Project sheet

Name

Requalificação do Centro de Saúde de Portalegre

Total project amount

287 thousand €

Amount paid

0 €

Non-refundable funding

287 thousand €

Loan funding

0 €

Start date

01.06.2024

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

19/C01-i01/2024.P11332

Summary

Reparação de cobertura; Reparação de fachadas e colocação de revestimentos exteriores do tipo “Capoto”, com isolamento mais eficiente; Reparação e pintura de algumas paredes interiores; Colocação de painéis fotovoltaicos para aquecimento de águas e produção de energia para auto consumo; Substituição de caixilharias por outras mais eficientes de PVC ou alumínio termo lacado, com corte térmico e vidro duplo, de baixa emissividade; Substituição de estores exteriores por outro tipo de soluções como “blackout”; Reparação de sistema de aquecimento; Substituição de portas interiores com patologias; Criação de infraestrutura para carregamento de veículos elétricos. Colocação de sinalética direcional e de identificação; Reconstrução do layout das instalações sanitárias existentes de modo a criar pelo menos uma instalação sanitária acessível a pessoas com mobilidade condicionada; Colocação de pavimento antiderrapante e com características, mas adequadas ao edifício e sua funcionalidade em alguns espaços; Colocação de guardas de proteção nas rampas e corredores interiores de atendimento (uma vez que as existentes não cumprem com a legislação em vigor); Reformulação de estacionamento exterior junto à entrada, de modo a criar 2 lugares de estacionamento para pessoas com mobilidade condicionada(com medidas mais assertivas); Possibilidade de Substituição/Aquisição de equipamentos clínicos e administrativos, necessários ao bom funcionamento do Centro de Saúde. Limpezas gerais

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

287 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Portalegre 287 thousand € ,
Source EMRP
10.02.2026