Project sheet

Name

BENEFICIAÇÃO DE ÁREAS DE PINHEIRO-BRAVO COM POTENCIAL PARA RESINAGEM

Total project amount

48,66 thousand €

Amount paid

0 €

Non-refundable funding

48,66 thousand €

Loan funding

0 €

Start date

07.09.2021

Expected end date

31.12.2025

Dimension

Climate Transition

Component

Bioeconomy

Investment

Bioeconomy

Operation code

03/C12-i01.01/2022.P28

Summary

Quanto ao enquadramento 1:25 000, a área de intervenção encontra-se na folha da Carta Militar n.º 259. Está inserida na ZIF DE PENHA GARCIA, cujo a entidade gestora é a AFLOBEI. É objetivo da candidatura será a beneficiação de povoamentos de pinheiro-bravo em áreas prioritárias para a resinagem, prioridade 4, através da gestão e desbaste dos povoamentos e aproveitamento da regeneração natural, com vista a revitalizar o setor da resina natural, contribuir para a diminuição da perigosidade de incêndio rural das áreas intervencionadas e aumentar a sustentabilidade social, ambiental e económica da área a intervencionar. Objetivos Gerais do PROF CENTRO INTERIOR: 1) Aumentar a resiliência dos espaços florestais aos incêndios; 2) Aumentar o rendimento potencial da exploração florestal; 3) Diminuir a perigosidade de incêndio florestal na componente associada ao ordenamento de cada SRH, tendo em conta a orientação da resposta Nacional aos incêndios de 2017 e as consequências desses incêndios em cada uma das SRH. 4) Contribuir para a conservação do solo e da água em geral e em particular para a conservação da água nas bacias das albufeiras de águas públicas; 5) Contribuir para a conservação da natureza e da biodiversidade, em particular para os objetivos de conservação das áreas classificadas; 6) Aumentar a superfície média das áreas de gestão florestal, aumentando a superfície sob gestão conjunta; 7) Promover sistemas de exploração florestal articulados com o ordenamento cinegético e silvopastoril; 8) Promover o aproveitamento de outros recursos silvestres, no quadro dos sistemas de exploração florestal; 9) Promover a utilização turística dos espaços florestais. 10) Aumentar o apoio técnico aos proprietários gestores florestais, com base no desenvolvimento da extensão florestal.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

48,66 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Góis 48,66 thousand € ,
Source AD&C, EMRP
19.09.2024