Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Conversão da Central Térmica 1ª fase - substituição dos queimadores

Total project amount

92,15 thousand €

Amount paid

23,04 thousand €

Non-refundable funding

92,15 thousand €

Loan funding

0 €

Start date

15.09.2025

Expected end date

15.11.2025

Dimension

Resilience

Component

National Health Service

Investment

Construction of the East Lisbon Hospital and equipment for hospitals in Lisbon and the Tagus Valley

Operation code

05/C01-i04/2025.P18013

Summary

O projeto visa a substituição dos atuais queimadores a nafta (fuelóleo) da Central Térmica do Hospital Senhora da Oliveira, em Guimarães, por novos queimadores modulantes a gás natural. Esta primeira fase é crucial e indissociável da implementação do ramal de gás natural e do respetivo Posto de Redução e Medição.A conversão representa um passo estratégico na modernização tecnológica da Unidade Local de Saúde do Alto Ave (ULSAAVE), com foco primordial na mitigação do elevado passivo ambiental e na melhoria da segurança e saúde ocupacional. A queima de nafta contribui com cerca de 1.457,4 toneladas de CO2 anuais (42% do total de emissões do hospital), além de outros poluentes atmosféricos (óxidos de azoto e enxofre), efluentes líquidos e resíduos de cinzas.Com a substituição, a ULSAAVE garantirá uma drástica redução nas emissões de gases com efeito de estufa e outros poluentes, eliminará os riscos associados ao manuseio e queima de nafta para os colaboradores, e otimizará a eficiência energética na produção de águas quentes sanitárias (AQS) e aquecimento do ambiente para os corpos 1 a 7 do hospital.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

92,15 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Guimarães 92,15 thousand € ,
Source EMRP
10.02.2026