Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

na

Total project amount

393,37 thousand €

Amount paid

150,23 thousand €

Non-refundable funding

393,37 thousand €

Loan funding

0 €

Start date

01.01.2024

Expected end date

31.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

07/C03-i01/2023.PPRR-RE-C03-i01-07-000197

Summary

No quadro da intervenção da autarquia nos territórios, baseada em dinâmicas de rede e parcerias, os instrumentos de planeamento assumem importância estratégica, de forma a adequar as respostas às necessidades e problemáticas das populações, assentes na promoção do desenvolvimento social, na prevenção dos riscos de pobreza e exclusão social e na atuação sobre os determinantes proporcionadores de assimetrias e desigualdades sociais.Implementar, desenvolver e atualizar instrumentos de diagnóstico, constitui-se como condição fundamental para a persecução de políticas sociais ativas e participadas que confluam para a melhoria e qualificação do bem-estar das pessoas e comunidades, servindo de enquadramento a toda a intervenção social, procurando articular as iniciativas de todos os interlocutores locais no quadro do Conselho Local de Ação Social do Seixal, cujo âmbito de atuação se repercute no desenvolvimento social do município.Desta forma, o proposto neste investimento PRR, está em sinergia com as dinâmicas da Rede Social do Seixal,que visa a criação de canais de comunicação e informação entre organismos públicos locais, ONG’s, instituições sociais, entidades privadas com ou sem fins lucrativos e entidades governamentais. O funcionamento desses canais possibilita quer a transparência dos processos e decisões, quer a adequação das respostas às características, necessidades e condicionantes locais, com o objectivo principal de impulsionar o progresso social.Portanto, através da medida Radar Social, procuramos trazer ainda maior eficácia à ação das entidades locais, através da implementação de um sistema de georreferenciarão social e de capacitação dos territórios, na otimização continua de respostas, por meio dos documentos estratégicos e estruturantes e em constante articulação com a Rede Social.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

95,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

393,37 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 38,2 %,

Where was the money spent

By county

1 county financed .

  • Seixal 393,37 thousand € ,
Source EMRP
23.12.2024