Empreitada de Construção do Hospital de Dia Oncológico no Hospital de São Sebastião – ULS Entre Douro e Vouga

Project sheet

Name

Empreitada de Construção do Hospital de Dia Oncológico no Hospital de São Sebastião – ULS Entre Douro e Vouga

Total project amount

2,57 million €

Amount paid

1,29 million €

Non-refundable funding

2,57 million €

Loan funding

0 €

Start date

01.07.2020

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Construction of the East Lisbon Hospital and equipment for hospitals in Lisbon and the Tagus Valley

Operation code

05/C01-i04/2025.P18002

Summary

A Unidade Local de Saúde Entre o Douro e Vouga (ULSEDV), que desde 1999 presta cuidados oncológicos a mais de 300.000 habitantes da região, enfrenta a necessidade urgente de construir uma nova Unidade de Hospital de Dia de Oncologia para garantir a segurança e qualidade da assistência aos doentes oncológicos, especialmente no contexto da pandemia de COVID-19. Atendendo à maior vulnerabilidade imunológica destes doentes e às orientações da Direção-Geral da Saúde (Norma 009/2020) que exigem a separação física dos circuitos assistenciais oncológicos dos demais serviços, bem como à obrigatoriedade legal de uma sala limpa para a manipulação segura de medicamentos citotóxicos, a atual infraestrutura revela-se inadequada, tornando imprescindível a criação de um espaço moderno, isolado e adaptado às normas vigentes para assegurar cuidados diferenciados e protegidos.Este projeto de construção do Hospital de Dia Oncológico, prevê a renovação das infraestruturas hospitalares, que contribuirá para uma melhoria significativa da qualidade, eficiência e acessibilidade dos serviços de saúde prestados à população local. Este investimento está alinhado com os pressupostos previstos no aviso da candidatura, promovendo uma reorganização interna que reforça a colaboração, a resiliência e a sustentabilidade do SNS.Pretende-se com esta construção, a transferência do Hospital de Dia Oncológico, que atualmente está localizado no interior do edifício hospitalar, para outro local garantindo a acessibilidade direta e autónoma, sem necessidade de percorrer o interior do edifício principal.Esta construção irá libertar o espaço atual do Hospital de Dia Oncológico para responder a outras necessidades hospitalares, por essa razão é proposta a sua transferência para uma área nova localizada na cobertura a qual permite a criação de acesso direto ao arruamento exterior a partir de um novo núcleo vertical.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

2,57 million €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 50,3 %,

Where was the money spent

By county

1 county financed .

  • Santa Maria da Feira 2,57 million € ,
Source EMRP