Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Aumento de Potência Elétrica

Total project amount

589 thousand €

Amount paid

0 €

Non-refundable funding

589 thousand €

Loan funding

0 €

Start date

01.01.2022

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Construction of the East Lisbon Hospital and equipment for hospitals in Lisbon and the Tagus Valley

Operation code

05/C01-i04/2025.P17802

Summary

O projeto de aumento de potência das instalações elétricas do Hospital Professor Doutor Fernando Fonseca (HFF), integrado na Unidade Local de Saúde Amadora-Sintra, EPE (ULSASI) visa aumentar a potência instalada do hospital de 3850 kVA para 6700 kVA. Esta intervenção é essencial para garantir que as infraestruturas elétricas do hospital possam suportar o crescimento da procura por cuidados de saúde e a expansão das suas instalações. O aumento de potência permitirá uma melhor distribuição da energia elétrica, assegurando a continuidade e segurança nos serviços essenciais prestados pela instituição.A intervenção contempla a instalação de novos postos de transformação (PT5, PT6, PT7) e a ampliação do PT7. Além disso, está prevista a modernização da infraestrutura de média tensão (10 kV), incluindo a substituição dos cabos elétricos, a instalação de novos quadros elétricos e a interligação dos postos de transformação, garantindo a segurança e eficiência no fornecimento de energia.O projeto está alinhado com as exigências técnicas e de segurança do hospital, e contribuirá para a sustentabilidade ambiental e para a eficiência energética, garantindo a continuidade da operação hospitalar sem interrupções no fornecimento de energia. A instalação dos novos postos de transformação irá também permitir a alimentação adequada das novas cargas, como o sistema de AVAC, espaços de psiquiatria e outras instalações de grande consumo energético. A este respeito importa referir que sem a implementação deste projeto, não será possível à ULSASI executar os investimentos previstos na candidatura apresentada ao Aviso PRR n.º 03-C01-i10-2025 | Equipamentos Médicos Pesados, que prevê a aquisição dos seguintes equipamentos: Ressonância Magnética; Angiógrafo e TAC com diferenciação.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

589 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Amadora 589 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading