Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Requalificação USF Valadares

Total project amount

500 thousand €

Amount paid

0 €

Non-refundable funding

500 thousand €

Loan funding

0 €

Start date

01.09.2025

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

16/C01-i01/2023.P7816

Summary

Com o projeto objeto de candidatura, o Município de Vila Nova de Gaia pretende levar a cabo a seguinte intervenção:– Reabilitação dos dois revestimentos:Perante a necessidade de revitalizar as suas instalações, principalmente reabilitar as fachadas e muros/paredes envolventes, propõem-se aplicação de novo revestimento em reboco delgado armado sobre a área de etics, com uma pré-preparação para aplicação do novo revestimento;Para as áreas de placagem em pedra natural – moca creme fino – prevê-se a sua limpeza e tratamento, assim como a substituição de 20% das placas partidas ou em falta;Para reabilitar as palas existentes nas diversas fachadas, prevê-se a substituição das membranas de impermeabilização existentes na superfície superior por novas membranas tipo Telas Betuminosas Polysis R 40, da Imperalum ou equivalente, as restantes superfícies serão pintadas, havendo previamente um tratamento a todas as superfícies das palas.Muros e paredes envolventes assim as paredes dos anexos sul. Tratamento e correção de fissuras com aplicação de pintura final. Interior - Reabilitação reorganização dos seus serviços:Será executada uma reabilitação e redefinição dos espaços e valências em coordenação com os técnicos responsáveis por este equipamento, para uma nova reorganização interior funcional e um aproveitamento total deste equipamento. Serve igualmente para corrigir pontuais patologias existentes no interior.O investimento proposto refere-se à execução da empreitada objeto de candidatura.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

500 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Vila Nova de Gaia 500 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading