PRR Project
Construção da Extensão de Saúde de Santa Susana - UCSP Redondo
Project sheet
Name
Construção da Extensão de Saúde de Santa Susana - UCSP RedondoTotal project amount
141,75 thousand €Amount paid
35,44 thousand €Non-refundable funding
141,75 thousand €Loan funding
0 €Start date
30.03.2023Expected end date
30.11.2024Dimension
ResilienceComponent
National Health ServiceInvestment
Primary Health Care with greater responsiveness ratesOperation code
11/C01-i01/2022.P2200Summary
O projeto contempla a construção de um novo edifício, integrado na Zona de Lazer de Santa Susana - Polidesportivo de Santa Susana, localizado junto à Estrada Municipal 534 (Rua 1, porque dentro do perímetro urbano). O novo edifício tem por base preocupações de acessibilidade universal, eficiência energética (edifício com necessidades de energia primária pelo menos inferiores em 20% ao padrão NZEB).A solução desenvolvida e agora proposta teve por base o Programa Funcional Tipo (até 1500 utentes) estabelecido pela ARS Alentejo I.P. para uma Extensão de Saúde que prevê os seguintes espaços e áreas úteis/m2: Átrio/ Zona de Espera 20m2; Gabinete Médico 14m2; Sala de Tratamentos/Enfermagem 14m2; Secretaria 11m2; Arrecadação 3m2; Compartimento para desejos e lixos 4m2; Instalações Sanitárias para deficientes e todos os utentes 5m2; Total de Área Útil 74,80m2; Total de Área Bruta 119,68m2.Para uma otimização da solução funcional proposta foi nosso intuito cumprir o programa e aproximá-lo o mais possível das áreas estabelecidas, observando-se apenas um pequeno aumento na área em ambos os gabinetes procurando uma circulação mais facilitada para a mobilidade condicionada, verificando-se do mesmo modo um pequeno aumento de área na Átrio de Entrada /Zona de Espera.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
141,75 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 25 %,Where was the money spent
By county
1 county financed .
-
Redondo 141,75 thousand € ,