Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

na

Total project amount

76,72 thousand €

Amount paid

23,02 thousand €

Non-refundable funding

76,72 thousand €

Loan funding

0 €

Start date

01.09.2022

Expected end date

30.08.2023

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P247

Summary

"As obras de eficiência energética propostas para os edifícios do Lar Residencial e Centro de Atividades Ocupacionais_Léa Nobre de Pinhel, tem com finalidade a adaptação às atuais exigências energéticas e económicas/financeiras. Nesse sentido propõe-se as seguintes Tipologias e Subtipologias:Tipologia 1 Envolvente opaca e envidraçadaSubtipologia 1.2 Intervenções para incorporação de soluções de arquitetura bioclimática, que envolvam a instalação ou adaptação de elementos fixos dos edifícios como sombreamentos, estufas e coberturas ou fachadas verdes, privilegiando soluções de base natural Tipologia 2 - Intervenção em sistemas técnicos Subtipologia 2.5 Ações em sistemas de iluminação interior e exterior, considerando apenas a substituição integral das luminárias Tipologia 3 - Produção de energia com base em fontes de energia renováveis (FER) para autoconsumoSubtipologia 3.1 - Instalação de sistemas de produção de energia elétrica para autoconsumo, através de fontes renováveis com e sem armazenamento de energiaTipologia 5 Ações Imateriais Subtipologia 5.1. Auditorias energéticas e a emissão de Certificado Energético en-ante e ex-post, no âmbito do SCE.Objetiva-se com esta operação a implementação de medidas que proporcionem o aumento da Eficiência Energética e a redução dos custos com a manutenção, tornando os edifícios mais sustentáveis. Com esta medida de incentivo a Lar Residencial Léa Nobre e Centro de Atividades Ocupacionais Léa Nobre de Pinhel, terá a oportunidade de concretizar a intervenção nos edifícios, cujo resultado se refletirá em significativos melhoramentos em termos de Eficiência Energética e paralelamente a execução da operação potenciará uma baixa nos custos de manutenção que se traduziram não só em benefícios para a própria Entidade.A operação que se pretende candidatar tem como finalidade a melhoria do edifício e identificar as oportunidades para otimizar o desempenho energético. Pretende-se garantir a qualidade do ar interior, promover a salubridade dos espaços, aumentar o conforto térmico, redução no consumo dos edifícios da Lar Residencial e Centro de Atividades Ocupacionais Léa Nobre de Pinhel, otimizando o consumo energético e reduzindo o impacto ambiental, com o aproveitamento de recursos naturais proporcionando a redução do consumo de energia primária."

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,1
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

76,72 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Pinhel 76,72 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading