Edifício ERPI Cónego CorreiaTotal project amount
53,61 thousand €Amount paid
0 €Non-refundable funding
53,61 thousand €Loan funding
0 €Start date
04.11.2022Expected end date
05.12.2025Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in buildings used by the service sectorOperation code
01/C13-i03/2022.P40Summary
O Edifício ERPI Cónego Correia é um edifício de serviços localizado na Rua General Norton de Matos n 471, 4990-118, Arca e Ponte de Lima, concelho de Ponte de Lima. As intervenções a executar são ao nível do aumento e monitorização da eficiência energética nas infraestruturas e equipamentos doedifício nomeadamente: - Intervenção em sistemas técnicos através da Substituição das atuais caldeiras por equipamentos do tipo Bomba de calor para produção de AQS - Produção de energia com base em fontes de energia renováveis (FER) para autoconsumo, através da Instalação de um sistema fotovoltaico para autoconsumo - Ações Imateriais através de Auditorias, diagnósticos e outros trabalhos necessários à realização de investimentos, bem como a avaliação ex-post independente que permita a avaliação e o acompanhamento do desempenho e da eficiência energética do investimento.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
53,61 thousand €
Total amount of the project
Where was the money spent
By county
1 county financed .
-