Project sheet

Name

Unidade de Saúde da Tapada das Mercês

Total project amount

2,74 million €

Amount paid

0 €

Non-refundable funding

2,74 million €

Loan funding

0 €

Start date

02.01.2024

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

17/C01-i01/2023.P7656

Summary

O projeto de construção das instalações da nova USF de Mira Sintra integra obras de conservação e beneficiação que visam garantir um bom funcionamento dos serviços prestados, a segurança e o conforto de utentes e profissionais e a melhoria da eficiência energética. O sistema construtivo do edifício, será um sistema misto, o tradicional (betão armado e paredes de alvenaria) e contemporâneo (fachadas ventiladas), melhorando assim as exigências térmicas NZEB do Aviso nº17/C01-i01/2023 da ARS.As paredes exteriores serão construídas em alvenaria de tijolo/reboco com acabamento térmico, que garante também o revestimento da estrutura, acabada com barramento.As fachadas serão ventiladas, com sistema próprio de sustentabilidade.A cobertura será em tela asfáltica com proteção mecânica (lajetas) com isolamento térmico. Todos os remates de capeamento e caleiras serão em peças continuas metálicas para garantia de estanquicidade.As paredes interiores serão compostas por painéis de gesso cartonado de dupla face, revestidas a painéis de madeira laminados coloridos.Os pavimentos serão revestidos de peças cerâmicas de grandes formatos para zonas de circulação, e vinílico de rolo com tratamento de superfície para espaços hospitalares em gabinetes.A caixilharia será de perfis de alumínio Termo lacado de cor cinza-escuro com vidro fosco de caraterísticas térmicas e acústicas.Os espaços exteriores serão revestidos de material permeável para boa absorção das chuvas.O objetivo da escolha de materiais é com base no conforto, baixa manutenção e excelente durabilidade.O investimento total da construção é de 3.150.000€ (sem IVA incluído)

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

2,74 million €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Sintra 2,74 million € ,
Source EMRP