Project sheet

Name

Empreitada de Construção do Edifício da Central Técnica

Total project amount

6,41 million €

Amount paid

1,6 million €

Non-refundable funding

6,41 million €

Loan funding

0 €

Start date

15.05.2025

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Construction of the East Lisbon Hospital and equipment for hospitals in Lisbon and the Tagus Valley

Operation code

05/C01-i04/2025.P17823

Summary

O presente projeto de construção do “Edifício das Centrais Técnicas” (CT) consiste na construção de um edifício de apoio e técnico que suporta o novo Edifício do Departamento de Psiquiatria e Saúde Mental (DPSM), já em construção, e o futuro edifício do Centro de Ambulatório e Radioterapia (CAR). A Resolução de Conselho de Ministros nº 41/2025, de 7 de março autoriza a realização da despesa bem como a assunção dos encargos plurianuais com a empreitada CT e com o CAR.O edifício técnico existente, de onde provêm as diversas alimentações ao edifício do Hospital São Teotónio dista aproximadamente 300m dos novos edifícios e encontra-se subdimensionado para novas ampliações o que inviabiliza a sua utilização. Neste contexto, por inadequação das infraestruturas existentes, para assegurar o funcionamento dos novos edifícios é necessário construir esta CT com as infraestruturas elétricas, mecânicas, águas de consumo e de incêndio, esgotos, gases medicinais e vácuo. A empreitada de construção do Edifício das Centrais Técnicas, em zona adjacente ao Hospital São Teotónio-Viseu, desenvolve-se numa única Fase, partilhando de dois projetos identificados como Centrais Técnicas Fase 1 e Centrais Técnicas Fase 2, correspondendo à construção do edifício e à instalação dos diversos equipamentos que constituem o mesmo.A obra a edificar tem uma área total bruta de 1710m2 e uma área total útil de 1338 m2 (conforme mapa de áreas).

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

6,41 million €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Viseu 6,41 million € ,
Source EMRP
10.02.2026
All themes
Transparency without leading