Project sheet

Name

Requalificação da USF de Rossas

Total project amount

138,49 thousand €

Amount paid

0 €

Non-refundable funding

138,49 thousand €

Loan funding

0 €

Start date

01.01.2024

Expected end date

31.12.2024

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

14/C01-i01/2023.P5260

Summary

O edifício apresenta várias patologias construtivas ao nível da cobertura, pavimentos, impermeabilizações, infiltrações, carecendo de uma intervenção na totalidade da edificação. Com este investimento, pretende-se: - aplicar um sistema de isolamento térmico pelo exterior, sistema Etics;- substituir o sistema da cobertura será substituído, onde serão aplicados novos sistemas de impermeabilização e será aumentada a espessura do isolamento;- renovação da pintura integral do edifício, interior e exterior;- serão efetuadas novos peitoris, para melhorar a correspondente drenagem das águas pluviais.- limpeza das paredes de fachada, muros e palas com recurso à aplicação de jato de água e areia sob pressão com função decapante e de limpeza e remoção dos elementos de reboco que se encontrem soltos e deteriorados. - reparação de fissuras, fendas e buracos existentes, mediante a substituição do reboco com recurso a argamassas apropriadas para o efeito. - substituição dos rodapés por sistema de meia cana;- como intervenções menores, referem-se a limpeza a jato de água, a limpeza de pavimentos exteriores, a reparação de elementos pontuais no interior do edificio.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

138,49 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Vieira do Minho 138,49 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading