Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Requalificação da Unidade de Saúde Familiar de S. Pedro da Cova

Total project amount

80 thousand €

Amount paid

0 €

Non-refundable funding

80 thousand €

Loan funding

0 €

Start date

15.03.2024

Expected end date

14.10.2024

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

14/C01-i01/2023.P5292

Summary

As Unidades de Saúde Familiar (USF) são pequenas unidades operativas dos Centros de Saúde com autonomia funcional e técnica que garantem aos cidadãos uma carteira básica de serviços, pelo que desempenham um papel crucial no atendimento, acompanhamento e tratamento das problemáticas com maior prevalência no Município de Gondomar.O edifício a intervencionar no âmbito desta operação alberga a Unidade de Saúde Familiar de S. Pedro da Cova, a Unidade de Recursos Assistenciais de S. Pedro da Cova e Saúde Oral de S. Pedro da Cova. Trata-se de uma construção localizada, na Rua da Associação Desportiva de S. Pedro da Cova, 244, 4510-429, à face da rua, constituída por dois pisos, com envolvente ajardinada. Tem uma única entrada de utentes no centro da fachada principal. Na entrada encontra-se a receção e sala de espera, de onde se distribuem as diversas unidades funcionais.Efetuou-se um mapa de trabalhos com as necessidades mais prementes e que se apresentam seguidamente: Instalação de monta 3 pratos para transporte de material clínico desde o armazém no piso -1 até sala de tratamento no piso 0; Reparação, limpeza, barramento geral e pintura de fachadas exteriores; Pintura pontual de paredes interiores; Reparação de porta de entrada seccionada de vidro e Colocação de roda cadeiras em algumas salas.De acordo com o Estudo Prévio, documento apresentado em anexo, esta obra terá um prazo de execução de 120 dias, prevendo-se um investimento total de 77.500,00€, IVA não incluído. Assim sendo, a candidatura em causa apenas incluirá os trabalhos de empreitada de obras públicas, de acordo com o indicado na alínea a) do ponto 5 do Aviso.Considerando o Aviso-convite em causa, o Município de Gondomar terá um limite máximo de financiamento no valor de 80.000,00€, pelo que o investimento da candidatura encontra-se dentro dos limites fixados no Aviso.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

80 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Gondomar 80 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading