Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Requalificação da Extensão de Saúde de Lentisqueira

Total project amount

150 thousand €

Amount paid

0 €

Non-refundable funding

150 thousand €

Loan funding

0 €

Start date

01.04.2024

Expected end date

01.01.2025

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

16/C01-i01/2023.P7720

Summary

A operação prevê a realização das seguintes ações enquadradas no ponto 5 do Aviso de Concurso, designadamente:AÇÃO N.º 1 – Empreitada de Requalificação da Extensão de Saúde de Lentisqueira – alínea a) e b)Esta ação preconiza como objetivo proporcionar melhores condições de conforto na extensão de saúde, pretendendo-se realizar os seguintes investimentos:1) Trabalhos de requalificação com vista a dotar as instalações de melhores condições de salubridade, acessibilidade e de desempenho energético:a. Aplicação de isolamento térmicos pelo exterior;b. Recuperação/substituição de revestimento de paredes e pavimentos danificados;c. Tetos falsos e Isolamentos;d. Remodelação de Instalações Sanitárias;e. Pinturas;f. Substituição de caixilharia existente por uma nova caixilharia e melhoria das características solares dos vidros.2) Instalação de Equipamentos de Aquecimento e Arrefecimento (AVAC);3) Remodelação de Rede Elétrica e substituição da iluminação, dotando o espaço de iluminação LED;4) Melhoria/substituição de elementos das redes de abastecimento de Águas;5) Melhoria/substituição de elementos das redes de Águas Residuais e Pluviais.Neste âmbito, importa salientar que a reabilitação preconizada para a extensão de saúde de Lentisqueira consagra medidas que permitem reduzir os consumos energéticos, de forma a melhorar significativamente as condições de conforto e salubridade dos utilizadores e profissionais da extensão de saúde. As intervenções a levar a efeito assumem particular importância no contexto da reabilitação geral do edifício, não só pelos benefícios que trazem para os utilizadores, mas também pelo contributo no cumprimento das metas nacionais e europeias no que diz respeito à eficiência energética.AÇÃO N.º 2 – Fiscalização e coordenação de segurança da obra – alínea c)Esta componente tem como objeto a fiscalização e coordenação de segurança da obra, tendo em vista assegurar uma vigilância proativa no processo de empreitada, e garantir a qualidade de obra de acordo com os dimensionamento e critérios fixados no projeto de execução.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

150 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Mira 150 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading