PRR Project
Eficiência Energética em Edifícios da Administração Pública Central
Project sheet
Name
Eficiência Energética em Edifícios da Administração Pública CentralTotal project amount
616,93 thousand €Amount paid
0 €Non-refundable funding
616,93 thousand €Loan funding
0 €Start date
07.12.2021Expected end date
31.12.2025Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in central public administration buildingsOperation code
01/C13-i02/2021.P86Summary
A FDUL pretende estar perfeitamente em sintonia com o Roteiro para a Neutralidade Carbónica 2050 e com o Plano Nacional para a Energia e Clima 2030, orientando-se no esforço continuado de reduzir as emissões de gases com efeito de estufa, de acelerar a transição energética e de promover uma gestão mais eficiente dos recursos. Para tal definiu um conjunto de medidas de eficiência e recursos (MER) a implementar até 2030, das quais se destacam as seguintes que são objeto da presente candidatura, envolvendo as várias tipologias de medidas: - Instalação de sistemas de domótica para sombreamento e melhoria da ventilação natural; - Substituição do chiller; - Melhoria da eficiência energética nos sistemas de AVAC do piso 2 do edifício 1; - Melhoria da iluminação; - Melhoria do sistema de ventilação mecânica; - Reforço do sistema de gestão técnica centralizada; - Ampliação da central fotovoltaica instalada e da capacidade de acumulação; - Remodelação do sistema de rega; - Ações imateriais de divulgação e sensibilização. Em sede de análise não foi considerada a elegibilidade das seguintes medidas: melhoria da iluminação e remodelação do sistema de rega. A realização da intervenção resulta numa redução de consumo de energia primária de 95,74% (44,26 tep) e de uma redução de emissões de gases com efeito de estufa de 95,74% (51,46 ton CO2eq).
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
616,93 thousand €
Total amount of the project
Where was the money spent
By county
1 county financed .
-
Lisboa 616,93 thousand € ,