Jump to main page content
Loading...

Project sheet

Name

Aumentar as condições habitacionais do parque habitacional da Região Autónoma dos Açores

Total project amount

60 million €

Amount paid

12,56 million €

Non-refundable funding

60 million €

Loan funding

0 €

Start date

01.02.2020

Expected end date

31.12.2025

Dimension

Resilience

Component

Housing

Investment

Improving housing conditions in the Autonomous Region of the Azores

Operation code

02/C02-i04-RAA/2022.P1

Summary

O investimento tem como objetivo reforçar as ofertas de habitação a vários níveis, depois de verificado um visível agravamento da degradação dos imóveis na Região Autónoma dos Açores e uma redução da oferta do mercado imobiliário. O investimento será realizado em várias ilhas e consistirá: - a construção de 277 edifícios; - a finalização de 77 apartamentos; e - a reabilitação de edifícios (renovação profunda de 106 edifícios, renovação média de 252 edifícios e pequenas intervenções em 116 edifícios), num total de 551 intervenções. A implementação do investimento estará concluída até 31 de dezembro de 2025

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

Not applicable
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

60 million €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 20,9 %,

Where was the money spent

By county

1 county financed .

  • Ponta Delgada 60 million € ,
Source AD&C, EMRP
10.05.2024