Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Condomínio de Aldeia Terras do Lince Malcata e Meimão

Total project amount

88,54 thousand €

Amount paid

17,71 thousand €

Non-refundable funding

88,54 thousand €

Loan funding

0 €

Start date

01.02.2024

Expected end date

21.05.2025

Dimension

Resilience

Component

Forests

Investment

Transforming the Landscape of Vulnerable Forest Territories

Operation code

04/C08-i01.01/2023.P151

Summary

ENQUADRAMENTO COM OS OBJETIVOS GERAIS E ESPECÍFICOS DO AVISO Objetivos gerais: O projeto será desenvolvido em duas freguesias identificadas na Portaria n.º 301/2020 de 24 de dezembro como territórios vulneráveis tornando-as mais resilientes a eventos climáticos extremos em particular os incêndios florestais. Objetivos específicos: Conforme demonstrado nas ações propostas o projeto converge para os 5 (cinco) objetivos específicos do aviso:a) Na medida em que se pretende alterar o uso e ocupação do solo nas faixas em redor dos aglomerados urbanos pré-definidos para garantir a remoção total ou parcial do combustível florestal criando descontinuidades verticais e horizontais dos combustíveis florestais;b) Promover a biodiversidade a qualidade da água o sequestro de CO2 e os valores naturais através das operações de beneficiação manutenção e sementeiras a realizar nestes aglomerados;c) Revitalizar as atividades agrícolas e silvopastoril através da instalação de prados/pastagens e de culturas melhoradoras do solo criando mosaicos e impulsionando as atividades económicas;d) Valorizar a aldeia do ponto paisagístico potenciando os seus ativos naturais patrimoniais e culturais associados à Serra da Malcata (área protegida de âmbito nacional) garantindo maior segurança e conforto às populações;e) Promover boas práticas de adaptação às alterações climáticas com boa gestão dos sobrantes escolha de métodos de compostagem e aproveitamento de biomassa. De forma a assegurar o caráter demonstrativo e de replicabilidade pretende-se seguir as diretrizes do Programa Aldeia Segura e Pessoas Seguras.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,4
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

88,54 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 20 %,

Where was the money spent

By county

1 county financed .

  • Sabugal 88,54 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading