Project sheet
Name
Implementação de medidas de eficiência energético no edifício de AlmadaTotal project amount
12,98 thousand €Amount paid
0 €Non-refundable funding
12,98 thousand €Loan funding
0 €Start date
28.11.2025Expected end date
30.06.2026Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in buildings used by the service sectorOperation code
01/C13-i03/2022.P814Summary
O presente projeto apresentado pela Sanitop Material Sanitário, Lda. (de agora em diante designada apenas por Sanitop) visa a aquisição para instalação de soluções diversas que visam melhorar a componente energética das suas instalações de Almada.Com este projeto, a Sanitop contribui de forma efetiva para o cumprimento dos objetivos do Aviso (nomeadamente a implementação de estratégias de eficiência energética e redução de consumos), bem como para aquilo que são as metas definidas no Plano Nacional Energia e Clima 2021-2030 (PNEC 2030), e na Estratégia de Longo Prazo para a Renovação dos Edifícios (ELPRE), dando um importante contributo para as metas e objetivos estabelecidos nestes referenciais, uma vez que prevê investimentos nas seguintes tipologias:i) Intervenção em sistemas técnicos:- Substituição da iluminação existente;ii) Produção de energia com base em fontes de energia renováveis (FER) para autoconsumo:- Instalação de um novo sistema de painéis fotovoltaicos para produção de energia renovável para autoconsumo.Com a introdução destas medidas, e tal como determinado pelo Relatório de Auditoria Energética que acompanha esta candidatura, a Sanitop pretende uma redução total anual de:- 5,1 TonCO2;- 14 058 kWh;- 2 587 em custos energéticos.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
12,98 thousand €
Total amount of the project
Where was the money spent
By county
1 county financed .
-
Almada 12,98 thousand € ,