Name

Construção do edifício subterrâneo para Medicina Nuclear da ULSSM

Total project amount

3,4 million €

Amount paid

850 thousand €

Non-refundable funding

3,4 million €

Loan funding

0 €

Start date

16.10.2025

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Construction of the East Lisbon Hospital and equipment for hospitals in Lisbon and the Tagus Valley

Operation code

05/C01-i04/2025.P24080

Summary

O presente projeto constitui uma iniciativa estratégica da Unidade Local de Saúde de Santa Maria (ULSSM), centrada na construção do edifício subterrâneo destinado ao Serviço de Medicina Nuclear do Hospital de Santa Maria, com o objetivo de reforçar a excelência no atendimento, modernizar as infraestruturas e promover a sustentabilidade do sistema de saúde numa área de crescente procura e relevância clínica.Como principais objetivos desta intervenção destaca-se a melhoria da qualidade do atendimento, a adequação aos novos modelos de prestação de cuidados, nomeadamente incorporando a modernização tecnológica, a segurança de utentes e profissionais, eficiência dos fluxos e adequação às normas, bem como a humanização, conforto e sustentabilidade dos espaços, a melhoria das condições de trabalho e o aumento dos níveis de eficiência operacional.A intervenção prevista, a construção do edifício subterrâneo destinado ao Serviço de Medicina Nuclear do Hospital de Santa Maria, é essencial para que ULSSM possa continuar a responder de forma eficaz às crescentes necessidades da população e cumprir a sua missão enquanto prestadora de cuidados de saúde de excelência.Este investimento constitui uma aposta estratégica para a ULSSM, ao criar um espaço moderno, seguro e tecnicamente adequado para a instalação de equipamentos de diagnóstico e terapêutica com radiofármacos, em conformidade com as normas e requisitos regulamentares atualmente em vigor. A nova infraestrutura permitirá ainda corrigir assimetrias regionais e locais no acesso a meios complementares de diagnóstico e tratamento altamente diferenciados, reforçando a equidade e a qualidade da resposta assistencial no âmbito do Serviço Nacional de Saúde (SNS).Em síntese, este projeto representa uma intervenção estruturante e transformadora para a ULSSM. Ao dotar o Hospital de Santa Maria de infraestruturas modernizadas, eficientes e tecnologicamente avançadas, a instituição reforçará a sua capacidade de resposta assistencial e logística, assegurando ganhos significativos em qualidade, segurança e eficiência dos cuidados prestados à população, e consolidando o papel estratégico da ULSSM no SNS.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

3,4 million €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Lisboa 3,4 million € ,
Source EMRP
10.02.2026