Project sheet

Name

Requalificação do Centro de Saúde de Penedono

Total project amount

580,88 thousand €

Amount paid

0 €

Non-refundable funding

580,88 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

14/C01-i01/2023.P4763

Summary

O projeto visa requalificar o exterior e o interior do edifício onde funciona o Centro de Saúde de Penedono que se encontra com degradação e várias patologias construtivas que prejudicam o regular funcionamento dos serviços e a qualidade e conforto dos profissionais e utentes. O projeto prevê uma reabilitação geral da qual se destacam as seguintes medidas a implementar: a) Substituição de caixilharias (portas e Janelas) em madeira por caixilharias em alumínio lacado com rotura térmica e vidro duplo; b) Aplicação de isolamento térmico exterior do tipo capoto, em paredes exteriores do edifício onde existe alvenaria de tijolo rebocada; c) Lavagem e aplicação de produto hidrófugo nas paredes exteriores onde existe alvenaria de pedra de granito à vista; d) Substituição da telha de cobertura, com aplicação de isolamento térmico sob a telha, do tipo XPS; e) Substituição de portadas nas caixilharias (Janelas) em madeira por portadas em alumínio; f) Execução de tetos falsos em placas de gesso cartonado, para permitir a aplicação de luminárias LED no sistema de iluminação, bem assim como a passagem de tubagens de pequenos diâmetros necessárias à remodelação das redes de abastecimento e água e drenagem de esgotos; g) Lavagem e pinturas interiores, em tetos e paredes; h) Substituição de aparelhagem dos sistemas de iluminação, abastecimento de água e sanitários; i) Reparações de pavimentos; j) Substituição da caldeira a gás por equipamento climatização; k) Aplicação de painéis solares fotovoltaicos em parte da cobertura do edifício, para produção de energia elétrica que será incluída na rede elétrica do edifício. Para o efeito, o Município adjudicou a elaboração do projeto no valor de 45.000,00€ + IVA e estimou a empreitada de obras públicas no valor de 650.732,35€ + IVA.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

580,88 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Penedono 580,88 thousand € ,
Source AD&C, EMRP
19.09.2024