Project sheet

Name

Reabilitação da chaminé

Total project amount

368,24 thousand €

Amount paid

92,06 thousand €

Non-refundable funding

368,24 thousand €

Loan funding

0 €

Start date

01.10.2025

Expected end date

31.01.2026

Dimension

Resilience

Component

National Health Service

Investment

Construction of the East Lisbon Hospital and equipment for hospitals in Lisbon and the Tagus Valley

Operation code

05/C01-i04/2025.P18133

Summary

As necessidades para aquecimento ambiente e Águas Quentes Sanitárias (AQS), dos corpos 1 a 7 (salas de internamento, enfermagem, gabinetes, circulações horizontais, esterilização, blocos operatórios, bar, salas de espera e oficinas), são asseguradas através de três caldeiras a vapor, localizadas na central térmica. A exaustão de gases provenientes da queima de combustível para produção de AQS é efetuada por uma chaminé em betão, de 39 metros de altura, com fugas em material refratário. A chaminé tem cerca de 40 anos e apresenta-se em elevado estado de degradação. No âmbito desta candidatura, procedeu-se a um estudo mais pormenorizado e, com base nas imagens recolhidas com drone, pode verificar-se que as armaduras das faces exteriores da chaminé, em áreas consideráveis, já não estão presentes, e a maior parte da superfície encontra-se criticamente afetada. Este estado de degradação é particularmente preocupante, dado que há uma clara ênfase à importância da armadura das faces exteriores, estruturantes, que estão severamente comprometidas.Desta análise mais aprofundada, ao contrário do que, inicialmente, se pensava ser a solução mais adequada, foi analisada a viabilidade de considerar a chaminé atual obsoleta e irrecuperável. Nesse caso, foi ponderada a execução de uma nova chaminé, mantendo a chaminé existente em operação durante a construção da nova. Pretende-se que a entrada em funcionamento da nova chaminé possa ser compatibilizada com a instalação dos novos queimadores a gás natural, garantindo a continuidade operacional durante todo o processo de execução.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

368,24 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Guimarães 368,24 thousand € ,
Source EMRP
10.02.2026