Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Adequação do AVAC Corpo 7

Total project amount

861 thousand €

Amount paid

215,25 thousand €

Non-refundable funding

861 thousand €

Loan funding

0 €

Start date

01.11.2025

Expected end date

28.02.2026

Dimension

Resilience

Component

National Health Service

Investment

Construction of the East Lisbon Hospital and equipment for hospitals in Lisbon and the Tagus Valley

Operation code

05/C01-i04/2025.P17780

Summary

O projeto Adequação do AVAC do Corpo 7 do Hospital da Senhora da Oliveira - Guimarães (HSOG) abrange um edifício que acolhe diversas valências clínicas, designadamente Internamento de Psiquiatria, Fisiatria, Oftalmologia, Hospital de Dia, Dor Crónica, Imunoalergologia e Medicina do Trabalho.A intervenção tem como principal objetivo substituir os equipamentos atualmente em funcionamento, tecnicamente ultrapassados e com fraco desempenho energético, por soluções mais eficientes, seguras e fiáveis. Para isso, está prevista a remoção das infraestruturas degradadas, a instalação de novas Unidades de Tratamento de Ar (UTAs), a introdução de ventiloconvectores nos espaços clínicos, bem como a produção de energia térmica por duas bombas de calor, em detrimento do abastecimento de água gelada e vapor atualmente existentes. A reorganização das redes de distribuição de ar e a integração dos novos sistemas na plataforma de gestão técnica centralizada do hospital permitirão melhorar o desempenho global da instalação.Com esta operação, a ULSAAVE procura contribuir para os objetivos estratégicos do Plano de Recuperação e Resiliência (PRR), promovendo a transição climática e digital. Paralelamente, a intervenção visa reforçar as condições de trabalho das equipas clínicas, administrativas e assegurar um ambiente mais seguro e confortável para os utentes. A par destes benefícios, está previsto um impacto positivo na redução do consumo de energia primária, bem como na modernização de um edifício com valências clínicas de elevada especificidade.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

861 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Guimarães 861 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading