Project sheet

Name

Construção da Extensão de Saúde de Santa Susana - UCSP Redondo

Total project amount

141,75 thousand €

Amount paid

35,44 thousand €

Non-refundable funding

141,75 thousand €

Loan funding

0 €

Start date

30.03.2023

Expected end date

30.11.2024

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

11/C01-i01/2022.P2200

Summary

O projeto contempla a construção de um novo edifício, integrado na Zona de Lazer de Santa Susana - Polidesportivo de Santa Susana, localizado junto à Estrada Municipal 534 (Rua 1, porque dentro do perímetro urbano). O novo edifício tem por base preocupações de acessibilidade universal, eficiência energética (edifício com necessidades de energia primária pelo menos inferiores em 20% ao padrão NZEB).A solução desenvolvida e agora proposta teve por base o Programa Funcional Tipo (até 1500 utentes) estabelecido pela ARS Alentejo I.P. para uma Extensão de Saúde que prevê os seguintes espaços e áreas úteis/m2: Átrio/ Zona de Espera 20m2; Gabinete Médico 14m2; Sala de Tratamentos/Enfermagem 14m2; Secretaria 11m2; Arrecadação 3m2; Compartimento para desejos e lixos 4m2; Instalações Sanitárias para deficientes e todos os utentes 5m2; Total de Área Útil 74,80m2; Total de Área Bruta 119,68m2.Para uma otimização da solução funcional proposta foi nosso intuito cumprir o programa e aproximá-lo o mais possível das áreas estabelecidas, observando-se apenas um pequeno aumento na área em ambos os gabinetes procurando uma circulação mais facilitada para a mobilidade condicionada, verificando-se do mesmo modo um pequeno aumento de área na Átrio de Entrada /Zona de Espera.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

141,75 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Redondo 141,75 thousand € ,
Source EMRP
23.12.2024