Jump to main page content
Loading...

Project sheet

Name

Complexo Social da Santa Casa da Misericórdia do Funchal

Total project amount

9,95 million €

Amount paid

0 €

Non-refundable funding

9,95 million €

Loan funding

0 €

Start date

01.02.2020

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

Reinforcing Social Intervention in the Autonomous Region of Madeira (ARM)

Operation code

04/C03-i03-RAM/2022.P2633

Summary

O presente projeto tem como premissas a valorização das condições de vivência e de apoio social, nomeadamente em termos de alojamento de pessoas com mais de 65 anos, materializada através de investimentos de renovação e de construção de uma Estrutura Residencial para Pessoas Idosas ( ERPI), de um Centro de Dia integrado na ERPI, de um conjunto de Residências Assistidas inserido no Complexo Social, bem como a construção de uma área de serviços de saúde vocacionados para a Reabilitação Física da Pessoa Idosa, área esta pioneira na Cidade do Funchal. O investimento do projeto visa assim a construção de raíz de um novo equipamento social, a remodelação, ampliação e adaptação das infraestruturas existentes, nomeadamente no atual “ Lar Santa Isabel”, bem como a reconversão de equipamentos sociais, como é o caso das antigas instalações da “ Escola Secundária do Funchal – Mercês”, tendo esta intervenção uma vertente ambiental, com beneficiação das condições ambientais e de conforto e eficiência energética, recorrendo à utilização de energias renováveis para autoconsumo e a redução de custos de consumo de energia e de combustíveis, e bem ainda, no caso das novas construções, com particular atenção ao seu desempenho energético.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

85,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

9,95 million €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Funchal 9,95 million € ,
Source AD&C, EMRP
17.05.2024