Project sheet

Name

Cuidados de Proximidade

Total project amount

4,35 million €

Amount paid

1,09 million €

Non-refundable funding

4,35 million €

Loan funding

0 €

Start date

01.01.2021

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

02/C01-i01/2022.P196

Summary

O projeto resume-se a 4 grandes ações, divididas em 7 programas de investimento, que asseguram a grande reforma dos CSP da ULSLA: Ação 1 – Modernização Equipamento Clínico (qualificar equipamentos) Investimento 1.1 – Centros de Saúde (dotar os Centros de Saúde de equipamento clínico adequado, moderno, funcional e que permita alargar a carteira de serviços). Investimento 1.2 – Pólos de Saúde (dotar os Pólos de Saúde de equipamento clínico adequado, moderno, funcional e que permita complementar a resposta dada pelos Centros de Saúde). Ação 2– Modernização Equipamento Administrativo (assegurar condições de qualidade, conforto e segurança para utentes e profissionais) Investimento 2.1 – Centros de Saúde (modernizar e equipar os Centros de Saúde, assegurando condições de qualidade, conforto e segurança para utentes e profissionais) Investimento 2.2 – Pólos de Saúde (modernizar e equipar os Pólos de Saúde, assegurando condições de qualidade, conforto e segurança para utentes e profissionais) Ação 3 – Modernização Informática Integrada (renovar o parque informática e conectá-lo em rede) Investimento 3.1 – Unificação do Sistema de Informação Principal (assegurar o funcionamento em rede segura e rápida de toda a ULSLA) Investimento 3.2. Reforma do Parque Informático (renovar todo o parque informático, assegurando melhoria na prestação de cuidados) Ação 4 – Infraestruturas seguras (assegurar condições de segurança para utentes e profissionais) Investimento 4.1 – Instalações dos CSP da ULSLA (adequar todas as instalações com planos de emergência e medidas de auto proteção)

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

5,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

4,35 million €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Santiago do Cacém 4,35 million € ,
Source AD&C, EMRP