Name
Eficiência Energética em Edifícios da Administração Pública CentralTotal project amount
3,09 million €Amount paid
13,34 thousand €Non-refundable funding
3,09 million €Loan funding
0 €Start date
07.12.2021Expected end date
31.12.2025Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in central public administration buildingsOperation code
01/C13-i02/2021.P80Summary
A presente operação consiste na adoção de um conjunto de medidas que visam a redução do consumo energético do edifício, por forma a que o edifício do Polo Artur Ravara se torne muito mais eficiente energeticamente. Estas medidas consistem: - Na aplicação de sistemas de sombreamento exterior nos vãos envidraçados; - Na substituição dos chillers existentes; - Na substituição das bombas (grupos circuladores) existentes; - Na substituição das UTA´s, UTAN´s e unidades de ventilação; - Na substituição completa das luminárias interiores e exteriores; - Na instalação de sistema de gestão técnica centralizada; - Na instalação de um sistema fotovoltaico para autoconsumo; - Na instalação de sistema solar térmico. A realização da intervenção resulta numa redução de consumo de energia primária de 54,70% (147,53 tep) e de uma redução de emissões de gases com efeito de estufa de 52,95% (173,30 ton CO2eq).
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
3,09 million €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 0,4 %,Where was the money spent
By county
1 county financed .
-
Lisboa 3,09 million € ,