Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Melhoria Eficiência Energética no Hotel Sénior Príncipe da Beira

Total project amount

200 thousand €

Amount paid

0 €

Non-refundable funding

200 thousand €

Loan funding

0 €

Start date

18.05.2026

Expected end date

15.10.2026

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P1327

Summary

No âmbito do Plano de Recuperação e Resiliência, nomeadamente do TC-C13-i03 Eficiência Energética em Edifícios de Serviços (N. 01/C13-i03/2022), e no mesmo espírito de desenvolvimento da sustentabilidade e a reabilitação energética, alinhando a recuperação económica com a transição climática. A Santa Casa da Misericórdia do Fundão (SCMF) propõe-se a apresentar um dossier de estudo técnico e operacional, para concorrer aos apoios do PRR, com vista a dotar as instalações da E.R.P.I. Hotel Príncipe da Beira, de condições que visam melhoria dos níveis de conforto para os seus utilizadores, nomeadamente o térmico, a melhoria da qualidade do ar interior, os benefícios para a saúde, a promoção da produtividade laboral, a extensão da vida útil dos edifícios, o aumento da sua resiliência, a redução dos consumos energéticos e da dependência energética do país, bem como a redução de emissões de gases com efeito de estufa (GEE), através das seguintes medidas: Instalação de sistema AVAC; Substituição da caldeira; Instalação de sistema solar fotovoltaico de autoconsumo; Auditoria Energética. Consultoria em eficiência energética

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,3
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

200 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Fundão 200 thousand € ,
Source EMRP
26.06.2026
All themes
Transparency without leading