Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Qualificação e modernização do parque tecnológico da ULSAR

Total project amount

3,01 million €

Amount paid

0 €

Non-refundable funding

3,01 million €

Loan funding

0 €

Start date

01.01.2021

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Construction of the East Lisbon Hospital and equipment for hospitals in Lisbon and the Tagus Valley

Operation code

06/C01-i04/2025.P17862

Summary

A Unidade Local de Saúde do Arco Ribeirinho (ULSAR), tendo por base o seu planeamento estratégico, contemplando as dimensões dos recursos humanos, atividade assistencial, designadamente produção, acesso, qualidade e eficiência, desempenho económico-financeiro e investimentos, identificou como prioritário o reforço e a substituição do seu parque tecnológico, em várias vertentes, traduzindo-se na aquisição de vários equipamentos médicos, equipamento básico bem como equipamento informático e de comunicação, de forma a assegurar os níveis de desempenho dos serviços, que potenciará também a atratividade e retenção dos profissionais de saúde.Neste sentido, e, atendendo a que os equipamentos existentes estão em obsolescência técnica e funcional, comprometendo a capacidade de realização de algumas técnicas de diagnóstico precoce, é absolutamente indispensável a aquisição/substituição dos equipamentos constante nesta candidatura. Assim, reforçaremos a capacidade de resposta básica da ULSAR à sua população, que beneficiará os utentes, a quem não será imposta a necessidade de deslocações para outras Instituições de saúde para a realização dos exames e tratamentos imprescindíveis à definição de diagnóstico e continuidade de cuidados.Por outro lado e, no contexto atual, de crescente digitalização dos serviços e de dependência crítica das infraestruturas tecnológicas, de forma a garantir a eficiência, segurança e continuidade operacional, torna-se imperativo proceder à modernização das componentes essenciais dos Sistemas de Informação nas suas diversas vertentes, garantindo, em alinhamento com as diretrizes de modernização e digitalização das infraestruturas públicas e organizacionais, implementar soluções tecnológicas integradas que garantam não só a segurança de pessoas, bens e informação, mas também a eficiência na gestão e operação dos sistemas envolvidos.Face ao exposto, afigura-se primordial todo o investimento que possa ser realizado na atualização, inovação e diferenciação técnica do parque tecnológico da Instituição, para fazer face às necessidades da nossa população.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

3,01 million €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Barreiro 3,01 million € ,
Source EMRP
10.02.2026
All themes
Transparency without leading