Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Construção de unidade de dia de promoção de autonomia

Total project amount

1,3 million €

Amount paid

0 €

Non-refundable funding

1,3 million €

Loan funding

0 €

Start date

03.01.2024

Expected end date

20.12.2025

Dimension

Resilience

Component

National Health Service

Investment

National Integrated Continued Care

Operation code

03/C01-i02/2023.P5312

Summary

Este projeto é uma ampliação do edifício onde já funciona atualmente uma Unidade de Cuidados Continuados Integrados, bem como o centro de dia doFundão, sito na Rua Aurélio Pinto, Roda ou Serrado, 6230-352 Fundão, que a Santa Casa da Misericórdia do Fundão, com sede social na Rua Dr. João Franco, nº59, 6230-363 Fundão. Pretende-se levar a efeito a através da construção de um novo edifício acoplado ao existente (ampliação) de modo a alargar areposta de cuidados continuados integrados, cuidados paliativos e criar uma Unidade de Dia e de Promoção de autonomia, com igualdade de acesso a serviços de qualidade na área da saúde, com o aumento da capacidade da RNCCI e RNCP, em todas as vertentes da sua intervenção. Cada unidade tem um espaço destinado aos utentes desse serviço, cumprindo as condições ambientais, de iluminação e de conforto necessárias. Associadas a estes espaços estão ainda as instalações sanitárias separadas por sexo, sendo acessível a pessoas com mobilidade condicionada.Sala de atividades e refeitório Unidade de longa duração e manutenção – 118,00 m2 ;Cuidados Paliativos de menor complexidade – 106,80 m2 ;Sala de atividades e refeitório _ Unidade de Convalescença – 105,00 m2A unidade de cuidados continuados presta um conjunto de atividades e serviços, entre eles são:alimentação adequada e variada; cuidados de higiene pessoal; tratamento de roupa; higienização de espaços; atividade de animação sociocultural, lúdico-recreativas e ocupacionais que visem contribuir para um clima de relacionamento saudável entre os utentes e para a estimulação e manutenção das suas capacidades físicas e psíquicas; apoio no desenvolvimento de atividades da vida diária; convivência social entre os utentes e familiares; participação dos familiares no apoio ao residente para um maior bem-estar e equilíbrio psico-afectivo do mesmo.O Centro de Dia e Promoção de Autonomia será no piso -1 do edifício e vai ser a ponte entre estes serviços e espaços de forma a usufruir de todos os serviços e garantir o conforto para os utentes do mesmo.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

46,7
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

1,3 million €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Fundão 1,3 million € ,
Source EMRP
10.02.2026
All themes