Name

Obras gerais de Conservação e Beneficiação, do DICAD-Unidade de Portimão.

Total project amount

309,96 thousand €

Amount paid

77,49 thousand €

Non-refundable funding

309,96 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

12/C01-i01/2022.P1790

Summary

O apoio financeiro PRR para o presente projeto integra trabalhos de Conservação e Beneficiação do DICAD – Unidade de Portimão; Elaboração de projeto e Encargos com publicitação e atos notariais e registo. Os principais trabalhos de modernização e adaptação funcional previstos são os seguintes: Adaptação das instalações sanitárias para utilizadores com mobilidade reduzida; Instalação de plataforma elevatória vertical para transporte de pessoas de mobilidade reduzida e cadeiras de rodas, incluindo estrutura metálica autoportante para instalação no interior do edifício; Instalação de fechadura de segurança eletrónica com código de acesso na porta de acesso à cave; Substituição de portas interiores existentes para portas com postigo de vidro de abrir; Anulação de vão interior de gabinete com correção da parede interior de pladur e execução de parede dupla com isolamento acústico; Execução de parede divisória com isolamento acústico; Execução de rede de águas e esgotos em todos os gabinetes médicos, com aplicação de revestimento, e lavatórios suspensos; Revisão e atualização da sinalética de espaços interiores; Implementação de medidas de eficiência energética, nomeadamente, melhorias na envolvente / cobertura do edifício, instalação de sistema solar para aquecimento de águas quentes sanitárias e de sistema fotovoltaico para autoconsumo e sistema de iluminação. E os principais trabalhos de conservação e beneficiação previstos são os seguintes:Revisão da Impermeabilização da cobertura actual, caleiras e tubos de queda; Reforço, manutenção e/ou substituição da porta principal de acesso ao edifício; Tratamento e pintura de fachadas e muretes; Tratamento e pintura de paredes interiores danificadas por fendas, humidades, bolores e salitres; Substituição de caixilharias de alumínio; Substituição (pontual, parcial ou integral) de elementos construtivos e equipamentos fixos que se encontrem danificados e/ou obsoletos ou que sejam desadequados à função a que se destinam, nomeadamente, torneiras e acessórios, loiças sanitárias, portas, bancadas hospitalares, balcões de atendimento, etc.; e, por fim, Substituição de todos os estores interiores.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

309,96 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Portimão 309,96 thousand € ,
Source AD&C, EMRP