Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Obras de remodelação do Hospital Dia de Pediatria

Total project amount

476 thousand €

Amount paid

119 thousand €

Non-refundable funding

476 thousand €

Loan funding

0 €

Start date

01.09.2025

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Construction of the East Lisbon Hospital and equipment for hospitals in Lisbon and the Tagus Valley

Operation code

05/C01-i04/2025.P17737

Summary

A presente candidatura visa a requalificação do Hospital de Dia de Pediatria do Instituto Português de Oncologia de Lisboa Francisco Gentil, E.P.E., o mais antigo centro de oncologia pediátrica do país e referência nacional na área. A intervenção incide sobre uma área de 350 m² no Pavilhão Rádio (Piso 1), com o objetivo de responder ao aumento da procura e da complexidade dos tratamentos em regime de ambulatório. A proposta contempla a criação de 12 postos de atendimento (4 camas e 8 cadeirões), a reorganização funcional do espaço, segregação por faixas etárias, melhorias nas condições de segurança, conforto e privacidade, bem como a introdução de soluções tecnológicas sustentáveis, garantindo a eficiência energética e o cumprimento do princípio do “não prejudicar significativamente” (DNSH).Esta remodelação está alinhada com os objetivos do Aviso nº 05/C01-i04/2025, contribuindo para a qualificação das instalações hospitalares, correção de assimetrias regionais e reforço da prestação de cuidados de saúde especializados. A intervenção será executada em duas fases, garantindo a manutenção da atividade assistencial durante as obras, minimizando impactos sobre doentes e profissionais. Estão previstas soluções como sistemas de gestão inteligente de energia, climatização AVAC eficiente, iluminação LED, isolamento térmico, entre outras, promovendo a sustentabilidade ambiental e operacional do edifício.O investimento estimado é de 525.900,00 €, com início previsto da empreitada em janeiro de 2026 e conclusão em junho de 2026, assegurando uma resposta robusta, moderna e centrada no utente, em linha com os desafios e orientações estratégicas do PRR e do SNS.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

476 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Lisboa 476 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading