Name

Adequação de Infraestruturas para Pólo de Imagiologia dedicado ao Serviço de Urgência

Total project amount

768,15 thousand €

Amount paid

192,04 thousand €

Non-refundable funding

768,15 thousand €

Loan funding

0 €

Start date

07.04.2025

Expected end date

06.10.2025

Dimension

Resilience

Component

National Health Service

Investment

Construction of the East Lisbon Hospital and equipment for hospitals in Lisbon and the Tagus Valley

Operation code

05/C01-i04/2025.P17849

Summary

O presente projeto visa a adequação de infraestruturas existentes na ULSAAVE, com o objetivo de criar um Pólo de Imagiologia dedicado ao Serviço de Urgência do Hospital da Senhora da Oliveira, Guimarães (HSOG). A intervenção contempla a adaptação de espaços atualmente subaproveitados para a instalação de equipamentos de diagnóstico por imagem de elevada complexidade, nomeadamente Ressonância Magnética 3 Tesla e Tomografia Computorizada.A operação inclui a execução de obras específicas nas áreas de climatização, blindagem e proteção radiológica, bem como a instalação de uma gaiola de Faraday, assegurando condições técnicas e funcionais adequadas ao funcionamento contínuo do serviço de urgência.Adicionalmente, em coordenação com o Técnico Responsável pela Exploração das Instalações Elétricas do Hospital Senhora da Oliveira, foi considerada a adequação da potência elétrica instalada que tornará as instalações elétricas mais seguras, com capacidade de suportar o acréscimo de potência por via da instalação destes equipamentos médicos pesados de elevado consumo, e equipamentos de climatização. De modo a otimizar a totalidade da área disponível, previu-se a ampliação da área de intervenção, de forma a acomodar todas as exigências funcionais e operacionais do novo Pólo de Imagiologia.Este projeto contribuirá para o reforço da capacidade de resposta clínica da ULS, com ganhos tangíveis em eficiência, qualidade no diagnóstico e equidade no acesso aos cuidados de saúde.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

768,15 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Guimarães 768,15 thousand € ,
Source EMRP