Project sheet

Name

Requalificação do Centro de Saúde de Rio Tinto

Total project amount

410 thousand €

Amount paid

0 €

Non-refundable funding

410 thousand €

Loan funding

0 €

Start date

01.07.2024

Expected end date

30.06.2025

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

14/C01-i01/2023.P5290

Summary

As Unidades de Saúde Familiar (USF) são pequenas unidades operativas dos Centros de Saúde com autonomia funcional e técnica que garantem aos cidadãos uma carteira básica de serviços, pelo que desempenham um papel crucial no atendimento, acompanhamento e tratamento das problemáticas com maior prevalência no Município de Gondomar.O edifício a intervencionar no âmbito desta Operação alberga a USF São Bento, USF Nascente e USF Santa Maria. Trata-se de uma construção localizada na Rua Ator Mário Viegas, 4435-076, em Rio Tinto, Gondomar, constituída por três pisos, com envolvente ajardinada e parque de estacionamento. Tem uma única entrada de utentes no centro da fachada principal.Na presente data, este edifício apresenta alguma degradação pelo que esta reabilitação incluirá as seguintes ações: Reparação da cobertura de modo a resolver os problemas de infiltrações; Reparação, limpeza e impermeabilização de fachadas exteriores; Reparação e/ou substituição de acessórios de abertura e fecho de vãos existentes; Reparação de tetos falsos; Reparação e pintura de paredes interiores; Substituição de tubagens interiores do sistema de AVAC; Reparação de pavimentos exteriores; Reparação de estruturas de suporte de terras exteriores.De acordo com o Estudo preliminar, documento apresentado em anexo, esta obra terá um prazo de execução de 9 meses, prevendo-se que inicie a 01 de julho de 2024 e esteja fisicamente concluída a 30 de março de 2025. Assim, espera-se que a Operação “Requalificação do Centro de Saúde de Rio Tinto” esteja física e financeiramente concluída a 30 de junho de 2025, cumprindo a data-limite fixada no Aviso. A presente intervenção apresenta um investimento total de 404.000,00€, IVA não incluído. A estrutura de custos encontra-se devidamente suportada na estimativa orçamental – programa preliminar. Assim sendo, a candidatura em causa apenas incluirá os trabalhos de empreitada de obras públicas, de acordo com o indicado na alínea a) do ponto 5 do Aviso.Considerando o Aviso-Convite em causa, o Município de Gondomar terá um limite máximo de financiamento no valor de 404.000,00€, sendo que o investimento da candidatura está em cumprimento com o limite fixado.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

410 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Gondomar 410 thousand € ,