PRR Project
Intervenção na USF "S. Tomé"
Project sheet
Name
Intervenção na USF "S. Tomé"Total project amount
100 thousand €Amount paid
0 €Non-refundable funding
100 thousand €Loan funding
0 €Start date
01.04.2024Expected end date
30.06.2026Dimension
ResilienceComponent
National Health ServiceInvestment
Primary Health Care with greater responsiveness ratesOperation code
14/C01-i01/2023.P4714Summary
A aposta nos cuidados de saúde primários, assentes em princípios da prevenção da doença e promoção da saúde, são premissas fundamentais para a saúde e bem-estar da população, pelo que, em alinhamento com as estratégias nacional e municipal, que resulta do diagnóstico nas diferentes áreas e domínios considerando as necessidades da população e as prioridades de ação, a presente operação de investimento contempla a requalificação e adaptação do edifício da USF São Tomé, por ordem de prioridades de Intervenção - patologias graves:a) colocação de piso vinílico e arranjos exteriores entre outros; b) Criação de 2 gabinetes médicos; c) Escadaria/Zona de acesso ao piso -1: compartimento/resguardo de segurança; d) secretaria, sala de espera dos utentes, gabinetes médicos separados em dois polos: necessidade de se reorganizar o espaço, criando mais privacidade entre as tipologias de espaço com os gabinetes médicos; e) Salas de Amenidades vs salas de reunião vs refeitórios; f) UCC/PróVida: humidades na cobertura + acessibilidades – elevador; g) Parque de Estacionamento;
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
100 thousand €
Total amount of the project
Where was the money spent
By county
1 county financed .
-
Santo Tirso 100 thousand € ,