Name

"Requalificação do Centro de Saúde Penafiel do ACES Vale do Sousa Sul”

Total project amount

800 thousand €

Amount paid

200 thousand €

Non-refundable funding

800 thousand €

Loan funding

0 €

Start date

01.12.2023

Expected end date

31.05.2026

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

16/C01-i01/2023.P7669

Summary

A requalificação ou adaptação de edifícios é uma medida importante para aumentar a eficiência energética, cumprir planos de contingência e assegurar a acessibilidade para todos os utentes e profissionais, de forma a promover o desenvolvimento sustentável e a qualidade de vida. Através destas medidas, é possível reduzir o consumo de energia, garantir a segurança das pessoas e melhorar o conforto dos utilizadores.Dentro deste contexto, vão ser adotadas para este projeto, as seguintes medidas: - Aplicação de isolamento térmico nas paredes, coberturas e pavimentos;- Substituição de janelas e portas por modelos mais eficientes;- Instalação de sistemas de aquecimento e arrefecimento mais eficientes;- Utilização de fontes de energia renováveis, como a energia solar e a energia eólica.- Saídas de emergência devidamente sinalizadas e sinalizadas;- Equipamentos de combate a incêndios em bom estado de funcionamento;- Sistemas de segurança contra incêndios e inundações; - Acessibilidade para pessoas com mobilidade reduzida;- Segurança contra quedas e outros acidentes;- Conforto térmico e acústico;Relativamente ao investimento do projeto, a presente candidatura expõe as seguintes rubricas:- Projeto: 70.000,00€- Revisão de Projeto: 10.000,00€- Empreitada: 1.200.000,00€- Certificação Energética: 1.000,00€- Medidas de Publicidade: 99,00€- Equipamentos: 200.000,00€A previsão do valor total de investimento para este projeto é de 1.485.099,00€ + IVA á taxa legal em vigor.Importa referir que, devido á imaturidade do projeto, por encontrar-se ainda em fase de estudo prévio, os valores apresentados são uma estimativa.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

800 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Penafiel 800 thousand € ,
Source EMRP