Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Acessibilidades - Instalações Sanitárias do Cemitério de Ramalde

Total project amount

13 thousand €

Amount paid

6,5 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

01.05.2025

Expected end date

31.08.2026

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

11/C03-i02/2025.P16123

Summary

A intervenção proposta visa melhorar as instalações sanitárias existentes, contemplando tanto as instalações femininas e masculinas, como a criação de uma instalação sanitária adaptada para pessoas com mobilidade condicionada. As soluções apresentadas baseiam-se nas normas estabelecidas pelos decretos-lei em vigor, nomeadamente o Decreto-Lei nº 163/2006, que regula a acessibilidade, e o Decreto-Lei nº 10/2015, que estabelece as orientações para instalações sanitárias públicas.A proposta não contempla alterações no traçado existente, mas sim uma renovação nos materiais, acabamentos e equipamentos. O objetivo das modificações é criar condições mais inclusivas, reduzindo as barreiras enfrentadas atualmente por pessoas com mobilidade reduzida, promovendo, dessa forma, a plena participação de todos na vida comunitária.Ao promover a acessibilidade física, a Junta de Freguesia de Ramalde reafirma o seu compromisso em reduzir as desigualdades, assegurando que todas as pessoas, independentemente das suas condições de saúde ou capacidade física, possam usufruir dos mesmos serviços públicos em condições de igualdade e dignidade. Este projeto, portanto, não só se alinha às normas legais, mas também reforça a missão de construir uma sociedade mais justa e inclusiva.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

70,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 50 %,

Where was the money spent

By county

1 county financed .

  • Porto 13 thousand € ,
Source EMRP
08.06.2026
All themes
Transparency without leading