PRR Project
Reabilitação da chaminé
Project sheet
Name
Reabilitação da chaminéTotal project amount
368,24 thousand €Amount paid
92,06 thousand €Non-refundable funding
368,24 thousand €Loan funding
0 €Start date
01.10.2025Expected end date
31.01.2026Dimension
ResilienceComponent
National Health ServiceInvestment
Construction of the East Lisbon Hospital and equipment for hospitals in Lisbon and the Tagus ValleyOperation code
05/C01-i04/2025.P18133Summary
As necessidades para aquecimento ambiente e Águas Quentes Sanitárias (AQS), dos corpos 1 a 7 (salas de internamento, enfermagem, gabinetes, circulações horizontais, esterilização, blocos operatórios, bar, salas de espera e oficinas), são asseguradas através de três caldeiras a vapor, localizadas na central térmica. A exaustão de gases provenientes da queima de combustível para produção de AQS é efetuada por uma chaminé em betão, de 39 metros de altura, com fugas em material refratário. A chaminé tem cerca de 40 anos e apresenta-se em elevado estado de degradação. No âmbito desta candidatura, procedeu-se a um estudo mais pormenorizado e, com base nas imagens recolhidas com drone, pode verificar-se que as armaduras das faces exteriores da chaminé, em áreas consideráveis, já não estão presentes, e a maior parte da superfície encontra-se criticamente afetada. Este estado de degradação é particularmente preocupante, dado que há uma clara ênfase à importância da armadura das faces exteriores, estruturantes, que estão severamente comprometidas.Desta análise mais aprofundada, ao contrário do que, inicialmente, se pensava ser a solução mais adequada, foi analisada a viabilidade de considerar a chaminé atual obsoleta e irrecuperável. Nesse caso, foi ponderada a execução de uma nova chaminé, mantendo a chaminé existente em operação durante a construção da nova. Pretende-se que a entrada em funcionamento da nova chaminé possa ser compatibilizada com a instalação dos novos queimadores a gás natural, garantindo a continuidade operacional durante todo o processo de execução.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
368,24 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 25 %,Where was the money spent
By county
1 county financed .
-
Guimarães 368,24 thousand € ,