Name

HABLO - Renovação do Bloco Operatório

Total project amount

1,47 million €

Amount paid

368,19 thousand €

Non-refundable funding

1,47 million €

Loan funding

0 €

Start date

01.02.2025

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Construction of the East Lisbon Hospital and equipment for hospitals in Lisbon and the Tagus Valley

Operation code

05/C01-i04/2025.P18162

Summary

O sistema de saúde em Portugal enfrenta, atualmente, desafios significativos relacionados com a evolução das necessidades em saúde e o aumento das exigências e expectativas da população.Neste contexto, o presente projeto, inserido no aviso convite n.º 05/C01-i04/2025, prevê a Renovação do Bloco Operatório do HABLO.Com um investimento estimado de 1 472 773,62 € a realizar entre 2025 e 2026, o projeto visa a requalificação do Bloco Operatório existente, corrigindo deficiências construtivas, técnicas e funcionais, bem como a reorganização espacial das diversas áreas do serviço.Este investimento permitirá atingir os seguintes objetivos:- Reforçar a capacidade de resposta com a criação de um segundo bloco operatório quando antes existia apenas uma;- Melhorar a prestação de cuidados, com maior segurança, acessibilidade e conforto;- Otimizar a eficiência económica, energética e administrativa;- Garantir o acesso a serviços de saúde de qualidade, com uma resposta mais adequada e eficiente para fazer face aos vários desafios que o SNS enfrenta.A ULS RL obterá assim uma resposta mais robusta, resiliente e eficaz, de acordo com a adoção das melhores práticas clínicas, da eficiência no uso de recursos e da sustentabilidade, o que se afigura como um passo de grande relevo para melhor servir a população abrangida.Em concreto, o projeto tem associados os seguintes objetivos SMART:- Instalações de saúde intervencionadas: 1- População potencialmente abrangida: 405.976No âmbito deste projeto, serão cumpridas as várias condições de acesso e de elegibilidade patentes no aviso, em termos técnicos, físicos e operacionais e cumprimento das demais regras associadas, como a contratação pública, o princípio DNSH e o tratamento de dados pessoais. Serão afetos, em número suficiente, recursos humanos, que farão o acompanhamento e gestão das várias etapas do processo, associados às áreas de gestão de infraestruturas, financeira, procurement e administração, com o perfil adequado às funções a desempenhar, contribuindo assim para o sucesso do projeto.Face ao exposto, a candidatura tem, de facto, enquadramento no aviso e contribuirá para os objetivos do PRR e demais estratégias nacionais e europeias nesta temática (ex. Estratégia da UE para a Saúde a Nível Mundial).

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

1,47 million €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Alcobaça 1,47 million € ,
Source EMRP