PRR Project
Eficiência Energética em Edifícios da Administração Pública Central
Project sheet
Name
Eficiência Energética em Edifícios da Administração Pública CentralTotal project amount
4,99 million €Amount paid
0 €Non-refundable funding
4,99 million €Loan funding
0 €Start date
07.12.2021Expected end date
31.12.2025Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in central public administration buildingsOperation code
01/C13-i02/2021.P138Summary
Com o presente projeto, a Universidade de Aveiro visa melhorar a qualidade energética e ambiental do Campus do Crasto através da redução do consumo de energia, criação de fontes de energia alternativa, e subsequente redução das emissões de CO2. Pretende também o aumento da eficiência hídrica, através da substituição de equipamentos. Este projeto visa a implementação de medidas de eficiência energética num conjunto de edifícios públicos em funcionamento, contribuindo desta forma, para a execução do Programa Eco.AP e do PNAEE. Edifícios considerados: Edifício da Saúde da Universidade de Aveiro, construída em 2012 com 3 pisos; Casa do Estudante, construída em 1999 com 3 pisos; Residência Universitária do Crasto, constituída por um conjunto de 14 blocos residenciais, construídas entre 2007 e 2011, com a mesma arquitetura, com 3 pisos; Balneários do Crasto, construídos em 2018 com 2 pisos e Complexo de Refeitórios do Crasto, construído em 2000, com 3 pisos. As medidas vão potenciar uma redução anual do consumo de energia primária do Campus de 3.858.148,04 kWhEP/ano , que equivale a uma diminuição anual estimada das emissões de gases com efeito de estufa de 453,52 t CO2eq/ano.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
4,99 million €
Total amount of the project
Where was the money spent
By county
1 county financed .
-
Aveiro 4,99 million € ,