Name

Unidade de Cuidados Continuados

Total project amount

420 thousand €

Amount paid

0 €

Non-refundable funding

420 thousand €

Loan funding

0 €

Start date

01.04.2025

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

National Integrated Continued Care

Operation code

25/C01-i02/2024.P15660

Summary

A candidatura visa a construção de raiz de uma Unidade de Cuidados Continuados, que irá integrar a primeira CIDADE SOCIAL em Portugal. Constituído por pequenas unidades de funcionamento, conseguindo promover maior tranquilidade e independência e que podem ser juntas conforme as necessidades, a Unidade de Cuidados Continuados integra ainda um centro constituído por salas de reabilitação física e motora, de estimulação sensorial, de estimulação cognitiva e multiusos. A construção será realizada numa parcela de terreno propriedade da SCMVC onde já se encontra instalada uma ERPI também sua propriedade.Prevê-se a construção de módulos funcionais, estipulando-se 10 novas camas para unidade de média duração, complementando as 60 camas já aprovadas na candidatura n.º 5824 (a entidade tem já uma candidatura aprovada no âmbito do concurso 06/C01-i02/2023 para ULDM).A construção desta Unidade mobiliza um investimento de 4.040.295,33 euros, na sua globalidade, dado tratar-se de um único projeto. No que a esta candidatura diz respeito, na qual a SCMVC se propõe a aumentar a sua resposta em 10 camas apresenta-se uma proporção dos custos de investimento envolvidos, atendendo à representatividade de camas no global (10 em 90). Assim, o valor de investimento a imputar a esta resposta é 448.921,70 euros, tendo sido esse o montante inscrito no separador “Investimentos” no formulário de candidatura, repartido entre:• Construção - 1.ª fase de edificações e instalações técnicas: 337.032,81 euros;• Equipamentos diversos (i. Equipamentos e instrumentos médicos; ii. Equipamentos informáticos e de comunicação; iii. Equipamentos gerais, incluindo mobiliário): 94.444,44 euros;• Projetos, fiscalização e segurança: 17.444,44 euros.A estimativa orçamental apresentada em anexo nos documentos é referente ao projeto na sua globalidade.Sobre a equipa de recursos humanos a envolver, prevê-se um alargamento da equipa técnica da SCMVC com o incremento das 10 novas camas, estimando-se ser necessário contratar 11 Recursos Humanos para assegurar a adequada resposta aos utentes.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

0,3
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

420 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Vila do Conde 420 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading