Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Requalificação Unidade Técnicas de Pneumologia

Total project amount

1,58 million €

Amount paid

0 €

Non-refundable funding

1,58 million €

Loan funding

0 €

Start date

01.07.2025

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Construction of the East Lisbon Hospital and equipment for hospitals in Lisbon and the Tagus Valley

Operation code

05/C01-i04/2025.P18053

Summary

A Unidade de Técnicas de Pneumologia (UTP) do Hospital Professor Doutor Fernando Fonseca (HFF) tem sido uma das unidades mais avançadas no país, com um crescimento acentuado na última década tanto na oferta de serviços como na complexidade dos procedimentos realizados. Contudo, as suas instalações, desde a sua criação em 2005, encontram-se desatualizadas, o que limita a capacidade de resposta às crescentes necessidades assistenciais e à evolução das técnicas de diagnóstico e tratamento.O estudo funcional elaborado (em anexo à presente candidatura) apresenta as não conformidades estruturais da UTP, do Laboratório de Função Respiratória (LFR) e do Laboratório do Sono, bem como as propostas de requalificação para melhorar as condições de trabalho e de atendimento. A requalificação da UTP está essencialmente centrada em expandir a capacidade de atendimento, modernizar os equipamentos e melhorar a segurança e conforto dos doentes, cumprindo as normas atuais de segurança e qualidade. Além disso, o projeto visa ainda renovar os recursos humanos, adequando-os ao crescimento previsto da atividade, especialmente com a implementação de programas de rastreio oncológico e o aumento das doenças respiratórias crónicas.A requalificação proposta permitirá também a internalização de novos exames, otimização do processo de reprocessamento de endoscópios, e melhoria da infraestrutura para exames do sono, com a aquisição de novos equipamentos e melhorias na área de recobro. Esses passos são fundamentais para a continuação da excelência do serviço prestado e a expansão das capacidades da UTP.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

1,58 million €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Amadora 1,58 million € ,
Source EMRP
10.02.2026
All themes
Transparency without leading