Project sheet

Name

Remodelação interior da USF Eça de Queirós, Mar e Corino de Andrade

Total project amount

671,15 thousand €

Amount paid

167,79 thousand €

Non-refundable funding

671,15 thousand €

Loan funding

0 €

Start date

01.01.2025

Expected end date

31.12.2025

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

14/C01-i01/2023.P5257

Summary

As obras de conservação e remodelação interior do edifício da USF Eça de Queirós, Mar e Corino de Andrade englobam a 3 unidades, que funcionam num único edifico, uma por piso.As obras previstas para o edifício, são na sua maior parte interiores, e com maior incidência nas zonas de atendimento dos pisos 1 e 2, com vista à melhoria das condições de segurança e de conforto dos profissionais de saúde e dos utentes, sendo ainda prevista a substituição das caixilharias exteriores, por se encontrarem bastante danificadas.A intervenção tem como principal objetivo colmatar algumas lacunas em termos de organização de espaço, no sentido de melhorar significativamente o seu funcionamento e atendimento aos utentes. Por outro lado, serão resolvidas questões pontuais que se prendem com a falta de água em alguns gabinetes e com o tratamento de zonas de intensa humidade e infiltrações, que se encontram perfeitamente identificadas. De referir ainda que no piso 0 se encontra prevista a remoção do PT para dar lugar a dois gabinetes médicos, com as devidas alterações. No exterior prevê-se ainda a manutenção e conservação da cobertura, que apresenta fissuras na cornija e infiltrações no teto interior dos gabinetes no piso 2, bem como a revisão integral do sistema de ar condicionado, que se verificou estar, grande parte, sem condições de funcionamento.A proposta prevê a alteração das zonas de atendimento, da secretaria e da sala de espera, no piso 1 e 2, na procura de melhoria do espaço e da sua forma de utilização, sendo esta a maior parte da intervenção, ou a de maior importância, dado que deixaremos de ter os utentes a circular nas áreas internas das unidades de saúde, respeitando assim os espaços de todos, utentes e profissionais de saúde. No piso 1 as áreas de sala de espera e atendimento darão lugar a mais gabinetes, que irão permitir uma melhor gestão do espaço e tempo.A criação de mais espaços, permite uma melhor gestão do mesmo colmatando pequenas questões organizacionais, que se tornam de extrema importância para o seu funcionamento. Na sequência das alterações da zona de atendimento no piso 2, naturalmente ocorre também uma ligeira reorganização dos espaços, em termos de atendimento e gabinetes.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

671,15 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Póvoa de Varzim 671,15 thousand € ,
Source EMRP
10.02.2026