Project sheet

Name

Eficiência Energética em Edifícios da Administração Pública Central

Total project amount

3,19 million €

Amount paid

0 €

Non-refundable funding

3,19 million €

Loan funding

0 €

Start date

07.12.2021

Expected end date

31.12.2025

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in central public administration buildings

Operation code

01/C13-i02/2021.P68

Summary

A entidade beneficiária do projeto é a Direção-Geral de Agricultura e Desenvolvimento Rural, abreviadamente designada por DGADR. Esta entidade é um serviço da administração direta do Estado dotado de autonomia administrativa. A operação incidirá nas seguintes tipologias de intervenção com os respectivos objetivos: - Envolvente opaca e envidraçada (fachadas envidraçadas + reabilitação do betão armado da guarda/platibanda do terraço (piso11) e do topo das lajes, de modo a permitir a fixação da estrutura da nova fachada; aplicação ou substituição de isolamento térmico em coberturas, paredes ou pavimentos, bem como a substituição de portas de entrada); - Intervenção em sistemas técnicos (Ações em sistemas de iluminação interior e exterior (fachada), considerando apenas a substituição integral das luminárias, excluindo a iluminação pública (ou seja, que tenham tarifário de iluminação pública); Instalação de Sistema de Ventilação e Tratamento de Ar Novo, com recurso a Unidades de Tratamento de Ar Novo, com Recuperação de Calor, filtragem e bateria de aquecimento/arrefecimento de expansão direta); - Produção de energia com base em fontes de energia renováveis (FER) para autoconsumo (Instalação de Sistema Fotovoltaico, composto por 18 painéis fotovoltaicos, para autoconsumo, sem baterias de acumulação); - Acções imateriais (Auditoria e Certificação Energética; Elaboração dos Anteprojetos das Medidas de Melhoria a implementar). Com a presente candidatura estima-se uma redução de 59,4% de consumo de energia primária (353.607,00 kWhep/ano) e 57,33% na redução das emissões de CO2 (35,36 tCO2 eq/ano).

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,7
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

3,19 million €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Lisboa 3,19 million € ,
Source AD&C, EMRP
16.05.2024