,00 €
4 077 099,00 €
10 599 089,00 €
13 522 453,00 €
1 443 780,00 €
4 452 147,00 €
23 908 868,00 €
13 467 670,00 €
10 960 616,00 €
203 272 186,00 €
4 196 711,00 €
34 309 009,00 €
16 346 650,00 €
6 191 072,00 €
11 331 114,00 €
12 248 855,00 €
5 071 895,00 €
10 833 741,00 €
399 490 227,00 €
15 787 425,00 €
90 963 005,00 €
14 025 680,00 €
3 610 008,00 €
24 092 137,00 €
12 495 542,00 €
1 997 116,00 €
2 702 610,00 €
111 711 924,00 €
277 385 448,00 €
|
16 791 344,00 €
5 816 061,00 €
17 176 107,00 €
18 110 731,00 €
3 626 709,00 €
5 071 929,00 €
19 078 370,00 €
15 868 652,00 €
125 941 022,00 €
12 389 808,00 €
239 870 730,00 €
7 598 624,00 €
89 459 582,00 €
283 864 845,00 €
21 983 914,00 €
2 207 369,00 €
21 670 139,00 €
426 784 472,00 €
5 315 910,00 €
27 392 342,00 €
279 089 015,00 €
9 730 420,00 €
3 066 309,00 €
193 491 056,00 €
20 871 205,00 €
3 524 733,00 €
542 480 991,00 €
14 989 484,00 €
7 863 533,00 €
76 183 501,00 €
39 905 607,00 €
39 929 852,00 €
20 094 310,00 €
50 692 260,00 €
166 820 114,00 €
449 525 894,00 €
55 655 115,00 €
901 389 826,00 €
63 055 704,00 €
62 437 796,00 €
34 733 075,00 €
96 264 610,00 €
173 746 304,00 €
73 279 423,00 €
2 326 566 409,00 €
3 783 176,00 €
24 096 989,00 €
2 349 990,00 €
9 349 125,00 €
2 502 907,00 €
9 030 271,00 €
51 112 459,00 €
15 014 452,00 €
18 214 642,00 €
36 514 688,00 €
43 583 007,00 €
28 658 919,00 €
34 279 378,00 €
23 543 082,00 €
52 611 206,00 €
110 097 683,00 €
13 696 948,00 €
3 660 176,00 €
379 874 182,00 €
2 171 244,00 €
3 000 000,00 €
2 812 789,00 €
4 112 717,00 €
9 767 941,00 €
751 608,00 €
1 573 308,00 €
15 831 245,00 €
6 522 351,00 €
3 891 660,00 €
118 338 317,00 €
1 856 970,00 €
16 684 212,00 €
7 575 505,00 €
2 925 183,00 €
4 394 007,00 €
5 407 355,00 €
2 212 213,00 €
3 504 061,00 €
213 332 686,00 €
8 839 676,00 €
56 098 209,00 €
8 463 134,00 €
1 855 877,00 €
14 739 894,00 €
6 263 410,00 €
1 179 123,00 €
2 041 479,00 €
108 862 290,00 €
208 343 093,00 €
|
7,76 %
3,68 %
5,28 %
8,19 %
1,79 %
2,61 %
8,27 %
9,19 %
48,24 %
4,99 %
1,68 %
25,75 %
59,77 %
7,22 %
0,63 %
4,95 %
1,49 %
5,67 %
50,65 %
2,89 %
0,72 %
34,41 %
3,11 %
1,07 %
0,74 %
0,62 %
3,51 %
2,32 %
1,90 %
0,92 %
2,41 %
7,30 %
18,52 %
2,53 %
37,13 %
2,22 %
2,43 %
1,89 %
4,02 %
9,00 %
2,53 %
5,90 %
49,66 %
7,07 %
13,42 %
4,40 %
19,55 %
4,69 %
4,51 %
11,44 %
8,74 %
8,40 %
9,07 %
6,28 %
16,20 %
26,45 %
3,12 %
1,10 %
1,43 %
1,89 %
1,02 %
2,65 %
3,38 %
0,36 %
1,11 %
5,98 %
3,37 %
2,74 %
50,88 %
1,05 %
8,59 %
4,09 %
1,55 %
2,84 %
3,07 %
1,27 %
2,71 %
5,69 %
32,79 %
5,06 %
1,30 %
8,69 %
4,50 %
0,72 %
0,97 %
40,27 %
|
| Center |
Oeste
Região de Aveiro
Região de Coimbra
Região de Leiria
Viseu Dão Lafões
Beira Baixa
Médio Tejo
Beiras e Serra da Estrela
|
Alcobaça
Bombarral
Caldas da Rainha
Nazaré
Óbidos
Peniche
Alenquer
Arruda dos Vinhos
Cadaval
Lourinhã
Sobral de Monte Agraço
Torres Vedras
Total
Águeda
Albergaria-a-Velha
Anadia
Aveiro
Estarreja
Ílhavo
Murtosa
Oliveira do Bairro
Ovar
Sever do Vouga
Vagos
Total
Mealhada
Arganil
Cantanhede
Coimbra
Condeixa-a-Nova
Figueira da Foz
Góis
Lousã
Mira
Miranda do Corvo
Montemor-o-Velho
Oliveira do Hospital
Pampilhosa da Serra
Penacova
Penela
Soure
Tábua
Vila Nova de Poiares
Mortágua
Total
Alvaiázere
Ansião
Batalha
Castanheira de Pêra
Figueiró dos Vinhos
Leiria
Marinha Grande
Pedrógão Grande
Pombal
Porto de Mós
Total
Aguiar da Beira
Carregal do Sal
Castro Daire
Mangualde
Nelas
Oliveira de Frades
Penalva do Castelo
Santa Comba Dão
São Pedro do Sul
Sátão
Tondela
Vila Nova de Paiva
Viseu
Vouzela
Total
Castelo Branco
Idanha-a-Nova
Oleiros
Penamacor
Proença-a-Nova
Vila Velha de Ródão
Total
Sertã
Vila de Rei
Abrantes
Alcanena
Constância
Entroncamento
Ferreira do Zêzere
Mação
Sardoal
Tomar
Torres Novas
Vila Nova da Barquinha
Ourém
Total
Belmonte
Covilhã
Fundão
Almeida
Celorico da Beira
Figueira de Castelo Rodrigo
Fornos de Algodres
Gouveia
Guarda
Manteigas
Mêda
Pinhel
Sabugal
Seia
Trancoso
Total
|
54 761 036,00 €
5 498 635,00 €
75 093 834,00 €
37 745 125,00 €
14 989 345,00 €
27 910 434,00 €
51 503 764,00 €
25 231 685,00 €
12 951 719,00 €
11 864 904,00 €
2 473 056,00 €
131 678 841,00 €
451 702 378,00 €
192 597 508,00 €
30 004 515,00 €
28 724 543,00 €
345 957 788,00 €
69 372 175,00 €
127 871 590,00 €
11 000 144,00 €
43 646 669,00 €
65 543 087,00 €
11 721 664,00 €
32 685 362,00 €
959 125 046,00 €
20 138 152,00 €
25 225 736,00 €
69 007 922,00 €
571 435 932,00 €
12 771 427,00 €
164 314 175,00 €
9 210 423,00 €
25 465 690,00 €
19 677 698,00 €
11 735 737,00 €
15 830 578,00 €
60 581 759,00 €
17 248 626,00 €
16 477 653,00 €
7 085 652,00 €
7 320 427,00 €
17 803 103,00 €
7 515 701,00 €
7 593 949,00 €
1 086 440 343,00 €
12 995 087,00 €
10 014 138,00 €
33 272 941,00 €
7 066 390,00 €
6 196 954,00 €
329 198 911,00 €
142 012 675,00 €
7 904 989,00 €
74 902 887,00 €
45 031 230,00 €
668 596 203,00 €
13 358 157,00 €
31 562 103,00 €
11 660 841,00 €
81 037 463,00 €
45 649 254,00 €
15 931 750,00 €
2 145 765,00 €
8 184 191,00 €
14 240 850,00 €
8 362 441,00 €
35 293 398,00 €
9 727 037,00 €
162 914 792,00 €
24 472 908,00 €
464 540 949,00 €
86 647 471,00 €
10 875 898,00 €
19 636 656,00 €
12 876 694,00 €
22 095 216,00 €
20 085 326,00 €
172 217 262,00 €
24 256 485,00 €
11 192 261,00 €
38 286 805,00 €
34 173 513,00 €
28 038 370,00 €
32 591 781,00 €
21 567 868,00 €
33 811 838,00 €
10 862 182,00 €
42 540 786,00 €
48 227 110,00 €
5 487 396,00 €
66 380 195,00 €
397 416 589,00 €
11 341 733,00 €
92 895 489,00 €
75 917 949,00 €
3 256 012,00 €
7 241 077,00 €
2 624 703,00 €
4 146 412,00 €
9 176 780,00 €
124 090 410,00 €
2 330 786,00 €
3 717 217,00 €
6 187 612,00 €
12 412 985,00 €
39 268 681,00 €
15 167 832,00 €
409 775 679,00 €
|
31 988 303,00 €
3 890 199,00 €
31 781 554,00 €
26 555 075,00 €
6 914 545,00 €
18 295 025,00 €
17 269 040,00 €
13 554 524,00 €
2 735 914,00 €
8 230 376,00 €
1 657 147,00 €
50 128 773,00 €
213 000 476,00 €
106 689 456,00 €
19 147 221,00 €
18 029 411,00 €
213 510 936,00 €
42 626 280,00 €
68 159 218,00 €
10 636 328,00 €
22 081 340,00 €
35 330 707,00 €
5 623 391,00 €
21 483 289,00 €
563 317 577,00 €
9 752 348,00 €
13 459 239,00 €
50 986 386,00 €
310 274 797,00 €
3 973 756,00 €
83 877 797,00 €
2 109 792,00 €
10 600 022,00 €
11 639 886,00 €
6 861 163,00 €
8 161 450,00 €
32 255 384,00 €
11 252 013,00 €
9 052 091,00 €
2 145 828,00 €
3 459 899,00 €
8 493 757,00 €
3 782 629,00 €
4 365 463,00 €
586 503 702,00 €
6 531 135,00 €
5 926 400,00 €
20 262 318,00 €
3 957 952,00 €
2 104 181,00 €
164 892 656,00 €
87 999 941,00 €
2 047 491,00 €
39 859 740,00 €
27 839 602,00 €
361 421 417,00 €
8 321 533,00 €
15 707 803,00 €
6 777 193,00 €
47 340 230,00 €
27 700 308,00 €
9 001 108,00 €
1 822 839,00 €
4 354 334,00 €
7 842 144,00 €
5 421 469,00 €
20 092 422,00 €
2 537 796,00 €
79 393 844,00 €
9 530 250,00 €
245 843 273,00 €
35 540 732,00 €
7 091 758,00 €
8 939 900,00 €
913 410,00 €
5 184 674,00 €
10 603 712,00 €
68 274 186,00 €
10 242 834,00 €
5 868 235,00 €
22 010 286,00 €
22 526 397,00 €
16 876 308,00 €
19 471 573,00 €
9 592 464,00 €
10 462 059,00 €
3 838 370,00 €
21 311 595,00 €
22 841 248,00 €
3 254 378,00 €
29 731 281,00 €
198 027 029,00 €
2 295 998,00 €
55 193 979,00 €
32 106 909,00 €
1 706 135,00 €
3 268 072,00 €
2 136 726,00 €
2 733 932,00 €
5 840 987,00 €
39 620 805,00 €
1 186 485,00 €
1 781 143,00 €
3 199 892,00 €
6 083 510,00 €
17 899 393,00 €
6 251 254,00 €
181 305 219,00 €
|
12,12 %
1,22 %
16,62 %
8,36 %
3,32 %
6,18 %
11,40 %
5,59 %
2,87 %
2,63 %
0,55 %
29,15 %
20,08 %
3,13 %
2,99 %
36,07 %
7,23 %
13,33 %
1,15 %
4,55 %
6,83 %
1,22 %
3,41 %
1,85 %
2,32 %
6,35 %
52,60 %
1,18 %
15,12 %
0,85 %
2,34 %
1,81 %
1,08 %
1,46 %
5,58 %
1,59 %
1,52 %
0,65 %
0,67 %
1,64 %
0,69 %
0,70 %
1,94 %
1,50 %
4,98 %
1,06 %
0,93 %
49,24 %
21,24 %
1,18 %
11,20 %
6,74 %
2,88 %
6,79 %
2,51 %
17,44 %
9,83 %
3,43 %
0,46 %
1,76 %
3,07 %
1,80 %
7,60 %
2,09 %
35,07 %
5,27 %
50,31 %
6,32 %
11,40 %
7,48 %
12,83 %
11,66 %
6,10 %
2,82 %
9,63 %
8,60 %
7,06 %
8,20 %
5,43 %
8,51 %
2,73 %
10,70 %
12,14 %
1,38 %
16,70 %
2,77 %
22,67 %
18,53 %
0,79 %
1,77 %
0,64 %
1,01 %
2,24 %
30,28 %
0,57 %
0,91 %
1,51 %
3,03 %
9,58 %
3,70 %
|
| Lisbon Metropolitan Area |
Lisbon Metropolitan Area
|
Cascais
Lisboa
Loures
Mafra
Oeiras
Sintra
Vila Franca de Xira
Amadora
Odivelas
Alcochete
Almada
Barreiro
Moita
Montijo
Palmela
Seixal
Sesimbra
Setúbal
Total
|
273 640 589,00 €
2 968 837 061,00 €
183 799 517,00 €
140 859 839,00 €
485 208 968,00 €
189 131 107,00 €
123 071 088,00 €
234 036 014,00 €
72 446 583,00 €
19 166 025,00 €
130 621 524,00 €
73 150 695,00 €
27 280 065,00 €
46 663 534,00 €
40 995 633,00 €
108 553 969,00 €
33 105 895,00 €
318 185 273,00 €
5 468 753 379,00 €
|
176 095 503,00 €
1 682 707 012,00 €
108 805 077,00 €
84 966 447,00 €
273 877 712,00 €
100 745 175,00 €
59 575 923,00 €
154 463 035,00 €
37 621 662,00 €
9 604 518,00 €
60 106 334,00 €
37 068 216,00 €
17 533 858,00 €
31 459 108,00 €
22 002 849,00 €
64 917 315,00 €
27 216 443,00 €
172 950 777,00 €
3 121 716 966,00 €
|
5,00 %
54,29 %
3,36 %
2,58 %
8,87 %
3,46 %
2,25 %
4,28 %
1,32 %
0,35 %
2,39 %
1,34 %
0,50 %
0,85 %
0,75 %
1,98 %
0,61 %
5,82 %
|
| Alentejo |
Alentejo Litoral
Baixo Alentejo
Lezíria do Tejo
Alto Alentejo
Alentejo Central
|
Odemira
Alcácer do Sal
Grândola
Santiago do Cacém
Sines
Total
Aljustrel
Almodôvar
Alvito
Barrancos
Beja
Castro Verde
Cuba
Ferreira do Alentejo
Mértola
Moura
Ourique
Serpa
Vidigueira
Total
Azambuja
Almeirim
Alpiarça
Benavente
Cartaxo
Chamusca
Coruche
Golegã
Rio Maior
Salvaterra de Magos
Santarém
Total
Alter do Chão
Arronches
Avis
Campo Maior
Castelo de Vide
Crato
Elvas
Fronteira
Gavião
Marvão
Monforte
Nisa
Ponte de Sor
Portalegre
Sousel
Total
Alandroal
Arraiolos
Borba
Estremoz
Évora
Montemor-o-Novo
Mora
Mourão
Portel
Redondo
Reguengos de Monsaraz
Vendas Novas
Viana do Alentejo
Vila Viçosa
Total
|
20 055 414,00 €
21 401 026,00 €
58 812 100,00 €
110 114 818,00 €
59 372 231,00 €
269 755 590,00 €
31 874 056,00 €
2 273 449,00 €
5 920 631,00 €
2 107 573,00 €
90 525 425,00 €
3 605 767,00 €
1 276 568,00 €
51 337 610,00 €
26 473 799,00 €
5 507 749,00 €
4 056 514,00 €
3 164 242,00 €
2 436 762,00 €
230 560 144,00 €
43 757 469,00 €
4 221 447,00 €
6 950 662,00 €
50 185 367,00 €
20 806 673,00 €
8 787 042,00 €
7 794 097,00 €
10 412 056,00 €
64 061 094,00 €
12 474 082,00 €
108 434 065,00 €
337 884 054,00 €
12 645 350,00 €
2 102 254,00 €
1 259 057,00 €
19 964 739,00 €
4 300 695,00 €
642 728,00 €
50 822 564,00 €
1 622 036,00 €
20 398 975,00 €
4 079 164,00 €
16 379 968,00 €
18 791 059,00 €
14 479 211,00 €
75 806 398,00 €
10 356 676,00 €
253 650 873,00 €
3 783 234,00 €
2 199 763,00 €
18 221 567,00 €
7 497 554,00 €
169 135 579,00 €
5 261 059,00 €
2 947 480,00 €
1 218 853,00 €
1 591 415,00 €
8 292 075,00 €
9 423 997,00 €
7 210 628,00 €
2 505 009,00 €
7 810 397,00 €
247 098 611,00 €
|
13 617 548,00 €
6 055 062,00 €
50 037 617,00 €
67 145 197,00 €
20 562 953,00 €
157 418 378,00 €
25 879 732,00 €
1 352 639,00 €
2 096 095,00 €
1 136 730,00 €
61 141 175,00 €
1 454 678,00 €
751 103,00 €
41 046 066,00 €
14 459 513,00 €
2 361 777,00 €
2 203 812,00 €
1 349 631,00 €
1 364 020,00 €
156 596 969,00 €
18 470 687,00 €
2 793 846,00 €
2 185 063,00 €
20 675 391,00 €
14 411 678,00 €
6 272 771,00 €
4 462 442,00 €
5 648 378,00 €
27 508 967,00 €
8 361 935,00 €
63 995 454,00 €
174 786 612,00 €
4 046 624,00 €
1 402 722,00 €
747 825,00 €
12 745 969,00 €
1 525 862,00 €
416 126,00 €
21 534 635,00 €
1 128 790,00 €
3 810 870,00 €
2 094 372,00 €
1 044 264,00 €
2 202 468,00 €
7 288 857,00 €
34 246 550,00 €
9 096 824,00 €
103 332 758,00 €
1 977 067,00 €
1 698 945,00 €
5 573 418,00 €
4 887 730,00 €
93 175 301,00 €
2 587 266,00 €
1 606 389,00 €
866 316,00 €
702 594,00 €
2 308 392,00 €
6 326 086,00 €
3 044 074,00 €
1 305 050,00 €
6 099 760,00 €
132 158 388,00 €
|
7,43 %
7,93 %
21,80 %
40,82 %
22,01 %
13,82 %
0,99 %
2,57 %
0,91 %
39,26 %
1,56 %
0,55 %
22,27 %
11,48 %
2,39 %
1,76 %
1,37 %
1,06 %
12,95 %
1,25 %
2,06 %
14,85 %
6,16 %
2,60 %
2,31 %
3,08 %
18,96 %
3,69 %
32,09 %
4,99 %
0,83 %
0,50 %
7,87 %
1,70 %
0,25 %
20,04 %
0,64 %
8,04 %
1,61 %
6,46 %
7,41 %
5,71 %
29,89 %
4,08 %
1,53 %
0,89 %
7,37 %
3,03 %
68,45 %
2,13 %
1,19 %
0,49 %
0,64 %
3,36 %
3,81 %
2,92 %
1,01 %
3,16 %
|
| Algarve |
Algarve
|
Albufeira
Alcoutim
Aljezur
Castro Marim
Faro
Lagoa
Lagos
Loulé
Monchique
Olhão
Portimão
São Brás de Alportel
Silves
Tavira
Vila do Bispo
Vila Real de Santo António
Total
|
49 924 390,00 €
35 351 257,00 €
7 843 210,00 €
3 545 841,00 €
153 209 340,00 €
20 563 661,00 €
46 272 128,00 €
58 527 154,00 €
17 805 569,00 €
54 002 110,00 €
65 582 644,00 €
7 742 581,00 €
32 524 941,00 €
23 746 203,00 €
7 667 673,00 €
110 009 026,00 €
694 317 727,00 €
|
33 008 955,00 €
7 583 994,00 €
3 325 434,00 €
1 868 688,00 €
84 980 836,00 €
13 975 666,00 €
28 540 384,00 €
37 667 959,00 €
7 851 422,00 €
32 040 956,00 €
30 113 173,00 €
4 964 171,00 €
18 356 753,00 €
12 147 544,00 €
3 208 528,00 €
90 178 566,00 €
409 813 030,00 €
|
7,19 %
5,09 %
1,13 %
0,51 %
22,07 %
2,96 %
6,66 %
8,43 %
2,56 %
7,78 %
9,45 %
1,12 %
4,68 %
3,42 %
1,10 %
15,84 %
|
| Autonomous Region of the Azores |
Autonomous Region of the Azores
|
Vila do Porto
Lagoa
Nordeste
Ponta Delgada
Povoação
Ribeira Grande
Vila Franca do Campo
Angra do Heroísmo
Vila da Praia da Vitória
Santa Cruz da Graciosa
Calheta
Velas
Lajes do Pico
Madalena
São Roque do Pico
Horta
Lajes das Flores
Santa Cruz das Flores
Corvo
Total
|
7 738 112,00 €
40 246 559,00 €
7 849 058,00 €
561 750 762,00 €
5 725 086,00 €
141 570 352,00 €
13 378 890,00 €
176 791 180,00 €
13 522 352,00 €
10 804 354,00 €
3 012 979,00 €
6 402 681,00 €
4 724 941,00 €
16 554 370,00 €
13 793 670,00 €
92 751 118,00 €
2 427 743,00 €
2 721 882,00 €
426 969,00 €
1 122 193 057,00 €
|
4 023 428,00 €
22 718 676,00 €
4 553 400,00 €
355 102 734,00 €
2 630 564,00 €
77 020 090,00 €
10 490 793,00 €
111 505 567,00 €
8 830 958,00 €
4 179 072,00 €
2 152 065,00 €
3 718 140,00 €
2 448 321,00 €
10 243 660,00 €
9 052 496,00 €
72 620 247,00 €
1 060 925,00 €
1 148 957,00 €
178 867,00 €
703 678 962,00 €
|
0,69 %
3,59 %
0,70 %
50,06 %
0,51 %
12,62 %
1,19 %
15,75 %
1,20 %
0,96 %
0,27 %
0,57 %
0,42 %
1,48 %
1,23 %
8,27 %
0,22 %
0,24 %
0,04 %
|
| Autonomous Region of Madeira |
Autonomous Region of Madeira
|
Calheta
Câmara de Lobos
Funchal
Machico
Ponta do Sol
Porto Moniz
Ribeira Brava
Santa Cruz
Santana
São Vicente
Porto Santo
Total
|
12 455 866,00 €
29 366 794,00 €
751 185 735,00 €
48 539 247,00 €
21 445 054,00 €
524 215,00 €
13 595 284,00 €
28 242 125,00 €
16 606 784,00 €
26 031 595,00 €
40 126 401,00 €
988 119 099,00 €
|
4 638 490,00 €
8 255 759,00 €
411 993 108,00 €
10 955 397,00 €
6 904 344,00 €
244 645,00 €
9 718 187,00 €
11 227 738,00 €
501 735,00 €
8 920 686,00 €
20 074 778,00 €
493 434 866,00 €
|
1,26 %
2,97 %
76,02 %
4,91 %
2,17 %
0,05 %
1,38 %
2,86 %
1,68 %
2,63 %
4,06 %
|
| Nation-wide investment |
|
|
3 655 353 461,00 €
|
2 604 803 314,00 €
|
|
Distribution of investment by regions
Region
North
:Sub-region
Alto Minho
:Municipality
Arcos de Valdevez
:Approved amount
: 29975412 €,29 975 412,00 €
Amount spent
: 16791344 €,16 791 344,00 €
Percentage of investment
: 7,76 %7,76 %
Municipality
Caminha
:Approved amount
: 14200547 €,14 200 547,00 €
Amount spent
: 5816061 €,5 816 061,00 €
Percentage of investment
: 3,68 %3,68 %
Municipality
Melgaço
:Approved amount
: 20409759 €,20 409 759,00 €
Amount spent
: 17176107 €,17 176 107,00 €
Percentage of investment
: 5,28 %5,28 %
Municipality
Monção
:Approved amount
: 31611754 €,31 611 754,00 €
Amount spent
: 18110731 €,18 110 731,00 €
Percentage of investment
: 8,19 %8,19 %
Municipality
Paredes de Coura
:Approved amount
: 6917242 €,6 917 242,00 €
Amount spent
: 3626709 €,3 626 709,00 €
Percentage of investment
: 1,79 %1,79 %
Municipality
Ponte da Barca
:Approved amount
: 10096968 €,10 096 968,00 €
Amount spent
: 5071929 €,5 071 929,00 €
Percentage of investment
: 2,61 %2,61 %
Municipality
Ponte de Lima
:Approved amount
: 31927388 €,31 927 388,00 €
Amount spent
: 19078370 €,19 078 370,00 €
Percentage of investment
: 8,27 %8,27 %
Municipality
Valença
:Approved amount
: 35475564 €,35 475 564,00 €
Amount spent
: 15868652 €,15 868 652,00 €
Percentage of investment
: 9,19 %9,19 %
Municipality
Viana do Castelo
:Approved amount
: 186312665 €,186 312 665,00 €
Amount spent
: 125941022 €,125 941 022,00 €
Percentage of investment
: 48,24 %48,24 %
Municipality
Vila Nova de Cerveira
:Approved amount
: 19283918 €,19 283 918,00 €
Amount spent
: 12389808 €,12 389 808,00 €
Percentage of investment
: 4,99 %4,99 %
Total
Approved amount
: 386211216 €,386 211 216,00 €
Amount spent
: 239870730 €,239 870 730,00 €
Percentage of investment
Sub-region
Cávado
:Municipality
Amares
:Approved amount
: 12193031 €,12 193 031,00 €
Amount spent
: 7598624 €,7 598 624,00 €
Percentage of investment
: 1,68 %1,68 %
Municipality
Barcelos
:Approved amount
: 187170838 €,187 170 838,00 €
Amount spent
: 89459582 €,89 459 582,00 €
Percentage of investment
: 25,75 %25,75 %
Municipality
Braga
:Approved amount
: 434466196 €,434 466 196,00 €
Amount spent
: 283864845 €,283 864 845,00 €
Percentage of investment
: 59,77 %59,77 %
Municipality
Esposende
:Approved amount
: 52519495 €,52 519 495,00 €
Amount spent
: 21983914 €,21 983 914,00 €
Percentage of investment
: 7,22 %7,22 %
Municipality
Terras de Bouro
:Approved amount
: 4588157 €,4 588 157,00 €
Amount spent
: 2207369 €,2 207 369,00 €
Percentage of investment
: 0,63 %0,63 %
Municipality
Vila Verde
:Approved amount
: 36003131 €,36 003 131,00 €
Amount spent
: 21670139 €,21 670 139,00 €
Percentage of investment
: 4,95 %4,95 %
Total
Approved amount
: 726940848 €,726 940 848,00 €
Amount spent
: 426784472 €,426 784 472,00 €
Percentage of investment
Sub-region
Ave
:Municipality
Cabeceiras de Basto
:Approved amount
: 13564868 €,13 564 868,00 €
Amount spent
: 5315910 €,5 315 910,00 €
Percentage of investment
: 1,49 %1,49 %
Municipality
Fafe
:Approved amount
: 51782873 €,51 782 873,00 €
Amount spent
: 27392342 €,27 392 342,00 €
Percentage of investment
: 5,67 %5,67 %
Municipality
Guimarães
:Approved amount
: 462614685 €,462 614 685,00 €
Amount spent
: 279089015 €,279 089 015,00 €
Percentage of investment
: 50,65 %50,65 %
Municipality
Póvoa de Lanhoso
:Approved amount
: 26398614 €,26 398 614,00 €
Amount spent
: 9730420 €,9 730 420,00 €
Percentage of investment
: 2,89 %2,89 %
Municipality
Vieira do Minho
:Approved amount
: 6560842 €,6 560 842,00 €
Amount spent
: 3066309 €,3 066 309,00 €
Percentage of investment
: 0,72 %0,72 %
Municipality
Vila Nova de Famalicão
:Approved amount
: 314356284 €,314 356 284,00 €
Amount spent
: 193491056 €,193 491 056,00 €
Percentage of investment
: 34,41 %34,41 %
Municipality
Vizela
:Approved amount
: 28395976 €,28 395 976,00 €
Amount spent
: 20871205 €,20 871 205,00 €
Percentage of investment
: 3,11 %3,11 %
Municipality
Mondim de Basto
:Approved amount
: 9755217 €,9 755 217,00 €
Amount spent
: 3524733 €,3 524 733,00 €
Percentage of investment
: 1,07 %1,07 %
Total
Approved amount
: 913429360 €,913 429 360,00 €
Amount spent
: 542480991 €,542 480 991,00 €
Percentage of investment
Sub-region
Área Metropolitana do Porto
:Municipality
Arouca
:Approved amount
: 28298652 €,28 298 652,00 €
Amount spent
: 14989484 €,14 989 484,00 €
Percentage of investment
: 0,74 %0,74 %
Municipality
Espinho
:Approved amount
: 23772114 €,23 772 114,00 €
Amount spent
: 7863533 €,7 863 533,00 €
Percentage of investment
: 0,62 %0,62 %
Municipality
Santa Maria da Feira
:Approved amount
: 133912896 €,133 912 896,00 €
Amount spent
: 76183501 €,76 183 501,00 €
Percentage of investment
: 3,51 %3,51 %
Municipality
Oliveira de Azeméis
:Approved amount
: 88666236 €,88 666 236,00 €
Amount spent
: 39905607 €,39 905 607,00 €
Percentage of investment
: 2,32 %2,32 %
Municipality
São João da Madeira
:Approved amount
: 72604897 €,72 604 897,00 €
Amount spent
: 39929852 €,39 929 852,00 €
Percentage of investment
: 1,9 %1,90 %
Municipality
Vale de Cambra
:Approved amount
: 35261679 €,35 261 679,00 €
Amount spent
: 20094310 €,20 094 310,00 €
Percentage of investment
: 0,92 %0,92 %
Municipality
Gondomar
:Approved amount
: 92224734 €,92 224 734,00 €
Amount spent
: 50692260 €,50 692 260,00 €
Percentage of investment
: 2,41 %2,41 %
Municipality
Maia
:Approved amount
: 278992373 €,278 992 373,00 €
Amount spent
: 166820114 €,166 820 114,00 €
Percentage of investment
: 7,3 %7,30 %
Municipality
Matosinhos
:Approved amount
: 707603609 €,707 603 609,00 €
Amount spent
: 449525894 €,449 525 894,00 €
Percentage of investment
: 18,52 %18,52 %
Municipality
Paredes
:Approved amount
: 96599867 €,96 599 867,00 €
Amount spent
: 55655115 €,55 655 115,00 €
Percentage of investment
: 2,53 %2,53 %
Municipality
Porto
:Approved amount
: 1418243470 €,1 418 243 470,00 €
Amount spent
: 901389826 €,901 389 826,00 €
Percentage of investment
: 37,13 %37,13 %
Municipality
Póvoa de Varzim
:Approved amount
: 84823108 €,84 823 108,00 €
Amount spent
: 63055704 €,63 055 704,00 €
Percentage of investment
: 2,22 %2,22 %
Municipality
Santo Tirso
:Approved amount
: 92733959 €,92 733 959,00 €
Amount spent
: 62437796 €,62 437 796,00 €
Percentage of investment
: 2,43 %2,43 %
Municipality
Valongo
:Approved amount
: 72188073 €,72 188 073,00 €
Amount spent
: 34733075 €,34 733 075,00 €
Percentage of investment
: 1,89 %1,89 %
Municipality
Vila do Conde
:Approved amount
: 153514257 €,153 514 257,00 €
Amount spent
: 96264610 €,96 264 610,00 €
Percentage of investment
: 4,02 %4,02 %
Municipality
Vila Nova de Gaia
:Approved amount
: 343783535 €,343 783 535,00 €
Amount spent
: 173746304 €,173 746 304,00 €
Percentage of investment
: 9 %9,00 %
Municipality
Trofa
:Approved amount
: 96602945 €,96 602 945,00 €
Amount spent
: 73279423 €,73 279 423,00 €
Percentage of investment
: 2,53 %2,53 %
Total
Approved amount
: 3819826405 €,3 819 826 405,00 €
Amount spent
: 2326566409 €,2 326 566 409,00 €
Percentage of investment
Sub-region
Alto Tâmega
:Municipality
Boticas
:Approved amount
: 6162572 €,6 162 572,00 €
Amount spent
: 3783176 €,3 783 176,00 €
Percentage of investment
: 5,9 %5,90 %
Municipality
Chaves
:Approved amount
: 51912849 €,51 912 849,00 €
Amount spent
: 24096989 €,24 096 989,00 €
Percentage of investment
: 49,66 %49,66 %
Municipality
Montalegre
:Approved amount
: 7395524 €,7 395 524,00 €
Amount spent
: 2349990 €,2 349 990,00 €
Percentage of investment
: 7,07 %7,07 %
Municipality
Ribeira de Pena
:Approved amount
: 14029711 €,14 029 711,00 €
Amount spent
: 9349125 €,9 349 125,00 €
Percentage of investment
: 13,42 %13,42 %
Municipality
Valpaços
:Approved amount
: 4597683 €,4 597 683,00 €
Amount spent
: 2502907 €,2 502 907,00 €
Percentage of investment
: 4,4 %4,40 %
Municipality
Vila Pouca de Aguiar
:Approved amount
: 20439932 €,20 439 932,00 €
Amount spent
: 9030271 €,9 030 271,00 €
Percentage of investment
: 19,55 %19,55 %
Total
Approved amount
: 104538270 €,104 538 270,00 €
Amount spent
: 51112459 €,51 112 459,00 €
Percentage of investment
Sub-region
Tâmega e Sousa
:Municipality
Castelo de Paiva
:Approved amount
: 26279841 €,26 279 841,00 €
Amount spent
: 15014452 €,15 014 452,00 €
Percentage of investment
: 4,69 %4,69 %
Municipality
Celorico de Basto
:Approved amount
: 25282987 €,25 282 987,00 €
Amount spent
: 18214642 €,18 214 642,00 €
Percentage of investment
: 4,51 %4,51 %
Municipality
Amarante
:Approved amount
: 64120610 €,64 120 610,00 €
Amount spent
: 36514688 €,36 514 688,00 €
Percentage of investment
: 11,44 %11,44 %
Municipality
Baião
:Approved amount
: 49008830 €,49 008 830,00 €
Amount spent
: 43583007 €,43 583 007,00 €
Percentage of investment
: 8,74 %8,74 %
Municipality
Felgueiras
:Approved amount
: 47063490 €,47 063 490,00 €
Amount spent
: 28658919 €,28 658 919,00 €
Percentage of investment
: 8,4 %8,40 %
Municipality
Lousada
:Approved amount
: 50833676 €,50 833 676,00 €
Amount spent
: 34279378 €,34 279 378,00 €
Percentage of investment
: 9,07 %9,07 %
Municipality
Marco de Canaveses
:Approved amount
: 35193627 €,35 193 627,00 €
Amount spent
: 23543082 €,23 543 082,00 €
Percentage of investment
: 6,28 %6,28 %
Municipality
Paços de Ferreira
:Approved amount
: 90820943 €,90 820 943,00 €
Amount spent
: 52611206 €,52 611 206,00 €
Percentage of investment
: 16,2 %16,20 %
Municipality
Penafiel
:Approved amount
: 148274946 €,148 274 946,00 €
Amount spent
: 110097683 €,110 097 683,00 €
Percentage of investment
: 26,45 %26,45 %
Municipality
Cinfães
:Approved amount
: 17503159 €,17 503 159,00 €
Amount spent
: 13696948 €,13 696 948,00 €
Percentage of investment
: 3,12 %3,12 %
Municipality
Resende
:Approved amount
: 6155739 €,6 155 739,00 €
Amount spent
: 3660176 €,3 660 176,00 €
Percentage of investment
: 1,1 %1,10 %
Total
Approved amount
: 560537850 €,560 537 850,00 €
Amount spent
: 379874182 €,379 874 182,00 €
Percentage of investment
Sub-region
Douro
:Municipality
Carrazeda de Ansiães
:Approved amount
: 5713415 €,5 713 415,00 €
Amount spent
: 2171244 €,2 171 244,00 €
Percentage of investment
: 1,43 %1,43 %
Municipality
Freixo de Espada à Cinta
:Approved amount
: 7543857 €,7 543 857,00 €
Amount spent
: 3000000 €,3 000 000,00 €
Percentage of investment
: 1,89 %1,89 %
Municipality
Torre de Moncorvo
:Approved amount
: 4077099 €,4 077 099,00 €
Amount spent
: 2812789 €,2 812 789,00 €
Percentage of investment
: 1,02 %1,02 %
Municipality
Vila Nova de Foz Côa
:Approved amount
: 10599089 €,10 599 089,00 €
Amount spent
: 4112717 €,4 112 717,00 €
Percentage of investment
: 2,65 %2,65 %
Municipality
Alijó
:Approved amount
: 13522453 €,13 522 453,00 €
Amount spent
: 9767941 €,9 767 941,00 €
Percentage of investment
: 3,38 %3,38 %
Municipality
Mesão Frio
:Approved amount
: 1443780 €,1 443 780,00 €
Amount spent
: 751608 €,751 608,00 €
Percentage of investment
: 0,36 %0,36 %
Municipality
Murça
:Approved amount
: 4452147 €,4 452 147,00 €
Amount spent
: 1573308 €,1 573 308,00 €
Percentage of investment
: 1,11 %1,11 %
Municipality
Peso da Régua
:Approved amount
: 23908868 €,23 908 868,00 €
Amount spent
: 15831245 €,15 831 245,00 €
Percentage of investment
: 5,98 %5,98 %
Municipality
Sabrosa
:Approved amount
: 13467670 €,13 467 670,00 €
Amount spent
: 6522351 €,6 522 351,00 €
Percentage of investment
: 3,37 %3,37 %
Municipality
Santa Marta de Penaguião
:Approved amount
: 10960616 €,10 960 616,00 €
Amount spent
: 3891660 €,3 891 660,00 €
Percentage of investment
: 2,74 %2,74 %
Municipality
Vila Real
:Approved amount
: 203272186 €,203 272 186,00 €
Amount spent
: 118338317 €,118 338 317,00 €
Percentage of investment
: 50,88 %50,88 %
Municipality
Armamar
:Approved amount
: 4196711 €,4 196 711,00 €
Amount spent
: 1856970 €,1 856 970,00 €
Percentage of investment
: 1,05 %1,05 %
Municipality
Lamego
:Approved amount
: 34309009 €,34 309 009,00 €
Amount spent
: 16684212 €,16 684 212,00 €
Percentage of investment
: 8,59 %8,59 %
Municipality
Moimenta da Beira
:Approved amount
: 16346650 €,16 346 650,00 €
Amount spent
: 7575505 €,7 575 505,00 €
Percentage of investment
: 4,09 %4,09 %
Municipality
Penedono
:Approved amount
: 6191072 €,6 191 072,00 €
Amount spent
: 2925183 €,2 925 183,00 €
Percentage of investment
: 1,55 %1,55 %
Municipality
São João da Pesqueira
:Approved amount
: 11331114 €,11 331 114,00 €
Amount spent
: 4394007 €,4 394 007,00 €
Percentage of investment
: 2,84 %2,84 %
Municipality
Sernancelhe
:Approved amount
: 12248855 €,12 248 855,00 €
Amount spent
: 5407355 €,5 407 355,00 €
Percentage of investment
: 3,07 %3,07 %
Municipality
Tabuaço
:Approved amount
: 5071895 €,5 071 895,00 €
Amount spent
: 2212213 €,2 212 213,00 €
Percentage of investment
: 1,27 %1,27 %
Municipality
Tarouca
:Approved amount
: 10833741 €,10 833 741,00 €
Amount spent
: 3504061 €,3 504 061,00 €
Percentage of investment
: 2,71 %2,71 %
Total
Approved amount
: 399490227 €,399 490 227,00 €
Amount spent
: 213332686 €,213 332 686,00 €
Percentage of investment
Sub-region
Terras de Trás-os-Montes
:Municipality
Alfândega da Fé
:Approved amount
: 15787425 €,15 787 425,00 €
Amount spent
: 8839676 €,8 839 676,00 €
Percentage of investment
: 5,69 %5,69 %
Municipality
Bragança
:Approved amount
: 90963005 €,90 963 005,00 €
Amount spent
: 56098209 €,56 098 209,00 €
Percentage of investment
: 32,79 %32,79 %
Municipality
Macedo de Cavaleiros
:Approved amount
: 14025680 €,14 025 680,00 €
Amount spent
: 8463134 €,8 463 134,00 €
Percentage of investment
: 5,06 %5,06 %
Municipality
Miranda do Douro
:Approved amount
: 3610008 €,3 610 008,00 €
Amount spent
: 1855877 €,1 855 877,00 €
Percentage of investment
: 1,3 %1,30 %
Municipality
Mirandela
:Approved amount
: 24092137 €,24 092 137,00 €
Amount spent
: 14739894 €,14 739 894,00 €
Percentage of investment
: 8,69 %8,69 %
Municipality
Mogadouro
:Approved amount
: 12495542 €,12 495 542,00 €
Amount spent
: 6263410 €,6 263 410,00 €
Percentage of investment
: 4,5 %4,50 %
Municipality
Vila Flor
:Approved amount
: 1997116 €,1 997 116,00 €
Amount spent
: 1179123 €,1 179 123,00 €
Percentage of investment
: 0,72 %0,72 %
Municipality
Vimioso
:Approved amount
: 2702610 €,2 702 610,00 €
Amount spent
: 2041479 €,2 041 479,00 €
Percentage of investment
: 0,97 %0,97 %
Municipality
Vinhais
:Approved amount
: 111711924 €,111 711 924,00 €
Amount spent
: 108862290 €,108 862 290,00 €
Percentage of investment
: 40,27 %40,27 %
Total
Approved amount
: 277385448 €,277 385 448,00 €
Amount spent
: 208343093 €,208 343 093,00 €
Percentage of investment
Region
Center
:Sub-region
Oeste
:Municipality
Alcobaça
:Approved amount
: 54761036 €,54 761 036,00 €
Amount spent
: 31988303 €,31 988 303,00 €
Percentage of investment
: 12,12 %12,12 %
Municipality
Bombarral
:Approved amount
: 5498635 €,5 498 635,00 €
Amount spent
: 3890199 €,3 890 199,00 €
Percentage of investment
: 1,22 %1,22 %
Municipality
Caldas da Rainha
:Approved amount
: 75093834 €,75 093 834,00 €
Amount spent
: 31781554 €,31 781 554,00 €
Percentage of investment
: 16,62 %16,62 %
Municipality
Nazaré
:Approved amount
: 37745125 €,37 745 125,00 €
Amount spent
: 26555075 €,26 555 075,00 €
Percentage of investment
: 8,36 %8,36 %
Municipality
Óbidos
:Approved amount
: 14989345 €,14 989 345,00 €
Amount spent
: 6914545 €,6 914 545,00 €
Percentage of investment
: 3,32 %3,32 %
Municipality
Peniche
:Approved amount
: 27910434 €,27 910 434,00 €
Amount spent
: 18295025 €,18 295 025,00 €
Percentage of investment
: 6,18 %6,18 %
Municipality
Alenquer
:Approved amount
: 51503764 €,51 503 764,00 €
Amount spent
: 17269040 €,17 269 040,00 €
Percentage of investment
: 11,4 %11,40 %
Municipality
Arruda dos Vinhos
:Approved amount
: 25231685 €,25 231 685,00 €
Amount spent
: 13554524 €,13 554 524,00 €
Percentage of investment
: 5,59 %5,59 %
Municipality
Cadaval
:Approved amount
: 12951719 €,12 951 719,00 €
Amount spent
: 2735914 €,2 735 914,00 €
Percentage of investment
: 2,87 %2,87 %
Municipality
Lourinhã
:Approved amount
: 11864904 €,11 864 904,00 €
Amount spent
: 8230376 €,8 230 376,00 €
Percentage of investment
: 2,63 %2,63 %
Municipality
Sobral de Monte Agraço
:Approved amount
: 2473056 €,2 473 056,00 €
Amount spent
: 1657147 €,1 657 147,00 €
Percentage of investment
: 0,55 %0,55 %
Municipality
Torres Vedras
:Approved amount
: 131678841 €,131 678 841,00 €
Amount spent
: 50128773 €,50 128 773,00 €
Percentage of investment
: 29,15 %29,15 %
Total
Approved amount
: 451702378 €,451 702 378,00 €
Amount spent
: 213000476 €,213 000 476,00 €
Percentage of investment
Sub-region
Região de Aveiro
:Municipality
Águeda
:Approved amount
: 192597508 €,192 597 508,00 €
Amount spent
: 106689456 €,106 689 456,00 €
Percentage of investment
: 20,08 %20,08 %
Municipality
Albergaria-a-Velha
:Approved amount
: 30004515 €,30 004 515,00 €
Amount spent
: 19147221 €,19 147 221,00 €
Percentage of investment
: 3,13 %3,13 %
Municipality
Anadia
:Approved amount
: 28724543 €,28 724 543,00 €
Amount spent
: 18029411 €,18 029 411,00 €
Percentage of investment
: 2,99 %2,99 %
Municipality
Aveiro
:Approved amount
: 345957788 €,345 957 788,00 €
Amount spent
: 213510936 €,213 510 936,00 €
Percentage of investment
: 36,07 %36,07 %
Municipality
Estarreja
:Approved amount
: 69372175 €,69 372 175,00 €
Amount spent
: 42626280 €,42 626 280,00 €
Percentage of investment
: 7,23 %7,23 %
Municipality
Ílhavo
:Approved amount
: 127871590 €,127 871 590,00 €
Amount spent
: 68159218 €,68 159 218,00 €
Percentage of investment
: 13,33 %13,33 %
Municipality
Murtosa
:Approved amount
: 11000144 €,11 000 144,00 €
Amount spent
: 10636328 €,10 636 328,00 €
Percentage of investment
: 1,15 %1,15 %
Municipality
Oliveira do Bairro
:Approved amount
: 43646669 €,43 646 669,00 €
Amount spent
: 22081340 €,22 081 340,00 €
Percentage of investment
: 4,55 %4,55 %
Municipality
Ovar
:Approved amount
: 65543087 €,65 543 087,00 €
Amount spent
: 35330707 €,35 330 707,00 €
Percentage of investment
: 6,83 %6,83 %
Municipality
Sever do Vouga
:Approved amount
: 11721664 €,11 721 664,00 €
Amount spent
: 5623391 €,5 623 391,00 €
Percentage of investment
: 1,22 %1,22 %
Municipality
Vagos
:Approved amount
: 32685362 €,32 685 362,00 €
Amount spent
: 21483289 €,21 483 289,00 €
Percentage of investment
: 3,41 %3,41 %
Total
Approved amount
: 959125046 €,959 125 046,00 €
Amount spent
: 563317577 €,563 317 577,00 €
Percentage of investment
Sub-region
Região de Coimbra
:Municipality
Mealhada
:Approved amount
: 20138152 €,20 138 152,00 €
Amount spent
: 9752348 €,9 752 348,00 €
Percentage of investment
: 1,85 %1,85 %
Municipality
Arganil
:Approved amount
: 25225736 €,25 225 736,00 €
Amount spent
: 13459239 €,13 459 239,00 €
Percentage of investment
: 2,32 %2,32 %
Municipality
Cantanhede
:Approved amount
: 69007922 €,69 007 922,00 €
Amount spent
: 50986386 €,50 986 386,00 €
Percentage of investment
: 6,35 %6,35 %
Municipality
Coimbra
:Approved amount
: 571435932 €,571 435 932,00 €
Amount spent
: 310274797 €,310 274 797,00 €
Percentage of investment
: 52,6 %52,60 %
Municipality
Condeixa-a-Nova
:Approved amount
: 12771427 €,12 771 427,00 €
Amount spent
: 3973756 €,3 973 756,00 €
Percentage of investment
: 1,18 %1,18 %
Municipality
Figueira da Foz
:Approved amount
: 164314175 €,164 314 175,00 €
Amount spent
: 83877797 €,83 877 797,00 €
Percentage of investment
: 15,12 %15,12 %
Municipality
Góis
:Approved amount
: 9210423 €,9 210 423,00 €
Amount spent
: 2109792 €,2 109 792,00 €
Percentage of investment
: 0,85 %0,85 %
Municipality
Lousã
:Approved amount
: 25465690 €,25 465 690,00 €
Amount spent
: 10600022 €,10 600 022,00 €
Percentage of investment
: 2,34 %2,34 %
Municipality
Mira
:Approved amount
: 19677698 €,19 677 698,00 €
Amount spent
: 11639886 €,11 639 886,00 €
Percentage of investment
: 1,81 %1,81 %
Municipality
Miranda do Corvo
:Approved amount
: 11735737 €,11 735 737,00 €
Amount spent
: 6861163 €,6 861 163,00 €
Percentage of investment
: 1,08 %1,08 %
Municipality
Montemor-o-Velho
:Approved amount
: 15830578 €,15 830 578,00 €
Amount spent
: 8161450 €,8 161 450,00 €
Percentage of investment
: 1,46 %1,46 %
Municipality
Oliveira do Hospital
:Approved amount
: 60581759 €,60 581 759,00 €
Amount spent
: 32255384 €,32 255 384,00 €
Percentage of investment
: 5,58 %5,58 %
Municipality
Pampilhosa da Serra
:Approved amount
: 17248626 €,17 248 626,00 €
Amount spent
: 11252013 €,11 252 013,00 €
Percentage of investment
: 1,59 %1,59 %
Municipality
Penacova
:Approved amount
: 16477653 €,16 477 653,00 €
Amount spent
: 9052091 €,9 052 091,00 €
Percentage of investment
: 1,52 %1,52 %
Municipality
Penela
:Approved amount
: 7085652 €,7 085 652,00 €
Amount spent
: 2145828 €,2 145 828,00 €
Percentage of investment
: 0,65 %0,65 %
Municipality
Soure
:Approved amount
: 7320427 €,7 320 427,00 €
Amount spent
: 3459899 €,3 459 899,00 €
Percentage of investment
: 0,67 %0,67 %
Municipality
Tábua
:Approved amount
: 17803103 €,17 803 103,00 €
Amount spent
: 8493757 €,8 493 757,00 €
Percentage of investment
: 1,64 %1,64 %
Municipality
Vila Nova de Poiares
:Approved amount
: 7515701 €,7 515 701,00 €
Amount spent
: 3782629 €,3 782 629,00 €
Percentage of investment
: 0,69 %0,69 %
Municipality
Mortágua
:Approved amount
: 7593949 €,7 593 949,00 €
Amount spent
: 4365463 €,4 365 463,00 €
Percentage of investment
: 0,7 %0,70 %
Total
Approved amount
: 1086440343 €,1 086 440 343,00 €
Amount spent
: 586503702 €,586 503 702,00 €
Percentage of investment
Sub-region
Região de Leiria
:Municipality
Alvaiázere
:Approved amount
: 12995087 €,12 995 087,00 €
Amount spent
: 6531135 €,6 531 135,00 €
Percentage of investment
: 1,94 %1,94 %
Municipality
Ansião
:Approved amount
: 10014138 €,10 014 138,00 €
Amount spent
: 5926400 €,5 926 400,00 €
Percentage of investment
: 1,5 %1,50 %
Municipality
Batalha
:Approved amount
: 33272941 €,33 272 941,00 €
Amount spent
: 20262318 €,20 262 318,00 €
Percentage of investment
: 4,98 %4,98 %
Municipality
Castanheira de Pêra
:Approved amount
: 7066390 €,7 066 390,00 €
Amount spent
: 3957952 €,3 957 952,00 €
Percentage of investment
: 1,06 %1,06 %
Municipality
Figueiró dos Vinhos
:Approved amount
: 6196954 €,6 196 954,00 €
Amount spent
: 2104181 €,2 104 181,00 €
Percentage of investment
: 0,93 %0,93 %
Municipality
Leiria
:Approved amount
: 329198911 €,329 198 911,00 €
Amount spent
: 164892656 €,164 892 656,00 €
Percentage of investment
: 49,24 %49,24 %
Municipality
Marinha Grande
:Approved amount
: 142012675 €,142 012 675,00 €
Amount spent
: 87999941 €,87 999 941,00 €
Percentage of investment
: 21,24 %21,24 %
Municipality
Pedrógão Grande
:Approved amount
: 7904989 €,7 904 989,00 €
Amount spent
: 2047491 €,2 047 491,00 €
Percentage of investment
: 1,18 %1,18 %
Municipality
Pombal
:Approved amount
: 74902887 €,74 902 887,00 €
Amount spent
: 39859740 €,39 859 740,00 €
Percentage of investment
: 11,2 %11,20 %
Municipality
Porto de Mós
:Approved amount
: 45031230 €,45 031 230,00 €
Amount spent
: 27839602 €,27 839 602,00 €
Percentage of investment
: 6,74 %6,74 %
Total
Approved amount
: 668596203 €,668 596 203,00 €
Amount spent
: 361421417 €,361 421 417,00 €
Percentage of investment
Sub-region
Viseu Dão Lafões
:Municipality
Aguiar da Beira
:Approved amount
: 13358157 €,13 358 157,00 €
Amount spent
: 8321533 €,8 321 533,00 €
Percentage of investment
: 2,88 %2,88 %
Municipality
Carregal do Sal
:Approved amount
: 31562103 €,31 562 103,00 €
Amount spent
: 15707803 €,15 707 803,00 €
Percentage of investment
: 6,79 %6,79 %
Municipality
Castro Daire
:Approved amount
: 11660841 €,11 660 841,00 €
Amount spent
: 6777193 €,6 777 193,00 €
Percentage of investment
: 2,51 %2,51 %
Municipality
Mangualde
:Approved amount
: 81037463 €,81 037 463,00 €
Amount spent
: 47340230 €,47 340 230,00 €
Percentage of investment
: 17,44 %17,44 %
Municipality
Nelas
:Approved amount
: 45649254 €,45 649 254,00 €
Amount spent
: 27700308 €,27 700 308,00 €
Percentage of investment
: 9,83 %9,83 %
Municipality
Oliveira de Frades
:Approved amount
: 15931750 €,15 931 750,00 €
Amount spent
: 9001108 €,9 001 108,00 €
Percentage of investment
: 3,43 %3,43 %
Municipality
Penalva do Castelo
:Approved amount
: 2145765 €,2 145 765,00 €
Amount spent
: 1822839 €,1 822 839,00 €
Percentage of investment
: 0,46 %0,46 %
Municipality
Santa Comba Dão
:Approved amount
: 8184191 €,8 184 191,00 €
Amount spent
: 4354334 €,4 354 334,00 €
Percentage of investment
: 1,76 %1,76 %
Municipality
São Pedro do Sul
:Approved amount
: 14240850 €,14 240 850,00 €
Amount spent
: 7842144 €,7 842 144,00 €
Percentage of investment
: 3,07 %3,07 %
Municipality
Sátão
:Approved amount
: 8362441 €,8 362 441,00 €
Amount spent
: 5421469 €,5 421 469,00 €
Percentage of investment
: 1,8 %1,80 %
Municipality
Tondela
:Approved amount
: 35293398 €,35 293 398,00 €
Amount spent
: 20092422 €,20 092 422,00 €
Percentage of investment
: 7,6 %7,60 %
Municipality
Vila Nova de Paiva
:Approved amount
: 9727037 €,9 727 037,00 €
Amount spent
: 2537796 €,2 537 796,00 €
Percentage of investment
: 2,09 %2,09 %
Municipality
Viseu
:Approved amount
: 162914792 €,162 914 792,00 €
Amount spent
: 79393844 €,79 393 844,00 €
Percentage of investment
: 35,07 %35,07 %
Municipality
Vouzela
:Approved amount
: 24472908 €,24 472 908,00 €
Amount spent
: 9530250 €,9 530 250,00 €
Percentage of investment
: 5,27 %5,27 %
Total
Approved amount
: 464540949 €,464 540 949,00 €
Amount spent
: 245843273 €,245 843 273,00 €
Percentage of investment
Sub-region
Beira Baixa
:Municipality
Castelo Branco
:Approved amount
: 86647471 €,86 647 471,00 €
Amount spent
: 35540732 €,35 540 732,00 €
Percentage of investment
: 50,31 %50,31 %
Municipality
Idanha-a-Nova
:Approved amount
: 10875898 €,10 875 898,00 €
Amount spent
: 7091758 €,7 091 758,00 €
Percentage of investment
: 6,32 %6,32 %
Municipality
Oleiros
:Approved amount
: 19636656 €,19 636 656,00 €
Amount spent
: 8939900 €,8 939 900,00 €
Percentage of investment
: 11,4 %11,40 %
Municipality
Penamacor
:Approved amount
: 12876694 €,12 876 694,00 €
Amount spent
: 913410 €,913 410,00 €
Percentage of investment
: 7,48 %7,48 %
Municipality
Proença-a-Nova
:Approved amount
: 22095216 €,22 095 216,00 €
Amount spent
: 5184674 €,5 184 674,00 €
Percentage of investment
: 12,83 %12,83 %
Municipality
Vila Velha de Ródão
:Approved amount
: 20085326 €,20 085 326,00 €
Amount spent
: 10603712 €,10 603 712,00 €
Percentage of investment
: 11,66 %11,66 %
Total
Approved amount
: 172217262 €,172 217 262,00 €
Amount spent
: 68274186 €,68 274 186,00 €
Percentage of investment
Sub-region
Médio Tejo
:Municipality
Sertã
:Approved amount
: 24256485 €,24 256 485,00 €
Amount spent
: 10242834 €,10 242 834,00 €
Percentage of investment
: 6,1 %6,10 %
Municipality
Vila de Rei
:Approved amount
: 11192261 €,11 192 261,00 €
Amount spent
: 5868235 €,5 868 235,00 €
Percentage of investment
: 2,82 %2,82 %
Municipality
Abrantes
:Approved amount
: 38286805 €,38 286 805,00 €
Amount spent
: 22010286 €,22 010 286,00 €
Percentage of investment
: 9,63 %9,63 %
Municipality
Alcanena
:Approved amount
: 34173513 €,34 173 513,00 €
Amount spent
: 22526397 €,22 526 397,00 €
Percentage of investment
: 8,6 %8,60 %
Municipality
Constância
:Approved amount
: 28038370 €,28 038 370,00 €
Amount spent
: 16876308 €,16 876 308,00 €
Percentage of investment
: 7,06 %7,06 %
Municipality
Entroncamento
:Approved amount
: 32591781 €,32 591 781,00 €
Amount spent
: 19471573 €,19 471 573,00 €
Percentage of investment
: 8,2 %8,20 %
Municipality
Ferreira do Zêzere
:Approved amount
: 21567868 €,21 567 868,00 €
Amount spent
: 9592464 €,9 592 464,00 €
Percentage of investment
: 5,43 %5,43 %
Municipality
Mação
:Approved amount
: 33811838 €,33 811 838,00 €
Amount spent
: 10462059 €,10 462 059,00 €
Percentage of investment
: 8,51 %8,51 %
Municipality
Sardoal
:Approved amount
: 10862182 €,10 862 182,00 €
Amount spent
: 3838370 €,3 838 370,00 €
Percentage of investment
: 2,73 %2,73 %
Municipality
Tomar
:Approved amount
: 42540786 €,42 540 786,00 €
Amount spent
: 21311595 €,21 311 595,00 €
Percentage of investment
: 10,7 %10,70 %
Municipality
Torres Novas
:Approved amount
: 48227110 €,48 227 110,00 €
Amount spent
: 22841248 €,22 841 248,00 €
Percentage of investment
: 12,14 %12,14 %
Municipality
Vila Nova da Barquinha
:Approved amount
: 5487396 €,5 487 396,00 €
Amount spent
: 3254378 €,3 254 378,00 €
Percentage of investment
: 1,38 %1,38 %
Municipality
Ourém
:Approved amount
: 66380195 €,66 380 195,00 €
Amount spent
: 29731281 €,29 731 281,00 €
Percentage of investment
: 16,7 %16,70 %
Total
Approved amount
: 397416589 €,397 416 589,00 €
Amount spent
: 198027029 €,198 027 029,00 €
Percentage of investment
Sub-region
Beiras e Serra da Estrela
:Municipality
Belmonte
:Approved amount
: 11341733 €,11 341 733,00 €
Amount spent
: 2295998 €,2 295 998,00 €
Percentage of investment
: 2,77 %2,77 %
Municipality
Covilhã
:Approved amount
: 92895489 €,92 895 489,00 €
Amount spent
: 55193979 €,55 193 979,00 €
Percentage of investment
: 22,67 %22,67 %
Municipality
Fundão
:Approved amount
: 75917949 €,75 917 949,00 €
Amount spent
: 32106909 €,32 106 909,00 €
Percentage of investment
: 18,53 %18,53 %
Municipality
Almeida
:Approved amount
: 3256012 €,3 256 012,00 €
Amount spent
: 1706135 €,1 706 135,00 €
Percentage of investment
: 0,79 %0,79 %
Municipality
Celorico da Beira
:Approved amount
: 7241077 €,7 241 077,00 €
Amount spent
: 3268072 €,3 268 072,00 €
Percentage of investment
: 1,77 %1,77 %
Municipality
Figueira de Castelo Rodrigo
:Approved amount
: 2624703 €,2 624 703,00 €
Amount spent
: 2136726 €,2 136 726,00 €
Percentage of investment
: 0,64 %0,64 %
Municipality
Fornos de Algodres
:Approved amount
: 4146412 €,4 146 412,00 €
Amount spent
: 2733932 €,2 733 932,00 €
Percentage of investment
: 1,01 %1,01 %
Municipality
Gouveia
:Approved amount
: 9176780 €,9 176 780,00 €
Amount spent
: 5840987 €,5 840 987,00 €
Percentage of investment
: 2,24 %2,24 %
Municipality
Guarda
:Approved amount
: 124090410 €,124 090 410,00 €
Amount spent
: 39620805 €,39 620 805,00 €
Percentage of investment
: 30,28 %30,28 %
Municipality
Manteigas
:Approved amount
: 2330786 €,2 330 786,00 €
Amount spent
: 1186485 €,1 186 485,00 €
Percentage of investment
: 0,57 %0,57 %
Municipality
Mêda
:Approved amount
: 3717217 €,3 717 217,00 €
Amount spent
: 1781143 €,1 781 143,00 €
Percentage of investment
: 0,91 %0,91 %
Municipality
Pinhel
:Approved amount
: 6187612 €,6 187 612,00 €
Amount spent
: 3199892 €,3 199 892,00 €
Percentage of investment
: 1,51 %1,51 %
Municipality
Sabugal
:Approved amount
: 12412985 €,12 412 985,00 €
Amount spent
: 6083510 €,6 083 510,00 €
Percentage of investment
: 3,03 %3,03 %
Municipality
Seia
:Approved amount
: 39268681 €,39 268 681,00 €
Amount spent
: 17899393 €,17 899 393,00 €
Percentage of investment
: 9,58 %9,58 %
Municipality
Trancoso
:Approved amount
: 15167832 €,15 167 832,00 €
Amount spent
: 6251254 €,6 251 254,00 €
Percentage of investment
: 3,7 %3,70 %
Total
Approved amount
: 409775679 €,409 775 679,00 €
Amount spent
: 181305219 €,181 305 219,00 €
Percentage of investment
Region
Lisbon Metropolitan Area
:Sub-region
Lisbon Metropolitan Area
:Municipality
Cascais
:Approved amount
: 273640589 €,273 640 589,00 €
Amount spent
: 176095503 €,176 095 503,00 €
Percentage of investment
: 5 %5,00 %
Municipality
Lisboa
:Approved amount
: 2968837061 €,2 968 837 061,00 €
Amount spent
: 1682707012 €,1 682 707 012,00 €
Percentage of investment
: 54,29 %54,29 %
Municipality
Loures
:Approved amount
: 183799517 €,183 799 517,00 €
Amount spent
: 108805077 €,108 805 077,00 €
Percentage of investment
: 3,36 %3,36 %
Municipality
Mafra
:Approved amount
: 140859839 €,140 859 839,00 €
Amount spent
: 84966447 €,84 966 447,00 €
Percentage of investment
: 2,58 %2,58 %
Municipality
Oeiras
:Approved amount
: 485208968 €,485 208 968,00 €
Amount spent
: 273877712 €,273 877 712,00 €
Percentage of investment
: 8,87 %8,87 %
Municipality
Sintra
:Approved amount
: 189131107 €,189 131 107,00 €
Amount spent
: 100745175 €,100 745 175,00 €
Percentage of investment
: 3,46 %3,46 %
Municipality
Vila Franca de Xira
:Approved amount
: 123071088 €,123 071 088,00 €
Amount spent
: 59575923 €,59 575 923,00 €
Percentage of investment
: 2,25 %2,25 %
Municipality
Amadora
:Approved amount
: 234036014 €,234 036 014,00 €
Amount spent
: 154463035 €,154 463 035,00 €
Percentage of investment
: 4,28 %4,28 %
Municipality
Odivelas
:Approved amount
: 72446583 €,72 446 583,00 €
Amount spent
: 37621662 €,37 621 662,00 €
Percentage of investment
: 1,32 %1,32 %
Municipality
Alcochete
:Approved amount
: 19166025 €,19 166 025,00 €
Amount spent
: 9604518 €,9 604 518,00 €
Percentage of investment
: 0,35 %0,35 %
Municipality
Almada
:Approved amount
: 130621524 €,130 621 524,00 €
Amount spent
: 60106334 €,60 106 334,00 €
Percentage of investment
: 2,39 %2,39 %
Municipality
Barreiro
:Approved amount
: 73150695 €,73 150 695,00 €
Amount spent
: 37068216 €,37 068 216,00 €
Percentage of investment
: 1,34 %1,34 %
Municipality
Moita
:Approved amount
: 27280065 €,27 280 065,00 €
Amount spent
: 17533858 €,17 533 858,00 €
Percentage of investment
: 0,5 %0,50 %
Municipality
Montijo
:Approved amount
: 46663534 €,46 663 534,00 €
Amount spent
: 31459108 €,31 459 108,00 €
Percentage of investment
: 0,85 %0,85 %
Municipality
Palmela
:Approved amount
: 40995633 €,40 995 633,00 €
Amount spent
: 22002849 €,22 002 849,00 €
Percentage of investment
: 0,75 %0,75 %
Municipality
Seixal
:Approved amount
: 108553969 €,108 553 969,00 €
Amount spent
: 64917315 €,64 917 315,00 €
Percentage of investment
: 1,98 %1,98 %
Municipality
Sesimbra
:Approved amount
: 33105895 €,33 105 895,00 €
Amount spent
: 27216443 €,27 216 443,00 €
Percentage of investment
: 0,61 %0,61 %
Municipality
Setúbal
:Approved amount
: 318185273 €,318 185 273,00 €
Amount spent
: 172950777 €,172 950 777,00 €
Percentage of investment
: 5,82 %5,82 %
Total
Approved amount
: 5468753379 €,5 468 753 379,00 €
Amount spent
: 3121716966 €,3 121 716 966,00 €
Percentage of investment
Region
Alentejo
:Sub-region
Alentejo Litoral
:Municipality
Odemira
:Approved amount
: 20055414 €,20 055 414,00 €
Amount spent
: 13617548 €,13 617 548,00 €
Percentage of investment
: 7,43 %7,43 %
Municipality
Alcácer do Sal
:Approved amount
: 21401026 €,21 401 026,00 €
Amount spent
: 6055062 €,6 055 062,00 €
Percentage of investment
: 7,93 %7,93 %
Municipality
Grândola
:Approved amount
: 58812100 €,58 812 100,00 €
Amount spent
: 50037617 €,50 037 617,00 €
Percentage of investment
: 21,8 %21,80 %
Municipality
Santiago do Cacém
:Approved amount
: 110114818 €,110 114 818,00 €
Amount spent
: 67145197 €,67 145 197,00 €
Percentage of investment
: 40,82 %40,82 %
Municipality
Sines
:Approved amount
: 59372231 €,59 372 231,00 €
Amount spent
: 20562953 €,20 562 953,00 €
Percentage of investment
: 22,01 %22,01 %
Total
Approved amount
: 269755590 €,269 755 590,00 €
Amount spent
: 157418378 €,157 418 378,00 €
Percentage of investment
Sub-region
Baixo Alentejo
:Municipality
Aljustrel
:Approved amount
: 31874056 €,31 874 056,00 €
Amount spent
: 25879732 €,25 879 732,00 €
Percentage of investment
: 13,82 %13,82 %
Municipality
Almodôvar
:Approved amount
: 2273449 €,2 273 449,00 €
Amount spent
: 1352639 €,1 352 639,00 €
Percentage of investment
: 0,99 %0,99 %
Municipality
Alvito
:Approved amount
: 5920631 €,5 920 631,00 €
Amount spent
: 2096095 €,2 096 095,00 €
Percentage of investment
: 2,57 %2,57 %
Municipality
Barrancos
:Approved amount
: 2107573 €,2 107 573,00 €
Amount spent
: 1136730 €,1 136 730,00 €
Percentage of investment
: 0,91 %0,91 %
Municipality
Beja
:Approved amount
: 90525425 €,90 525 425,00 €
Amount spent
: 61141175 €,61 141 175,00 €
Percentage of investment
: 39,26 %39,26 %
Municipality
Castro Verde
:Approved amount
: 3605767 €,3 605 767,00 €
Amount spent
: 1454678 €,1 454 678,00 €
Percentage of investment
: 1,56 %1,56 %
Municipality
Cuba
:Approved amount
: 1276568 €,1 276 568,00 €
Amount spent
: 751103 €,751 103,00 €
Percentage of investment
: 0,55 %0,55 %
Municipality
Ferreira do Alentejo
:Approved amount
: 51337610 €,51 337 610,00 €
Amount spent
: 41046066 €,41 046 066,00 €
Percentage of investment
: 22,27 %22,27 %
Municipality
Mértola
:Approved amount
: 26473799 €,26 473 799,00 €
Amount spent
: 14459513 €,14 459 513,00 €
Percentage of investment
: 11,48 %11,48 %
Municipality
Moura
:Approved amount
: 5507749 €,5 507 749,00 €
Amount spent
: 2361777 €,2 361 777,00 €
Percentage of investment
: 2,39 %2,39 %
Municipality
Ourique
:Approved amount
: 4056514 €,4 056 514,00 €
Amount spent
: 2203812 €,2 203 812,00 €
Percentage of investment
: 1,76 %1,76 %
Municipality
Serpa
:Approved amount
: 3164242 €,3 164 242,00 €
Amount spent
: 1349631 €,1 349 631,00 €
Percentage of investment
: 1,37 %1,37 %
Municipality
Vidigueira
:Approved amount
: 2436762 €,2 436 762,00 €
Amount spent
: 1364020 €,1 364 020,00 €
Percentage of investment
: 1,06 %1,06 %
Total
Approved amount
: 230560144 €,230 560 144,00 €
Amount spent
: 156596969 €,156 596 969,00 €
Percentage of investment
Sub-region
Lezíria do Tejo
:Municipality
Azambuja
:Approved amount
: 43757469 €,43 757 469,00 €
Amount spent
: 18470687 €,18 470 687,00 €
Percentage of investment
: 12,95 %12,95 %
Municipality
Almeirim
:Approved amount
: 4221447 €,4 221 447,00 €
Amount spent
: 2793846 €,2 793 846,00 €
Percentage of investment
: 1,25 %1,25 %
Municipality
Alpiarça
:Approved amount
: 6950662 €,6 950 662,00 €
Amount spent
: 2185063 €,2 185 063,00 €
Percentage of investment
: 2,06 %2,06 %
Municipality
Benavente
:Approved amount
: 50185367 €,50 185 367,00 €
Amount spent
: 20675391 €,20 675 391,00 €
Percentage of investment
: 14,85 %14,85 %
Municipality
Cartaxo
:Approved amount
: 20806673 €,20 806 673,00 €
Amount spent
: 14411678 €,14 411 678,00 €
Percentage of investment
: 6,16 %6,16 %
Municipality
Chamusca
:Approved amount
: 8787042 €,8 787 042,00 €
Amount spent
: 6272771 €,6 272 771,00 €
Percentage of investment
: 2,6 %2,60 %
Municipality
Coruche
:Approved amount
: 7794097 €,7 794 097,00 €
Amount spent
: 4462442 €,4 462 442,00 €
Percentage of investment
: 2,31 %2,31 %
Municipality
Golegã
:Approved amount
: 10412056 €,10 412 056,00 €
Amount spent
: 5648378 €,5 648 378,00 €
Percentage of investment
: 3,08 %3,08 %
Municipality
Rio Maior
:Approved amount
: 64061094 €,64 061 094,00 €
Amount spent
: 27508967 €,27 508 967,00 €
Percentage of investment
: 18,96 %18,96 %
Municipality
Salvaterra de Magos
:Approved amount
: 12474082 €,12 474 082,00 €
Amount spent
: 8361935 €,8 361 935,00 €
Percentage of investment
: 3,69 %3,69 %
Municipality
Santarém
:Approved amount
: 108434065 €,108 434 065,00 €
Amount spent
: 63995454 €,63 995 454,00 €
Percentage of investment
: 32,09 %32,09 %
Total
Approved amount
: 337884054 €,337 884 054,00 €
Amount spent
: 174786612 €,174 786 612,00 €
Percentage of investment
Sub-region
Alto Alentejo
:Municipality
Alter do Chão
:Approved amount
: 12645350 €,12 645 350,00 €
Amount spent
: 4046624 €,4 046 624,00 €
Percentage of investment
: 4,99 %4,99 %
Municipality
Arronches
:Approved amount
: 2102254 €,2 102 254,00 €
Amount spent
: 1402722 €,1 402 722,00 €
Percentage of investment
: 0,83 %0,83 %
Municipality
Avis
:Approved amount
: 1259057 €,1 259 057,00 €
Amount spent
: 747825 €,747 825,00 €
Percentage of investment
: 0,5 %0,50 %
Municipality
Campo Maior
:Approved amount
: 19964739 €,19 964 739,00 €
Amount spent
: 12745969 €,12 745 969,00 €
Percentage of investment
: 7,87 %7,87 %
Municipality
Castelo de Vide
:Approved amount
: 4300695 €,4 300 695,00 €
Amount spent
: 1525862 €,1 525 862,00 €
Percentage of investment
: 1,7 %1,70 %
Municipality
Crato
:Approved amount
: 642728 €,642 728,00 €
Amount spent
: 416126 €,416 126,00 €
Percentage of investment
: 0,25 %0,25 %
Municipality
Elvas
:Approved amount
: 50822564 €,50 822 564,00 €
Amount spent
: 21534635 €,21 534 635,00 €
Percentage of investment
: 20,04 %20,04 %
Municipality
Fronteira
:Approved amount
: 1622036 €,1 622 036,00 €
Amount spent
: 1128790 €,1 128 790,00 €
Percentage of investment
: 0,64 %0,64 %
Municipality
Gavião
:Approved amount
: 20398975 €,20 398 975,00 €
Amount spent
: 3810870 €,3 810 870,00 €
Percentage of investment
: 8,04 %8,04 %
Municipality
Marvão
:Approved amount
: 4079164 €,4 079 164,00 €
Amount spent
: 2094372 €,2 094 372,00 €
Percentage of investment
: 1,61 %1,61 %
Municipality
Monforte
:Approved amount
: 16379968 €,16 379 968,00 €
Amount spent
: 1044264 €,1 044 264,00 €
Percentage of investment
: 6,46 %6,46 %
Municipality
Nisa
:Approved amount
: 18791059 €,18 791 059,00 €
Amount spent
: 2202468 €,2 202 468,00 €
Percentage of investment
: 7,41 %7,41 %
Municipality
Ponte de Sor
:Approved amount
: 14479211 €,14 479 211,00 €
Amount spent
: 7288857 €,7 288 857,00 €
Percentage of investment
: 5,71 %5,71 %
Municipality
Portalegre
:Approved amount
: 75806398 €,75 806 398,00 €
Amount spent
: 34246550 €,34 246 550,00 €
Percentage of investment
: 29,89 %29,89 %
Municipality
Sousel
:Approved amount
: 10356676 €,10 356 676,00 €
Amount spent
: 9096824 €,9 096 824,00 €
Percentage of investment
: 4,08 %4,08 %
Total
Approved amount
: 253650873 €,253 650 873,00 €
Amount spent
: 103332758 €,103 332 758,00 €
Percentage of investment
Sub-region
Alentejo Central
:Municipality
Alandroal
:Approved amount
: 3783234 €,3 783 234,00 €
Amount spent
: 1977067 €,1 977 067,00 €
Percentage of investment
: 1,53 %1,53 %
Municipality
Arraiolos
:Approved amount
: 2199763 €,2 199 763,00 €
Amount spent
: 1698945 €,1 698 945,00 €
Percentage of investment
: 0,89 %0,89 %
Municipality
Borba
:Approved amount
: 18221567 €,18 221 567,00 €
Amount spent
: 5573418 €,5 573 418,00 €
Percentage of investment
: 7,37 %7,37 %
Municipality
Estremoz
:Approved amount
: 7497554 €,7 497 554,00 €
Amount spent
: 4887730 €,4 887 730,00 €
Percentage of investment
: 3,03 %3,03 %
Municipality
Évora
:Approved amount
: 169135579 €,169 135 579,00 €
Amount spent
: 93175301 €,93 175 301,00 €
Percentage of investment
: 68,45 %68,45 %
Municipality
Montemor-o-Novo
:Approved amount
: 5261059 €,5 261 059,00 €
Amount spent
: 2587266 €,2 587 266,00 €
Percentage of investment
: 2,13 %2,13 %
Municipality
Mora
:Approved amount
: 2947480 €,2 947 480,00 €
Amount spent
: 1606389 €,1 606 389,00 €
Percentage of investment
: 1,19 %1,19 %
Municipality
Mourão
:Approved amount
: 1218853 €,1 218 853,00 €
Amount spent
: 866316 €,866 316,00 €
Percentage of investment
: 0,49 %0,49 %
Municipality
Portel
:Approved amount
: 1591415 €,1 591 415,00 €
Amount spent
: 702594 €,702 594,00 €
Percentage of investment
: 0,64 %0,64 %
Municipality
Redondo
:Approved amount
: 8292075 €,8 292 075,00 €
Amount spent
: 2308392 €,2 308 392,00 €
Percentage of investment
: 3,36 %3,36 %
Municipality
Reguengos de Monsaraz
:Approved amount
: 9423997 €,9 423 997,00 €
Amount spent
: 6326086 €,6 326 086,00 €
Percentage of investment
: 3,81 %3,81 %
Municipality
Vendas Novas
:Approved amount
: 7210628 €,7 210 628,00 €
Amount spent
: 3044074 €,3 044 074,00 €
Percentage of investment
: 2,92 %2,92 %
Municipality
Viana do Alentejo
:Approved amount
: 2505009 €,2 505 009,00 €
Amount spent
: 1305050 €,1 305 050,00 €
Percentage of investment
: 1,01 %1,01 %
Municipality
Vila Viçosa
:Approved amount
: 7810397 €,7 810 397,00 €
Amount spent
: 6099760 €,6 099 760,00 €
Percentage of investment
: 3,16 %3,16 %
Total
Approved amount
: 247098611 €,247 098 611,00 €
Amount spent
: 132158388 €,132 158 388,00 €
Percentage of investment
Region
Algarve
:Sub-region
Algarve
:Municipality
Albufeira
:Approved amount
: 49924390 €,49 924 390,00 €
Amount spent
: 33008955 €,33 008 955,00 €
Percentage of investment
: 7,19 %7,19 %
Municipality
Alcoutim
:Approved amount
: 35351257 €,35 351 257,00 €
Amount spent
: 7583994 €,7 583 994,00 €
Percentage of investment
: 5,09 %5,09 %
Municipality
Aljezur
:Approved amount
: 7843210 €,7 843 210,00 €
Amount spent
: 3325434 €,3 325 434,00 €
Percentage of investment
: 1,13 %1,13 %
Municipality
Castro Marim
:Approved amount
: 3545841 €,3 545 841,00 €
Amount spent
: 1868688 €,1 868 688,00 €
Percentage of investment
: 0,51 %0,51 %
Municipality
Faro
:Approved amount
: 153209340 €,153 209 340,00 €
Amount spent
: 84980836 €,84 980 836,00 €
Percentage of investment
: 22,07 %22,07 %
Municipality
Lagoa
:Approved amount
: 20563661 €,20 563 661,00 €
Amount spent
: 13975666 €,13 975 666,00 €
Percentage of investment
: 2,96 %2,96 %
Municipality
Lagos
:Approved amount
: 46272128 €,46 272 128,00 €
Amount spent
: 28540384 €,28 540 384,00 €
Percentage of investment
: 6,66 %6,66 %
Municipality
Loulé
:Approved amount
: 58527154 €,58 527 154,00 €
Amount spent
: 37667959 €,37 667 959,00 €
Percentage of investment
: 8,43 %8,43 %
Municipality
Monchique
:Approved amount
: 17805569 €,17 805 569,00 €
Amount spent
: 7851422 €,7 851 422,00 €
Percentage of investment
: 2,56 %2,56 %
Municipality
Olhão
:Approved amount
: 54002110 €,54 002 110,00 €
Amount spent
: 32040956 €,32 040 956,00 €
Percentage of investment
: 7,78 %7,78 %
Municipality
Portimão
:Approved amount
: 65582644 €,65 582 644,00 €
Amount spent
: 30113173 €,30 113 173,00 €
Percentage of investment
: 9,45 %9,45 %
Municipality
São Brás de Alportel
:Approved amount
: 7742581 €,7 742 581,00 €
Amount spent
: 4964171 €,4 964 171,00 €
Percentage of investment
: 1,12 %1,12 %
Municipality
Silves
:Approved amount
: 32524941 €,32 524 941,00 €
Amount spent
: 18356753 €,18 356 753,00 €
Percentage of investment
: 4,68 %4,68 %
Municipality
Tavira
:Approved amount
: 23746203 €,23 746 203,00 €
Amount spent
: 12147544 €,12 147 544,00 €
Percentage of investment
: 3,42 %3,42 %
Municipality
Vila do Bispo
:Approved amount
: 7667673 €,7 667 673,00 €
Amount spent
: 3208528 €,3 208 528,00 €
Percentage of investment
: 1,1 %1,10 %
Municipality
Vila Real de Santo António
:Approved amount
: 110009026 €,110 009 026,00 €
Amount spent
: 90178566 €,90 178 566,00 €
Percentage of investment
: 15,84 %15,84 %
Total
Approved amount
: 694317727 €,694 317 727,00 €
Amount spent
: 409813030 €,409 813 030,00 €
Percentage of investment
Region
Autonomous Region of the Azores
:Sub-region
Autonomous Region of the Azores
:Municipality
Vila do Porto
:Approved amount
: 7738112 €,7 738 112,00 €
Amount spent
: 4023428 €,4 023 428,00 €
Percentage of investment
: 0,69 %0,69 %
Municipality
Lagoa
:Approved amount
: 40246559 €,40 246 559,00 €
Amount spent
: 22718676 €,22 718 676,00 €
Percentage of investment
: 3,59 %3,59 %
Municipality
Nordeste
:Approved amount
: 7849058 €,7 849 058,00 €
Amount spent
: 4553400 €,4 553 400,00 €
Percentage of investment
: 0,7 %0,70 %
Municipality
Ponta Delgada
:Approved amount
: 561750762 €,561 750 762,00 €
Amount spent
: 355102734 €,355 102 734,00 €
Percentage of investment
: 50,06 %50,06 %
Municipality
Povoação
:Approved amount
: 5725086 €,5 725 086,00 €
Amount spent
: 2630564 €,2 630 564,00 €
Percentage of investment
: 0,51 %0,51 %
Municipality
Ribeira Grande
:Approved amount
: 141570352 €,141 570 352,00 €
Amount spent
: 77020090 €,77 020 090,00 €
Percentage of investment
: 12,62 %12,62 %
Municipality
Vila Franca do Campo
:Approved amount
: 13378890 €,13 378 890,00 €
Amount spent
: 10490793 €,10 490 793,00 €
Percentage of investment
: 1,19 %1,19 %
Municipality
Angra do Heroísmo
:Approved amount
: 176791180 €,176 791 180,00 €
Amount spent
: 111505567 €,111 505 567,00 €
Percentage of investment
: 15,75 %15,75 %
Municipality
Vila da Praia da Vitória
:Approved amount
: 13522352 €,13 522 352,00 €
Amount spent
: 8830958 €,8 830 958,00 €
Percentage of investment
: 1,2 %1,20 %
Municipality
Santa Cruz da Graciosa
:Approved amount
: 10804354 €,10 804 354,00 €
Amount spent
: 4179072 €,4 179 072,00 €
Percentage of investment
: 0,96 %0,96 %
Municipality
Calheta
:Approved amount
: 3012979 €,3 012 979,00 €
Amount spent
: 2152065 €,2 152 065,00 €
Percentage of investment
: 0,27 %0,27 %
Municipality
Velas
:Approved amount
: 6402681 €,6 402 681,00 €
Amount spent
: 3718140 €,3 718 140,00 €
Percentage of investment
: 0,57 %0,57 %
Municipality
Lajes do Pico
:Approved amount
: 4724941 €,4 724 941,00 €
Amount spent
: 2448321 €,2 448 321,00 €
Percentage of investment
: 0,42 %0,42 %
Municipality
Madalena
:Approved amount
: 16554370 €,16 554 370,00 €
Amount spent
: 10243660 €,10 243 660,00 €
Percentage of investment
: 1,48 %1,48 %
Municipality
São Roque do Pico
:Approved amount
: 13793670 €,13 793 670,00 €
Amount spent
: 9052496 €,9 052 496,00 €
Percentage of investment
: 1,23 %1,23 %
Municipality
Horta
:Approved amount
: 92751118 €,92 751 118,00 €
Amount spent
: 72620247 €,72 620 247,00 €
Percentage of investment
: 8,27 %8,27 %
Municipality
Lajes das Flores
:Approved amount
: 2427743 €,2 427 743,00 €
Amount spent
: 1060925 €,1 060 925,00 €
Percentage of investment
: 0,22 %0,22 %
Municipality
Santa Cruz das Flores
:Approved amount
: 2721882 €,2 721 882,00 €
Amount spent
: 1148957 €,1 148 957,00 €
Percentage of investment
: 0,24 %0,24 %
Municipality
Corvo
:Approved amount
: 426969 €,426 969,00 €
Amount spent
: 178867 €,178 867,00 €
Percentage of investment
: 0,04 %0,04 %
Total
Approved amount
: 1122193057 €,1 122 193 057,00 €
Amount spent
: 703678962 €,703 678 962,00 €
Percentage of investment
Region
Autonomous Region of Madeira
:Sub-region
Autonomous Region of Madeira
:Municipality
Calheta
:Approved amount
: 12455866 €,12 455 866,00 €
Amount spent
: 4638490 €,4 638 490,00 €
Percentage of investment
: 1,26 %1,26 %
Municipality
Câmara de Lobos
:Approved amount
: 29366794 €,29 366 794,00 €
Amount spent
: 8255759 €,8 255 759,00 €
Percentage of investment
: 2,97 %2,97 %
Municipality
Funchal
:Approved amount
: 751185735 €,751 185 735,00 €
Amount spent
: 411993108 €,411 993 108,00 €
Percentage of investment
: 76,02 %76,02 %
Municipality
Machico
:Approved amount
: 48539247 €,48 539 247,00 €
Amount spent
: 10955397 €,10 955 397,00 €
Percentage of investment
: 4,91 %4,91 %
Municipality
Ponta do Sol
:Approved amount
: 21445054 €,21 445 054,00 €
Amount spent
: 6904344 €,6 904 344,00 €
Percentage of investment
: 2,17 %2,17 %
Municipality
Porto Moniz
:Approved amount
: 524215 €,524 215,00 €
Amount spent
: 244645 €,244 645,00 €
Percentage of investment
: 0,05 %0,05 %
Municipality
Ribeira Brava
:Approved amount
: 13595284 €,13 595 284,00 €
Amount spent
: 9718187 €,9 718 187,00 €
Percentage of investment
: 1,38 %1,38 %
Municipality
Santa Cruz
:Approved amount
: 28242125 €,28 242 125,00 €
Amount spent
: 11227738 €,11 227 738,00 €
Percentage of investment
: 2,86 %2,86 %
Municipality
Santana
:Approved amount
: 16606784 €,16 606 784,00 €
Amount spent
: 501735 €,501 735,00 €
Percentage of investment
: 1,68 %1,68 %
Municipality
São Vicente
:Approved amount
: 26031595 €,26 031 595,00 €
Amount spent
: 8920686 €,8 920 686,00 €
Percentage of investment
: 2,63 %2,63 %
Municipality
Porto Santo
:Approved amount
: 40126401 €,40 126 401,00 €
Amount spent
: 20074778 €,20 074 778,00 €
Percentage of investment
: 4,06 %4,06 %
Total
Approved amount
: 988119099 €,988 119 099,00 €
Amount spent
: 493434866 €,493 434 866,00 €
Percentage of investment
Region
Nation-wide investment
:Approved amount
: 3655353461 €,3 655 353 461,00 €
:Amount spent
: {{ regionNutsii.apoio_gasto|floatformat:'-2'|cut:' '|checkifdataisavailable|euro_symbol,2 604 803 314,00 €
:Comparison between realities
Assessing the impact of investments in the Recovery and Resilience Plan on the daily lives of populations is not a simple topic. It is necessary to analyze the context in a broader way and understand how investments can suppress everyday needs.
However, there are some indicators that can help to envision an equitable way in which investments are being distributed geographically.
How much is already approved to invest per inhabitant?
Number of inhabitants according to the 2021 Census
How much is already approved to invest per inhabitant?
Number of inhabitants according to the 2021 Census
| Municipality | Approved amount |
|---|---|
| Highest national value Vinhais | 14381 € 14 381,00 € |
| National average | 2423 € 2 423,00 € |
| Lowest national value Almeirim | 192 € 192,00 € |
How much is already approved to invest per inhabitant?
Municipality
Highest national value Vinhais
Approved amount
14381 €
14 381,00 €
Municipality
National average
Approved amount
2423 €
2 423,00 €
Municipality
Lowest national value Almeirim
Approved amount
192 €
192,00 €
How much is already approved to invest per km2?
How much is already approved to invest per km2?
| Municipality | Approved amount |
|---|---|
| Highest national value Porto | 34240547 € 34 240 547,00 € |
| National average | 271790 € 271 790,00 € |
| Lowest national value Crato | 1615 € 1 615,00 € |
How much is already approved to invest per km2?
Municipality
Highest national value Porto
Approved amount
34240547 €
34 240 547,00 €
Municipality
National average
Approved amount
271790 €
271 790,00 €
Municipality
Lowest national value Crato
Approved amount
1615 €
1 615,00 €