Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

UCCI - Gaia

Total project amount

2,19 million €

Amount paid

0 €

Non-refundable funding

2,19 million €

Loan funding

0 €

Start date

01.01.2024

Expected end date

28.12.2024

Dimension

Resilience

Component

National Health Service

Investment

National Integrated Continued Care

Operation code

06/C01-i02/2023.P5881

Summary

Projeto de construção de um edifício destinado a cuidados de saúde, “Unidade de Cuidados Continuados Integrados” que a empresa PRIMAWORLD, S.A. pretende levar a efeito na Rua de Espinho (EN109), freguesia de São Félix da Marinha, concelho de Vila Nova de Gaia, com 60 unidades de longa duração e manutenção.O edifício proposto está implantado num terreno composto por dois lotes, Lote 1 e Lote 2, do Alvará de Loteamento n.º 48/83 de 12 de Maio – 1.º aditamento, criado para efeitos de partilhas. Será efetuado o pedido de alteração de Alvará de Loteamento de forma que sejam unificados e possam receber o edifício proposto e a atividade a que se destina.O interior terá uma organização distribuída por zonas bem definidas ao longo dos três pisos, independentes, mas com interligação e articulação. Ponderou-se a melhor exposição solar para a maioria dos quartos e pretendeu-se reduzir a importância da fachada exposta a norte, privilegiou-se as melhores condições de salubridade como apoio à recuperação da saúde física e mental. Em todos os pisos estão salvaguardadas zonas de circulação com áreas e medidas regulamentares, portas com dimensões que possibilitam a circulação de macas hospitalares, dois ascensores (um para macas hospitalares) que interligam todos os pisos e portas de saída de emergência diretas para o exterior ou com ligação às duas escadarias e portas corta-fogo reduzindo a extensão entre os circuitos pedonais.O edifício não assume um volume agressivo para a envolvente, apesar da sua extensa frente para a nova rua, respeita as relações de proximidade, afastamentos e distâncias para com os vizinhos e os remates de empenas ou encostos com cotas altimétricas regulamentares. Na realidade estamos perante um edifício de um piso abaixo da cota de soleira e dois acima, apesar de na parte a poente a cave estar totalmente descoberta o piso 1 está recuado.A parcela e a intervenção são caracterizadas pelos seguintes parâmetros e valores numéricos:• Área do terreno 3 306,60 m2• Área de Impermeabilização 1 870,00 m2• Área de cedência a domínio público 1 160,10 m2• Área de implantação 1 315,10 m2• Área bruta de construção 2 970,00 m2• Número de pisos acima/abaixo da cota de soleira 2/1• Volumetria 10 654,00 m3• Uso pretendido Unidade de Cuidados Continuados Integrados• Cércea máxima 11,30 m• N.º de Lugares de estacionamento privado/público 15/0

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

86,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

2,19 million €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Vila Nova de Gaia 2,19 million € ,
Source EMRP
10.02.2026
All themes
Transparency without leading