Project sheet

Name

Empreitada - Unidade de Saúde de S. Pedro da Cadeira

Total project amount

616,92 thousand €

Amount paid

154,23 thousand €

Non-refundable funding

616,92 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

12/C01-i01/2022.P1968

Summary

O apoio financeiro PRR para o presente projeto integra trabalhos de empreitada de construção e aquisição de serviços para elaboração de projecto de especialidades e revisão de preços. Especificamente, a empreitada consiste na execução dos seguintes trabalhos mais relevantes: trabalhos preparatórios (i.e., delimitar, sinalizar e proteger os cabos e condutas nas proximidades; delimitar, através de vedações ou tapumes, toda a área circundante das divisões a demolir; garantir a inoperacionalidade das redes elétricas, de águas, de esgotos, etc., remover dos compartimentos/espaços a demolir, os equipamentos fixos e móveis, as bancadas, móveis e os elementos frágeis como janelas, portas ou painéis de vidro, etc.; demolir pavimentos, e localmente de paredes interiores, conforme desenho de amarelos e vermelhos e desmantelar o gesso, estuque ou reboco, que serão previamente humedecidos, com a finalidade de reduzir a libertação de poeiras); escavação para fundações; execução de estrutura de fundações para ampliação de uma parte do piso inferior; execução de escada exterior de acesso à cobertura; execução de rampa na entrada sul do edifício; execução de cobertura - perfis metálicos para apoio da chapa de cobertura em painéis com isolamento térmico; infraestruturas e Instalações técnicas; e arquitetura. Ademais, a empreitada inclui, os seguintes trabalhos complementares: montagem, manutenção e desmontagem do estaleiro; mobilização e desmobilização de equipamentos; remoção e envio dos RCD para entidade licenciada; e, por fim, realização de inspeções visuais de monitorização.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

616,92 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Torres Vedras 616,92 thousand € ,
Source AD&C, EMRP
10.05.2024