Barometer
Discover with clarity and detail the main data and status of the application of European Funds in the country through Portugal 2030.
Portugal 2030 in a minute
Percentage of funding approved for investment in implementing projects This indicator is known as the commitment rate. In order to ensure full use of available funds, higher amounts than those available may be approved as a way to anticipate projects that do not use all the amounts allocated to them.
, 52,2 %,Percentage of funding already used to implement projects This indicator is known as the execution rate.
, 15,9 %,Days left until the end of the Portugal 2030 implementation period
European Regional Development Fund
Percentage of funding approved for investment in implementing projects This indicator is known as the commitment rate. In order to ensure full use of available funds, higher amounts than those available may be approved as a way to anticipate projects that do not use all the amounts allocated to them.
, 44,3 %,Percentage of the amount executed compared to the amount approved for the ERDF This indicator is known as the realization rate.
, 20,4 %,Percentage of funding spent on implementing projects This indicator is known as the execution rate.
, 9 %,Distribution of European Regional Development Fund
Policy Objectives
+ Smart
Approved amount
2,9 billion €
Executed amount
379,1 million €
Amount executed compared to the amount approved
Policy Objectives
+ Green
Approved amount
885,7 million €
Executed amount
164,8 million €
Amount executed compared to the amount approved
Policy Objectives
+ Connected
Approved amount
218,1 million €
Executed amount
149,5 million €
Amount executed compared to the amount approved
Policy Objectives
+ Social
Approved amount
328,8 million €
Executed amount
79 million €
Amount executed compared to the amount approved
Policy Objectives
+ Proximity
Approved amount
590,5 million €
Executed amount
201 million €
Amount executed compared to the amount approved
Measure Financial complement that serves as technical support for each of the programmes.
Technical assistance
Approved amount
175,8 million €
Executed amount
64,4 million €
Amount executed compared to the amount approved
European Regional Development Fund
| Amount | |
|---|---|
| Programmed amount | 11496728210,00 € 11 496 728 210,00 € |
| Approved amount | 5097747490,44 € 5 097 747 490,44 € |
| Executed amount | 1037885369,41 € 1 037 885 369,41 € |
| Percentage of funding approved for investment in implementing projects | 44,34 % 44,34 % |
| Percentage of funding spent on implementing projects | 9,03 % 9,03 % |
| Percentage of the amount executed compared to the amount approved for the ERDF | 20,36 % 20,36 % |
Programmed amount
11496728210,00 €
11 496 728 210,00 €
Approved amount
5097747490,44 €
5 097 747 490,44 €
Executed amount
1037885369,41 €
1 037 885 369,41 €
Percentage of funding approved for investment in implementing projects
44,34 % 44,34 %
Percentage of funding spent on implementing projects
9,03 % 9,03 %
Percentage of the amount executed compared to the amount approved for the ERDF
20,36 % 20,36 %
Distribution of European Regional Development Fund
Policy Objectives
+ Smart
Approved amount
2,9 billion €
Executed amount
379,1 million €
Amount executed compared to the amount approved
Policy Objectives
+ Green
Approved amount
885,7 million €
Executed amount
164,8 million €
Amount executed compared to the amount approved
Policy Objectives
+ Connected
Approved amount
218,1 million €
Executed amount
149,5 million €
Amount executed compared to the amount approved
Policy Objectives
+ Social
Approved amount
328,8 million €
Executed amount
79 million €
Amount executed compared to the amount approved
Policy Objectives
+ Proximity
Approved amount
590,5 million €
Executed amount
201 million €
Amount executed compared to the amount approved
Measure Financial complement that serves as technical support for each of the programmes.
Technical assistance
Approved amount
175,8 million €
Executed amount
64,4 million €
Amount executed compared to the amount approved
Fundo Social Europeu Mais
Percentage of funding approved for investment in implementing projects This indicator is known as the commitment rate. In order to ensure full use of available funds, higher amounts than those available may be approved as a way to anticipate projects that do not use all the amounts allocated to them.
, 64,2 %,Percentage of the amount executed compared to the amount approved for the FSE+ This indicator is known as the realization rate.
, 42 %,Percentage of funding spent on implementing projects This indicator is known as the execution rate.
, 26,9 %,Distribution of Fundo Social Europeu Mais
Policy Objectives
+ Social
Approved amount
4,8 billion €
Executed amount
2 billion €
Amount executed compared to the amount approved
Measure Financial complement that serves as technical support for each of the programmes.
Technical assistance
Approved amount
171,8 million €
Executed amount
63,7 million €
Amount executed compared to the amount approved
Fundo Social Europeu Mais
| Amount | |
|---|---|
| Programmed amount | 7776520960,00 € 7 776 520 960,00 € |
| Approved amount | 4992440334,73 € 4 992 440 334,73 € |
| Executed amount | 2095370872,28 € 2 095 370 872,28 € |
| Percentage of funding approved for investment in implementing projects | 64,2 % 64,20 % |
| Percentage of funding spent on implementing projects | 26,94 % 26,94 % |
| Percentage of the amount executed compared to the amount approved for the FSE+ | 41,97 % 41,97 % |
Programmed amount
7776520960,00 €
7 776 520 960,00 €
Approved amount
4992440334,73 €
4 992 440 334,73 €
Executed amount
2095370872,28 €
2 095 370 872,28 €
Percentage of funding approved for investment in implementing projects
64,2 % 64,20 %
Percentage of funding spent on implementing projects
26,94 % 26,94 %
Percentage of the amount executed compared to the amount approved for the FSE+
41,97 % 41,97 %
Distribution of Fundo Social Europeu Mais
Policy Objectives
+ Social
Approved amount
4,8 billion €
Executed amount
2 billion €
Amount executed compared to the amount approved
Measure Financial complement that serves as technical support for each of the programmes.
Technical assistance
Approved amount
171,8 million €
Executed amount
63,7 million €
Amount executed compared to the amount approved
Cohesion Fund
Percentage of funding approved for investment in implementing projects This indicator is known as the commitment rate. In order to ensure full use of available funds, higher amounts than those available may be approved as a way to anticipate projects that do not use all the amounts allocated to them.
, 47,9 %,Percentage of the amount executed compared to the amount approved for the CF This indicator is known as the realization rate.
, 28,9 %,Percentage of funding spent on implementing projects This indicator is known as the execution rate.
, 13,9 %,Distribution of Cohesion Fund
Policy Objectives
+ Green
Approved amount
790,6 million €
Executed amount
328 million €
Amount executed compared to the amount approved
Policy Objectives
+ Connected
Approved amount
673,4 million €
Executed amount
92,8 million €
Amount executed compared to the amount approved
Measure Financial complement that serves as technical support for each of the programmes.
Technical assistance
Approved amount
22,5 million €
Executed amount
9,4 million €
Amount executed compared to the amount approved
Cohesion Fund
| Amount | |
|---|---|
| Programmed amount | 3105340566,00 € 3 105 340 566,00 € |
| Approved amount | 1486522161,00 € 1 486 522 161,00 € |
| Executed amount | 430230809,62 € 430 230 809,62 € |
| Percentage of funding approved for investment in implementing projects | 47,87 % 47,87 % |
| Percentage of funding spent on implementing projects | 13,85 % 13,85 % |
| Percentage of the amount executed compared to the amount approved for the CF | 28,94 % 28,94 % |
Programmed amount
3105340566,00 €
3 105 340 566,00 €
Approved amount
1486522161,00 €
1 486 522 161,00 €
Executed amount
430230809,62 €
430 230 809,62 €
Percentage of funding approved for investment in implementing projects
47,87 % 47,87 %
Percentage of funding spent on implementing projects
13,85 % 13,85 %
Percentage of the amount executed compared to the amount approved for the CF
28,94 % 28,94 %
Distribution of Cohesion Fund
Policy Objectives
+ Green
Approved amount
790,6 million €
Executed amount
328 million €
Amount executed compared to the amount approved
Policy Objectives
+ Connected
Approved amount
673,4 million €
Executed amount
92,8 million €
Amount executed compared to the amount approved
Measure Financial complement that serves as technical support for each of the programmes.
Technical assistance
Approved amount
22,5 million €
Executed amount
9,4 million €
Amount executed compared to the amount approved
Fundo para uma Transição Justa
Percentage of funding approved for investment in implementing projects This indicator is known as the commitment rate. In order to ensure full use of available funds, higher amounts than those available may be approved as a way to anticipate projects that do not use all the amounts allocated to them.
, 81,1 %,Percentage of the amount executed compared to the amount approved for the FTJ This indicator is known as the realization rate.
, 7 %,Percentage of funding spent on implementing projects This indicator is known as the execution rate.
, 5,7 %,Distribution of Fundo para uma Transição Justa
Policy Objectives
+ Just Transition
Approved amount
181,5 million €
Executed amount
12,7 million €
Amount executed compared to the amount approved
Fundo para uma Transição Justa
| Amount | |
|---|---|
| Programmed amount | 223839015,00 € 223 839 015,00 € |
| Approved amount | 181518985,01 € 181 518 985,01 € |
| Executed amount | 12739348,50 € 12 739 348,50 € |
| Percentage of funding approved for investment in implementing projects | 81,09 % 81,09 % |
| Percentage of funding spent on implementing projects | 5,69 % 5,69 % |
| Percentage of the amount executed compared to the amount approved for the FTJ | 7,02 % 7,02 % |
Programmed amount
223839015,00 €
223 839 015,00 €
Approved amount
181518985,01 €
181 518 985,01 €
Executed amount
12739348,50 €
12 739 348,50 €
Percentage of funding approved for investment in implementing projects
81,09 % 81,09 %
Percentage of funding spent on implementing projects
5,69 % 5,69 %
Percentage of the amount executed compared to the amount approved for the FTJ
7,02 % 7,02 %
Distribution of Fundo para uma Transição Justa
Policy Objectives
+ Just Transition
Approved amount
181,5 million €
Executed amount
12,7 million €
Amount executed compared to the amount approved
Fundo Europeu dos Assuntos Marítimos, das Pescas e da Aquicultura
Percentage of funding approved for investment in implementing projects This indicator is known as the commitment rate. In order to ensure full use of available funds, higher amounts than those available may be approved as a way to anticipate projects that do not use all the amounts allocated to them.
, 60,7 %,Percentage of the amount executed compared to the amount approved for the FEAMPA This indicator is known as the realization rate.
, 35,5 %,Percentage of funding spent on implementing projects This indicator is known as the execution rate.
, 21,5 %,Distribution of Fundo Europeu dos Assuntos Marítimos, das Pescas e da Aquicultura
Policy Objectives
+ Green
Approved amount
214,2 million €
Executed amount
79,5 million €
Amount executed compared to the amount approved
Policy Objectives
+ Proximity
Approved amount
15,4 million €
Executed amount
2,2 million €
Amount executed compared to the amount approved
Measure Financial complement that serves as technical support for each of the programmes.
Technical assistance
Approved amount
8,7 million €
Executed amount
2,8 million €
Amount executed compared to the amount approved
Fundo Europeu dos Assuntos Marítimos, das Pescas e da Aquicultura
| Amount | |
|---|---|
| Programmed amount | 392572022,00 € 392 572 022,00 € |
| Approved amount | 238354569,83 € 238 354 569,83 € |
| Executed amount | 84520528,80 € 84 520 528,80 € |
| Percentage of funding approved for investment in implementing projects | 60,72 % 60,72 % |
| Percentage of funding spent on implementing projects | 21,53 % 21,53 % |
| Percentage of the amount executed compared to the amount approved for the FEAMPA | 35,46 % 35,46 % |
Programmed amount
392572022,00 €
392 572 022,00 €
Approved amount
238354569,83 €
238 354 569,83 €
Executed amount
84520528,80 €
84 520 528,80 €
Percentage of funding approved for investment in implementing projects
60,72 % 60,72 %
Percentage of funding spent on implementing projects
21,53 % 21,53 %
Percentage of the amount executed compared to the amount approved for the FEAMPA
35,46 % 35,46 %
Distribution of Fundo Europeu dos Assuntos Marítimos, das Pescas e da Aquicultura
Policy Objectives
+ Green
Approved amount
214,2 million €
Executed amount
79,5 million €
Amount executed compared to the amount approved
Policy Objectives
+ Proximity
Approved amount
15,4 million €
Executed amount
2,2 million €
Amount executed compared to the amount approved
Measure Financial complement that serves as technical support for each of the programmes.
Technical assistance
Approved amount
8,7 million €
Executed amount
2,8 million €
Amount executed compared to the amount approved
Investments by policy objectives and programs
Investment values by policy objectives
Investment values by policy objectives
| Policy Objectives | Specific Objective | Approved amount | Executed amount |
|---|---|---|---|
| + Smart |
Research and innovation
|
848806124,50 €
848 806 124,50 €
|
80374578,98 €
80 374 578,98 €
|
|
Digitalisation for citizens and businesses
|
72685605,37 €
72 685 605,37 €
|
12527427,97 €
12 527 427,97 €
|
|
|
SME growth and competitiveness
|
1969616830,11 €
1 969 616 830,11 €
|
285756883,05 €
285 756 883,05 €
|
|
|
Smart specialisation
|
7720132,23 €
7 720 132,23 €
|
466541,55 €
466 541,55 €
|
|
|
Total
|
2898828692,21 €
2 898 828 692,21 €
|
379125431,55 €
379 125 431,55 €
|
|
| + Green |
Atividades de pesca sustentável
|
22315904,27 €
22 315 904,27 €
|
5161699,74 €
5 161 699,74 €
|
|
Energy efficiency and CO2 emission reduction from fishing vessels
|
94626,40 €
94 626,40 €
|
68593,91 €
68 593,91 €
|
|
|
Fishing capacity adjustment
|
5454693,63 €
5 454 693,63 €
|
4476762,90 €
4 476 762,90 €
|
|
|
Efficient fisheries control and enforcement
|
24802969,88 €
24 802 969,88 €
|
3745723,28 €
3 745 723,28 €
|
|
|
Condições equitativas para as regiões ultraperiféricas - produtos de pesca e aquicultura
|
32145834,41 €
32 145 834,41 €
|
24179493,13 €
24 179 493,13 €
|
|
|
Protecting and restoring aquatic biodiversity
|
4583142,60 €
4 583 142,60 €
|
252405,24 €
252 405,24 €
|
|
|
Sustainable aquaculture activities
|
56259498,76 €
56 259 498,76 €
|
10945538,39 €
10 945 538,39 €
|
|
|
Comercialização e a transformação - Pesca e Aquicultura
|
64222520,98 €
64 222 520,98 €
|
30669915,04 €
30 669 915,04 €
|
|
|
Marine knowledge and maritime surveillance
|
4299143,13 €
4 299 143,13 €
|
0,00 €
0,00 €
|
|
|
Eficiência energética
|
39679739,54 €
39 679 739,54 €
|
4893840,90 €
4 893 840,90 €
|
|
|
Climate change adjustment
|
260138136,87 €
260 138 136,87 €
|
61672331,15 €
61 672 331,15 €
|
|
|
Sustainable water management
|
421178978,29 €
421 178 978,29 €
|
70917024,60 €
70 917 024,60 €
|
|
|
Economia circular
|
124303409,12 €
124 303 409,12 €
|
22517330,22 €
22 517 330,22 €
|
|
|
Nature and biodiversity protection
|
86385893,47 €
86 385 893,47 €
|
13012781,26 €
13 012 781,26 €
|
|
|
Sustainable urban mobility
|
744546525,44 €
744 546 525,44 €
|
319747274,01 €
319 747 274,01 €
|
|
|
Total
|
1890411016,79 €
1 890 411 016,79 €
|
572260713,77 €
572 260 713,77 €
|
|
| + Connected |
Trans-European transport network
|
759106016,36 €
759 106 016,36 €
|
131529893,36 €
131 529 893,36 €
|
|
Rede nacional de transportes
|
132399909,55 €
132 399 909,55 €
|
110795759,01 €
110 795 759,01 €
|
|
|
Total
|
891505925,91 €
891 505 925,91 €
|
242325652,37 €
242 325 652,37 €
|
|
| + Social |
Access to employment
|
480014197,25 €
480 014 197,25 €
|
172458804,94 €
172 458 804,94 €
|
|
Access to quality services
|
1045941871,55 €
1 045 941 871,55 €
|
544291375,98 €
544 291 375,98 €
|
|
|
Tackling material deprivation
|
194905351,19 €
194 905 351,19 €
|
56045690,08 €
56 045 690,08 €
|
|
|
Adapting workers to change
|
157850271,30 €
157 850 271,30 €
|
6631320,87 €
6 631 320,87 €
|
|
|
Access to education and training
|
1659455493,09 €
1 659 455 493,09 €
|
939947757,35 €
939 947 757,35 €
|
|
|
Lifelong learning
|
539799743,98 €
539 799 743,98 €
|
184077099,89 €
184 077 099,89 €
|
|
|
Active inclusion and employability
|
742670104,21 €
742 670 104,21 €
|
128184840,02 €
128 184 840,02 €
|
|
|
Education and training infrastructure
|
78533000,51 €
78 533 000,51 €
|
15230485,20 €
15 230 485,20 €
|
|
|
Access to healthcare
|
169974657,90 €
169 974 657,90 €
|
48053137,54 €
48 053 137,54 €
|
|
|
Cultura e turismo sustentáveis
|
80340894,60 €
80 340 894,60 €
|
15755445,38 €
15 755 445,38 €
|
|
|
Total
|
5149485585,58 €
5 149 485 585,58 €
|
2110675957,25 €
2 110 675 957,25 €
|
|
| + Proximity |
Sustainable development of fishing communities
|
15429574,26 €
15 429 574,26 €
|
2194514,37 €
2 194 514,37 €
|
|
Integrated development in urban areas
|
570774976,27 €
570 774 976,27 €
|
197043777,02 €
197 043 777,02 €
|
|
|
Desenvolvimento integrado nas zonas não urbanas
|
19716308,43 €
19 716 308,43 €
|
3938965,77 €
3 938 965,77 €
|
|
|
Total
|
605920858,96 €
605 920 858,96 €
|
203177257,16 €
203 177 257,16 €
|
|
| Technical assistance |
Assistência Técnica MAR2030
|
8746661,51 €
8 746 661,51 €
|
2825882,80 €
2 825 882,80 €
|
|
Technical assistance
|
370165815,04 €
370 165 815,04 €
|
137616685,21 €
137 616 685,21 €
|
|
|
Total
|
378912476,55 €
378 912 476,55 €
|
140442568,01 €
140 442 568,01 €
|
|
| + Just Transition |
Just Transition funding
|
181518985,01 €
181 518 985,01 €
|
12739348,50 €
12 739 348,50 €
|
|
Total
|
181518985,01 €
181 518 985,01 €
|
12739348,50 €
12 739 348,50 €
|
|
| Total | 11996583541,01 € 11 996 583 541,01 € | 3660746928,60 € 3 660 746 928,60 € |
Policy Objectives
+ Smart
:Specific Objective
Research and innovation
:Approved amount
848806124,50 €848 806 124,50 €
Executed amount
80374578,98 €80 374 578,98 €
Specific Objective
Digitalisation for citizens and businesses
:Approved amount
72685605,37 €72 685 605,37 €
Executed amount
12527427,97 €12 527 427,97 €
Specific Objective
SME growth and competitiveness
:Approved amount
1969616830,11 €1 969 616 830,11 €
Executed amount
285756883,05 €285 756 883,05 €
Specific Objective
Smart specialisation
:Approved amount
7720132,23 €7 720 132,23 €
Executed amount
466541,55 €466 541,55 €
Total
Approved amount
2898828692,21 €2 898 828 692,21 €
Executed amount
379125431,55 €379 125 431,55 €
Policy Objectives
+ Green
:Specific Objective
Atividades de pesca sustentável
:Approved amount
22315904,27 €22 315 904,27 €
Executed amount
5161699,74 €5 161 699,74 €
Specific Objective
Energy efficiency and CO2 emission reduction from fishing vessels
:Approved amount
94626,40 €94 626,40 €
Executed amount
68593,91 €68 593,91 €
Specific Objective
Fishing capacity adjustment
:Approved amount
5454693,63 €5 454 693,63 €
Executed amount
4476762,90 €4 476 762,90 €
Specific Objective
Efficient fisheries control and enforcement
:Approved amount
24802969,88 €24 802 969,88 €
Executed amount
3745723,28 €3 745 723,28 €
Specific Objective
Condições equitativas para as regiões ultraperiféricas - produtos de pesca e aquicultura
:Approved amount
32145834,41 €32 145 834,41 €
Executed amount
24179493,13 €24 179 493,13 €
Specific Objective
Protecting and restoring aquatic biodiversity
:Approved amount
4583142,60 €4 583 142,60 €
Executed amount
252405,24 €252 405,24 €
Specific Objective
Sustainable aquaculture activities
:Approved amount
56259498,76 €56 259 498,76 €
Executed amount
10945538,39 €10 945 538,39 €
Specific Objective
Comercialização e a transformação - Pesca e Aquicultura
:Approved amount
64222520,98 €64 222 520,98 €
Executed amount
30669915,04 €30 669 915,04 €
Specific Objective
Marine knowledge and maritime surveillance
:Approved amount
4299143,13 €4 299 143,13 €
Executed amount
0,00 €0,00 €
Specific Objective
Eficiência energética
:Approved amount
39679739,54 €39 679 739,54 €
Executed amount
4893840,90 €4 893 840,90 €
Specific Objective
Climate change adjustment
:Approved amount
260138136,87 €260 138 136,87 €
Executed amount
61672331,15 €61 672 331,15 €
Specific Objective
Sustainable water management
:Approved amount
421178978,29 €421 178 978,29 €
Executed amount
70917024,60 €70 917 024,60 €
Specific Objective
Economia circular
:Approved amount
124303409,12 €124 303 409,12 €
Executed amount
22517330,22 €22 517 330,22 €
Specific Objective
Nature and biodiversity protection
:Approved amount
86385893,47 €86 385 893,47 €
Executed amount
13012781,26 €13 012 781,26 €
Specific Objective
Sustainable urban mobility
:Approved amount
744546525,44 €744 546 525,44 €
Executed amount
319747274,01 €319 747 274,01 €
Total
Approved amount
1890411016,79 €1 890 411 016,79 €
Executed amount
572260713,77 €572 260 713,77 €
Policy Objectives
+ Connected
:Specific Objective
Trans-European transport network
:Approved amount
759106016,36 €759 106 016,36 €
Executed amount
131529893,36 €131 529 893,36 €
Specific Objective
Rede nacional de transportes
:Approved amount
132399909,55 €132 399 909,55 €
Executed amount
110795759,01 €110 795 759,01 €
Total
Approved amount
891505925,91 €891 505 925,91 €
Executed amount
242325652,37 €242 325 652,37 €
Policy Objectives
+ Social
:Specific Objective
Access to employment
:Approved amount
480014197,25 €480 014 197,25 €
Executed amount
172458804,94 €172 458 804,94 €
Specific Objective
Access to quality services
:Approved amount
1045941871,55 €1 045 941 871,55 €
Executed amount
544291375,98 €544 291 375,98 €
Specific Objective
Tackling material deprivation
:Approved amount
194905351,19 €194 905 351,19 €
Executed amount
56045690,08 €56 045 690,08 €
Specific Objective
Adapting workers to change
:Approved amount
157850271,30 €157 850 271,30 €
Executed amount
6631320,87 €6 631 320,87 €
Specific Objective
Access to education and training
:Approved amount
1659455493,09 €1 659 455 493,09 €
Executed amount
939947757,35 €939 947 757,35 €
Specific Objective
Lifelong learning
:Approved amount
539799743,98 €539 799 743,98 €
Executed amount
184077099,89 €184 077 099,89 €
Specific Objective
Active inclusion and employability
:Approved amount
742670104,21 €742 670 104,21 €
Executed amount
128184840,02 €128 184 840,02 €
Specific Objective
Education and training infrastructure
:Approved amount
78533000,51 €78 533 000,51 €
Executed amount
15230485,20 €15 230 485,20 €
Specific Objective
Access to healthcare
:Approved amount
169974657,90 €169 974 657,90 €
Executed amount
48053137,54 €48 053 137,54 €
Specific Objective
Cultura e turismo sustentáveis
:Approved amount
80340894,60 €80 340 894,60 €
Executed amount
15755445,38 €15 755 445,38 €
Total
Approved amount
5149485585,58 €5 149 485 585,58 €
Executed amount
2110675957,25 €2 110 675 957,25 €
Policy Objectives
+ Proximity
:Specific Objective
Sustainable development of fishing communities
:Approved amount
15429574,26 €15 429 574,26 €
Executed amount
2194514,37 €2 194 514,37 €
Specific Objective
Integrated development in urban areas
:Approved amount
570774976,27 €570 774 976,27 €
Executed amount
197043777,02 €197 043 777,02 €
Specific Objective
Desenvolvimento integrado nas zonas não urbanas
:Approved amount
19716308,43 €19 716 308,43 €
Executed amount
3938965,77 €3 938 965,77 €
Total
Approved amount
605920858,96 €605 920 858,96 €
Executed amount
203177257,16 €203 177 257,16 €
Policy Objectives
Technical assistance
:Specific Objective
Assistência Técnica MAR2030
:Approved amount
8746661,51 €8 746 661,51 €
Executed amount
2825882,80 €2 825 882,80 €
Specific Objective
Technical assistance
:Approved amount
370165815,04 €370 165 815,04 €
Executed amount
137616685,21 €137 616 685,21 €
Total
Approved amount
378912476,55 €378 912 476,55 €
Executed amount
140442568,01 €140 442 568,01 €
Policy Objectives
+ Just Transition
:Specific Objective
Just Transition funding
:Approved amount
181518985,01 €181 518 985,01 €
Executed amount
12739348,50 €12 739 348,50 €
Total
Approved amount
181518985,01 €181 518 985,01 €
Executed amount
12739348,50 €12 739 348,50 €
Policy Objectives
TotalTotal
Approved amount
11996583541,01 €11 996 583 541,01 €
Executed amount
3660746928,60 €3 660 746 928,60 €
Investment values by programs
Investment values by programs
| Scope | Programme | Approved amount | Executed amount |
|---|---|---|---|
| Thematic |
Innovation and Digital Transition
|
1794762176,95 €
1 794 762 176,95 €
|
191055477,49 €
191 055 477,49 €
|
|
Climate Action and Sustainability
|
1486522161,00 €
1 486 522 161,00 €
|
430230809,62 €
430 230 809,62 €
|
|
|
Demographics, Qualifications and Inclusion
|
4115310328,83 €
4 115 310 328,83 €
|
1831671856,82 €
1 831 671 856,82 €
|
|
|
Sea
|
238354569,83 €
238 354 569,83 €
|
84520528,80 €
84 520 528,80 €
|
|
| Regionais |
North
|
1711761761,22 €
1 711 761 761,22 €
|
333211246,16 €
333 211 246,16 €
|
|
Center
|
858985538,91 €
858 985 538,91 €
|
254507111,40 €
254 507 111,40 €
|
|
|
Lisboa
|
232998600,20 €
232 998 600,20 €
|
60988418,32 €
60 988 418,32 €
|
|
|
Alentejo
|
472724345,39 €
472 724 345,39 €
|
100358978,24 €
100 358 978,24 €
|
|
|
Algarve
|
299773136,68 €
299 773 136,68 €
|
70261325,73 €
70 261 325,73 €
|
|
|
Azores
|
437924601,49 €
437 924 601,49 €
|
169733420,36 €
169 733 420,36 €
|
|
|
Madeira
|
217156460,17 €
217 156 460,17 €
|
87988815,49 €
87 988 815,49 €
|
|
| Technical Assistance |
Technical Assistance
|
130309860,34 €
130 309 860,34 €
|
46218940,18 €
46 218 940,18 €
|
Scope
Thematic
:Programme
Innovation and Digital Transition
:Approved amount
1794762176,95 €1 794 762 176,95 €
Executed amount
191055477,49 €191 055 477,49 €
Programme
Climate Action and Sustainability
:Approved amount
1486522161,00 €1 486 522 161,00 €
Executed amount
430230809,62 €430 230 809,62 €
Programme
Demographics, Qualifications and Inclusion
:Approved amount
4115310328,83 €4 115 310 328,83 €
Executed amount
1831671856,82 €1 831 671 856,82 €
Programme
Sea
:Approved amount
238354569,83 €238 354 569,83 €
Executed amount
84520528,80 €84 520 528,80 €
Scope
Regionais
:Programme
North
:Approved amount
1711761761,22 €1 711 761 761,22 €
Executed amount
333211246,16 €333 211 246,16 €
Programme
Center
:Approved amount
858985538,91 €858 985 538,91 €
Executed amount
254507111,40 €254 507 111,40 €
Programme
Lisboa
:Approved amount
232998600,20 €232 998 600,20 €
Executed amount
60988418,32 €60 988 418,32 €
Programme
Alentejo
:Approved amount
472724345,39 €472 724 345,39 €
Executed amount
100358978,24 €100 358 978,24 €
Programme
Algarve
:Approved amount
299773136,68 €299 773 136,68 €
Executed amount
70261325,73 €70 261 325,73 €
Programme
Azores
:Approved amount
437924601,49 €437 924 601,49 €
Executed amount
169733420,36 €169 733 420,36 €
Programme
Madeira
:Approved amount
217156460,17 €217 156 460,17 €
Executed amount
87988815,49 €87 988 815,49 €
Scope
Technical Assistance
:Programme
Technical Assistance
:Approved amount
130309860,34 €130 309 860,34 €
Executed amount
46218940,18 €46 218 940,18 €
Top beneficiaries
INFRAESTRUTURAS DE PORTUGAL, S.A.
INSTITUTO DO EMPREGO E FORMAÇÃO PROFISSIONAL, I.P.
DIRECÇÃO-GERAL DO ENSINO SUPERIOR
FUNDAÇÃO PARA A CIÊNCIA E A TECNOLOGIA
PORTOS DOS AÇORES, S.A.
9 833
Total beneficiaries
Top projects
Construção do novo porto das Lajes das Flores
Formação Avançada - Bolsas de Doutoramento
INSTITUTO DA SEGURANÇA SOCIAL, I.P.-PESSOAS-FSE+-003322
Bolsas de estudo para estudantes do ensino superior, incluindo estudantes com carência económica, deslocados e com incapacidades – ano letivo 2024/2025
Bolsas de estudo para estudantes do ensino superior, incluindo estudantes com carência económica, deslocados e com incapacidades – ano letivo 2025/2026
19 376
Total projects
See PT2030 implementation in detail
You can consult in detail the PT2030 implementation reports provided by the Agency for Development and Cohesion.
Consult reports Consult reports