Jump to main page content
Loading...

Project sheet

Name

Condomínio de Aldeia de Murça

Total project amount

263,81 thousand €

Amount paid

0 €

Non-refundable funding

263,81 thousand €

Loan funding

0 €

Start date

21.07.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Forests

Investment

Transforming the Landscape of Vulnerable Forest Territories

Operation code

04/C08-i01.01/2023.P209

Summary

O presente projeto pretende contribuir para a transformação da paisagem dos territórios de floresta vulneráveis na envolvente das áreas edificadas das aldeias de Carvas Mascanho Paredes Penabeice Ribeirinha e Valongo de Milhais localizadas no Município de Murça.A proposta centra-se na valorização multifuncional destes territórios severamente afetadospelos grandes incêndios de 2022 focando a proteção contra incêndios rurais futuros e a melhoria das condições para a atividade agroflorestal nos ecossistemas existentes através de intervenções concertadas e articuladas entre as Comunidades Locais e os utilizadores económicos (habitantes) destas áreas onde têm fundamental relevância agricultores produtores florestais e criadores de gado. Nesse objetivo pretende-se reabilitar atividades agroflorestais nestas parcelas promovendo uma gestão multifuncional com maior rentabilidade que a atualmente existente por forma a permitir a manutenção permanente destes espaços a baixo custo e de forma sustentável. A reabilitação das áreas passa de forma geral pela eliminação de espécies de Pinheiro-bravo existentes na envolvente das aldeias sendo no caso das quatro aldeias atingidas pelos incêndios de 2022 (Carvas Mascanho Penabeice e Valongo de Milhais) pinhal queimado que também necessita de remoção instalação de culturas como a amendoeira oliveira e o castanheiro corte e remoção de matos em áreas com regeneração natural de folhosas autóctones a beneficiar e beneficiação da galeria ripícola envolvente naslinhas de água. Haverá ainda algum adensamento e plantação de folhosas autóctones e instalação de pastagens.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

263,81 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Murça 263,81 thousand € ,
Source AD&C, EMRP
19.09.2024