Project sheet

Name

Remodelação da Unidade de Saúde de Cadima (Cantanhede)

Total project amount

79,67 thousand €

Amount paid

19,92 thousand €

Non-refundable funding

79,67 thousand €

Loan funding

0 €

Start date

24.05.2023

Expected end date

31.08.2025

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

19/C01-i01/2024.P11361

Summary

O projeto do Município de Cantanhede, para requalificar/adaptar/remodelar a USF Salusvida, pretende, a par do aumento da eficiência energética, criar as condições necessárias para o funcionamento desta USF, contribuindo para a melhoria do acesso das populações aos serviços de saúde primária, bem como dotá-lo de meios físicos, tecnológicos e humanos satisfatórios, para uma resposta de qualidade e eficiência nos cuidados prestados. A presente intervenção visa, principalmente, acautelar os aspetos relacionados com a eficiência energética, tais como:? Substituição da caixilharia existente (alumínio sem corte térmico e vidro simples), por caixilharia com melhor desempenho energético em PVC;? Pintura e tratamento das paredes exteriores;? Isolamento térmico da cobertura com poliuretano projetado;? Substituição das luminárias existentes, por luminárias em LED;? Colocação de painéis fotovoltaicos para diminuir o consumo de energia da rede;? Substituição do painel solar térmico, que se encontra bastante degradado.Considera-se que a intervenção proposta tem como objetivos principais:• Adequar e melhorar as condições funcionais do edifício e envolvente;• Diversificar a oferta ao nível da qualificação dos serviços e número de médicos de família, garantindo uma melhoria dos cuidados prestados tendo em conta o envelhecimento da população, as alterações epidemiológicas e a possibilidade de repetição de situações como o recente caso pandémico, que veio evidenciar as lacunas e deficiências ao nível logístico e de espaço;• Melhorar as condições de atendimento ao utente;• Adotar medidas dando resposta a utentes com mobilidade condicionada;• Melhorar a eficiência energética, com um edifício mais sustentável e eficiente, para o cumprimento das necessidades de energia primária inferiores em 20% ao padrão NZEB.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

79,67 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Cantanhede 79,67 thousand € ,
Source EMRP
10.02.2026