Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Intervenção na UCSP_Tomar

Total project amount

2 million €

Amount paid

0 €

Non-refundable funding

2 million €

Loan funding

0 €

Start date

02.11.2023

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

14/C01-i01/2023.P4578

Summary

O investimento proposto surge da necessidade de suprimir as deficiências detetadas na Unidade de Cuidados de Saúde Personalizados de Tomar, infraestrutura atualmente existente para a prestação de cuidados de saúde, localizada na União de Freguesias de São João Baptista e Santa Maria dos Olivais, na cidade de Tomar. Assim, com vista a aumentar a qualidade dos serviços prestados, foi definido um Programa Funcional que traduz o levantamento das necessidades, visando uma requalificação global das instalações. Decorre assim a necessidade de promover a realização de obras de reabilitação e ampliação que permitirão adaptar o edificado, com vista ao aumento da sua eficiência energética, assegurando também as acessibilidade, a segurança e o conforto de utentes e profissionais. Esta candidatura contempla duas ações, por um lado a empreitada para realização das obras de reabilitação e ampliação, e por outro, a aquisição de serviços para a elaboração do projeto de execução com base no Programa Funcional aprovado e que consta como anexo ao Protocolo de Colaboração celebrado entre este Município e a ARS LVT. No que respeita à aquisição de serviços para aquisição do projeto de execução, estamos a desenvolver as diligências necessárias para iniciar o respetivo procedimento contratual, prevendo-se que tenha início a 02.11.2023. Dada a especificidade do projeto para a intervenção em causa e a necessidade de articulação com entidades externas, prevemos que o mesmo seja aprovado durante o terceiro trimestre de 2024. Até final de 2024 prevemos que decorra o procedimento contratual para a empreitada e o início dos trabalhos em 02.01.2025. Com um prazo de execução de 18 meses, os trabalhos deverão estar concluídos até 30.06.2026. No que respeita à aquisição de equipamentos de saúde, no âmbito dos cuidados de saúde primários, que irão permitir adaptar e adequar as infraestruturas a um modelo de cuidados prestados por equipas multidisciplinares, será objeto de uma candidatura autónoma.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

2 million €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Tomar 2 million € ,
Source EMRP